Attachment_1_-_Appendix_C_TI22APB23_(DRAFT).doc

DOC document 159 KB Posted

Attached to
AN/BYG-1 Combat Control System (CCS) Payload Control System
Solicitation number
N00024-18-R-6102
Issued by

About this file

Appendix C

View the file

Other files

File Type Posted
Attachment_1_-_Statement_of_Work_for_the_Payload_Control_System_(DRAFT).doc DOC document
Attachment_1_-_Appendix_D_TI24APB23_(DRAFT).doc DOC document
Attachment_1_-_Appendix_A_TI20APB21_(DRAFT).doc DOC document
Attachment_5_-_PCS_GFP_Form_DRAFT.xlsx XLSX spreadsheet
Attachment_3_CDRLS_DRAFT.pdf PDF
Exhibit_B_-_Contract_Data_Requirements_List(s),_DD_Form_1423_DRAFT.doc DOC document
DRAFT_Attachment_4A_-_PCS_GFI_List_16_aug_18_N00024-18-NR-98173.pdf PDF
Attachment_1_-_Appendix_G_Eng_Svcs_(DRAFT).doc DOC document
N0002418R6102_Attachment_9_-_Part_B_Supporting_Cost_Data_Workbook_DRAFT.xlsx XLSX spreadsheet
Attachment_1_-_Appendix_B_TI22APB21_(DRAFT).doc DOC document
N00024-18-R-6102_DRAFT.pdf PDF
Attachment_1_-_Appendix_E_TI24APB25_(DRAFT).doc DOC document
Exhibit_A_-_Contract_Data_Requirements_List(s),_DD_Form_1423_DRAFT.doc DOC document
Attachment_4B_-_CLASSIFIED_GFI_Form_DRAFT.pdf PDF
Attachment_8_-_RFP_Question_Submittal_Form_DRAFT.pdf PDF
Attachment_2__-_DD_Form_254_(DRAFT).pdf PDF
Attachment_13_-_Classified_Material_Request_Form_DRAFT.pdf PDF
N0002418R6102_Attachment_9_-_Part_A_Supporting_Cost_Data_Workbook__DRAFT.xlsx XLSX spreadsheet
Attachment_4B_-_CLASSIFIED_GFI_Form_DRAFT.xlsx XLSX spreadsheet
Exhibit_C_-_Contract_Data_Requirements_List(s),_DD_Form_1423_DRAFT.doc DOC document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-18-NR-98173

APPENDIX C TO ATTACHMENT 1

APPENDIX C

TO

ATTACHMENT 1

TI-22/APB-23 Development, Integration, Testing and Delivery [CLINs 0205 and 0206]

TABLE OF CONTENTS

11.

SYSTEMS ENGINEERING

11.1 Systems Engineering Management Plan (SEMP)

11.2 Engineering Documentation Database

11.3 Studies and Analyses

21.4 Meetings, Integrated Product Teams (IPTs) and Working Groups (WGs)

21.5 System Requirements

21.5.1 Requirements Documentation

21.5.2 Interface Requirements Management

31.5.3 System Architecture and Design

41.5.4 Safety

51.5.5 Information Assurance (IA)

62.

SYSTEM DEVELOPMENT

62.1 TI-22/APB-23 Software Development

62.2 Problem Reporting

72.3 System Integration Planning

72.4 Test Documentation

72.4.1 Test and Evaluation Program Plan

72.4.2 Test Procedures

73.

TEST AND EVALUATION

73.1 Test Conduct

83.2 Testing Support to the Government

84.

PLATFORM INTEGRATION

84.1 System Delivery

85.

INTEGRATED LOGISTICS SUPPORT

85.1 Interactive Electronic Technical Manual (IETM) Source Data

95.2 Ready Reference Manual (RRM)

95.3 OD 44979 Redlines

96.

FACILITIES

96.1 Hardware/Software Integration and Test (HSIT) Facilities

96.2 Licenses

APPENDIX C TO ATTACHMENT 2

Statement of Work

FOR

TI-22/APB-23 Development, Integration, Testing and Delivery [CLINs 0205 and 0206]

The Contractor shall design, develop, test, integrate and deliver the AN/BYG-1 PCS TI-22/APB-23 PCS for variants (V) 2, 5, 6, and accomplish common efforts for TI-22/APB-21 RAN Submarines under CLIN 0205. Paragraphs 1 through 6 of this Appendix C apply to CLINs 0205 and 0206.

The Contractor shall provide unique requirements for a TI-22/APB-23 Royal Australian Navy (RAN) (V)8 PCS under Engineering Services CLINs which are documented in Appendix D. The RAN (V)8 configuration shall be included as a common element in all other efforts specified in this Appendix.

The Contractor shall use the AN/BYG-1 TI-22/APB-21 PCS capabilities as the baseline for developing the core TI-22/APB-23 PCS and shall ensure the TI-22/APB-23 PCS performance is in accordance with the Performance Specification for the Payload Control System (PCS) PMS4253-PCSPS-001 dated 28 November 2017 (Attachment 6). All tasks defined herein shall be accomplished and delivered in accordance with the PMS425 Integrated Master Plan (IMP) GFI Attachment 4A, Item and resultant IMS The Contractor shall ensure the PCS variants interface with the TI-22/APB-23 Tactical Control System (TCS) and the Information Assurance (IA) software being developed in parallel under separate Navy contracts. The Contractor shall coordinate with Government and contractor facilities as needed to ensure that system integration testing and subsystem simulations requiring Government assets outside the Contractor’s facility are appropriately coordinated and scheduled.

1. SYSTEMS ENGINEERING

The Contractor shall provide a Systems Engineering Lead for the TI-22/APB-23 effort under this contract. The Systems Engineering Lead shall ensure the application of disciplined Systems Engineering processes and Integrated Process and Product Development (IPPD) principles toward the development of the TI-22/APB-23 PCS baseline supporting the final certified system configurations of the AN/BYG-1 SCCS.

1.1 Systems Engineering Management Plan (SEMP)

The Contractor shall update the Systems Engineering Management Plan (SEMP) if required for any unique TI-22/APB-23 differences or as required due to changes in processes and effectively aligns with the processes, of the Submarine Combat and Weapon Control System SEP (provided as GFI, Attachment 4). [CDRL A015]

1.2 Engineering Documentation Database

The Contractor shall update and maintain the Contractor Integrated Digital Environment databases (i.e. Dynamic Object-Oriented Requirements System (DOORS)) to support the generation, traceability and configuration management of TI-22/APB-23 requirements, plans and procedures. At a minimum, the database shall trace all TI-22/APB-23 requirements to the SRVM, SRSs, SSSs, and Test Procedures. The database shall also allow for storage of these deliverables. The Contractor shall ensure the Government has full real-time access to the database. [CDRL A016]

1.3 Studies and Analyses

The Contractor shall deliver and/or assist the Government in developing strategies and studies, performing system engineering analysis, and developing implementation plans to ensure the PCS achieves the specified performance. [CDRLs A010 and A011]

1.4 Meetings, Integrated Product Teams (IPTs) and Working Groups (WGs)

The Contractor shall participate in and/or support the following Government-established Integrated Product Teams (IPTs) and working groups supporting the TI-22/APB-23 design, development, integration and installation:

a) AN/BYG-1 System Engineering Integrated Product Team (SEIPT)

b) AN/BYG-1 Requirements Architecture Design Working Group (RADWG)

c) AN/BYG-1 Integration and Test Working Group (ITWG)

d) AN/BYG-1 Integrated Logistics Support Working Group (ILSWG)

e) AN/BYG-1 Problem Trouble Report (PTR) Review Board

f) SWFTS Architecture Working Group (SAWG)

g) SWFTS Systems Engineering Working Group (SEWG)

h) Technology Insertion IPT (TI IPT)

i) Integration IPT (I&T IPT)

j) Installation IPT

k) VIRGINIA Class and COLUMBIA Class new construction technical team meetings and Platform Integration Teams (PITs)

l) Submarine Combat System Combined Safety Working Group; the Software System Safety Technical Review Panel (SSSTRP); and the Weapons System Explosives Safety Review Board (WSESRB)

m) Design reviews and working groups for the design and development of the AN/BYG-1 TI hardware baselines

1.5 System Requirements

The Contractor shall deliver and/or assist the Government in defining and documenting the capabilities and requirements for the TI-22/APB-23 baseline. The Contractor shall maintain the PCS requirements in the Contractor Integrated Digital Environment database (i.e., Dynamic Object-Oriented Requirements System (DOORS)) with updates required for TI-22/APB-23.

The Contractor shall assist in coordinating efforts between modernization and new construction VIRGINIA Class programs to target and support a common (to the extent practicable) TI-22/APB-23 baseline for installation during new construction. This shall include efforts for functional requirements determination and interface definition. The Contractor shall assist in reviewing and providing PCS inputs for all applicable VIRGINIA Class Block IV TI-18 new construction ship specifications and Functional Requirements Documents (FRDs).

1.5.1 Requirements Documentation

The Contractor shall review the TI-22/APB-21requirements documentation and revise and provide the following for the PCS TI-22/APB-23 configurations:

· System/Subsystem Specifications (SSS) [CDRL A017]

· Specification Requirement Verification Matrix (SRVM) [CDRL A018] The Contractor shall document the specific weapon/payload tubes and launcher equipment provided as GFE (Attachment 5) that will be utilized for each test in the SRVM.

1.5.2 Interface Requirements Management

The Contractor shall continue to manage interface requirements and ensure PCS interface integrity in accordance with the processes established by the Government-approved Contractor SEMP [CDRL A015] and System/Subsystem Design Description (SSDD). [CDRL A019] The Contractor shall continue to interact with the SWFTS subsystems and weapons/payload/launcher systems to ensure compliance with the Interface Control Drawings (ICDs), Interface Requirements Documents (IRDs), and Interface Requirements Specifications (IRSs), including weapons and payloads, as defined in the PCS Performance Specification (provided as GFI, Attachment 4).

The Contractor shall manage interface change activity and participate in the SWFTS Baseline Management System. The Contractor shall notify the Program Office of any required Non-Propulsion Electronics System (NPES) Baseline Change Requests (NBCRs) required to support PCS external interface changes. The Contractor shall create NBCRs as directed by the Program Office. The Contractor shall evaluate NBCRs submitted by other SWFTS systems for impact to the PCS. The Contractor shall also initiate appropriate interface change requests for other interface specifications, including weapons and payload when updates are required.

1.5.3 System Architecture and Design

1.5.3.1 Modular Open Systems Architecture Approach

The Contractor shall establish and maintain a modular open systems architecture approach in accordance with the requirements of the DoD Open System Architecture Contract Guidebook, v1.1. The Contractor shall ensure the following system architecture characteristics are maintained for the TI-22/APB-23 PCS:

a) Open Architecture - The Contractor shall develop and maintain a PCS architecture that incorporates appropriate considerations for reconfigurability, portability, maintainability, technology insertion, vendor independence, reusability, scalability, interoperability, upgradeability, and long-term supportability.

b) Modular, Open Design – The Contractor shall develop and maintain a PCS architecture that is layered and modular and uses COTS/NDI hardware, operating systems, and middleware that utilizes non-proprietary or non-vendor-unique, key Application Programming Interfaces (APIs). The Contractor’s design approach shall be applied to all subsystems and components. The Contractor shall provide the Government (and/or Government support contractors) electronic access to its integrated development environment throughout the term of the contract.

c) Modular Open Systems Approach (MOSA) –The Contractor’s design approach shall produce a system that consists of hierarchical collections of software and hardware configuration items (components). These components shall be of a size that supports competitive acquisition as well as reuse. The Contractor’s design approach shall emphasize the selection of components that are available commercially or within the DOD, to avoid the need to redevelop products that already exist and that can be re-used.

In technical and design reviews, the Contractor shall provide the approach to be used relating to the overall Software CSCI structure, functional flows, and interface requirements and shall describe how their approach supports Open Architecture goals while interfacing with the other SWFTS systems simultaneously under development. The Contractor shall disclose the approach to support the system’s collaborative development environment including the frequent and continuous design disclosure to Navy designated third-party developers throughout the development process. Additionally, as part of technical and design reviews, the Contractor shall, at a minimum:

a) Describe how the proposed system architecture meets the modular, open design goals, including the steps taken to use non-proprietary or non-vendor unique COTS or reusable NDI components wherever practicable.

b) Describe its rationale for the modularization choices made to generate the design.

c) Provide rationale that explicitly address any tradeoffs performed, particularly those that compromise the modular and open nature of the system.

d) Provide rationale for maintaining continued access to cutting edge technologies and products from multiple suppliers

e) Describe how it will mitigate the risks associated with technology obsolescence

f) Describe how it will avoid being locked into proprietary or vendor-unique technology and reliance on a single source of supply over the life of the system

1.5.3.2 System Design Documents

The Contractor shall review the TI-22/APB-21 design documentation and revise, develop and deliver the following TI-22/APB-23 documents to fully detail the PCS TI-22/APB-23 configurations:

· System/Subsystem Design Description (SSDD) [CDRL A019]

· Software Requirements Specifications (SRSs) [CDRL A020]

· Software Design Description (SDD) [CDRL A021] The Contractor shall ensure the above documents fully describe the overall software Computer Software Configuration Item (CSCI) structure, functional flows and interface requirements, including external PCS interface requirements, as applicable. The Contractor shall include separate sections that detail any unique variant or platform requirements.

The Contractor shall also generate SWFTS-level interface documentation including Group Requirements Lists (GRLs).

1.5.3.3 Technical and Design Reviews

Technical and design reviews shall be held at the Contractor’s facility to discuss and evaluate overall design progress and the status of entrance and exit criteria as defined in the PMS425 SEP. The structure and intervals shall be defined in the IMS. However, the scope of the TI-22/APB-23 technical reviews shall be limited to the impact of the new TI-22/APB-23 CIs. The Contractor shall address all review action items within the scope of the TI-22/APB-23 changes and document (but defer) any effort involving legacy issues.

The Contractor shall provide for the following TI-22/APB-23 technical and design reviews:

· System Requirements Review (SRR)

· Preliminary Design Review (PDR)

· Critical Design Review (CDR)

The Contractor shall provide Design Review Data Packages supporting these reviews two (2) weeks prior to the design review. [CDRL A022]

1.5.3.4 Hardware Design

The Contractor shall work with the Technology Insertion Hardware (TIH) contractor and other hardware contractors to ensure that the PCS TI-22 baseline design meets the requirements of the system performance specification and is not technologically obsolete when fielded. The Contractor shall provide engineering services to support TI-22 end-of-life hardware studies or form/fit/function replacement studies. The Contractor shall support any required replacement hardware prototyping; hardware requirements definition; Critical Item Test and product deselect; and product selection and validation.

If replacement production evaluation and selection is required, the Contractor shall ensure that the requirements of National Aerospace Standard (NAS 411) are considered to eliminate, or at least minimize to the highest possible extent, the following:

· Any usage of hazardous materials, including those on the Environmental Protection Agency (EPA) listing of 17 toxics,

· Any Class I or II Stratospheric Ozone depleting substances

· Any of the Department of Defense (DoD) Top Ten Toxic Release Inventory (TRI) Chemicals

The Contractor shall also consider electromagnetic requirements, specifically that candidate components must be electromagnetically self-compatible with all other onboard systems and equipment in the submarine’s below-deck operational electromagnetic environment.

1.5.4 Safety

1.5.4.1 Safety Program

The Contractor shall maintain a system safety program in accordance with the requirements of MIL-STD-882 and the PMS425 System Safety Management Plan (SSMP) 425-SAFETY-SSMP-02. The Contractor shall update the Contractor’s System Safety Program Plan (SSPP) as required to describe the system safety management and system safety engineering tasks and activities required to identify, evaluate, and eliminate/ control hazards, or reduce the associated risk to a level acceptable by PMS425. [CDRL B001]. The Contractor shall provide an addendum to the SSPP to address specific analyses and activities required to achieve the overall system safety objectives for TI-22/APB-23 configurations.

The Contractor is responsible and accountable for the PCS Safety Program. As such, the Contractor shall:

· Ensure the safety tasks are properly conducted and reported to the Program Office

· Resolve Program Office concerns regarding safety

· Provide support to the Software System Safety Technical Review Panel (SSSTRP) and Weapon System Explosive Safety Review Board (WSESRB) reviews and resolve action items as they relate to the PCS

· Plan and chair AN/BYG-1 Safety Working Groups to be held quarterly at the contractor’s facility

· Provide support to the quarterly PMS425 Combined Weapons System Safety Working Group with the system safety certification process

· Conduct safety analysis and develop associated reports

When safety impacts are identified, the Contractor shall notify PMS425 of a decrease in the level of safety on the system. The Contractor shall ensure safety is considered in test and evaluation activities and shall ensure that all test safety requirements are met prior to and during testing.

1.5.4.2 Safety Documents

The Contractor shall conduct, document and deliver the following safety analyses/reports for the TI-22/APB-23 configuration with supporting details for variant or platform differences:

· Preliminary Hazard Analysis (PHA) [CDRL B002]

· System Hazard Analysis (SHA) [CDRL B002]

· Subsystem Hazard Analysis (SSHA), the SSHA shall consist of two parts hardware and firmware/software which may be separate deliverables [CDRL B002]

· Safety Requirements/Criticality Analysis (SR/CA)

[CDRL B002]

· Inadvertent Launch Analysis (ILA) [CDRL B002]

· Operational & Safety Hazard Analysis (O&SHA) [CDRL B002] The Contractor shall create Functional One-Line Diagrams (FOLDs) and Fault Tables for the TI-22/APB-23 configurations. The Contractor shall also perform a comprehensive safety assessment for the TI-22/APB-23 configuration and generate a Safety Assessment Report (SAR) to evaluate the mishap risk being assumed prior to the WSESRB. [CDRL B003]

1.5.5 Information Assurance (IA)

The Contractor shall maintain an IA program to support the customer's system security certification and accreditation of PCS. The Contractor shall implement IA in accordance with NAVSEAINST 9400.2, DoDD 8500.01, and COMNAVNETWARCOM Communications Tasking Order (CTO) 11-16. During the course of the contracting period, the Contractor shall ensure the system design and engineering processes employed in system design include IA considerations as delineated in the technical reference documents and the PCS Performance Specification, and that IA measures and design characteristics are correctly implemented in the PCS. Furthermore, the Contractor shall ensure that personnel are trained and appropriately certified in accordance with DoDD 8570.01 for providing IA functional services.

The Government will periodically update the IA technical reference documents, as needed. If it is determined that a change in guidance will impact the system design, existing labor requirements, or other contract deliverables, the Contractor shall notify the Government within 30 calendar days.

The Contractor shall implement and apply safeguards such that information and resources maintain the appropriate level of confidentiality, integrity, availability, authentication, and non-repudiation based upon mission criticality, level of required information assurance and classification or sensitivity level of information entered, processed, stored, or transmitted for PCS. The Contractor shall safeguard information and information systems through the use of multi-disciplined defensive layers, as well as sound administrative and operational practices.

The Contractor shall analyze system security requirements, provide data inputs to support the Program Office in the development of System Security Authorization Agreements (SSAAs) and provide Information Assurance Vulnerability Messages (IAVM) support in accordance with the Information Assurance Vulnerability Management Policy for PMS425 (PMS425 ltr Ser 425/0161 dated 24 August 2007).

2. SYSTEM DEVELOPMENT

2.1 TI-22/APB-23 Software Development

The Contractor shall establish and maintain a software engineering process by tailoring the requirements of the IEEE/EIA 12207 series standard as applicable to the PCS program. The Contractor shall provide an update to the Software Development Plan (SDP) as required for TI-22/APB-23. The Contractor shall manage, develop, update, test and deliver the PCS computer software in accordance with the SDP. [CDRL A023] The Contractor shall provide the following TI-22/APB-23 software development efforts:

· Execute Code and Unit Test (CUT)

· Perform code review

· Assess, adjudicate, and resolve Problem Trouble Reports (PTRs)

· Generate and deliver software builds as necessary to support software development and integration requirements [CDRL A024]

· Generate Software Version Description (SVD) documents for the generated software builds [CDRL A025]

· Generate software configuration build procedures

· Provide Information Assurance Vulnerability Messages (IAVM) support

The Contractor shall support integration of SWFTS Interface Data Language (IDL) versions.

2.2 Problem Reporting

The Contractor shall establish a single Problem Trouble Report (PTR) system for the identification, tracking and resolution of all TI-22/APB-23 hardware, software and baseline documentation problems identified during system development, integration and testing. In addition, the PTR system shall be used to track test documentation problems and technical manual errors. The Contractor shall ensure the Government has full real-time access to the database.

For planning purposes and guidance only, the following table provides the Government’s estimation on the number and classification of PTRs that may require Contractor analysis and software resolution during development, integration and testing of the TI-22/APB-23 baseline:

Total PTRs
High Severity
Medium Severity
Low Severity
Common
225
25
180
20
Virginia Class
75
15
50
10

The Contractor shall co-lead the AN/BYG-1 PTR Review Board (PTRB) with the government to assess, adjudicate, and provide recommendations to the Government. The Contractor shall use NAVSEAINST 9410.02 in providing PTR classification recommendations. The Government will designate and approve final classification of PTR severity. The Contractor shall provide support and conduct a technical assessment in adjudication of the PTR; however, the Government will determine which PTRs to authorize for correction during the integration and test events including incorporation into software builds. A synopsis of all problems identified under this PTR system shall be included with the monthly IPMR. The PTR shall reference applicable requirements, system notes, any other applicable interface system PTR (Ex. Tactical Control PTR) and COATs Common Problem Reports (CPRs). For PTRs adjudicated by the Government as requiring a System Note, the Contractor shall provide data supporting Ready Reference Manual (RRM) preparation. For PTRs adjudicated as requiring a Hazard Analysis Report (HAR), the Contractor shall provide input to the PMS425 Principal for Safety for preparation of the HAR.

2.3 System Integration Planning

The Contractor shall support overall AN/BYG-1 integration throughout the design, development and test phases of the PCS and TCS components (including TacLAN and Information Assurance) as well as system-level integration of the variants and delivery of associated logistics products. The Contractor shall support all system integration requirements including integration with TCS, IA, the Tactical Tomahawk Weapon Control System (TTWCS) and all applicable Submarine Warfare Federated Tactical Systems (SWFTS) as required to support delivery of both TCS and PCS as a certified AN/BYG-1 (V) 2, 5, 6, and 8 TI-22/APB-23 Combat Control System.

2.4 Test Documentation

The Contractor shall maintain a comprehensive test program and perform integrated test planning to ensure that all tests are properly time phased and that duplicative or redundant testing is minimized. The test program shall concentrate on ensuring the delivered PCS meets the performance requirements as intended for operational deployment. The test planning shall address pass/fail criteria and provisions for analyzing and correcting the cause of any failures.

2.4.1 Test and Evaluation Program Plan

The Contractor shall update the Test and Evaluation Program Plan (TEPP) as required to describe the Contractor’s approach for a comprehensive test program for TI-22/APB-23. The TEPP shall include a description of all test procedures and planned test events for the PCS life cycle including, but not limited to, software verification, regression testing, validation testing, longevity testing and testing of associated payloads, launchers, shipboard subsystems and interfaces. The Contractor shall ensure the TEPP addresses the location for conduct of the specific test events as well as all required hardware, Simulation/Stimulation (SIM/STIM) equipment, and other test support. [CDRL A026]

2.4.2 Test Procedures

Additionally, the Contractor shall review the TI-22/APB-21Test Procedures and update and deliver new procedures, in accordance with the Contractor’s TEPP, to support TI-22/APB-23 requirements. [CDRL A027]

3. TEST AND EVALUATION

The Contractor shall perform demonstrations and tests per the Contractor-prepared and Government-approved test plans and test procedures in accordance with the SOW and the PCS Performance Specification. [CDRL A026 and A026]. Government acceptance of the final TI-22/APB-23 PCS software is contingent upon successful completion of these demonstrations and tests. The Contractor shall provide test lead support and test meeting support for all T&E efforts within this SOW.

3.1 Test Conduct

The Contractor shall document and conduct Test Readiness Reviews (TRRs) as scheduled in the IMS to ensure the system software is configuration managed, test documents and RFDs are approved, and test entrance requirements are satisfied prior to entering formal test events. [CDRL A022] The Contractor shall deliver software builds and conduct testing as defined in the TEPP and SRVM.

The Contractor’s T&E services shall also include:

a) Conduct of integration as necessary to ready the product for formal testing

b) Software build installation

c) Execution of Build Quality Assessment (BQA)

d) PTR Verification and Validation (V&V)

e) System Integration Tests

f) Use of payload simulators and test tools (ex. Torpedo Mini-PV and Tomahawk GTS units)

g) Generation and delivery of Test/Inspection Reports [CDRL A028] The Contractor shall conduct regression testing to determine adequacy of PTR fix solutions and to ensure that no new faults have been introduced. TRRs and TRR presentations shall be required for regression test events.

3.2 Testing Support to the Government

The Contractor shall provide access to the PCS and associated sensors in its development and test facilities for the Government to perform on-site independent tests or evaluations.

The Contractor shall provide support, as required, for Government-conducted SWFTS-level test events such as External Interface Tests (EITs), System Level Tests (SLTs), and System Integrated Tests (SITs).

4. PLATFORM INTEGRATION

4.1 System Delivery

To be accepted by the Government, the Contractor shall deliver software that meets the System Delivery Verification Review (SDVR) criteria in accordance with the PMS 425 SEP. The SDVR follows the completion of the formal test program to validate the system meets the appropriate requirements outlined in the AN/BYG-1 P-SPEC. The SDVR signals the end of the software design and test program and the readiness of the system for Fleet use. SDVR criteria includes delivery by the contractor of Government Objective Quality Evidence (OQE) indicating all system verification activities are complete and in accordance with the Government approved contractor delivered TEPP [CDRL A026]. The Contractor shall deliver as OQE the approved SRVM) [CDRL A018] for all requirements identified in the approved SSS [CDRL A017] with all verification results captured in the Test Completion Report (TCR) [CDRL A028]. Any requirement identified in the SRVM with a verification method of test or demonstrate shall be verified by the execution of approved Test Procedures [CDRL A027]. Other requirements, verified by other methods, shall have results captured and delivered in the identified OQE.

Furthermore, all safety documentation has been approved [CDRL B001] in accordance with the PMS 425 SEP and System Safety Master Plan with any safety risks documented in a System Safety Hazard Analysis Report [CDRL B002]. All failed requirements shall be documented by RFVs [CDRL A009], which must be approved by the Government prior to the DRR. All software quality metrics as defined in the P-SPEC shall be met and an analysis of failed and untested requirements, as well as open PTRs shall be provided in the Software Version Description (SVD) [CDRL A025]. The SVD shall be updated and resubmitted as different software builds are produced for each variant in the baseline.

The tactical SW shall be delivered per the Software Product Specification (SPS) [CDRL A024] into a Government repository. The term “tactical SW” is defined as the media, libraries, and executables to install, rebuild and complete all operational requirements set forth in the Government’s P-SPEC. Additionally, as part of the SPS [CDRL A024] the processes, tools, supporting documentation, source code and all supporting files required to fully recompile and reconstitute the tactical SW build for system deployment shall also be provided to the Government for archiving and/or distribution at the Government's discretion.

4.2 Interactive Electronic Technical Manual (IETM) Source Data

The contractor shall develop, update, maintain, and deliver PCS TI-22/APB-23 Interactive Electronic Technical Manual (IETM) source data to support government or other contractor development of the AN/BYG-1 IETM for all applicable TI-22/APB-23 configurations [CDRL A029]. These updates shall include but are not limited to, functional descriptions, physical descriptions, operating procedures including power-up/down, display screen shots, display hot links and text hyper-links, which address all aspects of PCS operations and maintenance for each configuration consistent with similar PCS data contained within the AN/BYG-1 IETMs for TI-22 APB-21 provided as GFI (Attachment 4 GFI). The contractor shall develop source data that is S1000D compliant in a government approved S1000D database environment. TMCR NO. NDMS-090092-000 shall be used as a reference. The contractor shall provide subject matter expertise to support comment incorporation, desktop lab validations and verifications and provide single point of contact for the government and other members of the ILS working group in all matters relating to PCS IETM delivery, development and schedules.

Delivery schedule of IETM source data shall be documented in the contractor’s Integrated Master Schedule (IMS) and support the AN/BYG-1 Integrated Master Plan (IMP). The contractor shall participate in bi-weekly ILS working group forums.

4.3 Ready Reference Manual (RRM)

The contractor shall provide data, including system notes, to support preparation of the ready reference manual [CDRL A010]. Format for the RRM and System Notes shall be provided in Attachment 4 GFI. The RRM data shall include:

a) Software Build Procedures. These build procedures shall include identification of all necessary required to build the PCS portion of the AN/BYG-1 system. Procedures shall be reviewed and validated and must include any warnings, cautions, danger, and notes as applicable including any prerequisites and all necessary default passwords.

b) Procedural Steps. Procedural steps for a post build verification shall be included into a larger post build checklist.

c) Information Assurance Information: List of all swappable/removable disks/media affected by PCS software, security level during various posture transitions and clearing methods for each. Validated posture transition procedures to support shipboard posture transitions.

The contractor shall ensure that all system notes for are provided post internal review and verification to the System Notes Working Group (SNWG) for inclusion into the consolidated system notes RRM. The contractor shall participate in the SNWG and update notes as required. Delivery of the RRM and system notes shall be as agreed to by ILS Working group schedules.

4.4 OD 44979 Redlines

The contractor shall provide redlines to OD 44979 based on PCS TI-22/APB-23 software changes [CDRL A010]. Approved OD44979 documents will be provided as part of Attachment 4 GFI. Delivery schedule of the OD44979 redlines shall be documented in the contractors IMS and as agreed to in the approved ILSWG schedules. Delivery of the OD 44979 redlines shall be consistent with provided GFI.

5. FACILITIES

5.1 Hardware/Software Integration and Test (HSIT) Facilities

The Contractor shall maintain Defense Security Service (DSS) compliant Hardware/Software Integration and Test (HSIT) facilities that provide the resources and environment for development, integration and testing of PCS TI-22/APB-23 functionality on submarine variants (V) 2, 5, 6, and 8. The Contractor shall define any new or replacement TI-22 developmental hardware required to execute all efforts defined within this SOW for all TI-22/APB-23 efforts and all TI-22/APB-23 variants. The Contractor shall procure, receive, assemble, integrate and install any replacement developmental hardware under CLIN 0006 and shall maintain the TI-22 development hardware under CLIN 0205. The Contractor shall ensure that any tactical hardware or test resources required to support its T&E and Integration approaches are identified in the TEPP and SIP.

The Contractor shall provide hardware troubleshooting, repair, and regular upkeep for all AN/BYG-1 TI-22 project-related hardware. The Contractor shall ensure all equipment is working properly prior to the start of TRR for each AN/BYG-1 TI-22/APB-23 variant. The Contractor shall create and maintain an AN/BYG-1 facilities schedule.

The Contractor shall provide the status of the HSIT maintenance effort including labor cost and ODC (materials) in the IPMR. [CDRL A005]

5.2 Licenses

The Contractor shall procure software licenses supporting all configurations and deliveries of the TI-22/APB-23 baseline.

Non-Developmental Items (NDI). The Contractor shall be responsible for the procurement of all software licenses for non-GFE Non-Developmental Items (NDI) products delivered in this contract including both contractor developed and third party NDI If the Contractor needs to obtain a license for any NDI incorporated into a deliverable under this contract, the Contractor shall notify the Government immediately in writing. This notification shall specify whether the license(s) that need to be procured are transferable to the Government and/or any of its other contractors. These licenses shall be transferred to the Government in accordance with the technical data clauses in Section I of the contract. The license shall be of the appropriate scope to allow the Government to develop, maintain, use, release, disclose and support (including updates and modifications) the end item throughout the life cycle of the product.

Modified NDI. The Contractor shall provide to the Government all licenses and documentation required by the Government to support any NDI that is modified by the Contractor.