This is a solicitation for the production of the MK 41 Vertical Launch System (VLS) from fiscal year 2018 through 2022. The Navy seeks to award firm fixed-price contracts for the manufacture, assembly, testing and delivery of VLS launchers, modules, modernization hardware and associated equipment. Offerors must have a secret facility clearance by award with domestic production required. The response due date was extended to November 16, 2018 with annual delivery periods running through 2025 and destination ports in Mississippi, Maine or to be determined. Options could extend the contracts through 2026 to support additional configurations.
amendment 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments.zip | ZIP file | |
| 18-R-5310_Bidders_Q&A_9.14.18.xlsx | XLSX spreadsheet | |
| N00024-18-R-5310_(Conformed_copy_through_Amendment_0004).pdf | ||
| J-S8_CLIN_Matrix_rev_08-13.xlsx | XLSX spreadsheet | |
| N00024-18-R-5310-0003_(conformed).pdf | ||
| N00024-18-R-5310-0003.pdf | ||
| Attachment_11-_GFP_Electronic_rev_1_(8.08.18).xlsx | XLSX spreadsheet | |
| N00024-18-R-5310-0002_(conformed).pdf | ||
| J-S4_Mechanical_CLIN_Pricing_rev_08-01.xlsx | XLSX spreadsheet | |
| J-S8_CLIN_Matrix_rev_08-01.xlsx | XLSX spreadsheet | |
| N00024-18-R-5310-0002.pdf | ||
| J-S3_Electronic_CLIN_Pricing_rev_08-01.xlsx | XLSX spreadsheet | |
| N00024-18-R-5310-0001.pdf | ||
| N00024-18-R-5310-0001_(Conformed).pdf | ||
| Attachment_1_-_Appendix_A_-_Electronic_Parts_List_rev_1_(07.23.18).xlsx | XLSX spreadsheet | |
| Attachments.zip | ZIP file | |
| N00024-18-R-5310.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) update the solicitation as refrenced in the bidders questions and Government’s response w hich also updates/includes Attachment J-S8, Attachment 1, Attachment 1 Appendix A; Attachment 1 Appendix D, Attachment 2 Appendix A, Attachment 11, Attachment 19 and
Attachment 20;
2) update the PCO;
3) remove clauses 52.209-4 and HQ C-2-0027; and
4) extend the offer due date to 16 November 2018.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 75
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002418R5310
X 9B. DATED (SEE ITEM 11)
19-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2018
CODE
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVENUE
WASHINGTON NAVY YARD DC 20376
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002418R5310
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Oct-2018 02:00 PM to 16-Nov-2018 02:00
PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN description has changed from MK 41 MOD 15 VLS to MK 41 MOD 36 VLS.
The CLIN extended description has changed from:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLSNOTES E and F
To:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLSNOTES E and F
CLIN 0002
CLIN 0003
CLIN 0004
CLIN 0005
CLIN 0006
CLIN 0007
CLIN 0008
CLIN 0009
CLIN 0010
CLIN 0011
CLIN 0012
CLIN 0013
CLIN 0301
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLS NOTES A, E, and F
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS NOTES A, E, and F
CLIN 0303
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLS NOTES A, E and F
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS NOTES A, E and F
CLIN 1001
The CLIN description has changed from MK 41 MOD 15 VLS MECHANICAL to MK 41 MOD 36 VLS
MECHANICAL.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLS MECHANICAL COMPONENTSNOTE G
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS MECHANICAL COMPONENTSNOTE G
SUBCLIN 1001AA
The CLIN description has changed from MK 41 MOD 15 VLS MODULE MECH to MK 41 MOD 36
VLS MODULE MECH.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLS MODULE MECHANICAL
COMPONENTSNOTES E and G
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS MODULE MECHANICAL
CLIN 1002
SUBCLIN 1002AA
CLIN 1003
SUBCLIN 1003AA
COMPONENTNOTES E and G
COMPONENTNOTES E and G
CLIN 1004
SUBCLIN 1004AA
CLIN 1105
VLS MECHANICAL.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLS MECHANICAL COMPONENTSNOTES A
and G
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS MECHANICAL COMPONENTSNOTES A
SUBCLIN 1105AA
COMPONENTSNOTES A, E, and G
CLIN 1106
SUBCLIN 1106AA
CLIN 1207
SUBCLIN 1207AA
CLIN 1208
SUBCLIN 1208AA
CLIN 1301
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLS. NOTES A and G
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS. NOTES A and G
SUBCLIN 1301AA
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLS MODULE MECHANICAL COMPONENTS
NOTES A, E, and G
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS MODULE MECHANICAL COMPONENTS
NOTES A, E, and G
CLIN 1303
MANUFACTURE, ASSEMBLE, AND TESTMK 41 MOD 36 VLS MECHANICAL COMPONENTSNOTES A
SUBCLIN 1303AA
CLIN 1309
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 15 VLS MECHANICAL COMPONENTS
NOTES A and G
MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS MECHANICAL COMPONENTS
SUBCLIN 1309AA
CLIN 1310
SUBCLIN 1310AA
CLIN 1311
SUBCLIN 1311AA
CLIN 1312
SUBCLIN 1312AA
CLIN 1313
SUBCLIN 1313AA
The following have been modified:
SECTION B INTRODUCTION*
Offerors may propose on either the electronic or mechanical requirements or both. If an Offeror elects to propose for both efforts, two individual and separate proposals must be submitted, one for the electronic requirements and one for the mechanical requirements. NAVSEA will not accept a combined electronic/mechanical requirements proposal. A combined proposal will render an Offeror ineligible for award and that Offeror will be excluded from the competition. NAVSEA may award a Firm Fixed Price contract for electronic requirements and a separate Firm
Fixed Price contract for mechanical requirements, or one Firm Fixed Price contract for both the electronic and mechanical requirements. Offerors who propose for both efforts may be awarded either the electronic or the mechanical requirements, or both in the event that each individual offer is selected under the source selection criteria prescribed in Section M. In the event that two different Offerors are selected for award of the electronic and mechanical requirements, the electronic requirements contract award shall only contain the electronic requirements under this solicitation; the mechanical requirements contract award shall only contain the mechanical requirements under this solicitation.
If separate contracts are awarded, the mechanical contractor will be required to procure all mechanical requirements outlined in the solicitation and deliver them to the electronic contractor as GFE after Government acceptance in accordance with (IAW) Section F. The Government will provide GFE to the electronic contractor IAW Attachment
11. The electronic contractor will be required to procure all electronic requirements outlined in the solicitation and integrate these electronics with all GFE IAW Attachment 1, Statement of Work - Electronic.
Note that in the event that one Offeror is selected for both the mechanical and electronic requirements, the awarded
Offeror will be required to procure all mechanical requirements outlined in the solicitation and deliver them to itself or its subcontractor as Contractor Furnished Equipment (CFE) vice Government Furnished Equipment (GFE) after
Government inspection IAW Attachment 2, Statement of Work – Mechanical. The Offeror will be required to procure all electronic requirements outlined in the solicitation and integrate these electronics with all the CFE and
GFE referenced above in this paragraph, IAW Attachment 1, Statement of Work – Electronic.
MK 41 Vertical Launching Systems Electronic Requirements:
Items 0001-0010, 0014-0023, 0100, 0500-0506, and (if options are exercised) Items 0011-0013, 0024-0058, 0099, 0137- 0158, 0237-0258, 0301-0304, 0337-0358, 0437-0458, 0507-0520, 0600-0621, and 0700-0706.
MK 41 Vertical Launching Systems Mechanical Requirements:
Items 1001-1004 (AA, AB, & AC), 1100, 1500, 1501, 1503, 1504, 1506, and (if options are exercised) Items 1027-
1032, 1037, 1039, 1041, 1049, 1050, 1059-1069, 1099, 1105-1106(AA, AB & AC), 1137, 1139, 1141, 1149, 1150, 1159-1169, 1207-1208(AA, AB, & AC), 1237, 1239, 1241, 1249, 1250, 1259-1269, 1301(AA, AB, & AC), 1303(AA, AB, & AC), 1309-1313(AA, AB, & AC), 1337, 1339, 1341, 1349, 1350, 1359-1369, 1437, 1439, 1441, 1449, 1450, 1459-1469, 1507, 1508, 1510, 1511, 1513-1515, 1517, 1518, 1520, 1600, 1601, 1603,1604, 1606-1608, 1610, 1611, 1613-1615, 1617, 1618, 1620, 1700, 1701, 1703, 1704, and 1706
*This SECTION B INTRODUCTION will be deleted at time of award
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
SECTION C
PART 1 - CONTRACT LINE ITEM DESCRIPTION
ELECTRONIC CLINS:
This contract is for the fabrication, assembly, test, final acceptance and delivery of Vertical Launcher Module
Assemblies, Modernization Kits, Launch Control Units, spare parts and associated equipment in accordance with the
Statement of Work - Electronic, Attachment 1, and the MK 41 VLS Technical Data Package (TDP) and associated drawings, Attachment 3.
The Electronic contractor shall grant access and provide support to the Mechanical contractor in the event it is necessary for the Mechanical contractor to visit and/or perform work on the Mechanical requirements that have been delivered to the Electronic contractor as GFP.
The components in the TDP (Attachment 3) are covered by the United States Munitions List (USML). Offerors shall comply with the restrictions imposed by that designation.
Items 0001–0010 and Option Items 0011-0013,0301 and 0303 - MK 41 MOD 36 VLS:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 36 Vertical
Launching Systems in accordance with the MK 41 Vertical Launching System drawings, standards, & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each MK 41
MOD 36 Vertical Launching System shall consist of the material listed in NAVSEA Parts List 8407395-29; the parts listed in Attachment 1, Appendix A, and the GFP listed in the Attachment 11.
Items 0014–0023 and Option Items 0024-0026, 0302 and 0304 - MK 235 MOD 12 LCU:
The contractor shall manufacture, assemble, test and deliver each MK 235 MOD 12 Vertical Launch
Control Unit, part number 7104280-129 in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3.
Option Item 0027 - Launcher Fit Check Tools:
The contractor shall manufacture, assemble, test and deliver the Launcher Fit Check Tools in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. The Launcher Fit Check Tools shall consist of the items listed in
Attachment 1, Appendix A.
Option Item 0028 – Production Readiness Review:
A Preliminary Production Readiness Review and a Final Production Readiness Review, will be conducted as described and scheduled in Statement of Work - Electronic, Attachment 1 and The Production Readiness Review
Plan, Attachment 6.
The contractor shall provide engineering, technical, administrative, and management support for these reviews as described and scheduled in Statement of Work - Electronic, Attachment 1 and The Production Readiness
Review Plan, Attachment 6.
The contractor shall conduct subcontractor Production Readiness Review(s) in accordance with the
Statement of Work - Electronic, Attachment 1 and The Production Readiness Review Plan, Attachment 6.
Option Item 0029 – Physical Configuration Audit:
Physical Configuration Audits shall be conducted in accordance with the Statement of Work - Electronic, Attachment 1.
Option Item 0030 – First Article Test – Launch Sequencer:
The contractor shall conduct a First Article Test of the Launch Sequencer MK 5 in accordance with the
Statement of Work - Electronic, Attachment 1.
Option Item 0031 – First Article Test – Launch Control Unit:
The contractor shall conduct a First Article Test of the Launch Control Unit MK 235 in accordance with the Statement of Work - Electronic, Attachment 1.
Option Item 0032 – First Article Test – Motor Control Panel:
The contractor shall conduct a First Article Test of the Motor Control Panel MK 448 in accordance with the
Option Item 0033 – First Article Test – Programmable Power Supply:
The contractor shall conduct a First Article Test of the Programmable Power Supply MK 179 in accordance with the Statement of Work - Electronic, Attachment 1.
Option Item 0034 – First Article Test – Power Distribution Panel:
The contractor shall conduct a First Article Test of the Power Distribution Panel MK 419 in accordance
Option Item 0035 – First Article Test – Power Distribution Panel:
The contractor shall conduct a First Article Test of the Power Distribution Panel MK 420 in accordance
Option Item 0036 – First Article Test – Status Panel:
The contractor shall conduct a First Article Test of the Status Panel MK 430 in accordance with the
Option Items 0037, 0137, 0237, 0337, and 0437 - DDG AMOD B/L V KIT:
The contractor shall manufacture, assemble, test and deliver DDG AMOD B/L V Kits in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each DDG AMOD B/L V Kit shall consist of the material listed in Attachment 1, Appendix A.
The Fiber Optic Circuit Card Assemblies, SBC CCAs and GPM GPS VME Receiver Circuit Card
Assemblies, procured under Option Items 0038, 0138, 0238, 0338, and 0438 listed in the table “PARTS TO BE
ASSEMBLED INTO MK 235 MOD 11 VERTICAL LAUNCH CONTROL UNITS” in Attachment 1 Appendix A shall be assembled into the MK 235 MOD 11 Vertical Launch Control Units procured under this Item.
Option Items 0038, 0138, 0238, 0338, and 0438 - DDG AMOD B/L V BMD MATERIAL:
The contractor shall manufacture, assemble, test and deliver DDG AMOD B/L V BMD MATERIAL in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work -
Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each set of DDG AMOD B/L V BMD MATERIAL shall consist of the material listed in Attachment 1 Appendix A.
Assemblies listed in the table “PARTS TO BE ASSEMBLED INTO MK 235 MOD 11 VERTICAL LAUNCH
CONTROL UNITS” in Attachment 1 Appendix A shall be assembled into the MK 235 MOD 11 Vertical Launch
Control Units procured by Option Items 0037, 0137, 0237, 0337, and 0437.
Option Items 0039, 0139, 0239, 0339, and 0439 - DDG AMOD B/L VII KIT:
The contractor shall manufacture, assemble, test and deliver DDG AMOD B/L VII Kits in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each DDG AMOD B/L VII Kit shall consist of the material listed in Attachment
1, Appendix A, and the GFP listed in Attachment 11.
Assemblies, procured under Option Items 0040, 0140, 0240, 0340, and 0440 listed in the table “PARTS TO BE
Option Items 0040, 0140, 0240, 0340, and 0440 - DDG AMOD B/L VII BMD MATERIAL:
The contractor shall manufacture, assemble, test and deliver DDG AMOD B/L VII BMD MATERIAL in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work -
Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each set of DDG AMOD B/L VII BMD MATERIAL shall consist of the material listed in Attachment 1 Appendix A.
Control Units procured by Option Items 0039, 0139, 0239, 0339, and 0439.
Option Items 0041, 0141, 0241, 0341, and 0441 - CG AMOD KIT:
The contractor shall manufacture, assemble, test and deliver CG AMOD Kits in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each CG AMOD Kit shall consist of the material listed in Attachment 1, Appendix A, and the GFP listed in Attachment 11.
Assemblies, procured under Option Items 0042, 0142, 0242, 0342, and 0442 listed in the table “PARTS TO BE
Option Items 0042, 0142, 0242, 0342, and 0442 - CG AMOD KIT BMD MATERIAL:
The contractor shall manufacture, assemble, test and deliver CG AMOD KIT BMD MATERIAL in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work -
Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each set of CG AMOD KIT BMD MATERIAL shall consist of the material listed in Attachment 1 Appendix A.
Control Units procured by Option Items 0041, 0141, 0241, 0341, and 0441.
Option Items 0043, 0143, 0243, 0343, and 0443 – AMOD SPARES:
The contractor shall manufacture, assemble, test and deliver AMOD Spares in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each set of CG AMOD Spares shall consist of the material listed in Attachment 1, Appendix A, and the GFP listed in Attachment 11.
Option Items 0044, 0144, 0244, 0344, and 0444 – Production Support Material:
The contractor shall manufacture, assemble, test and deliver each set of Production Support Material in accordance with the applicable drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1 and the VLS TDP, Attachment 3. Each set of DDG Production Support Material shall consist of the items listed in Attachment 1, Appendix A.
Option Items 0045, 0145, 0245, 0345, and 0445 – Module Shipping Trailer:
The contractor shall manufacture, assemble, test and deliver each Module Shipping Trailer, part number
5599453, in accordance with the applicable engineering drawings, standards & specifications, the Statement of
Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3.
Option Items 0046, 0146, 0246, 0346, and 0446 – Module Shipping Fixtures:
The contractor shall manufacture, assemble, test and deliver each set of Module Shipping Fixtures listed in
Attachment 1, Appendix A in accordance with the applicable engineering drawings, standards & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each set of Module Shipping
Fixtures shall consist of the items listed in Attachment 1, Appendix A.
Option Items 0047, 0147, 0247, 0347, and 0447 – Installation Attrition Spares:
The contractor shall manufacture, assemble, test and deliver Installation Attrition Spares in accordance with the applicable drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, the VLS
TDP, Attachment 3. Each set of Installation Attrition Spares shall consist of the items listed in Attachment 1, Option Items 0048, 0148, 0248, 0348, and 0448 – B/L VII LRU Shipset:
The contractor shall manufacture, assemble, test and deliver B/L VII LRU Shipsets in accordance with the applicable drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS
TDP, Attachment 3. Each set of B/L VII LRU Shipset shall consist of the items listed in Attachment 1, Appendix A.
Option Items 0049, 0149, 0249 0349, and 0449 – MK 9 MOD 5 System Module:
The contractor shall manufacture, assemble, test and deliver each MK 9 MOD 5 System Module, part number 8407427-29 in accordance with the applicable engineering drawings, standards & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3 and the GFP listed in Attachment
11.
Option Items 0050, 0150, 0250, 0350, and 0450 – MK 8 MOD 5 Standard Module:
The contractor shall manufacture, assemble, test and deliver each MK 8 MOD 5 Standard Module, part number 8407428-29 in accordance with the applicable engineering drawings, standards & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3 and the GFP listed in Attachment
Option Items 0051, 0151, 0251, 0351, and 0451 – MK 5 MOD 2 Launch Sequencer:
The contractor shall manufacture, assemble, test and deliver each MK 5 MOD 2 Launch Sequencer, part number 7104340-39 in accordance with the applicable engineering drawings, standards & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3 and the GFP listed in Attachment
Option Items 0052, 0152, 0252, 0352, and 0452 – MK 235 MOD 12 Vertical Launch Control Unit:
The contractor shall manufacture, assemble, test and deliver each MK 235 MOD 12 Vertical Launch
Control Unit, part number 7104280-129 in accordance with the applicable engineering drawings, standards &
Option Items 0053, 0153, 0253, 0353, and 0453 – MK 448 Motor Control Panel Assembly:
The contractor shall manufacture, assemble, test and deliver each MK 448 Motor Control Panel Assembly, part number 7103707-39 in accordance with the applicable engineering drawings, standards & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3.
Option Items 0054, 0154, 0254, 0354, and 0454 – MK 179 Programmable Power Supply
The contractor shall manufacture, assemble, test and deliver each MK 179 Programmable Power Supply, part number 7104312-39 in accordance with the applicable engineering drawings, standards & specifications, the
Option Items 0055, 0155, 0255, 0355, and 0455 – MK 419 MOD 0 Power Distribution Panel Assembly:
The contractor shall manufacture, assemble, test and deliver each MK 419 MOD 0 Power Distribution
Panel Assembly, part number 5498052-19 in accordance with the applicable engineering drawings, standards &
Option Items 0056, 0156, 0256, 0356, and 0456 – MK 420 MOD 0 Power Distribution Panel Assembly:
The contractor shall manufacture, assemble, test and deliver each MK 420 MOD 0 Power Distribution
Panel Assembly, part number 5498051-39 in accordance with the applicable engineering drawings, standards &
Option Items 0057, 0157, 0257, 0357, and 0457 – MK 430 MOD 0 Status Panel Assembly:
The contractor shall manufacture, assemble, test and deliver each MK 430 MOD 0 Status Panel Assembly, part number 6135857-9 in accordance with the applicable engineering drawings, standards & specifications, the
Option Items 0058, 0158, 0258, 0358, and 0458 – MK 235 MOD 11 Vertical Launch Control Unit:
The contractor shall manufacture, assemble, test and deliver each MK 235 MOD 11 Vertical Launch
Control Unit, part number 7104280-119 in accordance with the applicable engineering drawings, standards &
Option Item 0099 - Provisioned Item Order (PIO):
The contractor shall manufacture, assemble, test and deliver hardware in support of the MK 41 VLS USN and FMS New Construction, Aegis Modernization, and Aegis Ashore programs in accordance with “HQ C-1-0003
Provisioned Items Orders (APR 1999)”. Varying quantities of spares may be ordered dependent upon needs.
Item 0100 – Data Items:
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements
List, DD Form 1423, Exhibits A and B, attached hereto.
Item 0500 - MK 41 MOD 35 VLS KS KDX III:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 Mod 35 Vertical Launching
Systems in accordance with the MK 41 Vertical Launching System drawings, standards, & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each MK 41 Mod 35 Vertical
Launching System shall consist of the material listed in NAVSEA Parts List 8652163; the parts listed in Attachment
Item 0501 and (if options are exercised) Option Items 0508, 0515, 0601, 0608, 0615, and 0701 – MK 41 VLS
OBRP:
The contractor shall manufacture, assemble, test and deliver a set of Onboard Repair Parts in accordance with the applicable drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the
VLS TDP, Attachment 3. Each set of Onboard Repair Parts shall consist of the material listed in Attachment 1
Appendix A, and the GFP listed in Attachment 11.
Item 0502 and (if options are exercised) Option Items 0509, 0516, 0602, 0609, 0616, 0621 and 0702– MK 41 VLS
Transportation Equipment:
The contractor shall manufacture, assemble, test and deliver the Launcher Transportation Equipment in accordance with the applicable drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each set of Launcher Transportation Equipment shall consist of the material listed in Attachment 1, Appendix A.
Item 0503 and (if options are exercised) Option Items 0510, 0517, 0603, 0610, 0617, and 0703– MK 41 VLS INCO
Spares:
The contractor shall manufacture, assemble, test and deliver a set of INCO Spares in accordance with the applicable drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS
TDP, Attachment 3. Each set of INCO Spares shall consist of the material listed in Attachment 1, Appendix A, and the GFP listed in Attachment 11.
Item 0504 and (if options are exercised) Option Items 0511, 0518, 0604, 0611, 0618 and 0704– MK 41 VLS INCO
Tools and Test Equipment:
The contractor shall manufacture, assemble, test and deliver a set of INCO Tools and Test Equipment in accordance with the applicable drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each set of INCO Tools and Test Equipment shall consist of the material listed in Attachment 1, Appendix A, and the GFP listed in Attachment 11.
Item 0505 and (if options are exercised) Option Items 0512, 0519, 0605, 0612, 0619, and 0705 – MK 41 VLS
Lifting, Handling And Alignment Equipment:
The contractor shall manufacture, assemble, test and deliver the Lifting, Handling and Alignment
Equipment in accordance with the applicable drawings, standards & specifications, the Statement of Work -
Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each set of Lifting, Handling and Alignment
Equipment shall consist of the items listed in Attachment 1, Appendix A.
Item 0506 and (if options are exercised) Option Items 0513, 0520, 0606, 0613, 0620, and 0706– MK 41 VLS Depot
The contractor shall manufacture, assemble, test and deliver a set of Depot Spares in accordance with the applicable drawings, standards & specifications, the Statement of Work - Electronic, Attachment 1, and the VLS
TDP, Attachment 3. Each set of Depot Spares shall consist of the material listed in Attachment 1 Appendix A, and the GFP listed in Attachment 11.
Option Item 0507 - MK 41 MOD 39 VLS FI SQ2020:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 Mod 39 Vertical Launching
Systems in accordance with the MK 41 Vertical Launching System drawings, standards, & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each MK 41 Mod 39 Vertical
Launching System shall consist of the material listed in NAVSEA Parts List 8652163; the parts listed in Attachment
Option Item 0514 - MK 41 MOD 42 VLS SR LCS:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 Mod 42 Vertical Launching
Systems in accordance with the MK 41 Vertical Launching System drawings, standards, & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each MK 41 Mod 42 Vertical
Launching System shall consist of the material listed in NAVSEA Parts List 8652163; the parts listed in Attachment
Option Item 0600 - MK 41 MOD 41 VLS BU MMPV:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 Mod 41 Vertical Launching
Systems in accordance with the MK 41 Vertical Launching System drawings, standards, & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each MK 41 Mod 41 Vertical
Launching System shall consist of the material listed in NAVSEA Parts List 8652163; the parts listed in Attachment
Option Item 0607 - MK 41 MOD 40 VLS AT SEA5000:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 Mod 40 Vertical Launching
Systems in accordance with the MK 41 Vertical Launching System drawings, standards, & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each MK 41 Mod 40 Vertical
Launching System shall consist of the material listed in NAVSEA Parts List 8652163; the parts listed in Attachment
Option Item 0614 - MK 41 MOD 38 VLS SP F110:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 Mod 38 Vertical Launching
Systems in accordance with the MK 41 Vertical Launching System drawings, standards, & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each MK 41 Mod 38 Vertical
Launching System shall consist of the material listed in NAVSEA Parts List 8652163; the parts listed in Attachment
Option Item 0700 - MK 41 MOD 43 VLS IN NGD-NGF:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 Mod 43 Vertical Launching
Systems in accordance with the MK 41 Vertical Launching System drawings, standards, & specifications, the
Statement of Work - Electronic, Attachment 1, and the VLS TDP, Attachment 3. Each MK 41 Mod 43 Vertical
Launching System shall consist of the material listed in NAVSEA Parts List 8652163; the parts listed in Attachment
MECHANICAL CLINS:
This contract is for the fabrication, assembly, test, final acceptance and delivery of Vertical Launcher Mechanical
Module Assemblies, Modernization Kits, spare parts and associated equipment in accordance with the Statement of
Work - Mechanical, Attachment 2, and MK 41 VLS Technical Data Package (TDP) and associated drawings, Attachment 3.
The Mechanical contractor will have to coordinate with the Electronic contractor, as the Electronic contractor will grant access and provide support to the Mechanical contractor in the event it is necessary for the Mechanical contractor to visit and/or perform work on the Mechanical requirements that have been delivered to the Electronic contractor as GFP.
Sub-Line Items 1001AA, 1002AA, 1003AA, and 1004AA; and (if options are exercised) Option Sub-Line Items
1105AA, 1106AA, 1207AA, 1208AA, 1301AA, 1303AA, 1309AA, 1310AA, 1311AA, 1312AA and 1313AA - MK
41 MOD 36 Vertical Launching System Module Mechanical Components:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 36 Vertical
Launching System Mechanical components listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
2, the VLS TDP, Attachment 3, and the GFP listed in Attachment 19.
Sub-Line Items 1001AB, 1002AB, 1003AB, and 1004AB; and (if options are exercised) Option Sub-Line Items –
1105AB-1106AB, 1207AB, 1208AB, 1301AB, 1303AB, 1309AB, 1310AB, 1311AB, 1312AB, and 1313AB -
Vertical Launching System Ancillary Components:
The contractor shall manufacture, assemble, test and deliver each of the Vertical Launching System Plenum
Cell Covers and Canister Adapter Assemblies listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
2, and the VLS TDP, Attachment 3.
Sub-Line Items 1001AC, 1002AC, 1003AC, and 1004AC; and (if options are exercised) Option Sub-Line Items –
1105AC, 1106AC, 1207AC, 1208AC, 1301AC, 1303AC, 1309AC, 1310AC, 1311AC, 1312AC and 1313AC -
Vertical Launching System Sill Adapter Assemblies:
The contractor shall manufacture, assemble, test and deliver each of the Vertical Launching System Sill
Adapter Assemblies listed in Attachment 2, Appendix A in accordance with the MK 41 Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3.
Option Item 1027 – Production Readiness Review:
A Preliminary Production Readiness Review and a single Final Production Readiness Review, will be conducted as described and scheduled in Statement of Work - Mechanical, Attachment 2 and The Production
Readiness Review Plan, Attachment 6.
The contractor shall provide engineering, technical, administrative, and management support for these reviews as described and scheduled in Statement of Work - Mechanical, Attachment 2 and The Production
Readiness Review Plan, Attachment 6.
The contractor shall conduct subcontractor Production Readiness Review(s) in accordance with the
Statement of Work - Mechanical, Attachment 2 and The Production Readiness Review Plan, Attachment 6.
Option Item 1028 – Physical Configuration Audit:
Physical Configuration Audits shall be conducted in accordance with the Statement of Work - Mechanical, Attachment 2.
Option Item 1029 - First Article Test - Module Structure:
The contractor shall conduct a First Article Test of the Module Structure in accordance with the Statement of Work - Mechanical, Attachment 2.
Option Item 1030 - First Article Test - Deck and Hatch:
The contractor shall conduct a First Article Test of the Module Deck & Hatch Assembly in accordance with the Statement of Work - Mechanical, Attachment 2.
Option Item 1031 - First Article Test - Bonded Ablative:
The contractor shall conduct a First Article Test of Bonded Ablative in accordance with the Statement of
Work - Mechanical, Attachment 2.
Option Item 1032 - First Article Test - Cable Assembly:
The contractor shall conduct a First Article Test of a Cable Assembly in accordance with the Statement of
Work - Mechanical, Attachment 2.
Option Items 1037, 1137, 1237, 1337, and 1437- DDG AMOD B/L V Kit Mechanical Components:
The contractor shall manufacture, assemble, test and deliver DDG AMOD B/L V Mechanical Components listed in Attachment 2, Appendix A in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3.
Option Items 1039, 1139, 1239, 1339, and 1439 - DDG AMOD B/L VII Kit Mechanical Components:
The contractor shall manufacture, assemble, test and deliver DDG AMOD B/L VII Mechanical
Components listed in Attachment 2, Appendix A in accordance with the applicable engineering drawings, standards
& specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3.
Option Items 1041, 1141, 1241, 1341 and 1441- CG AMOD Kit Mechanical Components:
The contractor shall manufacture, assemble, test and deliver CG AMOD B/L VII Mechanical Components listed in Attachment 2, Appendix A in accordance with the applicable engineering drawings, standards &
Option Items 1049, 1149, 1249, 1349 and 1449 - MK 9 MOD 5 System Module Mechanical:
The contractor shall manufacture, assemble, test and deliver MK 9 MOD 5 System Module
Mechanical Components in accordance with the applicable engineering drawings, standards & specifications, the
Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each set of MK 9 MOD 5 System
Module Mechanical Components shall consist of the material listed in Attachment 2 Appendix A, and the GFP listed in Attachment 19.
Option Items 1050, 1150, 1250, 1350 and 1450 - MK 8 MOD 5 Standard Module Mechanical:
The contractor shall manufacture, assemble, test and deliver MK 8 MOD 5 Standard Module Mechanical
Components in accordance with the applicable engineering drawings, standards & specifications, the Statement of
Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each set of MK 8 MOD 5 Standard Module
Mechanical Components shall consist of the material listed in Attachment 2 Appendix A, and the GFP listed in
Attachment 19.
Option Items 1059, 1159, 1259, 1359 and 1459 - Plenum Cell Cover:
The contractor shall manufacture, assemble, test and deliver each lot of quantity 48 Plenum Cell Covers, MK 18 MOD 0, part number 5599373-29 in accordance with the applicable engineering drawings, standards &
Option Items 1060, 1160, 1260, 1360 and 1460- Canister Adapter Assembly:
The contractor shall manufacture, assemble, test and deliver each lot of quantity 48 Canister Adapter
Assemblies, MK 18 MOD 1, part number 5599372-49 in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3.
Option Items 1061, 1161, 1261,1361 and 1461- MK 165 Sill Assembly:
The contractor shall manufacture, assemble, test and deliver each lot of quantity 48 MK 165 Sill
Assemblies, MK 165 MOD 1, part number 5599783-29 in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3.
Option Items 1062, 1162, 1262, 1362 and 1462 - MK 170 Sill Assembly:
The contractor shall manufacture, assemble, test and deliver each lot of quantity 48 MK 170 Sill
Assemblies, MK 170 MOD 0, part number 6658779-19 in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3.
Option Items 1063, 1163, 1263, 1363 and 1463 - Extender Cable Set:
The contractor shall manufacture, assemble, test and deliver Extender Cable Set in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each Extender Cable Set shall consist of the material listed in Attachment 2
Option Items 1064, 1164, 1264, 1364 and 1464 - Deck and Hatch Cable Set:
The contractor shall manufacture, assemble, test and deliver Deck and Hatch Cable Set in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each Deck and Hatch Cable Set shall consist of the material listed in Attachment 2
Option Items 1065, 1165, 1265, 1365 and 1465 - Lower System Module Cable Set:
The contractor shall manufacture, assemble, test and deliver Lower System Module Cable Set in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work -
Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each Lower System Module Cable Set shall consist of the material listed in Attachment 2 Appendix A.
Option Items 1066, 1166, 1266, 1366 and 1466 - Upper System Module Cable Set:
The contractor shall manufacture, assemble, test and deliver Upper System Module Cable Set in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work -
Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each Upper System Module Cable Set shall consist of the material listed in Attachment 2 Appendix A.
Option Items 1067, 1167, 1267, 1367 and 1467 - Lower Standard Module Cable Set:
The contractor shall manufacture, assemble, test and deliver Lower Standard Module Cable Set in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work -
Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each Lower Standard Module Cable Set shall consist of the material listed in Attachment 2 Appendix A.
Option Items 1068, 1168, 1268, 1368 and 1468 - Upper Standard Module Cable Set:
The contractor shall manufacture, assemble, test and deliver Upper Standard Module Cable Set in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work -
Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each Upper Standard Module Cable Set shall consist of the material listed in Attachment 2 Appendix A.
Option Items 1069, 1169, 1269, 1369 and 1469 - Ancillary Cable Set:
The contractor shall manufacture, assemble, test and deliver Ancillary Cable Set in accordance with the applicable engineering drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each Ancillary Cable Set shall consist of the material listed in Attachment 2
Item 1099 - Provisioned Item Order (PIO):
The contractor shall manufacture, assemble, test and deliver hardware in support of the MK 41 VLS USN and FMS New Construction, Aegis Modernization, and Aegis Ashore programs in accordance with “HQ C-1-0003
Provisioned Items Orders (APR 1999)”. Varying quantities of spares may be ordered dependent upon needs.
Item 1100 – Data Items
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements
List, DD Form 1423, Exhibit B, attached hereto.
Item 1500 –MK 41 MOD 35 Vertical Launching System KS KDXIII (Mechanical):
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 35 Vertical
Launching System Mechanical components listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
Item 1501 and (if options are exercised) Option Items 1508, 1515, 1601, 1608, 1615, 1701 – MK 41 VLS OBRP:
The contractor shall manufacture, assemble, test and deliver a set of Onboard Repair Parts consisting of the material listed in Attachment 2, Appendix A in accordance with the applicable drawings, standards & specifications, the Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3.
Item 1503 and (if options are exercised) Option Items 1510, 1517, 1603, 1610, 1617, and 1703– MK 41 VLS INCO
The contractor shall manufacture, assemble, test and deliver a set of INCO Spares consisting of the material listed in Attachment 2, Appendix A in accordance with the applicable drawings, standards & specifications, the
Statement of Work - Mechanical, Attachment 2, and the VLS TDP, Attachment 3.
Item 1504 and (if options are exercised) Option Items1511, 1518, 1604, 1611, 1618, and 1704– MK 41 VLS INCO
Tools and Test Equipment:
The contractor shall manufacture, assemble, test and deliver a set of INCO Tools and Test Equipment in accordance with the applicable drawings, standards & specifications, the Statement of Work – Mechanical, Attachment 2, and the VLS TDP, Attachment 3. Each set of INCO Tools and Test Equipment shall consist of the material listed in Attachment 2, Appendix A.
Item 1506 and (if options are exercised) Option Items 1513, 1520, 1606, 1613, 1620 and 1706 – MK 41 VLS Depot
The contractor shall manufacture, assemble, test and deliver a set of Two-Year Depot Spares consisting of the material listed in Attachment 2, Appendix A in accordance with the applicable drawings, standards &
Option Item 1507 –MK 41 MOD 39 Vertical Launching System FI SQ2020 (Mechanical):
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 39 Vertical
Launching System Mechanical components listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
Option Item 1514 –MK 41 MOD 42 Vertical Launching System SR LCS:
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 42 Vertical
Launching System Mechanical components listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
Option Item 1600 – MK 41 MOD 41 VLS BU MMPV (Mechanical):
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 41 Vertical
Launching System Mechanical components listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
Option Item 1607 –MK 41 MOD 40 Vertical Launching System AT SEA5000 (Mechanical):
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 40 Vertical
Launching System Mechanical components listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
Option Item 1614 –MK 41 MOD 38 Vertical Launching System SP F110 (Mechanical):
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 38 Vertical
Launching System Mechanical components listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
Option Item 1700 –MK 41 MOD 43 Vertical Launching System IN NGD-NGF (Mechanical):
The contractor shall manufacture, assemble, test and deliver each of the MK 41 MOD 43 Vertical
Launching System Mechanical components listed in Attachment 2, Appendix A in accordance with the MK 41
Vertical Launching System drawings, standards & specifications, the Statement of Work - Mechanical, Attachment
Applicability of Clauses:
The following Clauses under Section C apply to both Electronic and Mechanical requirements and shall be included under both the Electronic and Mechanical contract awards.
The following have been deleted:
HQ C-2-0027 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA)
(SEP 1990)
MAR 2003
SECTION E - INSPECTION AND ACCEPTANCE
The following have been deleted:
52.246-11 Higher-Level Contract Quality Requirement DEC 2014
SECTION F - DELIVERIES OR PERFORMANCE
Note:
The format and placement of the Section F tables may change at the time of award.
ELECTRONIC CLINS:
Items 0001 – 0010, 0014-0023, and (if options are exercised) Items 0011-0013, 0024-0026, 0301, 0302, 0303, and
0304- Notwithstanding DD-250 signature by the Government of supplies furnished under these contract line items, all furnished supplies shall be delivered free of expense to the Government on the date and to the destination specified in the following table in accordance with the instructions specified in General Provision FAR 52.247-34 entitled "FOB Destination". Items may be delivered earlier than the date specified in the following table, only with
Government authorization.
All items with a destination listed as TBD shall be delivered to a destination within the continental United States that is specified when the option is exercised.
CLIN DELIVERY
DATE
QTY SHIP TO ADDRESS DODAAC/CAGE
30-APR-
Ingalls Shipbuilding Land Based Test Facility
West Bank Pascagoula, MS 39567 Contact
Phone: (228) 935-3863 or (228) 769-4458
N69316
30-APR-
Supervisor of Shipbuilding, Conversion and
Repair, USN Bath Iron Works, Consolidated
Warehouse, Mallet Park, Brunswick, ME
04011, Contact Phone: (207) 442-1275 or
(207) 442-2150
N62786
30-APR-
Ingalls Shipbuilding Land Based Test Facility
West Bank Pascagoula, MS 39567 Contact
Phone: (228) 935-3863 or (228) 769-4458
N69316
30-APR-
Supervisor of Shipbuilding, Conversion and
Repair, USN Bath Iron Works, Consolidated
Warehouse, Mallet Park, Brunswick, ME
04011, Contact Phone: (207) 442-1275 or
(207) 442-2150
N62786
30-APR-
Ingalls Shipbuilding Land Based Test Facility
West Bank Pascagoula, MS 39567 Contact
Phone: (228) 935-3863 or (228) 769-4458
N69316
30-APR-
Supervisor of Shipbuilding, Conversion and
Repair, USN Bath Iron Works, Consolidated
Warehouse, Mallet Park, Brunswick, ME
04011, Contact Phone: (207) 442-1275 or
(207) 442-2150
N62786
30-APR-
Ingalls Shipbuilding Land Based Test Facility
West Bank Pascagoula, MS 39567 Contact
Phone: (228) 935-3863 or (228) 769-4458
N69316
30-APR-
Supervisor of Shipbuilding, Conversion and
Repair, USN Bath Iron Works, Consolidated
Warehouse, Mallet Park, Brunswick, ME
04011, Contact Phone: (207) 442-1275 or
(207) 442-2150
N62786
30-APR-
Ingalls Shipbuilding Land Based Test Facility
West Bank Pascagoula, MS 39567 Contact
Phone: (228) 935-3863 or (228) 769-4458
N69316
30-APR-
Supervisor of Shipbuilding, Conversion and
Repair, USN Bath Iron Works, Consolidated
Warehouse, Mallet Park, Brunswick, ME
04011, Contact Phone: (207) 442-1275 or
(207) 442-2150
N62786
0011 24 MAOE 1
Ingalls Shipbuilding Land Based Test Facility
West Bank Pascagoula, MS 39567 Contact
Phone: (228) 935-3863 or (228) 769-4458
N69316
0012 24 MAOE 1
Supervisor of Shipbuilding, Conversion and
Repair, USN Bath Iron Works, Consolidated
Warehouse, Mallet Park, Brunswick, ME
04011, Contact Phone: (207) 442-1275 or
(207) 442-2150
N62786
0013 24 MAOE 1
Ingalls Shipbuilding Land Based Test Facility
West Bank Pascagoula, MS 39567 Contact
Phone: (228) 935-3863 or (228) 769-4458
N69316
30-APR-
2 TBD TBD
30-APR-
2 TBD TBD
31-MAR-
2 TBD TBD
31-MAR-
2 TBD TBD
31-MAR-
2 TBD TBD
31-MAR-
2 TBD TBD
31-MAR-
2 TBD TBD
31-MAR-
2 TBD TBD
31-MAR-
2 TBD TBD
31-MAR-
2 TBD TBD
0024 12 MAOE 2 TBD TBD
0025 12 MAOE 2 TBD TBD
0026 12 MAOE 2 TBD TBD
0301 36 MAOE 1 TBD TBD
0302 24 MAOE 2 TBD TBD
0303 48 MAOE 1 TBD TBD
0304 36 MAOE 2 TBD TBD
Item 0099 - Parts shall be delivered in accordance with the delivery schedule established in each PIO. Unless otherwise stated in the PIO, parts shall be delivered free of expense to the Government in accordance with instructions specified in the clause entitled "F.O.B. Destination" (FAR 52.247-34).
Item 0100 - All data to be furnished under this contract shall be delivered prepaid to destination(s) at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.
If exercised Option Items 0037 – 0058, 0137 – 0158, 0237 – 0258, 0337 – 0358, and 0437 – 0458 –
Notwithstanding DD-250 signature by the Government of supplies furnished under…