Sample_Notional_Work_Package_PIA_DPIA.pdf
PDF 53 KB Posted
- Solicitation number
- N00024-18-R-4300
About this file
This sources sought announcement requests information from interested parties for a potential five-year Navy contract to provide maintenance, repair, and modernization efforts for CVN 68 Class and CVN 78 Class aircraft carriers homeported in and visiting the Pacific Northwest region. Services required include planning, program management, and integration support for docking planned incremental availabilities, inter-availability work, and emergent repairs. Responses are requested by July 22, 2016 to address capabilities, experience completing comparable work, accounting practices, logistics support, and plans to bid. The incumbent contractor is General Dynamics - NASSCO under contract N00024-14-C-4321. The Naval Sea Systems Command will consider small business set-aside categories for the anticipated follow-on solicitation with an award by fiscal year 2019.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample_CVN_Notional_Package_Specs.pdf | ||
| CVN_PNW_Private_Sector_Maintenance_Draft_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notional Work Package PIA
Work Item
Number Work Item Title
042‐60‐001 Schedule and Associated Reports; provide and manage
077‐11‐001 Hazardous Waste Produced on Naval Vessels; control
123‐11‐001 Dry Dock ‐ Inner Bottom Tank; inspect
123‐12‐001 JP‐5 Tank; preserve
123‐12‐002 DC Void; preserve
123‐12‐003 JP‐5 Tank; inspect
123‐12‐004 Dry Dock ‐ Bilge and Oily Wast Storage Tank; preserve
123‐12‐005 Dry Dock ‐ JP‐5 Tank; preserve
123‐12‐006 JP‐5 Tank; inspect
123‐14‐001 Dry Dock ‐ Potable Water Tanks Preservation;
accomplish
123‐19‐001 Dry Dock ‐ CHT Tank; clean, inspect, preserve, and test
123‐21‐001 Collection Holding and Transfer Piping in Voids
Ultrasonic Inspection; accomplish
163‐11‐001 DRY DOCK ‐ Inspection and Repair of Sea Chest;
accomplish
314‐11‐001 Special Frequency Motor Generator Industrial
Cleaning; accompllish
330‐90‐001 ShipAlt CVN‐8725.1K Upgrade 115V System;
accomplish
443‐11‐001 5MC Announcing System Cable; in‐line splice
508‐11‐001 Insulation and Lagging; install
512‐11‐002 Vent Plenum Preservation; accomplish
512‐11‐003 Preheater 01‐36‐1; replace
512‐11‐004 Cooling Coil; replace
512‐11‐005 Vent Plenum and Catapult Pipoing Space; inspect and preserve
513‐11‐001 Vent Plenum Preservation; accomplish
514‐80‐001 SCD CVN‐75 10174 Aviation Maintenance Storeroom
HVAC Installation; accomplish
526‐11‐001 Weather Drain Piping; repair
529‐11‐001 Overboard Discharge Valve; repair
541‐11‐001 JP‐5 Manifold; refurbish
581‐11‐001 Anchor and Anchor Chain; inspect and preserve
583‐80‐001 Shipalt CVN 75‐8775.02D, Install 50‐Man Lifeboats
(Port Side Only); accomplish
593‐11‐001 CHT Overboard Discharge Header Piping; replace
593‐11‐002 CHT Discharge Piping; replace
612‐01‐001 Aircraft Elevator and Flight Deck Safety Net and
Frame; remove, install, test
631‐31‐001 DRY DOCK ‐ Underwater Hull Preservation;
accomplish
631‐31‐002 DRY DOCK ‐ Underwater Hull Low Pressure Wash;
accomplish
631‐41‐001 DRY DOCK – Freeboard Assessment and Preservation;
accomplish
633‐11‐001 DRY DOCK ‐ Stern Tube and Sea Chest Zinc Anodes;
replace
633‐21‐001 ICCP Shaft Grounding Assembly; replace
633‐21‐002 Dry Dock ‐ Impressed Cathodic Protection System;
inspect and repair
661‐80‐001 ShipAlt CVN 68‐8454D Convert SWU Office to
Weapon Dept W/C; accomplish
672‐80‐001 SCD CVN 76‐9623.0D Flammable Liquid Storeroom
Modification; accomplish
982‐32‐001 Sea Trials; accomplish
992‐11‐001 Dry Dock ‐ Drydock Cleaning; accomplish
992‐31‐001 Cleaning and Pumping; accomplish
997‐11‐001 Ship's Docking Report, Inspection and Services;
provide
Dry Dock Requirement (DPIA)