This instruction establishes NAVSEA policy for Temporary Modifications (TEMPMOD) to Deep Submergence Systems (DSS).

View the file

Other files

File Type Posted
Attachment_1_and_2.pdf PDF
NAVSEA_INSTRUCTION_4855_34B.pdf PDF
NAVSEA_NOTICE_5000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEAINST 4720.23D

propulsion. Accordingly, nothing in this instruction supersedes or changes those authorities, and SEA 08 shall be consulted concerning all matters related to Naval Nuclear Propulsion.

b. For equipment temporarily added to or used with a DSS that interfaces and requires a modification of the host submarine, a Temporary Alteration (TEMP ALT) must be submitted for approval per reference (b) for the modification(s) to the host submarine.

c. A TEMPALT (vice TEMPMOD) must be submitted for approval per reference (b) for modificatfon(s) of host submarine DSS. Examples of such systems are Lock-Out Chambers, Lock Out Trunks, host submarine diver's air systems, etc.

5. Background. Deep Submergence Systems, as defined in reference (a), are those systems and components that, when working together, provide the capability for manned underwater operations.

TEMPMODs are components, systems, or subsystems temporarily installed for the purpose of test and evaluation, research and development programs, or in support of short-term mission or exercise requirements. TEMPMODs are not intended to cover equipment required for normal or long-term operation of the DSS.

6. Action

a. Administration. The cognizant NAVSEA Program Office and the Sustaining Activity for the DSS shall maintain a file of DSS TEMPMODs. The file shall contain the information shown in enclosure (I), and all official correspondence regarding each TEMPMOD. Enclosure (I) has columns for a unique tracking number (TEMPMOD Number), title of the TEMPMOD, the DSS asset/platform on which the TEMPMOD is installed, purpose of the TEMPMOD (i.e., Test and Evaluation, Research and Development, etc.), any restrictions or limitations imposed while the TEMPMOD is installed, the date of approval, date of installation, and th~ required removal date.

Installation approvals and durations shall be in accordance with, and not exceed, the guidelines provided in Table 6.a-1. IN NO CASE shall equipment that is required for regular and routine operations of the DSS asset remain installed by TEMPMOD beyond the time period(s) authorized by NAVSEA. All equipment required for regular operations shall be permanently installed via the formal configuration change process established by the Program Office for the DSS asset. If equipment has been temporarily installed for evaluatio11 purposes via a TEMPMOD, an evaluation shall be conducted by the DSS asset's operational command using a form similar to enclosure (2). If a TEMPMOD is determined as suitable to become a permanent part of the configuration of the DSS asset, the appropriate configuration change process shall be initiated to convert the TEMPMOD into a permanent configuration change prior to the expiration of the approved TEMPMOD installation period.

b. Policy

(I) TEMPMODs will not be accomplished on certified DSS assets unless detailed technical design packages have been approved by NA VSEA for the specific DSS Asset or DSS

16 Sep 2016

NAVSEAINST 4720.230

Table 6.a-1 TEMPMOD Installation Duration and Approval Authority

Deployed Platform or Purpose System

Test and SSGN/SSN Evaluation AUS*

Research and SSGN/SSN Development AUS*

Special Mission

SSGN/SSN

AUS*

Scientific SSGN/ SSN Mission AUS*

Exercise

SSGN/ SSN

AUS*

Approval Authority

* Advanced Undersea Systems (AUS)

Maximum Initial Installation Duration** 18 Months 6 Months

18 Months 6 Months

18 Months 18 Months 6 Months 6 Months 6 Months 6 Months

Program Manager

Maximum Extension Increments***

12 Months 6 Months

12 Months 6 Months

12 Months 12 Months 6 Months 6 Months 6 Months 6 Months

SCA**

** For other than AUS, the Program Manager may approve an extension up to 6 months beyond the initially approved removal date. For AUS, all extensions will be approved by the SCA.

*** TEMPMOD installation extension approvals shall not exceed a total TEMPMOD installation period of 36 months.

Class (i.e., Dry Deck Shelters) designated to receive the modification and the installation is authorized by the parent Type Commander (TYCOM). A major nonconformance (i.e., Departure From Specification, waiver or deviation) shall be submitted to document an installation that is not accomplished per the approved NAVSEA TEMPMOD design and when the TEMPMOD removal does not return the DSS Asset to an "as-certified" configuration.

(2) All modification design packages shall address the relevant attributes defined in paragraph 6.c below.

(3) In all cases, NAVSEA, the Immediate Superior In Command (ISIC), the cognizant Sustaining Activity and TYCOMs will be notified by Naval message when the installation has been accomplished, relocated, or removed. Installation and removal of mission specific equipment which has been approved and authorized for reinstallation for continuing use, i.e. side scan sonar, is controlled locally and does not need to be reported via message except for initial installation and for final removal within the approved duration period.

(a) Installation. At a minimum, the Naval message shall include the TEMPMODs number and title, DSS asset, ship's name and hull number (when applicable), purpose of the TEMPMOD (i.e., Test and Evaluation, Research and Development, etc.), date of installation, any preliminary Integrated Logistic Support provided, any restrictions or limitations imposed as a result of the installation, proposed removal date, the Installing Activity's point of contact, and a reference to the NA VSEA approval and TYCOM installation authorization letters. The message will contain a statement certifying the installation was accomplished per the NA VSEA approved technical design package; and will identify any lessons learned, authorized administrative "red line" changes, and any non-conformances that were adjudicated per references (a) and (c) or the applicable DSS Scope of Certification Notebook. The message will include a statement that Ship's personnel have been trained to operate the TEMPMOD equipment, when required.

(b) Removal. At a minimum, the Naval message will include the TEMPMODs number and title, DSS asset, ship's name and hull number (when applicable), date of removal, the Removal Activity's point of contact, a statement certifying that the DSS asset was restored to original configuration or identify any non-conformances initiated, and identify any outstanding item(s) preventing complete TEMPMOD removal and restoration of the DSS asset.

c. Procedures. Any organization within the DSS community may recommend the development of a TEMPMOD. In developing a TEMPMOD, the recommending (sponsoring) organization should work closely with the cognizant NA VSEA Program Office, the SEA 05 DSS Ship Design Manager, the specific DSS Planning Yard (PY), and the DSS Engineering Agent, throughout the development process to ensure all technical requirements are adequately identified and addressed prior to submittal to the cognizant NAVSEA Program Office for approval. The proposed TEMPMOD or TEMPMOD technical design package shall be submitted in writing to the cognizant NAVSEA Program Office. The request shall be submitted no less than 60 working days prior to the requested approval date. Due to the varying degrees of complexity among different potential TEMPMOD installations, the NA VSEA review and approval process may take significantly longer than 60 working days to perform a thorough engineering and logistical analysis, particularly if the TEMPMOD has an impact on Scope of

Certification/SUBSAFE items or requires modification or attachment to a pressure boundary/hull structure. The submitting activity may prepare and submit to NA VSEA a preliminary design study investigating the impacts of the proposed TEMPMOD in any available areas listed below to streamline the review process. The preliminary design study may be submitted prior to submitting a formal TEMPMOD technical design package to NAVSEA for approval. The results of this preliminary design study, along with any applicable design analyses, calculations and testing results should be provided to NA VSEA along with the formal TEMPMOD technical design package. At a minimum, the submitting activity should address the following areas in their technical design package:

(I) Purpose and description of the proposed TEMPMOD, including desired installation date.

(2) A System Safety Program Plan tailored to address all aspects necessary to protect DSS personnel per paragraph 2.2.2 of reference (a).

(3) Mounting details (e.g. equipment location, type of fasteners, welding requirements, etc.).

(4) Shock analysis and qualification (for special mission installation), as applicable.

Shock qualification shall meet the requirements for the DSS asset on which the TEMPMOD is being installed.

(5) Electrical power requirements and design safety features (e.g. voltage, amperages, fuses, breakers, connector types, type and length of cable, etc.).

(6) A statement certifying that the TEMPMOD equipment and installation plans comply with the emissions requirements of reference (d) and will not introduce Electromagnetic Interference (EMI) problems to other shipboard systems. The installing activity shall be responsible for correcting any EMI problems resulting from the TEMPMOD installation.

(a) Reference (e) contains information providing guidance for determining cable locations based upon electromagnetic interference requirements. Shielding requirements are also addressed. Classification guidelines are provided so that cables can be categorized as radiator or susceptor and their spacing requirements can be determined. All TEMPMOD cables shall be installed with existing ship's cables when possible, as specified in reference (e).

(b) As required by paragraph 5.12 of reference (f), national security information shall not be compromised by emanations from classified information processing equipment. The TEMPMOD package shall include Objective Quality Evidence (OQE) of testing, analysis, inspections or a combination thereof verifying compliance with this requirement. Baseline requirements are contained in NSTISSAM TEMPEST 1-92, NSTISSAM TEMPEST 1-93, NSTISSAM TEMPEST 2-95 and IA Pub-5239-31, Information Assurance Shipboard Red/Black Installation Publication. Those publications and the Committee on National Security Systems (CNSS) Advisory Memorandum TEMPEST 01-02 provide testing guidelines. The CNSS

(formerly the National Security Telecommunications and Information Systems Security Committee) maintains a web site at http://www.cnss.gov.

(7) Analysis of impact on weight and stability of the DSS asset, including change to dry weight, change in buoyancy and righting moment, height above baseline, location fore or aft of the center of gravity, height above baseline (keel), and location port or starboard of centerline.

(8) Weight and moment compensation required, including weight in pounds, location fore or aft of the center of gravity, height above baseline (keel), and location port or starboard of centerline.

(9) Impact on other systems or design specifications (e.g. hydrodynamics, hazardous electromagnetic radiation to ordnance, access to vital equipment, life support, etc.).

( 10) Impact on the DSS-Scope of Certification (SOC).

( 11) How the certification requirements of reference (a) will be addressed, including:

(a) Implodable or Explodable volume drawings and structural analyses (if applicable), including the NA VSEA calculated minimum standoff distances from all critical items when required, with all associated required test procedures and test results.

(b) Items subjected to explosive decompression shall have the approved test procedure and the test results included in the technical design package.

(c) Toxicity analyses:

(1) Obtain either a Closed DSS Atmospheric Sample from a NA VSEA approved gas analysis laboratory or an Environmental Chamber Atmospheric Gas Sample as soon as possible after the TEMPMOD hardware is initially installed inside of a DSS asset and prior to any manned operations. An off gas test of the TEMPMOD equipment may be accomplished in lieu of a Closed DSS Atmospheric Sample. All off gas testing shall be conducted by a NA VSEA approved gas analysis laboratory and the test results shall be included in the technical design package.

(2.) Develop a List of Toxic or Flammable Materials, and eliminate all materials determined to represent unacceptable risk (e.g. heavy metals, mercury, lead, etc.).

(d) Bench Testing Requirements: Conduct a "bum-in bench test" to determine the maximum temperature experienced by energized units and perform a flammability evaluation.

Bum-in test results and the flammability evaluation shall be included in the technical design package.

(1) Equipment Heat Source: If new hardware is a potential heat source, address how the surrounding area must be protected.

NAVSEAINST 4720.230

(£)De-energizing Equipment: Energized hardware must be able to be de energized quickly, and a redundant method to de-energize the equipment must be provided or an adequate safety feature shall be incorporated in the TEMPMOD design

(e) Access To and Operation of Vital Equipment: Ensure new components do not interfere with the time needed to access existing vital equipment. If the TEMPMOD equipment is also vital, verify that the installation location and equipment layout allows operators to meet the time requirements of the DSS Asset as defined in the applicable Maintenance Requirement, Hull Inspection Procedure/Unrestricted Operation Procedures, and that the equipment is added to the vital equipment operating and casualty/emergency procedures.

( 12) Technical Documentation

(a) Calculations: Submit the design calculations as part of the TEMPMOD technical design package.

(b) Drawings or Sketches: Submitted drawings shall be sufficiently detailed to support fabrication, assembly, installation, testing and evaluation of the TEMPMOD equipment.

(c) Technical Manuals and Procedures: All normal or casualty/emergency procedures affected by the TEMPMOD shall be modified and provided for approval as part of the TEMPMOD package.

(d) Fabrication and Installation Instructions: Detailed fabrication and installation instructions shall be developed and submitted as part of the TEMPMOD.

(e) Test Procedures: Procedures for testing the TEMPMOD equipment shall be developed and submitted as part of the TEMPMOD package to ensure that all systems and components meet specification requirements, and do not represent a hazard to the DSS operators.

( 13) Material certification requirements shall be identified and OQE provided in the package showing that the material certification requirements have been met. The TEMPMOD designer should consult the cognizant Program Manager when possible to determine the material control requirements. Refer to reference (a) for material control definitions and requirements.

( 14) A corrosion assessment of the material compatibility between the TEMPMOD components and other existing installed systems.

( 15) An analysis of the impact on existing DSS asset, host submarine systems, including any interfaces between DSS-SOC and SUBSAFE components.

( 16) Maintenance and spare requirements shall be identified.

(17) Preventive Maintenance System: Any additional preventive maintenance requirements, or changes to existing Maintenance Requirement Cards shall be identified and included in the TEMPMOD package.

( 18) Include the recommended removal date for the TEMPMOD.

(19) Identify any related TEMPALTs to the host submarine that are either required by or impact the TEMPMOD installation.

NOTE: NA VSEA recognizes that some of the above areas may not be applicable for every type of TEMPMOD. Tailor the above list to suit the specific requirements of the TEMPMOD being processed.

d. Responsibilities

( 1) Submitting (Sponsoring) Activities:

(a) When the need for a TEMPMOD is established, the responsible NA VSEA Program Office shall be contacted, well in advance of the TEMPMOD hardware development and package submittal, to obtain the necessary guidance with respect to all applicable technical and certification requirements that must be met in order to obtain TEMPMOD approval.

(b) Submit the TEMPMOD technical design package including all of the items in paragraph 6.c above to the NA VSEA Program Office for technical review and approval and send an informational copy to the appropriate DSS PY.

(c) Provide a digital copy of the TEMPMOD technical design package including all the items in paragraph 6.c above to NAVSEA, SUPSHIP (when applicable), the appropriate DSS PY, DSS Asset TYCOM and DSS ISIC upon NA VSEA approval. A hard copy shall be provided to the DSS Asset Sustaining Activity

(d) Notify all cognizant activities, per paragraph 6.b.(3) above, when a TEMPMOD has been installed, relocated or removed if the Installing Activity does not have Naval message capability.

(e) Submit revisions to each TEMPMOD as necessary. Any change to an approved TEMPMOD requires NA VSEA Program Office approval. TEMPMOD revi_sions are required when there is a change to a certification attribute, equipment, configuration, scope, a boundary or a retest requirement. Revisions shall be given a letter designator (e.g. Rev A, Rev B, etc.).

(f) The sponsoring activity has full responsibility for any ILS that may be required for aTEMPMOD.

(g) Retain a copy of the approved technical design package and all revisions or changes to the technical design package including all test and inspection certification records generated to support TEMPMOD approval until the TEMPMOD is cancelled or incorporated into the design as a permanent change. These records shall be maintained up-to-date and they shall be maintained in a manner to support an audit of the records for completeness.

(h) Maintain correspondence initiated to support the approval, installation, and removal activities related to the TEMPMOD until the TEMPMOD is cancelled or incorporated into the design as a permanent change. These records shall be maintained up-to-date and they shall be maintained in a manner to support an audit of the records for completeness.

(2) Type Commanders:

(a) Perform the following actions for assets under their cognizance and as agreed upon by Memorandum of Agreement (MOA).

(b) Authorize installation of only those TEMPMODs that have been approved by NA VSEA per this instruction.

(c) Maintain administrative control and manage the current configuration of the DSS asset including all TEMPMODs installed, and the required removal date for each.

(d) Notify the appropriate interfacing TYCOMs and CNO (for DSS assets under CNO operational control) when authorizing the installation of TEMPMODs that impact the mission or operational capabilities of the DSS asset or the Host Submarine.

(e) Accomplish the removal of TEMPMODs prior to the required removal date. If it becomes necessary to extend the authorized installation period, provide justification to the Program Manager or SCA, as applicable, for approval of an extension.

(f) If a TEMPMOD has been approved and installed on one DSS asset and it becomes necessary to install the (unmodified) TEMPMOD on another DSS asset, obtain NAVSEA Program Office approval via letter for the additional installation.

(g) If a TEMPMOD must be modified to support installation on the new asset, a TEMPMOD revision package must be developed and submitted for NA VSEA Program Office review and approval.

(h) If a TEMPMOD has been properly removed from a DSS asset and it becomes necessary to reinstall the unmodified TEMPMOD on the original asset, obtain NA VSEA Program Office approval prior to reinstalling the TEMPMOD.

(i) If installation of a TEMPMOD requires a revision, contact the initiating TEMPMOD activity and coordinate the submission of a TEMPMOD revision package to the NA VSEA Program Office.

U) Designate installation and removal activities as necessary. If the TEMPMOD includes DSS-SOC work, the installation and removal activity must be authorized per

NA VSEANOTE 5000.

(k) Ensure an MOA, per reference (c), is initiated between the TYCOM, ISIC, Sustaining Activity, Installation/Removal Activity and other applicable organizations prior to authorizing the installation of a TEMPMOD.

(I) If a DSS asset enters an overhaul period with a TEMPMOD installed, contact the NA VSEA Program Office for a determination of whether the TEMPMOD may remain installed.

Unless otherwise directed, the overhauling activity must remove all TEMPMODs.

(m) Maintain a Jog to document the status of all approved TEMPMODs and their installation. Maintain a file of all records required by this instruction. Records required to be retained include the approval, authorization for installation, copy of the approved technical design package, supporting test and certification records, and all changes/revisions to these records while the TEMPMOD is active. These records shall be maintained up-to-date and they shall be maintained in a manner to support an audit of the records for completeness.

(3) Installing Activity:

(a) For the purpose of adjudicating non-conformances, TEMPMOD drawings are considered non-deviation drawings. In cases where the approved TEMPMOD design must be modified to suit a particular installation or if the TEMPMOD is only partially installed, the required nonconformance to the TEMPMOD design will be adjudicated by the cognizant authority in accordance with departure from specification procedures of reference (a), reference (c), or the applicable Scope of Certification Notebook as applicable.

(b) Ensure that the design documentation for TEMPMODs has been approved by NA VSEA prior to the start of work per the policy and procedures of this instruction and as specified in the MOA.

(c) Ensure that authorization has been obtained from the applicable TYCOM prior to installation.

(d) Establish an MOA for all work to be performed and accomplish all work per reference (c) and this instruction.

(e) Ensure the applicable Access to Vital Equipment maintenance requirement is accomplished by Forces Afloat in the vicinity affected by the TEMPMOD after each installation.

(f) Notify the NA VSEA Program Office, applicable DSS TYCOM, Sustaining/User Activity, ISIC, appropriate DSS PY, and Sponsoring Activity by Naval message whenever a TEMPMOD has been installed, relocated, or removed per paragraph 6.b.(3) above. If the Activity does not have Naval message capability, provide all paragraph 6.b.(3) information to the Sponsoring Activity in support of Naval message issuance.

(g) Provide two hard copies and one digital copy of the approved technical design package to the DSS asset/ship each time an installation is accomplished.

(h) Maintain a copy of the installation and removal records, such as work packages, task group instructions, and all supporting test and inspection reports, until authorization to destroy these records is received from the cognizant NAVSEA Program Manager. These records shall be maintained up-to-date and they shall be maintained in a manner to support an audit of the records for completeness.

(4) Removing Activity: The TEMPMOD removing activity shall be approved per the TEMPMOD approval letter, or a TYCOM designation letter. In addition, during DSS overhauls, all TEMPMODs shall be removed by the activity performing the overhaul work, unless the overhauling activity is specifically directed by the applicable TYCOM (with NAVSEA approval) to leave a TEMPMOD installed. Removal of a TEMPMOD during overhaul will preempt the TEMPMOD letter removal date. The removing activity shall report the removal to cognizant and operational DSS TYCOMs, the parent ISIC, the NA VSEA Program Office, the Sustaining/User Activity, and the appropriate DSS PY.

(5) DSS Planning Yard:

(a) Review proposed TEMPMODs for compliance with reference (a) as directed by NA VSEA and assist as requested to support analysis of the cumulative weight effect of multiple TEMPMODs prior to manned operations and underway as applicable.

(b) Maximize use of shipchecks, photos, overlays, 30 models and mockups where appropriate to validate that installed systems are satisfactory and not adversely impacted by the proposed TEMPMOD installations.

(c) Ensure TEMPMODs with requested installation durations in excess of 6 months do not interfere with configuration management of planned modernization actions.

(d) Maintain a copy of the approved technical design package and all supporting information on file in a manner suitable for audit. This information shall be made available to the planning yard activity for use in the performance of assigned planning yard responsibilities.

These records shall be maintained up-to-date and they shall be maintained in a manner to support an audit of the records for completeness.

(6) NAVSEA:

(a) The NAVSEA Program Office shall provide technical requirements to the developer of the TEMPMOD technical design package, as approved by SEA 05.

(b) The NAVSEA Program Office shall review all requests for TEMPMODs, and fund development of a formal TEMPMOD package if the Program Manager deems the request is appropriate.

(c) The NAVSEA Program Office shall forward the proposed TEMPMOD to the applicable DSS PY for technical review and evaluation, prior to obtaining final approval from

SEA05.

(d) The NAVSEA Program Office shall obtain a review and concurrence from the SEA 05 DSS Ship Design Manager for all installation instances. Review and concurrence shall also be obtained from the DSS Engineering Agent, SEA05U7TC, SEA07Q, SEAOOC and SEAOO as required.

(e) The NAVSEA Program Office shall issue a technical approval letter stating that the requirements of paragraph 6.b above have been satisfied, and that the TEMPMOD is approved and recommended for installation. The approval letter shall identify the following:

Installation funding, authorized duration for TEMPMOD installation, source of materials, and the activity responsible for Re-Entry Control per reference (a). The NA VSEA Program Office approval letter can also suggest appropriate installation and removal activities, but the final designation of those activities will come from the TYCOM. The approval letter will require the end user or installing activity to report the installation completion and removal by Naval message to the cognizant activities. The approval letter shall also require the end user to perform the applicable Access to Vital Equipment checks, perform an assessment of the performance and suitability of the temporary equipment, and shall include a TEMPMOD Evaluation Sheet listing instructions for conducting the evaluation, and the attributes necessary to determining the item's suitability for permanent use. A sample TEMPMOD Evaluation Sheet is shown in enclosure (2).

Enclosure (3) is a guide for developing a NA VSEA Program Office TEMPMOD approval letter.

(t) The NA VSEA Program Office shall review and process all TYCOM request for extension of an approved TEMPMOD installation per Table 6.a-1. The Program Office shall review each request and the associated justification for the extension prior to approval or forwarding to the SCA for approval as required.

(g) Maintain all records and objective quality evidence to demonstrate the cognizant technical and certification authorities have reviewed and concurred with the TEMPMOD technical design package. Maintain a copy of all TEMPMOD approval and extension correspondence and supporting information (if any). These records shall be maintained up-to date and they shall be maintained in a manner to support an audit of the records for completeness as long as the TEMPMOD remains active.

(7) Supervisor of Shipbuilding/Defense Contract Management Agency/NA VSEA Activity assigned (e.g. Alteration/ Modification Team Manager) to perform oversight of the TEMPMOD installation:

(a) Provide management, coordination and oversight of work including, but not limited to, contracts, engineering, in-process surveillance, and quality assurance for TEMPMOD installations accomplished by private shipbuilders or activities.

(b) Monitor the certification status of DSS-SOC boundaries worked by private shipbuilders or activities during TEMPMOD installations. Report on the certification continuity status subsequent to completion of TEMPMOD installations per reference (a).

NAVSEAINST 4720 . 230

(c) Maintain a copy of records initiated in the execution of the activities assigned here and as tasked by the cognizant sponsor/Program Manager. These records shall be maintained up to-date and they shall be maintained in a manner to support an audit of the records for completeness as long as the TEMPMOD remains active.

(8) Sustaining Activity/User Activity:

(a) Ensure that the equipment is inspected prior to each use. This inspection shall verify that the TEMPMOD has not been modified (hardware or software) from the approved design and that the hardware condition is suitable for continued use.

(b) Conduct Access to Vital Equipment checks in accordance with the approved procedure. Provide the results to the Installing Activity upon completion.

(c) Maintain a copy of the approved technical design package and all supporting information on file in a manner suitable for audit. This information shall be made available to the DSS PY activity for use in the performance of assigned responsibilities. These records shall be maintained up-to-date and they shall be maintained in a manner to support an audit of the records for completeness.

7. Records created as a result of this instruction, regardless of media and format, must be managed per Secretary of the Navy Manual 5210.1 of January 2012.

Distri bu ti on:

COMUSFLTFORCOM NORFOLK VA (Code N4) COMNA VSPECW ARCOM CORONADO CA (Code N84) COMSUBLANT (Code N4) COMSUBPAC PEARL HARBOR HI (Code N4)

NA VSPECW ARGRU THREE DET LITTLE CREEK (QAO)

CO MN A VSPECW ARGRU THREE (Code N9)

NAVSEAINST 4720.230

CO MN A VSPECW ARGRU THREE LOGSUPPU PEARL HARBOR HI (QAO)

UNSEARESCOM SAN DIEGO CA (Code N6, QAO) COMSUBDEVRON FIVE SILVERDALE WA (Code N4) COMSUBRON ELEVEN (Code N4) NA VUNDSEA W ARCENDIV NEWPORT RI (Code 1259) NA VSHIPYD & IMF PEARL HARBOR HI (Code 200DSS) NA VSHIPYD AND IMF PUGET SOUND WA (Code 120, 200DSS) NA VSHIPYD NORFOLK VA (Code 200DSS) NA VSHIPYD PORTSTMOUTH NH (Code 200DSS, 205, 206) SUPSHIP GROTON CT (Code 200, 300) SUPS HIP NEWPORT NEWS VA (Code 200,300) AMERICAN BUREAU OF SHIPPING (R. Bleiberg, M. Samuelsson) DDL OMNI ENGINEERING LLC-ENGINEERING SERVICES DIV. (T. Kearney) ELECTRIC BOAT (320, EBCorp Data Bank)

HUNTINGTON INGALLS INDUSTRIES-NEWPORT NEWS SHIPBUILDING (003)

OCEANEERING INTERNATIONAL, INC.-MARINE SERVICES DIV. (J. Schmidt) OCEANWORKS INTERNATIONAL CORP. (D. Brown) PHOENIX INTERNATIONAL HOLDINGS, INC. (E. Peterson, L. Southerland, E. Henry) WOODS HOLE OCEANOGRAPHIC INSTITUTION (P. Hickey)

Enclosure (1)

Sample DSS TEMPMOD LOG

TEMPMOD

Number

Title DSS Asset/ Platform

Purpose Restrictions/ Limitations/ Comments

Date of Approval

Date of Installation

Required Removal Date

Enclosure (2)

Sample TEMPMOD Evaluation Sheet

Part A - Filled in By Originator with NAVSEA PM Concurrence TEMPMOD Number: TEMPMOD Title:

Instructions for Evaluation (From TEMPMOD Approval Letter):

<<Attributes for Determining Acceptability (from TEMPMOD Approval Letter>>

Part B - Filled in by Evaluator Yes No Comments

Were all tests satisfactorily performed?

Were all attributes satisfactorily met?

Did TEMPMOD demonstrate an improvement over similar existing equipment?

Did TEMPMOD provide added capability for the DSS?

Did the TEMPMOD experience any unexpected failures or degraded performance? If so, describe.

Should this TEMPMOD be converted to a permanent configuration?

Remarks

Evaluated by / Date Organization

To: NAVSEA Program Office Via: ISIC

TYCOM

cc: Planning Yard

Design Yard

Enclosure (3)

Guide for NAVSEA Approval Letter

Ser 399AXX/XXX <Date>

From: Commander, Naval Sea Systems Command

To: Applicable Type Commander Initiating Activity (if applicable)

Subj: APPROVAL OF DEEP SUBMERGENCE SYSTEM <TITLE OF TEMPMOD>;

TEMPORARY MODIFICATION NUMBER ######

Ref: (a) <applicable activity> ltr <Serial number of ltr> dtd DD MMM YY (NOTAL)

(b) <forwarding activity (if applicable) ltr <Serial number of ltr> dtd DD MMM YY

(c) NAVSEAINST 4720.23D

(d) <list any other applicable references>

Encl: (1) TEMPMOD Evaluation Sheet

1. Reference (a) forwarded reference (b) to NAVSEA for review and approval.

2. NAVSEA has reviewed reference (a), TEMPMOD Number######, <TEMPMOD Title>, and approves it for installation. {if minor corrective comments are required, they should be inserted here.} All of the requirements of reference (c), paragraph 6.c have been satisfied. This TEMPMOD shall be funded by <identify appropriate source of funding>, and the total amount to be expended for this TEMPMOD shall not exceed <authorized funding limit>. Equipment included in this TEMPMOD shall be provided by <activity providing TEMPMOD equipment>. <Activity responsible for Re-Entry Controls (REC)> shall be responsible for maintaining Re-Entry Control (REC) for work on all Scope-of-Certification components.

3. This TEMPMOD shall be removed no later than <# of months – 6 is default> months after installation, or during the next regularly scheduled overhaul, whichever occurs first. Written verification of the TEMPMOD installation and removal shall be forwarded to NAVSEA PMS <enter program office code> by the installation and removal activities. An evaluation of the performance and suitability of the temporary equipment shall be conducted and documented on the enclosed TEMPMOD Evaluation Sheet.

4. The NAVSEA point of contact for this item is <Program Office Point of Contact>, PMS <POC’s office code>, (202) 781-<POC’s phone number>.

Program Manager

Enclosure (3)

Subj: APPROVAL OF DEEP SUBMERGENCE SYSTEM <TITLE OF TEMPMOD>;

TEMPORARY MODIFICATION NUMBER ######

Copy to:

TYCOMs (if not already action addressees) SUPSHIP GROTON/NEWPORT NEWS (Code ###) (if applicable) DDS PY (Code ###) NAVSEA (Program Office Code) Initiating and Design Activity (if applicable)

Record Note: CONCUR with the technical approval of TEMPMOD-##-####, <TEMPMOD Title>, for a period not-to-exceed <#> months after installation.

Code Name Signature Date

File details come from the government source that posted it. Updated .