Attachment_1_and_2.pdf

PDF 78 KB Posted

Attached to
DDS Engineering Services and Maintenance Contract
Solicitation number
N00024-17-R-6405
Issued by

About this file

Attachment 1 Example of Type of Work and the associated Requirements and Notional Maintenance Schedule Attachment 2 Example of Key Personnel

View the file

Other files

File Type Posted
NAVSEA_INSTRUCTION_04720-23D.pdf PDF
NAVSEA_INSTRUCTION_4855_34B.pdf PDF
NAVSEA_NOTICE_5000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example of Type of Work and the associated Requirements and Notional Maintenance Schedule

Field Change Designs

Design Field Changes or temporary modifications for DDS and provide appropriate Field Change documentation (e.g., Field Change records, Field Change installation drawings, logistics changes including recommended spare parts list, Provisioning Technical Documentation (PTD), a mass properties data report associated with the change, and interim supply support plans, as well as an order of magnitude estimate and period of performances for proposed DDS alterations). A Logistics Management Information Summary shall be prepared when tasked by Technical Instruction (TI) for development of Field Change proposals. Engineering drawings requiring modifications shall be developed on computer-aided design equipment (note that DDS drawings that have been converted to AutoCAD format shall be digitally transferred to the DDS Planning Yard (PY) for configuration control/sustainment). The certification requirements of NAVSEA SS800-AG-MAN-010/P-9290, Rev. A, Change 2, "System Certification Procedures and Criteria Manual for Deep Submergence Systems" shall be met.

The maintainer shall be capable of providing new technical manuals, technical manual changes and/or technical manual revisions to document Field Change related system changes for DDS along with recommended spare parts list, Provisioning Technical Data (PTD); interim spares;

and/or new or revised DDS Preventive maintenance System (PMS) pages as directed by the Technical Instruction, to support DDS Field Change tasks. As a minimum, all Phase 1 Field Change technical data packages must meet the requirements of NAVSEAINST 4720.23B (available upon request) and the Dry Deck Shelter Program Manual (included as a reference to this RFI).

All proposed designs will be supported by data and analysis results that demonstrate the design will meet parameters such as, but not limited to: occupant safety; structural adequacy; off-gassing of non-metallic material; system and/or component operability; human factors considerations, especially with regards to diver operations under limited light and building sea states; impact of the Field Change's weight and displacement to each DDS and its impact to the different DDS host submarine (HOSUB) Classes; and Field Change reliability, availability and maintainability requirements. The Field Change design shall include a Failure Mode, Effects and Criticality Analysis for each Field Change. If required and tasked, the maintainer (Field Change Developer) shall develop Field Changes or an applicable configuration change for DDS ancillary program hardware including, but not limited to, each DDS transporter, Little Creek and Pearl City Training Facilities, Training Closure and Hatch Assemblies (TC&HA) and any resulting interfacing support submarine configuration changes. New or modified software developed for a Field Change shall be engineered in accordance with the Contractor's approved Software Development Plan (SDP).

Field Change Production/Kitting/Installation and Test The maintainer will provide technical support including engineers, mechanics and/or technicians, and/or other experienced personnel to the operational site of the assigned DDS during installation, along with any testing and/or production hardware, as well as to investigate and resolve technical problems, material casualties and malfunctions.

The maintainer will provide the necessary labor and facilities required to fabricate, assemble, and test Field Change Kits. Kitting shall be accomplished to facilitate the shipment and installation

Attachment 1 through clear/proper marking and packaging. Kitting shall consider the order of need of an item during Field Change installation, as well as receipt inspection, and special storage and handling requirements. The maintainer will provide the necessary services for installation, along with support for post installation acceptance testing of the Field Change. A mass properties data report will be submitted for each Field Change installed.

The maintainer will be responsible for submitting a deviation for any departure or non-compliance with the DDS specification requirements in accordance with the Dry Deck Shelter Program Manual. The maintainer will also be responsible for submitting a Liaison Action Request (LAR) to the DDS Planning Yard when direction or a clarification regarding specifications or requirements or a course of action is required in accordance with the Joint Fleet Maintenance Manual (JFMM), COMUSFLTFORCOMINST 4790.3. The maintainer will be responsible to coordinate with the fleet activity for 'hotel support services' for the installation including the development of any Memorandum of Agreements.

DDS ROH Planning and Advance Material Procurement Support The maintainer will provide planning support to include attendance at ROH planning conferences, reviewing/assessing availability start dates, desired completion dates, and changes to the baseline work package. The maintainer will provide recommendations on best approaches to complete the ROH and acceptably return the DDS and the associated Training Closure & Hatch Assembly (TC&HA) to full operational condition, within cost and schedule objectives.

The maintainer will prepare necessary cost proposals in a timely fashion to support authorization and implementation of work changes.

DDS Regular Overhaul (ROH) The maintainer will conduct the assigned DDS ROH per the Baseline Overhaul Work Package (OWP). The DDS ROH entails, but is not limited to: restoring or replacing the Hangar Inner Door (HID) based on inspections; the disassembling, refurbishment and re-installation of all other DDS watertight doors; the rip-out, refurbishment and re-installation of all electrical components and wiring; and the rip-out, refurbishment and reinstallation of all piping and associated components from all systems. If the HID restoration requires removal and replacement with an available Ready For Issue (RFI) asset from the rotatable pool, the removed HID will be fully restored to include correction of corroded buttress threads, worn pinion bearings and worn quad gear bearings, worn Locking Ring, and seating inspections prior to its return to the rotatable pool. The Contractor shall prepare a project plan detailing the work plan, sequence, schedule and resources for conduct of the ROH at the Contractor’s facility.

The maintainer will blast, sand or remove paint and re-preserve all metallic and non-metallic surfaces such as the: DDS pressure hull and frames; fairing support structure and the composite fairings; fixed and portable track and cradle system; DDS support equipment such as the transporter; and TC&HA that the DDS rests on. In addition the maintainer will conduct Non- Destructive Testing (NDT) inspections and repair or replacement in accordance with DDS Hull Integrity Procedures (HIPs). Inspection and repair of DDS support equipment such as the transporter and its mechanical systems are also part of an ROH effort. The procedures to be followed for the inspection, repair or replacement of components or systems are contained in the NAVSEA Approved DDS Technical Manuals, Test Procedures, HIPs and/or PMS.

The maintainer will submit a deviation for any departure or non-compliance to the DDS specification requirements in accordance with the Dry Deck Shelter Program Manual. The maintainer will submit a Liaison Action Request (LAR) to the DDS Planning Yard when direction or a clarification regarding specifications or requirements or a course of action is required in accordance with the JFMM.

RAV/TAV

RAV and TAV start dates shall be subject to revision as addressed in the RAV and TAV planning support effort. The RAV work effort as clarified by the Technical Instruction typically may entail but is not limited to:

(a) Corrections of fleet identified hardware issues

(b) Conduct of visual inspection of the composite fairings and fairing support structure, repair or replace deficient hardware as necessary

(c) As required by HIP periodicity, perform a Non Destructive Test (NDT) inspection of DDS pressure hull welds

(d) Clean and inspect or replace zinc anodes

(e) Clean and inspect and groom as necessary the Hangar Outer Door

(f) Clean and inspect and groom as necessary Hangar Inner and Hyperbaric Chamber Watertight Doors

(g) Inspect and calibrate all DDS Gauges

(h) Conduct an 89 psi tightness test of each DDS Compartment

(i) Inspect and repair any discrepancies associated with DDS Electrical Hull Fittings (EHFs)

(j) Measure insulation resistance of DDS Power Panel Junction Boxes

(k) Test lighting distribution and fixtures

(l) Inspect and test diver recall system

(m) Inspect and test DDS communications and alarm systems

(n) Inspect and test DDS camera system

(o) Clean, inspect and groom as necessary valve manual remote operators

(p) Clean, inspect and groom as necessary hangar and transfer trunk and flood valves

(q) Clean, inspect and groom as necessary all other system valves greater than 1 inch Iron Pipe Size (IPS)

(r) Clean, inspect, groom as necessary and conduct a tightness test of all piping and components in the air system

(s) Clean and inspect air silencers

(t) Recertify oxygen flask (if due)

(u) Clean, inspect, groom as necessary and test all piping and components in the oxygen system

(v) Clean, inspect and groom as necessary the C02 Scrubber

(w) Recertify the nitrogen flask (if due)

(x) Clean, inspect, groom as necessary and test all piping and components in the nitrogen system

(y) Clean, inspect, repair and/or groom as necessary the DDS hydraulic power plant system including the pump, motor and accumulator

(z) Clean, inspect, groom as necessary and test all piping and components (including relief valves) in the hydraulic system

(aa) Clean, inspect, repair and/or groom as necessary the track and cradle system

(bb) Clean (e.g., hydro blast) and re-preserve the DDS

(cc) Perform PMS

(dd) Repair deficiencies contained in the Consolidated Ship's Maintenance Plan

The maintainer will prepare a project plan detailing the work plan, sequence, schedule and resources for conduct of the RAV/TAV.

The maintainer will submit a deviation for any departure or non-compliance with the DDS specification requirements in accordance with the Dry Deck Shelter Program Manual. The maintainer will submit a LAR to the DDS Planning Yard when direction or a clarification regarding specifications or requirements or a course of action is required in accordance with the

JFMM.

Other Maintenance Services The Contractor shall conduct other maintenance of DDS units, transporters, trainers and support equipment and other related items as tasked under Technical Instruction.

Example of Type of Work and the associated Requirements and Notional Maintenance Schedule

Notional Maintenance and Availability Schedule:

The expected period of performance for this maintenance and services contract is estimated to start from mid-2018 through mid-2023.

Color Key

7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

CY 19 CY 21 CY 22 CY 23

EAST COAST

DDS-01S RAV

(ROH due Mar 2019)

DDS-03P RAV RAV

(ROH due Feb 2026)

DDS-05S RAV 159, 166 RAV RAV

(ROH due Feb 2018)

WEST COAST

DDS-02P RAV, 159 RAV RAV

(ROH due Aug 2025) DDS-04S Dual DDS on Host RAV RAV RAV (ROH due Mar 2018))

DDS-06P RAV RAV ROH

(ROH due Dec 2022)

CY 20

Examples of Key Personnel

Attachment 2

The maintainer will describe its personnel capabilities as well as its ability and approach to hiring and maintaining sufficient and proficient staff to conduct the work identified in Attachment 1.

The maintainer will be expected to provide evidence to support the ability to meet the following key personnel and lead personnel listed below. Individuals that support multiple roles shall reflect the expected time for each work area proposed.

(a) Overall Program Management/Key Personnel:

(1) Program Manager (Key Personnel)

(2) Chief Engineer (Key Personnel)

(3) Waterfront Engineering Manager (Key Personnel)

(4) Production Manager (Key Personnel)

(5) Test Director (Key Personnel)

(6) Quality/Certification Director (Key Personnel)

Each Key Personnel will be expected to have a minimum of 10 years of experience in their respective field demonstrating specific capability, knowledge, and relevant experience of similar scope and complexity for assigned functions. In addition to the above, the Program Manager shall have an additional 5 years of experience in contract program management.

(b) Leads for Field Changes:

(1) Field Change lead

(2) Design lead

(3) Hull/structural lead

(4) Piping/fluids lead

(5) Diver support/atmospheric control lead

(6) Electrical/electronic lead

(7) Production lead

(8) Quality/Certification specialty lead

(9) Test lead

(10) Tiger team/installation team lead

(c) Leads for ROHs:

(1) ROH management lead

(2) Production lead

(3) Quality/Certification specialty lead

(4) Test lead

(5) Production lead

(d) RAV/TAV:

(1) RAV/TAV management lead

(2) Production lead

(3) Engineering liaison/support lead

(4) Test lead

(5) Quality/Certification specialty lead

(e) Rotatable Pool:

(1) Rotatable pool lead

(f) Emergent/Emergency Repairs:

(1) Engineering Lead

(2) Production Lead

All lead personnel must have a minimum of 5 years of experience in their respective field demonstrating specific capability, knowledge, and relevant experience for contract(s) of similar scope and complexity.