Attachment_2.pdf

PDF 17 KB Posted

Attached to
Torpedo Intermediate Maintenance Activity for Pearl Harbor, HI and Yorktown, VA
Solicitation number
N00024-16-R-6405
Issued by

About this file

Attachment 2 NAVSUBTORPFAC Yorktown

View the file

Other files

File Type Posted
Attachment_1.pdf PDF
Attachment_3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2: NAVSUBTORPFAC Yorktown

The mandatory HWT I-Level and PDLR Level Maintenance and associated integral and ancillary support requirements (approximately 54,300 hours level of effort per annum) are as follows:

Operational Requirement Detailed Description

1. Guidance & Control Section I-Level Maintenance

1. Describe experience with Heavyweight Torpedo Guidance & Control (G&C) section maintenance

2. Quality Assurance functions 2. Describe experience with and understanding of the roles and responsibilities of:

a. Quality Assurance Inspector

b. Quality Assurance Supply Inspector

c. Final Acceptance Inspector

3. Progressive Depot Level Repair (PDLR) (providing limited depot level repair capability in an Intermediate Maintenance Activity location)

3. Describe experience related to:

a. Electronic, mechanical, and electro-mechanical Depot level repair of torpedo components

b. Drafting and Maintaining PDLR Work Instructions (WI’s), including procedure development, certification and introduction in cooperation with the In Service Engineering Agent (ISEA)

Speed Control Valve Repair and Testing

4. Test Equipment Maintenance (preventive and corrective maintenance to GFE test equipment)

4. Describe experience in conducting all required periodic/corrective maintenance and calibration on all In-Service Support Equipment (ISSE) and Depot Factory Test Equipment (DFTE) authorized for use at the IMA, including calibration and self-test.

5. Test Equipment modification 5. Describe experience with implementing upgrades to GFE Test Equipment including:

a. Ordnance Alterations, (ORDALTs)

b. Retrofit Installation Drawing (RIDs)

c. Production Screens (PSs) Retrofit Screens (RSs)

6. Test Equipment Fault Isolation

6. Describe experience performing fault isolation between the torpedo and test equipment, including ability for Test Equipment Maintenance technicians to train torpedo technicians on troubleshooting fault logic diagrams and schematic diagrams.

7. Automated Process Control System (APCS)

7. Describe experience with:

a. User training for the APCS system

b. Maintenance, troubleshooting and local repair of APCS support equipment

8. Supply 8. Describe experience with:

a. Material requisitioning

b. Data analysis

c. PDLR logistic support

File details come from the government source that posted it. Updated .