J-1_PH_EDSRA_Specification_Work_Package.pdf
PDF 13 MB Posted
- Attached to
- USS PAUL HAMILTON (DDG 60) EDSRA
- Solicitation number
- N00024-16-R-4400
About this file
Attachment J-1 USS PAUL HAMILTON EDSRA Specification Package No. TPPC-DDG60-SSSD16-CN01
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER:
SHIP CHARACTERISTICS
FEET INCHESLENGTH OVERALL
FEET INCHESMAX. BEAM AT DESIGN WATERLINE
FEET INCHESEXTREME BEAM INCLUDING APPENDAGES
FEET INCHESDRAFT (MAX. NAVIGABLE) (FWD.)
FEET INCHESDRAFT (MAX. NAVIGABLE) (AFT.)
LONG TONLIGHT DISPLACEMENT
LONG TONFULL LOAD DISPLACEMENT
INCHESFEETHEIGHT OF MAST ABOVE DESIGN WATERLINE
INCLUDES ALL CHANGES THROUGH 12/15/2015
INDEX
SHIP: USS PAUL HAMILTON (DDG 60) TPPC-DDG60-SSSD16-CN01
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 07/18/2014
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014
009-03 Toxic and Hazardous Substances; control 07/18/2014
009-04 Quality Management System; provide 07/18/2014
009-05 Temporary Accesses; provide 07/18/2014
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
07/18/2014
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/18/2014
009-08 Fire Protection at Contractor's Facility; accomplish 07/18/2014
009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014
009-18 Magnetic Material; control 07/18/2014
009-19 Provisioning Technical Documentation (PTD); provide 07/18/2014
009-20 Government Property; control 07/18/2014
009-21 Logistics and Technical Data; provide 07/18/2014
009-23 Interferences; remove and install 07/18/2014
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 07/18/2014
009-28 Fire Prevention Requirements; accomplish 06/10/2014
009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
07/18/2014
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide
07/19/2007
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish
07/18/2014
009-59 Organotin Antifouling Material; control 07/29/2011
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
07/18/2014
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014
009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011
009-67 Integrated Total Ship Testing; manage 07/18/2014
009-69 Heavy Weather/Mooring Plan; provide 07/18/2014
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
07/18/2014
009-72 Physical Security at Private Contractor's Facility; accomplish 07/18/2014
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 07/18/2014
009-74 Occupational, Safety and Health Requirements; accomplish 07/18/2014
009-77 Cofferdam Requirements; accomplish 07/18/2014
009-79 Government Owned Material (GOM); status reporting 07/18/2014
Page 1 of 14 EXECUTING WORK
ITEM_NO. TITLE DATE
009-80 Ship's Facilities; provide 07/18/2014
009-81 Compartment Closeout; accomplish 07/18/2014
009-82 Data Requirements When Installing an Equal Component Vice Specified Component;
provide
07/29/2011
009-83 Wire Rope Fitting Verfication; provide 01/17/2013
009-84 Accountability of Temporary Fasteners; provide 07/18/2014
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish
08/01/2008
009-87 Chemical disinfection Procedures; accomplish 07/18/2014
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
07/18/2014
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;
accomplish
07/29/2011
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
07/18/2014
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
01/17/2013
009-99 Ship Departure Report; provide 07/18/2014
009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/18/2014
009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 07/18/2014
009-102 Alteration Verification; provide 07/29/2011
009-103 Weight and Moment Change Data; provide 07/18/2014
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014
009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish
07/18/2014
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;
accomplish
07/18/2014
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/18/2014
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
07/18/2014
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/18/2014
009-118 CG Deck Loading; accomplish 07/18/2014
009-120 Fact Finding and Critique of Unplanned Events; manage 07/18/2014
009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014
Page 2 of 14 EXECUTING WORK
DATETITLEITEM NO.
CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
009-09 Process Control Procedure (PCP); provide and accomplish 07/18/2014
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
09/01/2015
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
07/18/2014
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
07/18/2014
009-13 Meters; repair and certify calibration 07/18/2014
009-14 Gages, Switches, and Thermometers; repair and certify calibration
07/18/2014
009-15 Rotating Machinery; balance 01/17/2013
009-16 Electronic Equipment; repair 07/29/2011
009-17 Rotating Electrical Equipment; repair 07/18/2014
009-22 Shipboard Electric Cable; test 07/18/2014
009-25 Structural Boundary Test; accomplish 07/18/2014
009-26 Deck Covering Requirements; accomplish 07/18/2014
009-32 Cleaning and Painting Requirements; accomplish 07/10/2015
009-32 Cleaning and Painting Requirements; accomplish 11/07/2013
009-36 Controller; repair 07/18/2014
009-43 Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide
07/18/2014
009-55 Regulating/Reducing Valve; repair 07/30/2010
009-57 Reduction Gear Security Requirements; accomplish 07/18/2014
009-58 Pump and Driver Shaft Alignment; accomplish 07/18/2014
009-58 Pump and Driver Shaft Alignment; accomplish 09/01/2015
009-63 Lubricating Oils and Hydraulic Fluids; analyze 07/18/2014
009-71 Testing Requirements for Piping Systems; accomplish 07/18/2014
009-71 Testing Requirements for Piping Systems; accomplish 07/10/2015
009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish
07/29/2011
009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish
11/07/2013
009-90 Technical Representative; provide 07/18/2014
009-92 Resilient Mount; remove and install 07/18/2014
009-98 Monel Fasteners; inspect 07/18/2014
009-104 Vibration Testing and Analysis; accomplish 07/18/2014
009-107 Piping System Cleanliness (Non-Nuclear); accomplish 07/18/2014
Page 3 of 14 EXECUTING WORK
009-113 Rotating Electrical Equipment with Sealed Insulation Systems (SIS); rewind
07/18/2014
Page 4 of 14 EXECUTING WORK
ITEM NO. TITLE
Work Package Execution Review; accomplish042-11-001
Accountability of Manhour and Material Reservation; accomplish042-27-001
Hazardous Waste Produced on Naval Vessels; control077-01-001
Underwater Hull; inspect110-11-001
Bulkhead and Overhead Plating; repair110-21-001
Machinery Space Bilge Drain Well; repair113-11-001
Sonar Passage Drain Well; replace113-11-002
Sonar Cooling Equipment Room Sump; repair113-11-004
Machinery Room Structural Repair; accomplish120-11-001
Main Engine Room No. One Structural Repair; accomplish120-11-002
Auxiliary Machinery Room Number One and 2 Structural Repair;
accomplish
120-11-003
Fuel Oil Tanks, Group 3 and 4; inspect and preserve123-11-001
Fuel Service Tank; repair123-11-003
Contaminated Oil Tank; repair and preserve123-17-001
AER 84650D, Escape Trunk Manhole and Cover; install123-80-001
Flight Deck Tiedown Fitting; replace130-11-001
AER 83007D, Increase Deck Plate Thickness Modifications(Partial);
accomplish
130-80-001
Bulkhead and Scupper; repair and preserve150-11-001
Bridge Wing Repair; accomplish150-11-002
SLQ-32 Antenna Platform and Step Platform; preserve and replace150-11-003
04 Level Deck; repair and preserve150-11-004
Deck Edge Waterway Bar; replace150-11-005
03 Level Structural Repair; accomplish150-11-006
02 Level Bulkhead and SRBOC Deck; repair150-11-007
02 and 03 Level Structural Repair; accomplish150-11-008
05 Level Deck; repair150-11-009
Main Deck Bulkhead; repair150-11-010
CIWS Weapon Group Mount 21 Deck; repair150-11-011
CIWS Weapon Group Mount 22 Deck; repair150-11-012
Page 5 of 14 EXECUTING WORK
06 Level Director Maintenance Deck; repair150-11-013
05 Level Structural; repair150-11-014
Weather Deck Corrosion Repairs; Accomplish150-11-015
Harpoon Stowage Foundation; replace150-11-017
Flight Deck; repair150-11-018
01 Level Superstructure; repair150-11-019
01 Level Bulkhead; repair150-11-020
Passage Structural; repair150-11-021
ShipAlt DDG51-64156D, Harpoon Blast Pad Corrosion Modification;
accomplish (Option Item)
150-80-001
03 Level Deck; repair154-11-001
03 Level Deck; repair154-11-002
Forward Stack; repair and preserve162-11-001
Aft Stack; repair and preserve162-11-002
Sea Chest; inspect163-11-001
Waster Sleeve; replace163-11-002
Sonar Dome Rubber Window (SDRW); inspect and repair165-11-001
Lower Sonar Dome Access Scuttle; repair165-11-002
Upper Sonar Dome Access Scuttle; repair165-11-003
ShipAlt DDG51-83678D, Sonar Dome Air Flow Meter Replacement;
accomplish
165-80-001
Bolted Equipment Removal Plate (BERP) Repair; accomplish167-11-001
Watertight Scuttle; replace167-11-002
Hatch and Scuttle; repair167-11-003
Bolted Equipment Removal Plate (BERP) Repair (Option Item);
accomplish
167-11-004
Bolted Equipment Removal Plate (BERP) Repair (Option Item);
accomplish
167-11-005
No. 2A GTM Bolted Equipment Removal Plate (BERP) Repair;
accomplish (OPTION ITEM)
167-11-006
No. 2B GTM Bolted Equipment Removal Plate (BERP) Repair;
accomplish (OPTION ITEM)
167-11-007
Watertight Scuttle and Hatch; replace167-11-008
Watertight Scuttle; repair167-11-009
No. 1A GTM Bolted Equipment Removal Plate (BERP) Repair;
accomplish (OPTION ITEM)
167-11-010
ShipAlt DDG51-77228D (Partial), Watertight Door; replace167-80-004
Page 6 of 14 EXECUTING WORK
Cargo Door; replace168-11-001
Structural Door Assembly; replace168-11-002
Remove and Overhaul the Actuator; accomplish168-12-001
ShipAlt DDG51-64233, Improved Fan Room Access Modification;
accomplish
168-80-001
ShipAlt DDG51-78049D, Install Bridge Wing Void Manholes; accomplish168-80-002
Main Reduction Gear No. 2 Input Shaft Seal; replace241-11-001
Stern Tube Shaft Seal; overhaul243-11-001
Propulsion Shafting; inspect, repair and align243-11-002
ShipAlt DDG51-73395D, Bulkhead Shaft Seal Upgrade Modification;
accomplish
243-80-001
Outboard Propulsion Shafting, Bearing Clearance Measurement;
accomplish
244-12-001
Controllable Pitch Propeller (CPP) Blade; inspect and repair245-11-001
Controllable Pitch Propeller (CPP) Oil Sump Tank Heater Element;
inspect and clean
245-11-002
Controllable Pitch Propeller (CPP) Oil Distribution Box; replace245-12-001
Controllable Pitch Propeller (CPP) System, Propeller Hub; replace245-12-002
Controllable Pitch Propeller (CPP) Prairie Air Tube, and Valve Rod Assembly; repair and test
245-12-003
Moisture Separator Assembly Mounting Flange; repair251-11-001
Air Intake and Exhaust Louver and Screen; remove, crate and install251-31-001
Ship Service Gas Turbine Generator (SSGTG) Number One Generator Intake; repair and preserve
251-31-002
Forward Intake Repair; accomplish251-31-004
Forward Intake/Uptake Engine Room Number One Repair; accomplish251-31-005
Forward Intake (Clean Side) Repair; accomplish251-31-006
SSGTG No. 3 Generator Exhaust Trunk; repair and preserve251-31-007
Forward Mixing Room Repair; accomplish251-31-008
Ships Service Gas Turbine Generator (SSGTG) Number One Intake;
repair
251-31-009
Ships Service Gas Turbine Generator (SSGTG) Intake Trunk; preserve251-31-011
Intake/Uptake Engine Room No. 2; repair251-31-012
Ships Service Gas Turbine Generator No. 3 (SSGTG) Intake Trunk; repair251-32-001
Ship Service Gas Turbine Generator (SSGTG) Number 2 Intake (Dirty Side); repair
251-32-002
Engine Room No. 2B Intake; repair251-32-003
Engine Room No. 2A Intake; repair251-32-004
Page 7 of 14 EXECUTING WORK
Seawater Service Piping; replace256-11-001
Ship Service Gas Turbine Generator (SSGTG) Lube Oil Cooler Sea Water Piping; repair
256-11-002
Seawater Air Cooler Piping; replace256-61-001
ShipAlt DDG51-64250D Ship Service Gas Turbine Generator (SSGTG) Emergency Seawater Cooling System Modification; accomplish
256-80-001
Gas Turbine (GTRB) Exhaust Duct Collector; repair259-11-001
SSGTG Exhaust Trunk No. One and No 2; repair and preserve259-11-002
Forward Gas Turbine Exhaust Duct Lagging and Insulation; replace259-11-003
Uptake, Manhole Cover; replace259-11-004
Aft Gas Turbine Exhaust Duct Lagging and Insulation; replace259-11-005
Number 3 Ship Service Gas Turbine Generator (SSGTG) Exhaust Anchor Flange; repair / replace
259-11-006
Gas Turbine Module 1A Exhaust Gasket and Lagging; replace259-11-007
Uptake Engine Room Exhaust Flange Fasteners and Anchor Flange;
replace / repair
259-11-009
No. 2A Propulsion Gas Turbine Exhaust Duct Internal Insulation Sheathing Tabs; replace
259-11-010
Ship Service Gas Turbine Generator (SSGTG) Uptake Trunk No. One and No. 2; repair and preserve
259-11-011
2B Gas Turbine Module (GTM) Duct Lagging; replace259-11-012
No. 2 Ship Service Generator Gas Turbine Exhaust Duct; repair259-11-013
No.2 Ship Service Gas Turbine Generator (SSGTG) Exhaust Flange;
repair
259-11-014
Uptake Deck; repair and preserve259-11-015
ShipAlt DDG51-76087D, Gas Turbine (GTRB) and Ship Service Gas Turbine Generator (SSGTG) Boundary Layer Infrared Suppression System (BLISS) Cap Modification; accomplish
259-80-001
Fuel Riser Mounting Bracket; replace261-11-001
Number One Main Reduction Gear (MRG) Lube Oil Cooler; repair262-11-001
Lube Oil Temperature Regulating Valve; repair262-11-002
Number 2 Main Reduction Gear (MRG) Lube Oil Cooler; repair262-12-001
Lube Oil Settling Tank Heater Element; inspect and clean262-21-001
Lube Oil Settling Tank Heater Element; inspect and clean262-22-001
Electric Driven Lube Oil Pump; repair262-41-001
ShipAlt DDG51-76253K, Install Lube Oil Coalescing Filter; accomplish262-90-001
Number One Lube Oil Purifier Heater Shell; replace264-11-001
ShipAlt DDG-51-85973K, Lube Oil Purifier Heat Exchanger Modifications;
accomplish
264-90-001
Page 8 of 14 EXECUTING WORK
ShipAlt DDG51-64208D, SSGTG Emergency Cooling Water Activation Modification; accomplish
310-80-001
Electrical Receptacle Replacement; accomplish321-11-001
01 Level Weatherdeck Electrical Equipment, Electromagnetic Pulse (EMP) Conduit, Stuffing Tubes and Method Mount Foundations; replace
321-11-003
Weatherdeck Electrical Equipment, Electromagnetic Pulse (EMP) Conduit and Stuffing Tube; replace
321-11-004
01 Level Weatherdeck Lighting and Bulkhead; repair321-11-005
Stuffing Tube, Conduit and Dimmer Switch Replacement; accomplish321-11-006
Flight Deck Electrical Equipment; replace321-11-007
Running Lights Telltale Panel; replace324-11-001
ShipAlt DDG51-77427K, DDGM Digital Indicators Installation: accomplish411-90-001
ShipAlt DDG51-73088K, Gigabit Ethernet Data Multiplex System (GEDMS) Upgrade; accomplish
431-90-001
ShipAlt DDG-51-83419D, Removal Halocarbon Monitoring System;
accomplish
436-80-001
ShipAlt DDG51-77829K, Installation of Radar and Time Domain Reflectrometer (TDR), Tank Level Indicator (TLI) for Diesel Fuel Marine (DFM), JP-5 and Potable Water Tanks; accomplish
437-90-001
ShipAlt DDG51-77269K, Installation of Redundant Tank Level Indicators (TLI) on Generator Head Tanks; accomplish
437-90-002
ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Single Central Control Station (CCS) Watchstander; accomplish
438-90-001
ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish
438-90-002
ShipAlt DDG51-80612K, Backfit ICAS Installation (ICAS); accomplish438-90-003
ShipAlt DDG51-80897K, Navy Multiband Terminal (NMT) AN/WSC-9(V)2 Q/KA/X/GBS Installation; accomplish
441-90-001
ShipAlt DDG-51-01100K, NTWK Build, PEOC4I INC 1, Consolidated Afloat Network and Enterprise Services (CANES), PEOC4I ADNS AN/USQ-144K(V)2 W/SP 1/2 and PEOC4I Naval Modular Automated Communications System (NAVMACS) Tech Refresh; accomplish
441-90-002
ShipAlt DDG51-74283K, AEGIS Ballistic Missile Defense (BMD) 4.0 Installation; accomplish (OPTION ITEM)
450-90-002
ShipAlt DDG51-79322K, AEGIS Ballistic Missile Defense (BMD) 4.0.1 Installation; accomplish (OPTION ITEM)
450-90-003
ShipAlt DDG51-74012K, BMD VLS Magazine Ventilation Upgrade;
accomplish (OPTION ITEM)
450-90-004
OrdAlt 75920 and AER 66030, Electronic Equipment Water Cooler A-Style Bonnet and Titanium Tube Bundle Installation; accomplish
456-90-001
ShipAlt DDG51-84530K, AWS: Peripherals Upgrade to SPRS Installation;
accomplish (OPTION ITEM)
456-90-002
SCD 85218K, AN/SQQ-89A(V)15 Tech Refresh with TI-12 Plus Hardware; accomplish
468-90-001
ShipAlt DDG51-86644 K USW-DSS AN/UYQ-100(V)3 to AN/SQQ-89(V)15 Interface; install
468-90-002
OrdAlt-80831 Guided Missile Director AS-3444/SPG-62, Passive Countermeasures System (PCMS) Material; install
472-90-001
Silicon Aluminum Bronze (SAB) Union Fittings; inspect and replace505-11-001
Page 9 of 14 EXECUTING WORK
Collective Protection System (CPS) Clean Side Access Plate; remove512-11-001
Supply Ventilation; replace512-11-004
Ventilation Ducting; replace512-11-005
Vaneaxial Fan; repair512-11-006
Ventilation Diffuser; install512-11-007
Cooling Coil Condensate Drain Piping; install512-11-008
ShipAlt DDG51-77419K, Textile Duct Installation; accomplish512-90-001
Chilled Water Piping Bulkhead Penetration; replace514-11-001
Air Conditioning Plant Resilient Mount; replace514-24-001
ShipAlt DDG51-76721, TOTS Valve Installation; accomplish514-80-001
ShipAlt DDG51-76648K, Refrigeration Plant Overboard Pressure Relieving Modification; accomplish
516-90-001
Sea Valve; repair and replace520-11-001
Firemain Valve and Piping; replace521-11-002
Number 5 Fire Pump Class B Overhaul; accomplish521-21-001
ShipAlt DDG51-73738, Installation of Additional Bulkhead Cutout Valves;
accomplish
521-80-001
ShipAlt DDG51-75829D, Firemain Regulator Strainer, Cord Piping and Structural Modifications; accomplish
521-80-002
ShipAlt DDG51-82474D, Relocation of CIWS, Torpedo and DLS Magazine Gauges (Partial); accomplish
522-80-001
Fan Room Deck Drain; replace526-11-001
Deck Drain; replace526-11-002
Deck Drain; replace528-11-001
Deck Drain Piping; replace528-11-002
Plumbing Valve Remote Operator Deck Box Cover; replace528-11-003
Deck Drain Piping; replace528-11-004
Main Eductor Overboard Discharge Valve Teleflex Cable; replace529-11-001
Electronic Cooling Water (ECW) Flow Switch; replace532-11-001
Machinery Space Structural Repairs and Preservation; accomplish533-11-001
ShipAlt DDG51-70403K, Digital Fuel Control System Installation;
accomplish
541-90-001
ShipAlt DDG51-76034K, Modify JP-5 Piping to Allow Emergency JP-5 Supply to Number 3 Gas Turbine Generator Head Tank and ML;
accomplish
542-90-001
Anti-Icing Hanger and Bellow; replace551-11-001
Number One High Pressure Air Compressor (HPAC) Class B Overhaul;
accomplish
551-51-001
Page 10 of 14 EXECUTING WORK
Number 2 High Pressure Air Compressor (HPAC) Class B Overhaul;
accomplish
551-52-001
ShipAlt DDG51-64209D, Anti-Icing Piping Hot Hanger Modifications (Partial); accomplish
551-80-001
Halon Actuator Tubing Assembly; replace555-31-001
Steering Gear Hydraulic Power Unit (HPU) Number 1A Axial Piston Pump Class B Overhaul; accomplish (Option Item)
561-11-001
Rudder Stock Bearing; inspect562-11-001
Rudder Bearing Seal and Rudderstock Seal; repair562-11-002
Anchor and Anchor Chain Inspection and Preservation; accomplish581-11-001
Boat Handling and Stowage System; repair583-11-001
Vacuum, Collection, Holding and Transfer (VCHT) Piping System;
chemical cleaning
593-11-001
Plumbing Drain Tank; preserve593-11-002
Vacuum, Collection, Holding and Transfer (VCHT) System Piping, replace593-11-003
ShipAlt DDG51-73622, Installation of H2S Detectors in VCHT Rooms;
accomplish
593-90-001
Portable J-Bar Davit; replace611-11-001
Reversible Deck Socket and Bolt; repair and replace612-11-001
ShipAlt DDG51-64223D, CIWS Grating and Corrosion Modifications;
accomplish
622-80-001
Inclined Ladder Grating Platform; replace623-11-001
ShipAlt DDG51-64213D, Vertical Ladder Corrosion Modification (Partial);
accomplish
623-80-001
Balanced Joiner Door; remove, store, repair and install624-11-001
VCHT Room No. 2 Bilge; inspect and preserve631-11-001
Generator Room Bilge; repair and preserve631-11-003
Collective Protection System (CPS) Zone 2 Fan Room; repair631-11-004
Fan Room; repair and preserve631-11-005
Vacuum Collection Holding Tank (VCHT) Room Bilge; preserve631-11-006
Fan Room; preserve631-11-009
Chain Locker; inspect and repair631-13-001
Mast Preservation; accomplish631-21-001
Antenna Platform Structure and Plating; inspect and preserve631-21-003
Underwater Hull; preserve631-31-001
Freeboard Preservation; accomplish631-41-001
Impressed Current Cathodic Protection (ICCP) System; inspect and repair
633-11-001
Page 11 of 14 EXECUTING WORK
Scullery Deck Covering; replace634-11-002
Flight Deck Nonskid; replace634-21-001
Sonar Dome Hull Damping; preserve and replace636-11-001
ShipAlt DDG51-86249D, Removal of Overhead Sheathing in Battle Dressing Stations; accomplish
637-80-001
ShipAlt DDG51-64194D, Composite Radar Cross Section (RCS) Plating Installation; accomplish
639-80-001
Berthing Habitability Projects (BENL-S4329) Installation; accomplish643-11-001
Crew Messroom Renovation; accomplish643-11-003
Sanitary Space Habitability Project (HENL-S4330) Installation;
accomplish
644-11-002
ShipAlt DDG51-71605K, DDG Mod Advance Galley Inst; accomplish651-90-001
Vertical Launch System (VLS) Flush; accomplish721-31-001
Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch;
preserve
721-31-002
MK 41 Vertical Launching System (VLS) Uptake Hatch; replace721-31-003
Vertical Launching System (VLS) Cell Hatch; replace721-31-004
Torpedo Handling Transfer Station Chock Plate and Protective Screw;
replace
752-11-001
AEGIS Light-Off (ALO) Compartment Release Schedule; provide813-11-001
Production Planning and Estimating, On-Site Planning and Support Services (NAVSEA); provide
813-11-002
Production Planning and Estimating, On-Site Planning and Support Services (TYCOM); provide
813-11-003
Compartment Closeout Schedule; provide813-11-004
Antenna Photographs; provide837-11-001
Personnel Berthing Barge Support; provide857-11-001
TYCOM and SWRMC Office Space; provide980-11-001
Industrial Support Services, Hygienist; provide980-11-002
Light-Off Discrepancy Correction Assistance; provide980-11-003
Local Area Network (GIG-E LAN) Support Service; provide980-11-004
ShipAlts 70403K, 71604K, 71615K, 71726K, 73088K and 77829K Naval Surface Warfare Center (NSWC-CD) SSES Alteration Installation Team (AIT) Production, Test Sequence, Coordination and Testing Services;
provide
980-90-001
NAVSEA (PHD) Office Space; provide980-90-002
ShipAlt DDG51-00151.02K, Air Conditioning Plants No. One and 4 Upgrade Industrial Support; provide (OPTION ITEM)
980-90-003
ShipAlt DDG51-80897K, NMT AN/WSC-9(V)2 Q/KA/X/GBS Installation, Alteration Installation Team (AIT) Support Service; provide
980-90-004
Page 12 of 14 EXECUTING WORK
ShipAlt DDG-51-83940K, Video Distribution System (VDS) Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION
ITEM)
980-90-005
ShipAlt DDG-51-01100K, NTWK Build, Alteration Installation Team (AIT) Support Service; provide
980-90-006
OrdAlt 83135, CIWS Cable Reliability, Alteration Installation Team (AIT) Support Service; provide
980-90-007
ShipAlt EC 70619K Alteration Installation Team (AIT) Support Service;
provide
980-90-008
Digital Video Surveillance System (DVSS), 1MC Announcing System Upgrade, Moriah HW for DDG, EM Log Replace AN/WSN-9(V)1 DHYSL and SIWCS, Alteration Installation Team (AIT) Support Service; provide
980-90-009
SHIPALT DDG-51-70403K, 71604K, 71726K, 73088K, 77427K and 77829K DDG MOD CORE Alteration Installation Team (AIT) Support Services
980-90-010
SHIPALT DDG51-70403K, 71604K, 71726K, 73088K, 77829, 71615
Asset Recovery; provide.
980-90-011
ShipAlts 74283K BMD 4.0 Program ORTS Display Upgrade and 79322K BMD-DDG 4.0.1 Ship Impact, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
980-90-012
ShipAlts 70403K, 71604K, 71615K, 71726K, 73088K and 77829K, Naval Surface Warfare Center (NSWC-CD) SSES Alteration Installation Team (AIT) Office Space; provide
980-90-013
ShipAlt DDG-51-77333K, CKT 3TV COTS Upgrade, Alteration Installation Team (AIT) Support Service; provide
980-90-014
OA and SA 79362 AWS Seawater Flow Meter Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
980-90-017
ShipAlt DDG51-84530K, AWS: Peripherals Upgrade to SP, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
980-90-018
ShipAlt DDG51-85218 K AN/SQQ-89A(V)15 Tech Refresh Alteration Installation Team (AIT) Support Services; provide
980-90-019
OA 82668, COTS, Upgrade, Alteration Installation Team (AIT) Support Service; provide
980-90-020
Dock Trial, Fast Cruise and Sea Trial; accomplish982-31-001
Engineering Plant Production Completion and Requirement for Light-Off Assessment (LOA); provide
982-31-002
Temporary Service; provide992-11-001
Temporary Flammable Liquid Storage and Hazardous Material Storage Unit, 640 Square Feet; provide
992-11-002
Pierside T-1 Line; provide992-11-003
Crew Transportation; provide992-11-004
Ship's Force Parking; provide992-11-005
Temporary Air Conditioning; provide992-11-006
Fuel Assistance and Towboat Service for Fuel Barge; provide992-11-007
Temporary Refrigerated Storage Facility, 7,000 Cubic Feet; provide992-11-008
Oil Spillage and Floating Sandblasting Debris Boom; install992-11-009
Small Boat Storage and Repair Facility for Ship's Force Use; provide992-21-001
Page 13 of 14 EXECUTING WORK
Cleaning and Pumping; accomplish992-31-001
Demineralized Water; provide992-31-002
NAVSEA Cleaning, Pumping and Gas Free; provide992-90-003
Ship's Force Warehouse Storage Space; provide993-11-001
Pressurized Waveguide and Transmission Line Dry Air Lay-Up;
accomplish
993-11-002
Rigging, Crane and Forklift Service; provide993-11-003
Rigging, Crane and Transportation Service; provide993-21-001
Temporary Deck Covering; install993-31-001
Temporary Main Reduction Gear (MRG) Dehumidifier System; provide993-31-002
AN/SPY-1D Antenna Protective Cover; install993-31-003
Drydocking and Undocking; accomplish997-11-001
Page 14 of 14 EXECUTING WORK
SHIP: USS PAUL HAMILTON (DDG 60) ITEM NO: 042-11-001
COAR: 16 PCN: EXSY-ZA50
SWT FILE NO: 042-002 CMP: NONE
REVISED: 23 Jan 2015 PLANNER: BRITT, BROOKS
SSP: TPPC-DDG60-SSSD16-CN01 1 of 2 ITEM NO: 042-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Work Package Execution Review; accomplish
1.2 Location of Work:
1.2.1 Not Applicable
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
3. REQUIREMENTS:
3.1 Schedule and chair a Work Package Execution Review (WPER) meeting 30 days prior to availability start. The purpose of this meeting is to review with all activities accomplishing work during the availability, the integrated work production schedule required by NAVSEA Standard Item 009-60. This is the final opportunity to resolve any work interface or production support issues between the various activities before actual production work begins.
Report: Meeting Minutes Date: + 3
3.1.1 Record the minutes of the meeting and submit one legible copy in approved transferrable media to the SUPERVISOR within 3 working days after the meeting. All action items, responsible activity, and proposed date for resolution, shall be included in the report.
3.1.2 In addition to the requirements of 009-60 the following applies:
3.1.2.1 For availabilities greater than 120 days in duration, the production schedule shall be provided no later than 25 days after contract award in lieu of 30 days.
4. NOTES:
4.1 Work Package Execution Review. A meeting that takes place at A-30 for CNO availabilities. There should be representation from all the organizations that are accomplishing work during the scheduled CNO availability. The purpose of this meeting is to review the intergrated work production schedule that has been prepared by the executing activity. This is the final opportunity to resolve any work interface or production support issues between the different activities before actual production work begins.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
SHIP: USS PAUL HAMILTON (DDG 60)
SSP: TPPC-DDG60-SSSD16-CN01 2 of 2 ITEM NO: 042-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
SHIP: USS PAUL HAMILTON (DDG 60) ITEM NO: 042-27-001
COAR: 16 PCN: EXSY-ZA15
SWT FILE NO: 042-001 CMP: NONE
SSP: TPPC-DDG60-SSSD16-CN01 1 of 4 ITEM NO: 042-27-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Accountability of Manhour and Material Reservation;
accomplish
1.2 Location of Work:
1.2.1 Not Applicable
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 None
3. REQUIREMENTS:
3.1 Accomplish the following, in addition to the specific requirements of the Job Order, for Work Items which identify reservation of manhours or material dollars.
3.2 Identify task/discrepancies and initiate an estimate of manhours and material dollars on Reservation Task Request/Control Form (Attachment A) for each discrepancy or task identified to be accomplished under a reservation item or reservation paragraph, entering the date and estimate of labor and material, and deliver the estimate to the SUPERVISOR.
3.2.1 Reservation taskings shall not be used to accomplish work outside the scope of the specific Work Item identifying a reservation work paragraph.
3.3 The SUPERVISOR shall review the estimate submitted and if in agreement, shall sign the "RMC/NSA Authorization Agreement to Quote" blank, authorizing the work at the manhour and material dollars quoted.
The contractor shall then sign the "Contractor Obligation/Agreement to Quote" blank and enter the estimated start date. The RMC/NSA contracts representative shall initial the form in the blank provided.
3.3.1 If there is a difference of opinion in the estimate provided by the contractor and RMC/NSA, the manhours and material dollars shall be negotiated immediately to resolve the difference. The negotiated manhour and material dollars shall then be entered in the provided "Revised Estimate" blocks with the required signatures as indicated in 3.3.
3.4 The Contractor shall enter the work completion date, sign and date the control form, and submit to the SUPERVISOR within two (2) days after completion of the tasking authorized.
Report: Weekly Manhour and Material Reservation Date: + 0
3.5 Submit one legible copy, in approved transferrable media, of a weekly report listing all Work Items with manhour and material reservation paragraphs identified to the SUPERVISOR.
SSP: TPPC-DDG60-SSSD16-CN01 2 of 4 ITEM NO: 042-27-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.5.1 The report shall contain the following: Work Item number, reservation control form serial number, reservation paragraph number, total original manhours and material dollars allocated in each paragraph, the manhour and material dollars negotiated for each authorized tasking, and the remaining balances of manhour and material dollars.
Report: Weekly Report - Final Date: + 5
3.6 Submit one legible copy, in approved transferrable media, of a final report no later than five days after completion of the availability to the SUPERVISOR.
3.6.1 The report shall contain the same information specified in 3.5.1.
3.7 The reservation manhours and material dollar requirements listed in the individual Work Items are a part of this contract under the original solicitation and award. Therefore they are subject to the provisions, terms, conditions and clauses of this contract job order and the Master Ship Repair Agreement (MSRA)/The Agreement for Boat Repair (ABR).
3.7.1 The manhour reservation shall include both prime contractor and sub contractor efforts.
3.8 The balance of hours remaining in the reservation items after negotiations have concluded, and it is evident that no additional work will be tasked, is subject to a decrease change order.
3.9 Only actual production manhours expended will be considered towards the contractors obligation to provide the defined reservation manhour effort. While supervision, quality assurance, and other nonproductive labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractors obligation to provide reserved manhours. The production manhour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual Work Item.
3.10 Material dollars shall be based on actual costs to the Contractor of acquiring the materials provided. Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G & A), or profit into the actual cost of materials expended toward the reservation.
4. NOTES:
4.1 The information received in the consolidated final report of 3.6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for all reservation Work Items.
4.2 The reservations listed in the individual Work Items are not to be considered Time and Material or a Level of Effort. Once the scope of work for a task has been listed and a mutually agreeable number of manhours or materials has been agreed to, neither party will be entitled
SSP: TPPC-DDG60-SSSD16-CN01 3 of 4 ITEM NO: 042-27-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
to an adjustment based on actual manhours or material dollars required.
4.3 Each task shall not exceed 25 mandays without approval of the Project Manager.
4.4 The SUPERVISOR will serialize each reservation control form.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: TPPC-DDG60-SSSD16-CN01 4 of 4 ITEM NO: 042-27-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
ATTACHMENT A
SHIP: USS PAUL HAMILTON (DDG 60) ITEM NO: 077-01-001
COAR: 16 PCN: EXSY-ZA46
CSWT FILE NO: 077-003 CMP: NONE
SSP: TPPC-DDG60-SSSD16-CN01 1 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 49 U.S.C 5103, Federal Hazardous Materials Transportation Act
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311, Repair and Maintenance of Naval Vessels - Handling of Hazardous Waste
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
3.1.3 Submit one legible copy, in hard copy or approved
transferrable media, of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification
SSP: TPPC-DDG60-SSSD16-CN01 2 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, SSP: TPPC-DDG60-SSSD16-CN01 3 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
hydrochloric, etc.)
Ethylene Glycol (Antifreeze) 20 GAL 30 GAL 50 GAL
Sodium Hydroxide 50 GAL 50 GAL 50 GAL
Cleaning Solvents _____ ____________ __________
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Methyl Ethyl Ketone 10 GAL 10 GAL 10 GAL
Spent Abrasive Blast Material 500 LB 500 LB 200 TON
(contaminated with a known hazardous waste)
Trichloroethane 20 GAL 20 GAL 20 GAL
Miscellaneous Chemicals 20 GAL 20 GAL 20 GAL
(Ignitable)
Miscellaneous Chemicals 20 GAL 20 GAL 20 GAL
(Corrosive)
Miscellaneous Chemicals 20 GAL 20 GAL 20 GAL
(TCLP Toxic)
Miscellaneous Chemicals _______ _______ _______
(Reactive)
Oil (Synthetic) 10 GAL 10 GAL 10 GAL
Paints (Enamel, Latex, 26 GAL 350 GAL 150 GAL
Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)
Paints (May include lead, 10 GAL 10 GAL 20 GAL cadmium, or chrome)
Paint Strippers (phenols, 10 GAL 10 GAL 10 GAL lead, chromium)
Sludge (Contaminated with 100 GAL 5000 GAL 500 GAL a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________
SSP: TPPC-DDG60-SSSD16-CN01 4 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
with chromium and PCB's)
Petrolatum 0 GAL 0 GAL 330 GAL
3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
3.7 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed
SSP: TPPC-DDG60-SSSD16-CN01 5 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS).
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
DRYDOCK REQUIRED
SHIP: USS PAUL HAMILTON (DDG 60) ITEM NO: 110-11-001
COAR: 16 PCN: ER01-ZA98
ER01-ZA90
CSWT FILE NO: 110-004 CMP: NONE
REVISED: 23 Jan 2015 PLANNER: DENNIS, SHAUN
BRITT, BROOKS
ZAYAS, ALBERTO
SSP: TPPC-DDG60-SSSD16-CN01 1 of 5 ITEM NO: 110-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Underwater Hull; inspect
1.2 Location of Work:
1.2.1 Underwater Hull, Sides and Stern
1.2.2 Bilge Keel, Port and Starboard
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 100-6218906 Rev AA, Unit Structural Arr Dwg-Assy Unit 1410
2.3 100-6218911 Rev U, Unit Structural Arr Dwg-Assy Unit 2110
2.4 100-6218916 Rev V, Unit Structural Arr Dwg-Assy Unit 2210
2.5 100-6218917 Rev Y, Unit Structural Arr Dwg-Assy Unit 2220
2.6 100-6218921 Rev U, Unit Structural Arr Dwg-Assy Unit 2310
2.7 100-6218922 Rev AB, Unit Structural Arr Dwg-Assy Unit 2320
2.8 100-6218926 Rev AB, Unit Structural Arr Dwg-Assy Unit 2410
2.9 100-6218927 Rev U, Unit Structural Arr Dwg-Assy Unit 2420
2.10 100-6218931 Rev W, Unit Structural Arr Dwg-Assy Unit 3110
2.11…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .