N00024-15-R-2439-0001_J-1_NAVSEA_Standard_Items_Index_FY16_(CH-2)_.pdf

PDF 69 KB Posted

Attached to
LPD 27 Post Shakedown Availability (PSA)
Solicitation number
N00024-15-R-2439
Issued by

About this file

Amendment 0001 Attachment J-1

View the file

Other files

File Type Posted
N00024-15-R-2439-0003.pdf PDF
N00024-15-R-2439_Amend_0002.pdf PDF
N00024-15-R-2439-0001.pdf PDF
N00024-15-R-2439.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 of 8 FY-16 (CH-2)

NAVSEA

STANDARD ITEM

NUMERICAL INDEX

FY-16 (CH-2)

ITEM NO. TITLE

UTILIZATION

CATEGORY DATE

009-01 General Criteria; accomplish I 18 JUL 2014

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide

I 18 JUL 2014

009-03 Toxic and Hazardous Substances;

control

I 18 JUL 2014

009-04 Quality Management System;

provide

I 18 JUL 2014

009-05 Temporary Accesses; provide I 18 JUL 2014

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I 18 JUL 2014

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I 18 JUL 2014

009-08 Fire Protection at Contractor's Facility; accomplish

I 18 JUL 2014

009-09 Process Control Procedure (PCP);

provide and accomplish

II 18 JUL 2014

009-10 Shipboard Asbestos-Containing Material (ACM); control

I 18 JUL 2014

009-11 Insulation and Lagging Requirements; accomplish

II 18 JUL 2014

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

II 01 SEP 2015

009-13 Meters; repair and certify calibration

II 18 JUL 2014

009-14 Gages and Thermometers; repair and certify calibration

II 18 JUL 2014

009-15 Rotating Machinery; balance II 17 JAN 2013

2 of 8 FY-16 (CH-2)

ITEM NO. TITLE

UTILIZATION

CATEGORY DATE

009-16 Electronic Equipment; repair II 29 JUL 2011

009-17 Rotating Electrical Equipment;

repair

II 18 JUL 2014

009-18 Magnetic Material; control I 18 JUL 2014

009-19 Provisioning Technical Documentation (PTD); provide

I 18 JUL 2014

009-20 Government Property; control I 18 JUL 2014

009-21 Logistics and Technical Data;

provide

I 18 JUL 2014

009-22 Shipboard Electric Cable; test II 18 JUL 2014

009-23 Interferences; remove and install I 18 JUL 2014

009-24 Shipboard Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

I 10 JUL 2015

009-25 Structural Boundary Test;

accomplish

II 18 JUL 2014

009-26 Deck Covering Requirements;

accomplish

II 18 JUL 2014

009-27 Material Identification and Control (MIC) for Level I Systems; accomplish

II 18 JUL 2014

009-28 Fire Prevention Requirements;

accomplish

I 10 JUN 2014

009-29 Asbestos-Free Pipe Hanger Liner Material; install

I 29 JUL 2004

009-30 Boiler Sample Tubes; inspect II 29 JUL 2011

009-31 Boiler Waterjet Cleaning;

accomplish

II 18 JUL 2014

009-32 Cleaning and Painting Requirements; accomplish

II 10 JUL 2015

009-33 Rotating Electrical Equipment;

rewind

II 18 JUL 2014

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility;

provide

I 17 JAN 2013

3 of 8 FY-16 (CH-2)

UTILIZATION

CATEGORY DATE

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

I 18 JUL 2014

009-36 Controller; repair II 18 JUL 2014

009-37 General Procedures for Woodwork;

accomplish

II 18 JUL 2014

009-38 Boiler Dry Lay-up; accomplish II 17 JAN 2013

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide

I 19 JUL 2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

I 18 JUL 2014

009-41 Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; provide

II 19 JUL 2007

009-42 Technical Manual Contract Requirement (TMCR) for Updating Technical Manuals; provide

II 19 JUL 2007

009-43 Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide

II 18 JUL 2014

009-44 Cancelled 18 JUL 2014

009-45 Tapered Plug Valve; repair II 29 JUL 2011

009-46 Butterfly Valve, Synthetic and Metal Seated; repair

II 18 JUL 2014

009-47 Gate Valve; repair II 18 JUL 2014

009-48 Pressure Seal Bonnet Valve;

repair (shop)

II 29 JUL 2011

009-49 Pressure Seal Bonnet Valve;

repair (in-line)

II 29 JUL 2011

009-50 Horizontal Swing Check Valve;

repair

II 29 JUL 2011

4 of 8 FY-16 (CH-2)

UTILIZATION

CATEGORY DATE

009-51 Globe, Globe Angle, and Globe Stop Check Valve; repair

II 17 JAN 2013

009-52 Relief Valve; repair II 29 JUL 2011

009-53 Bolted Bonnet Steam Valve; repair (shop)

II 29 JUL 2011

009-54 Bolted Bonnet Steam Valve; repair (in-line)

II 30 JUL 2010

009-55 Regulating/Reducing Valve; repair II 30 JUL 2010

009-56 Main Propulsion Boiler Wet Lay-up; accomplish

II 18 JUL 2014

009-57 Reduction Gear Security Requirements; accomplish

II 18 JUL 2014

009-58 Pump and Driver Shaft Alignment;

accomplish

II 01 SEP 2015

009-59 Organotin Antifouling Materials;

control

I 29 JUL 2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I 01 SEP 2015

009-61 Shipboard Use of Fluorocarbons;

control

I 18 JUL 2014

009-62 Boiler Handhole and Manhole Seats and Plates; inspect

II 29 JUL 2011

009-63 Lubricating Oils and Hydraulic Fluids; analyze

II 18 JUL 2014

009-64 Synthetic Fire Resistant Hydraulic Fluid; control

I 18 JUL 2014

009-65 Polychlorinated Biphenyls (PCBs);

control

I 29 JUL 2011

009-66 Cancelled 18 JUL 2014

009-67 Integrated Total Ship Testing;

manage

I 18 JUL 2014

009-68 Bolted Bonnet Valve; repair II 29 JUL 2011

009-69 Heavy Weather/Mooring Plan;

provide

I 18 JUL 2014

5 of 8 FY-16 (CH-2)

UTILIZATION

CATEGORY DATE

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

I 18 JUL 2014

009-71 Testing Requirements for Piping Systems; accomplish

II 10 JUL 2015

009-72 Physical Security at Private Contractor's Facility; accomplish

I 18 JUL 2014

009-73 Shipboard Electrical/Electronic/ Fiber Optic Cable; remove, relocate, repair, and install

I 18 JUL 2014

009-74 Occupational, Safety and Health Requirements; accomplish

I 10 JUL 2015

009-75 Circuit Breaker; repair II 29 JUL 2011

009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

II 29 JUL 2011

009-77 Cofferdam Requirements;

accomplish

I 18 JUL 2014

009-78 Passive Countermeasures System (PCMS) Material Repair/ Installation Requirements;

accomplish

II 07 NOV 2013

009-79 Government Owned Material (GOM);

status reporting

I 18 JUL 2014

009-80 Ship's Facilities; provide I 18 JUL 2014

009-81 Compartment Closeout; accomplish I 18 JUL 2014

009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide

I 29 JUL 2011

009-83 Wire Rope Fitting Verification;

provide

I 17 JAN 2013

009-84 Accountability of Temporary Fasteners; provide

6 of 8 FY-16 (CH-2)

UTILIZATION

CATEGORY DATE

009-85 Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II 19 JUL 2007

009-86 Recovery of Chlorofluorocarbon (CFC's) and Fire Suppressant Halon (H) Materials; accomplish

I 01 AUG 2008

009-87 Chemical Disinfection Procedures;

accomplish

I 18 JUL 2014

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

I 18 JUL 2014

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish

I 29 JUL 2011

009-90 Technical Representative; provide II 18 JUL 2014

009-91 Propeller In-Place Inspection;

accomplish

II 07 NOV 2013

009-92 Resilient Mount; remove and install

II 18 JUL 2014

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I 18 JUL 2014

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish

I 17 JAN 2013

009-95 Mechanically Attached Fittings (MAFs) for Piping Systems;

install

I 18 JUL 2014

009-96 Ball Valve; repair II 29 JUL 2011

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

I 17 JAN 2013

009-98 Monel Fasteners; inspect II 18 JUL 2014

7 of 8 FY-16 (CH-2)

UTILIZATION

CATEGORY DATE

009-99 Ship Departure Report; provide I 18 JUL 2014

009-100 Ship's Stability Process Control Procedure (PCP); maintain

I 18 JUL 2014

009-101 Requirements for Entry to, and | Departure from Contractor's Facility; accomplish

I 18 JUL 2014

009-102 Alteration Verification; provide I 29 JUL 2011

009-103 Weight and Moment Change Data;

provide

I 18 JUL 2014

009-104 Vibration Testing and Analysis;

accomplish

II 18 JUL 2014

009-105 Thermal Sprayed Coatings for Machinery Component Repair;

accomplish

II 18 JUL 2014

009-106 Work Authorization Form Coordinator (WAFCOR); provide

I 06 JAN 2014

009-107 Piping System Cleanliness (Non- Nuclear); accomplish

II 18 JUL 2014

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and | Departure from Contractor's Facility; accomplish

I 18 JUL 2014

009-109 Special Requirements for Non- SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish

I 18 JUL 2014

009-110 Special Requirements for Non- Nuclear Work on Nuclear Vessels;

accomplish

I 18 JUL 2014

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I 18 JUL 2014

009-112 Prevention of Radiographic- Inspection Ionizing-Radiation Hazards; accomplish

8 of 8 FY-16 (CH-2)

UTILIZATION

CATEGORY DATE

009-113 Rotating Electrical Equipment with Sealed Insulation Systems (SIS); rewind

II 18 JUL 2014

009-114 Mold Remediation; accomplish II 07 NOV 2013

009-115 Bearing Rebabbitting; accomplish II 18 JUL 2014

009-116 Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up;

accomplish

II 18 JUL 2014

009-117 Support for Combat Systems Light- Off; provide

II 18 JUL 2014

009-118 CG Deck Loading; accomplish I 18 JUL 2014

009-119 Cancelled 18 JUL 2014

009-120 Fact Finding and Critique of Unplanned Events; manage

I 18 JUL 2014

009-121 Ship Assessment/Inspection Requirements; provide