Att._8_-_N00024-13-R-2215_Q A_NSW_11M_SSC_8-5-13.doc

DOC document 31 KB Posted

Attached to
Naval Special Warfare Command 11 Meter Surface Support Craft
Solicitation number
N0002413R2215
Issued by

About this file

Att. 8 - Questions and Answers (05-August-2013)

View the file

Other files

File Type Posted
Att__8_-_Solicitation_QA_NSW_11M_SSC_8-19-13.doc DOC document
N00024-13-R-2215-0005.doc DOC document
Att._1_-_Revised_Specification_NSW_11M_SSC_v1_2_2013_08_19.doc DOC document
Att._8_-_Solicitation_Q A_NSW_11M_SSC_8-14-13.doc DOC document
N00024-13-R-2215-0004.doc DOC document
Att._1_-_Revised_Specification_NSW_11M_SSC_v1_2_2013_08_14.docx DOCX document
Att._05_-_Past_Performance.doc DOC document
Att._04_-_NSW_11M_SSC_Spares_List.xls XLS spreadsheet
N00024-13-R-2215-0002.doc DOC document
Solicitation_Q A_N00024-13-2215_NSW_11M.docx DOCX document
Attachment_1_NSW_11M_SSC_Specification_v1_1_2013_07_22.docx DOCX document
Att._02_-_NSW_11M_SSC_CDRL.PDF PDF
N00024-13-R-2215_Request_for_Proposals.doc DOC document
Att._07_-_ID_of_Commercial_Data.doc DOC document
N00024-13-R-2215_RFP_Amendment_0001_(7-3-13).doc DOC document
Att._06_-_ID_of_Non-Commercial_Data.doc DOC document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-13-R-2215

August 01, 2013

Attachment 8-Solicitation Questions and Answers

Question 1: The FBO Notice and some RFP Section I clauses indicate that this is a Small Business Set-Aside acquisition. Could you please clarify to what extent a Small Business offeror may include components or services provided by large businesses in its proposal?

Government Response 1: Per solicitation clause 52.219-6 (d) Notice of Total Small Business Set Aside, A Small Business concern submitting an offer in its own name shall furnish, in performing the contract, only end items manufactured or produced by small business concerns in the United States or its outlying areas. For the purpose of this solicitation, the NAICS code for the end item is 336612 with 500 employee size. For subcontracting, please refer to 52.219-14 Limitation on Subcontracting, services or supplies, the small business shall perform at least 50% of the work, not including the cost of materials. This clause will be checked under 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2013) to provide clarity to offerors on the subcontracting limitations. You can also refer to FAR Part 19.502-2 (c) Total Small Business Set-Asides for information on SBA Waivers or exceptions for non-manufacture components such as Engines and navigation.

Questions 2: 042-3: Is there an estimated quantity of boats that will be shelved before being placed in service?

Government Response 2: Boats for this program are not normally stocked to maintain an inactive inventory. Once the boats have been accepted, they are made available to the operational command for issue.

Question 3: 070-3a: Does the trial weight include the passenger gear and if do which gear weight?

Government Response 3: No. See revised Section 070-3a for requirement.

Question 4: 070-3b: Does the trial weight include the passenger gear and if do which gear weight?

Government Response 4: No. See revised Section 070-3b requirement.

Question 5: 070-3a: Is the mission gear weight to be used in the design hoisting load?

Government Response 5: Yes. See revised Section 070-3a requirement.

Question 6. 070-3b: Is the mission gear weight to be used in the design hoisting load?

Government Response 6: Yes. See revised Section 070-3b requirement.

Question 7. 083-1: What is the estimated yearly operation hours for both platforms?

Government Response 7: 1,560 hours per boat.

Question 8. 150-1a: Is the windscreen to hinge independent of the T-top?

Government Response 8: Yes.

Question 9. 150-1a: Is the T-Top required to support a particular load and weight outside of the radar, lights and antenna?

Government Response 9: No.

Question 10. 150-1a: Is the T-top intended to be used as a walking surface?

Government Response 10: No.

Question 11. Is a walk around cabin acceptable?

Government Response 11: A "walk around" cabin style is not prohibited by the specification; however, the cabin must be capable of meeting all minimum requirements, including 070-4b, 150-1b, 150-2b, 150-3, and 150-4. The hull must also meet gross dimension requirements of 070-1.

Question 12. 070-2: This water separator requirement is unclear. Is this intended to be an air-conditioner?

Government Response 12: No air conditioner is required. Air separator is only required to remove spray and runoff from the ventilation inlet.

Question 13. 330-4 Infrared Lighting. This item calls for the use of the Hoffman Engineering IR Illuminator when operating with night-vision goggles. Upon further review of this solicitation, we don't see where any additional NVIS compliance is required. Generally when using night-vision goggles we are required to comply with NVIS compliance by using filter overlay material and NVIS compliant bilge indicator lights, warning lights, etc. Please confirm that NVIS compliance is not a requirement for this contract.

Government Response 13: “NVIS” is not a requirement for this solicitation.

Question 14. Item 313-1 Batteries: “Batteries shall be installed in close proximity to main distribution panel.”

In our particular boat design, this would place the batteries in the console in the open configuration and in the cuddy trunk for the cabin configuration. We generally install batteries in the aft rigging compartment where there is ample space and wireway access to power the main distribution panel. All wiring is sized per IEEE standards. Is there a particular reason that aft installation of the batteries would not be acceptable? Batteries are securely installed as required, but the further forward the batteries are installed the more impact they incur under heavy seas at speed.

Government Response 14: The requirement as stated is an installation preference. However, per Section L of the solicitation, builders are allowed to modify non-vital requirements to state how they intend to implement an alternate solution. This alternate solution will be assessed thereafter as defined in Section M.

Question 15. The DT800 is a 'Smart Transducer' that send numerical depth and temp to an NMEA 0183 or NMEA2000 data port depending on version ordered. The DFF1 sounder requires a 'fishfinder' style transducer like the Airmar SS60 600 watt or SS164 1 kw (Furuno 556TID-LTD/12 or 20). Is the DFF1 required? If so is there a preferred transducer?

Government Response 15: Water depth and temperature must be displayed on the NAVNET system and a through hull sensor fully integrated. Per section L of the solicitation, builders may modify non-vital requirements to state how they intend to implement an alternate solution. This alternate solution will be assessed thereafter as defined in section M. Therefore, offerors may offer a navigation package without DFF1 network sounder, provided that the system displays water depth and temperature.