This document is an amendment to a solicitation for Pacific Northwest Carriers CVN IDIQ Maintenance/Repair contract (Solicitation #N00024-24-R-4110-0003). The amendment's purpose is to 1) post responses to bidder questions and 2) revise the L-3 Attachment and update Section J.

Key details:

  • The solicitation is issued by the Department of the Navy Naval Sea Systems Command.
  • Amendment 0003 modifies the original solicitation, dated May 1, 2024, to provide clarifications and update attachments.
  • Attachments J-1 through J-7, J-9, and J-10 contain CUI information and are not publicly posted; interested offerors must contact the Procuring Contracting Officer to obtain copies.
  • Revised attachments include the Contract Data Requirements List, Notional Work Item Specification Packages, ILS - Non-Nuclear Technical Specifications, Contract Security Classification Specification, Carrier Planning Activity CVN Availability Schedule, Drydock Utilization Schedule, and the Section L Cost Exhibits.
  • The offer due date is not extended by this amendment.

View the file

Other files

File Type Posted
N00024-24-R-4110_PNW-PSM-RFP Q and As_A0003.pdf PDF
L-3_Cost-Proposal-Format-PNW PSM_Updated.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Post responses to bidder questions

2) Revise L-3 Attachment and update Section J

1. CONTRACT ID CODE PAGE OF PAGES

S 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Jun-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002424R4110

X 9B. DATED (SEE ITEM 11)

01-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Jun-2024

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002424R4110

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

TABLE

ATTACHMENT # DOCUMENT TITLE DOCUMENT DATE

Exhibit A Contract Data Requirements List(s) CDRLs, DD Form 1423 / Glossary

2/9/2024

J-1 CUI:// CVN Notional Work Item Specification

Package (PIA)

11/16/2023

J-2 CUI:// CVN Notional Work Item Specification

Package (DPIA)

11/16/2023

J-3 CUI:// ILS - Non-Nuclear Technical

Specifications

12/1/2023

J-4 CUI:// Contract Security Classification

Specification, DD Form 254

11/16/2023

J-5 CUI:// Carrier Planning Activity CVN

Availability Schedule

2/1/2024

J-6 CUI://Drydock Utilization Schedule 2/1/2024

J-7 CUI:// Standard Work Template 897-11-01 6/16/2021

J-8 Determination of AF and SBSIF 3/5/2024

J-9 CUI:// Reserved – Small Business

Subcontracting Plan (upon contract award)

N/A

J-10 CUI:// Reserved - Contractor Direct & Indirect

Escalation Rates

N/A

L-1 Request for Clarification 11/16/2023

L-2 Subcontractor Past Performance Form 11/16/2023

L-3 Section L Cost Exhibits 6/11/2024

* Attachments J-1, J-2, J-3, J-4, J-5, J-6, J-7, J-9 and J-10 will not be posted in public forum due to the CUI nature of the product. To obtain copies of the respective documents, please reach out to the PCO as identified in Section L.

(End of Summary of Changes)