N00024-23-R-6203 ISIS TI-26 Exhibit A CDRLs DD-1423 (2024-03-26).pdf
PDF 842 KB Posted
- Attached to
- BVY-1 ISIS TI-26 TI-28 TI-30 Solicitation
- Solicitation number
- N0002424R6203
About this file
This document is a Contract Data Requirements List (CDRL) for a federal contract opportunity related to the Integrated Submarine Imaging System (ISIS) technology insertion (TI) baselines TI-26, TI-28, and TI-30.
The CDRL lists over 50 data items the contractor will be required to provide, including program management reports, system engineering documentation, logistics information, training materials, and test reports. Key details include the authority document, contract reference, requiring office, and submission requirements for each data item. The work is being procured by the Naval Sea Systems Command (NAVSEA) under solicitation N00024-24-R-6203 for the development, production, and engineering support of the AN/BVY-1 ISIS system. The first submission for many of the data items is required 30-90 days after contract award, with subsequent submissions at various frequencies specified in the CDRL.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00024-24-R-6203
TBD
EXHIBIT A
CONTRACT DATA REQUIREMENTS LIST
FOR THE
AN/BVY-1 ISIS TI-26, TI-28, & TI-30
DEVELOPMENT, PRODUCTION AND ENGINEERING SUPPORT
PREPARED BY
PROGRAM EXECUTIVE OFFICE, UNDERSEA WARFARE SYSTEM (PEO UWS)
PMS435
3/26/24
NO. TITLE DID #
A001 Contractor's Progress and Status Report DI-MGMT-81928 NOT 2 A002 Contract Work Breakdown Structure DI-MGMT-81334D NOT 1 A003 Integrated Program Management Data and Analysis Report (IPMDAR) DI-MGMT-81861C (SEE BLK 16) A004 Meeting Agenda DI-ADMN-81249C A005 Meeting Minutes DI-ADMN-81250C A006 System Safety Hazard Analysis Report (SSHAR) DI-SAFT-80101C (SEE BLK 16) A007 Quality Deficiency Report DI-QCIC-80736 NOT 2 A008 Health Hazard Assessment Report (HHAR) DI-SAFT-80106C (SEE BLK 16) A009 Commercial Engineering Design Data and Associated Lists DI-SESS-81003F NOT 1 (SEE BLK 16) A010 Product Engineering Design Data and Associated List DI-SESS-81000F NOT 1
A011 System/Segment Interface Control Specification DI-SESS-81314A NOT 2 (SEE BLK 16)
A012 Engineering Change Proposal (ECP) DI-SESS-80639E A013 Request for Variation (RFV) DI-SESS-80640E A014 Specification Change Notice (SCN) DI-SESS-80643E A015 Logistics Management Information (LMI) DI-SESS-82294 A016 Configuration Status Accounting (CSA) Information DI-SESS-81253E A017 Technical Report/Study Services Report DI-MISC-80508B A018 Logistics Product Data DI-SESS-81758A NOT 2 A019 Failure Modes, Effects, and Criticality Analysis DI-SESS-81495B NOT 2 A020 Reliability Centered Maintenance (RCM) Documentation Control Sheet DI-PSSS-80990A NOT 1
A021 International Specification for Technical Publications Utilising a Common Source Data Base ASD-S1000D
A022 Technical Training Plan DI-SESS-81958 NOT 2 (SEE BLK 16) A023 Test Package DI-SESS-81525C NOT 1 A024 Course Conduct Information Package DI-PSSS-81522D A025 Item Unique Identification (IUID) Marking Activity, Validation and Verification Report DI-MGMT-81804A NOT 1 A026 Systems Engineering Management Plan (SEMP) DI-SESS-81785A A027 Specification Requirement Verification Matrix DI-MISC-81283 A028 Open Systems Management Plan (OSMP) DI-MGMT-82099A A029 System/Subsystem Design Description (SSDD) DI-IPSC-81432A NOT 2 A030 Design Review Information Package (DRIP) DI-SESS-81757A NOT 1
A031 Reliability and Maintainability (R&M) Block Diagrams and Mathematical Models Report DI-SESS-81496B
A032 Reliability and Maintainability Predictions Report DI-SESS-81497B
A033 Software Requirements Specification (SRS) DI-IPSC-81433A NOT 1 (SEE BLK 16)
A034 Failure Summary and Analysis Report DI-SESS-80255B (SEE BLK 16) A035 Program-Unique Specification Documents DI-SDMP-81493A NOT 2 A036 Software Development Plan (SDP) DI-IPSC-81427B (SEE BLK 16) A037 Interface Requirements Specification (IRS) DI-IPSC-81434A NOT 1 (SEE BLK 16) A038 Software Product Specification (SPS) DI-IPSC-81441A NOT 1 (SEE BLK 16) A039 Software Version Description (SVD) DI-IPSC-81442A NOT 2 A040 Software Center Operator Manual (SCOM) DI-IPSC-81444A NOT 2 A041 Test and Evaluation Program Plan (TEPP) DI-NDTI-81284 A042 Test Procedure DI-NDTI-80603A A043 Test/Inspection Report DI-NDTI-80809B NOT 2 A044 Provisioning Parts List Index (PPLI) SEE BLK 16 A045 Bill of Materials (BOM) for Logistics and Supply Chain Risk Management DI-PSSS-81656B A046 Parts Management Plan DI-SDMP-81748 NOT 1 A047 Material Safety Data, Transportation Data, and Disposal Data for Hazardous Materials Furnished to Government ActivitiesFED-STD-313F A048 Installation Control Drawings DI-DRPR-81242 NOT 1 (SEE BLK 16) A049 Item Unique Identification (IUID) Marking Plan DI-MGMT-81803A A050 Supplier's Configuration Management Plan DI-SESS-80858D A051 Interface Design Description (IDD) DI-IPSC-81436A NOT 2 A052 System Safety Program Plan (SSPP) DI-SAFT-81626 A053 Cost and Hour Report (FlexFile) DI-FNCL-82162 A054 Quantity Data Report (QDR) DI-MGMT-82164 A055 Technical Data Report (TDR) DI-MGMT-82165 A056 Contractor Business Data Report DD Form 1921-3 DI-FNCL-81765C
A057 Software Resources Data Reporting: Development, Maintenance and Enterprise Resource Planning Development Reports, and Data Dictionary
DI-MGMT-82035A
CDRL SUMMARY
CONTRACT DATA REQUIREMENTS LIST Form Approved I
(1 Data Item) OMB No. 0704-0188 I
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 57 Pages
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCK 12: First submission shall be delivered 10 calendar days after the second full accounting month after contract award.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic notification that the Data Item has been uploaded shall be sent to the distribution list. If CDRL contains classified data, contact COR for direction on delivery.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
SOW Para 3.2, 3.2.6, 3.2.7, 3.2.8, 3.2.12, 3.3.10, 3.13 NAVSEA PMS435
b. COPIES
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203
A
TBD
OTHER___X___: MGMT
Contractor's Progress and Status ReportA001
N/A N/A 10 DARP
MTHLY
DI-MGMT-81928 NOT 2
Draft
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16
T. Nguyen (PMS435)M. Rausch (PMS435) 3/26/24 3/26/24
See Block 16
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
DD
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 57 Pages
See Block 16
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER___X___:MGMT
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
A002 Contract Work Breakdown Structure
DI-MGMT-81334D NOT 1 SOW Para 3..2.1 NAVSEA PMS435
SEE BLK 16
b. COPIES
A
SEE BLK 16
SEE BLK 16 SEE BLK 16 Draft
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435) 3/26/24
0 0
BLOCK 7: The COR will provide electronic notification of acceptance or rejection.
BLOCK 8: Allow 60 days for review. Contractor shall incorporate all comments and resubmit in accordance with direction from Office of the Secretary of Defense Cost Assessment & Program Evaluation (OSD CAPE).
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKS 10-13: Prepare the CWBS in accordance with DI-MGMT-81334D and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The CSDR Plan is included as a contract attachment.
Contractors shall be required to submit the CWBS Dictionary at frequencies specified in the OSD DDCA-approved contract CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." In the event of a programmatic schedule slip, the Contractor shall notify the COR that a date change is needed. It is the responsibility of PMS435 to submit a date change request with supporting documentation in the CADE system for the event-driven submission for CAPE approval. CAPE will not issue an updated OSD DDCA-approved contract CSDR plan for revisions based solely on date changes.
The CWBS Dictionary shall be submitted electronically using the CSDR Submit-Review System. The required form and file type for each CWBS is specified in its Data Item Description (DID). Data submitters must register through the CADE website (https://cade.osd.mil) and possess a DoD-approved ECA digital certificate or a DoD-issued CAC to obtain a CADE Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the CADE Portal and requesting a CSDR submitter user role. After the registration information has been verified, CAPE shall authorize the user account and requested role. All CADE Portal accounts need to be renewed at least annually.
Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to CAPE using the CSDR Submit-Review System.
The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to CAPE for DDCA approval.
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 57 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER___X___:MGMT
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
A003 Integrated Program Management Data and Analysis Report (IPMDAR)
DI-MGMT-81861C (SEE BLK 16) SOW Para 3.2.2, 3.2.3 NAVSEA PMS435
14. DISTRIBUTION (SEE BLK 16)
MTHLY SEE BLK 16
b. COPIES
A
SEE BLK 16
N/A SEE BLK 16 Draft
See Block 16
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435) 3/26/24
BLOCK 4: The Integrated Master Schedule (IMS) shall be delivered in MS Project file.
BLOCK 8: Review will be for technical content. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: First submission shall be delivered NLT 90 calendar days after contract awarded.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic
0 0
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 57 Pages
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435)
BLOCK 8: Review will be for concurrence. For each submission, allow 5 calendar days for the Government comment resolution/incorporation and redelivery for the submittal.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: An agenda shall be submitted NLT 10 calendar days prior to significant meetings, excluding weekly or bi-weekly meetings.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic notification that the Data Item has been uploaded shall be sent to the distribution list. If CDRL contains classified data, contact COR for direction on delivery.
3/26/24
0 0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
0005 A OTHER__X___:ADMN
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
A004 Meeting Agenda
DI-ADMN-81249C SOW Para 3.2.4, 3.2.9, 3.3.2, 3.6.1, 3.8.1 NAVSEA PMS435
A
SEE BLK 16
N/A SEE BLK 16 Draft
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 57 Pages
A005 Meeting Minutes
DI-ADMN-81250C SOW Para 3.2.4, 3.2.9, 3.3.2, 3.6.1, 3.8.1 NAVSEA PMS435
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER__X___:ADMN
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
N/A
SEE BLK 16
N/A SEE BLK 16 Draft
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435) 3/26/24
BLOCK 8: Review will be for technical content. The Contractor shall incorporate Government comments and resubmit within 5 calendar days of receipt of comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: Minutes shall be submitted NLT 10 calendar days after each scheduled meeting.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 57 Pages
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435) 3/26/24
BLOCK 4: Contractor format is acceptable.
BLOCK 8: Review will be for technical content. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: Shall be delivered 30 calendar days after completion of work as speficied in the IMS or individual TI.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic notification that the Data Item has been uploaded shall be sent to the distribution list. If CDRL contains classified data, contact COR for direction on delivery.
0 0
See Block 16
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
N/A SEE
BLK 16
N/A SEE BLK 16 Draft
A006 System Safety Hazard Analysis Report (SSHAR)
DI-SAFT-80101C (SEE BLK 16) SOW Para 3.3.8 NAVSEA PMS435
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER___X___: SAFT
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 57 Pages
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435) 3/26/24
BLOCK 8: Review will be for technical content. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: Deficiency reports shall be submitted within 10 calendar days of receipt of each item of GFP and thereafter within 10 calendar days of detect occurrence.
Negative reports are not required.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic notification that the Data Item has been uploaded shall be sent to the distribution list. If CDRL contains classified data, contact COR for direction on delivery.
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
See Block 16
A
SEE BLK 16
N/A SEE BLK 16 Draft
A007 Quality Deficiency Report
DI-QCIC-80736 NOT 2 SOW Para 3.2.15 NAVSEA PMS435
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER__X___: QCIC
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 57 Pages
N/A SEE BLK 16 Draft
A008 Health Hazard Assessment Report (HHAR)
DI-SAFT-80106C (SEE BLK 16) SOW Para 3.3.9 NAVSEA PMS435
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
N/A
SEE BLK 16
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER__X____:SAFT
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
BLOCK 4: Contractor format is acceptable.
BLOCK 8: Review will be for technical content. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: Shall be delivered 30 calendar days after completion of work as speficied in the IMS or individual TI.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 57 Pages
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435) 3/26/24
0 0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
0005 A OTHER__X___:SESS
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
A009 Commercial Engineering Design Data and Associated Lists FUNCTIONAL CONFIGURATION AUDIT (FCA)
DI-SESS-81003F NOT 1 (SEE BLK 16) SOW Para 3.4.3, 3.4.6 NAVSEA PMS435
A
SEE BLK 16
N/A SEE BLK 16 Draft
See Block 16
BLOCK 4: Contractor's format is acceptable.
BLOCK 8: Review will be for adequacy of design disclosure information that matches the product configuration and contractual acceptance. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO SUB (PMS435).
BLOCKs 10, 12, AND 13: Shall be delivered 30 calendar days after completion of work as speficied in the IMS or individual TI. Revisions or delta packages shall be delivered per direction of the Contracting Officer's Representative (COR). Final submission shall be delivered NLT 30 calendar days after the final production DD-250 is signed and EQT is completed.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 57 Pages
A010 Product Engineering Design Data and Associated List Product Drawings, As Built Lists, PCK List, 2-D Mockups
DI-SESS-81000F NOT 1 SOW Para 3.4.6, 3.7.5, 3.8.2.4, 3.11.1, 3.11.2 NAVSEA PMS435
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER___X___:SESS
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
A
SEE BLK 16
N/A SEE BLK 16 Draft
BLOCK 8: Review will be for adequacy of design disclosure information which matches the product configuration and contractual acceptance. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: Initial submission provided NLT 30 calendar days after the initial production DD-250 is signed. Revisions or delta packages must be returned by the Government Contracting Officer. Final submission provided NLT 30 calendar days after the final production DD-250 is signed and EQT is completed.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic notification that the Data Item has been uploaded shall be sent to the distribution list. If
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 57 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER___X___:SESS
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
A011 System/Segment Interface Control Specification INTERFACE CONTROL DRAWINGS
DI-SESS-81314A NOT 2 (SEE BLK 16) SOW Para 3.4.6 NAVSEA PMS435
14. DISTRIBUTION (SEE BLK 16)
ONE/R SEE BLK 16
b. COPIES
A
SEE BLK 16
N/A SEE BLK 16 Draft
See Block 16
BLOCK 8: Review will be for technical content. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments and must be a minimum of 5 calendar days prior to commencement of test.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 12 AND 13: 1st submission shall be 60 days prior to FDR. 2nd submission shall be at FDR. Subsequent submissions, all changes shall be identified with change bars.
Subsequent revisions shall be as required to reflect program changes or discrepancies identified during verification of the functional baseline. Final submission shall be a complete document without change bars.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic notification that the Data Item has been uploaded shall be sent to the distribution list. If CDRL contains classified data, contact COR for direction on delivery.
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 57 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
0005 A OTHER___X___:SESS
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
A
SEE BLK 16
N/A SEE BLK 16 Draft
A012 Engineering Change Proposal (ECP)
DI-SESS-80639E SOW Para 3.7.3.1 NAVSEA PMS435
BLOCK 8: Review will be for technical content and contractual acceptance. Allow 24 hours for review of emergency changes and 30 calendar days for Government review of all other changes. For each submission allow 30 calendar days for comment resolution/incorporation and redelivery of approval.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: ECP shall be submitted NLT 30 calendar days after the need is identified by the Contractor or when specified by the Government.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 13 of 57 Pages
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435)
BLOCK 8: Review will be for technical content and contractual acceptance. Allow for 24 hours for review of emergency changes and 30 calendar days for Government review of all other changes. Resubmittal is due 15 calendar days after receipt of Government review comments. Notification of deviation approval/disapproval shall be indicated on the RFV or via direct correspondence from the COR.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: RFV shall be submitted NLT 30 calendar days after the need is identified by the Contractor or when specified by the Government.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic notification that the Data Item has been uploaded shall be sent to the distribution list. If
3/26/24
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
0005 A OTHER__X___:SESS
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
A013 Request for Variation (RFV)
DI-SESS-80640E SOW Para 3.7.3.4 NAVSEA PMS435
A
SEE BLK 16
N/A SEE BLK 16 Draft
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 57 Pages
BLOCK 8: Review will be for technical content. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: Submission shall be delivered NLT 30 calendar days after the need is identified by the Contractor or when specified by the Government.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic
See Block 16
14. DISTRIBUTION (SEE BLK 16)
SEE BLK 16 SEE BLK 16
b. COPIES
A
SEE BLK 16
N/A SEE BLK 16 Draft
A014 Specification Change Notice (SCN)
DI-SESS-80643E SOW Para 3.7.3.7 NAVSEA PMS435
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER__X___: SESS
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 15 of 57 Pages
14. DISTRIBUTION (SEE BLK 16)
ONE/R SEE BLK 16
b. COPIES
A
SEE BLK 16
N/A SEE BLK 16 Draft
A015 Logistics Management Information (LMI)
DI-SESS-82294 SOW Para 3.7.3.8, 3.8.2.4, NAVSEA PMS435
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0005 A OTHER___X___:SESS
AN/BVY-1 ISIS TI-26, TI-28, & TI-30 N00024-24-R-6203 TBD
See Block 16
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435) 3/26/24
0 0
BLOCK 8: Review will be for technical content. The Government will review and comment within 30 calendar days. Resubmittal is due 15 calendar days after receipt of Government review comments.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO UWS (PMS435).
BLOCKs 10, 12, AND 13: Shall be delivered 30 calendar days after completion of work as specified in the IMS or individual TI.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic
I
I
I
I
I
I
I
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY I
TDP______ TM______ I
I
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR I
I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE I 17. PRICE GROUP
I
I
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE I 18. ESTIMATED
I
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION I
LT
REQUIRED
I
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION I
SEE BLK 16 a. ADDRESSEE Final I
Reg Repro I
16. REMARKS I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
15. TOTAL I
G. PREPARED BY H. DATE I. APPROVED BY J. DATE I
I
I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 57 Pages
M. Rausch (PMS435) 3/26/24 T. Nguyen (PMS435) 3/26/24
0 0
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to PEO SUB (PMS435).
BLOCKs 10, 12, AND 13: First submission shall be delivered 10 calendar days after the second full accounting month after contract award. For each submission, allow 30 days for comment resolution/incorporation and redelivery for the submittal.
BLOCK 14: Unclassified Data Item shall be submitted electronically by uploading to the PMS435 site on the Integrated Product Data Management (iPDM) System. Electronic
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
14.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .