Q&A_Notice ID N00019-26-RFPREQ-WPM242-0096 GAU-24 Sources Sought Questions & Answers

Q1. The sources sought announcement lists Jan 28, 2026 11:59 PM EST as the due date/ time in the header of the announcement but in Submittal Instructions states capability statements must be received on or before 13 February 2026. Is the due date 28 JAN or 13 FEB?

A1. The sources sought response is due by 13 February 2026. This has been updated in the announcement header.

Q2. Has the GAU-24/A, built from the TDP, been through any TOP 03-2-45A testing?

A2. Yes.

Q3. Will the Contractor be required to perform parts interchangeability/compatibility testing with parts from the various non-DOD civilian M134 manufacturers ex: Dillon Aero, Profense, Garwood, Highground etc.?

A3. Compatibility testing will be performed by the Government. All vendors are expected to meet the production requirements of the Government TDP, so no variation is expected between vendors.

Q4. Will this requirement be a complete system to include the Gun Control Unit, Feeder/Delinker as well as the ammunition booster and magazine?

A4. The top level GAU-24 includes the gun and the feeder/delinker. No ancillary equipment or weapon system integration hardware will be included.

Q5. Are there already approved/expected suppliers for some of the parts, such as barrels, or will the contractor be required to find sourcing for 100% of the gun?

A5. FN America is currently approved to manufacture the barrel. All other components will need to be produced/sourced by the offeror.

Q6. Does the GAU-24/A have a current military specification available, and if so will it be provided in addition to the TDP? Ex: MIL-M-45920 was used for the GAU-2B/A A6. A specification is currently being developed based on the GAU-2B/A spec.

Q7. Is there a required “proof test”, utilizing high pressure ammunition, of the weapon once manufacturing is complete? If so what will the non destructive testing requirements be?

A7. Yes, likely mirroring GAU-2B/A requirement. Non-destructive testing requirements will include magnetic particle inspection on the barrels and Computed Tomography or similar for cracks in the titanium rotor.

Q8. Is there a test fire requirement of the weapon once manufacturing is complete? If so how many rounds are required.

A8. Yes, 100 rounds maximum. The Government anticipates that this will be performed by the Government acceptance facility.

Q9. Is the intent for this Sources Sought to find a vendor(s) that will produce all parts? In other words, you do not want someone who will just manufacture the barrels?

A9. The Government intends to award to a vendor that will produce all parts of the system.

Q10. Is it a requirement for the contractor to develop, deliver, maintain, and implement a Corrosion Prevention and Control Plan (CPCP) to identify corrosion mitigation measures for operation, storage, and sustainment?

A10. No, the effort does not include a requirement for the contractor to develop, deliver, maintain, and implement a CPCP.

Q11. For corrosion mitigation, will it be required for the contractor to provide a fitted protective cover that is waterproof, yet air-permeable (to prevent moisture buildup) as a Basic Item of Issue (BII) and Component of End Item (COEI) for storage and shipment?

A11. No, it is not required for the contractor to provide a fitted protective cover for corrosion mitigation.

Q12. How does NAVAIR intend to allow alternate sources for this project?

A12. The Government has the ability to qualify additional approved sources.

Q13. Is there a listing of the historical NSNs of the end item and components this gun replaces?

A13. There is not a listing of the historical NSNs available at this time. Replacement part orders would be a separate contracting action via the Defense Logistics Agency (DLA).

Q14. Is the intention to approve multiple sources of supply or just one vendor?

A14. This contract will only be qualifying one vendor to produce the overall end item. Unless a specific drawing is labeled as source controlled, the DLA will manage qualification of sources for replacement parts. DLA will also be responsible for all contracting for sustainment parts.

Q15. Will there be a single NSN for all vendors and end users, or separate NSNs?

A15. There will be a single NSN for all end users. NAVAIR will be the Primary Inventory Control Activity for the DoW.

File details come from the government source that posted it. Updated .