MAGTF UAS Expeditionary (MUX) Industry Day Agenda: June 6-7, 2018

Wingate Hotel – Fredericksburg, VA

DAY 1

• 0730-0845: Sign-In

• 0855-0900 Administrative Remarks Marci Spiotta / PMA-266

• 0900-0905 Introduction Col Frey

• 0905-0920 Opening Remarks LtGen Rudder / DCA

• 0920-0935 Opening Remarks LtGen Walsh / MCCDC

• 0935-1005 Marine Corps MUX Concepts & Overview Col Frey / BGen Adams

‒ CONOPS

‒ Requirement

• 1005-1020 MUX Acquisition Overview CAPT Dodge / PMA-266 ‒ Teaming Arrangements / Small Business Opportunities

• 1020-1030 Break

• 1030-1200 Detailed Briefings:

‒ Budget/Schedule Col Frey

• CBA / ICD

‒ Mission Profiles FMID / PMA-266 ‒ Technical Requirements PMA-266

• Aircraft

• Mission Systems

• Control Station / NIOPS

• Systems Engineering Environment

• 1200-1330 LUNCH

• 1330-1630 One-on-One Session 1 – Separately Scheduled Govt./Industry

DAY 2

• 0830-1630 One-on-One Session 2 – Separately Scheduled Govt./Industry

NAVAIR Public Release 2018-468. Distribution Statement A - "Approved for public release; distribution is unlimited"

MUX Acquisition Overview

CAPT Dodge, Program Manager

PMA-266

2NAVAIR Public Release 2018-468. Distribution Statement A - "Approved for public release; distribution is unlimited"

Program Timeline

• Initial program development FY18-FY20

– Analysis of Alternatives (AoA) and trade studies

– Additional RFI(s) may be released for mission systems, control station, etc.

• Refine the acquisition plan FY19

– Mid-tier rapid prototyping vs. tailored DoD 5000

• MUX acquisition decision FY20

– Commence prototyping and development

– Land-based Early Operational Capability (EOC) within five years of acquisition decision

– Land-based Initial Operational Capability (IOC) within seven years of acquisition decision

– Sea-based IOC within nine years of acquisition decision

3NAVAIR Public Release 2018-468. Distribution Statement A - "Approved for public release; distribution is unlimited"

Intellectual Property

• Expect a mix of contracting elements to include

– Limited

– Government Purpose Rights (GPR)*

– Unlimited rights

• Seeking the right balance that supports sustainment, maintenance, and operations

*Government desires the data rights necessary to enable rapid upgrades

NAVAIR Public Release 2018-468. Distribution Statement A - "Approved for public release; distribution is unlimited"

Integration Strategy

• The overall system integration strategy remains undecided

– Seeking Industry feedback on effective combinations of Original

Equipment Manufacturer (OEM), Government, and Third Party development and integration

• Intended Government Furnished Equipment (GFE)

– Common Control System (CCS)

– Communication systems (e.g., radios, data link terminals, etc.)

– Weapon systems

• Open Architecture

– Architecture that allows for separation of flight controls and mission systems management

– Use of recognized open standards

– Use of model-based engineering where feasible

5NAVAIR Public Release 2018-468. Distribution Statement A - "Approved for public release; distribution is unlimited"

Small Business

• Government desire for rapid delivery presents opportunities for small business participation

• Integration strategy / acquisition strategy being developed with a goal of encouraging / incentivizing small business participation

6NAVAIR Public Release 2018-468. Distribution Statement A - "Approved for public release; distribution is unlimited"

MAGTF UAS Expeditionary (MUX)�Industry Day Agenda: June 6-7, 2018�Wingate Hotel – Fredericksburg, VA
MUX Acquisition Overview ��CAPT Dodge, Program Manager�PMA-266
Program Timeline
Intellectual Property
Integration Strategy
Small Business