CLS_PWS_DRAFT_v_21_Nov14.docx
DOCX document 126 KB Posted
- Attached to
- C-12 Sources Sought Notice Amendment
- Solicitation number
- N00019-15-R-5500
About this file
Draft PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C-12_Pre-Solic_Brief_v_25Jun15.pptx | PPTX presentation | |
| C-12_Industry_Day_attendee_list_June_24_posted_to_FBO_30_June.xlsx | XLSX spreadsheet | |
| DRAFT_UL_CLS_CDRLS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
xx November 2014
N00019-15-R-XXXX
PERFORMANCE WORK STATEMENT
FOR
DEPARTMENT OF NAVY UTILITY LIFT AIRCRAFT
CONTRACTOR LOGISTICS SUPPORT SERVICES
Approved By_________________ Prepared by
PMA-207
1.1 Table of Contents
1.2 SCOPE
1.1 General Scope
This contract is for performance based Contractor Logistics Support (CLS) for site support, aircraft Depot maintenance, engine Depot maintenance, modifications, site stand ups, and strategies that optimize total system availability while minimizing cost and logistics footprint. Sustainment strategies include the best use of public and private sector capabilities through Government and industry partnering initiatives. This contract includes all facilities, labor, services, equipment, tools, parts, materials, and consumables not explicitly stated as Government furnished to perform the work requirements for Site Support, Aircraft Depot, and Engine Depot requirements identified in this Performance Work Statement (PWS), the C-12 and C-26 Depot Level Maintenance Specification, and the TPE331-12, PT6A-41, PT6A-42, and PT6A-60A Engine Specifications as referenced herein.
1.2 Background
Initial C-12 aircraft were procured as a COTS product between 1976 and 1990, with additional aircraft purchased in 2008. C-26 aircraft were manufactured from 1989 to 1993. The C-26 aircraft were obtained from the Air National Guard and deployed in 1998 for Navy missions. Both the C-12 and C-26 are Federal Aviation Administration (FAA) type-certificated, commercial-derivative aircraft modified with Navy and Marine Corps required items, supported and maintained in accordance with Federal Aviation Regulations (FAR), Original Equipment Manufacturers (OEM), and Naval Air Forces Instructions. The aircraft provide on-call, rapid response, cargo and passenger transportation as well as forward-deployed logistics support. Selected C-26 aircraft are tasked with range support. The C-12 T/M/S aircraft, manufactured by Beechcraft Corporation as Model 200 Series (military-designated C-12B, -F, or -M) and Model 350 Series (designated UC-12W), are high-performance, fixed-wing, pressurized, twin-engine turboprops that accommodate a pilot, co-pilot, up to eight passengers, cargo, or a combination of passengers and cargo. The C-26 aircraft, manufactured by Fairchild Industries as Metroliner SA-227 Series, is a high-performance, fixed-wing, pressurized, twin-engine turboprop that accommodates a pilot, co-pilot, 19 passengers, cargo, or a combination of passengers and cargo. Both aircraft programs are in the sustainment phase and have been continuously maintained under competitive CLS services contracts since initial fleet introduction. C-12 inventory changes are anticipated during FY15-FY20. UC-12W is expected to increase from 6 to 12 aircraft via annual procurements and likely divest of an equal number of UC-12F during the same timeframe; TC-12B is expected to divest all 25 aircraft during FY16-17.
1.3 Site Operations
As of 1 November 2014, DoN UL aircraft currently operate from the following locations:
Table 1
| Operating Site |
| Sponsor |
| Aircraft T/M/S |
| Quantity |
| NSA Bahrain |
| AIRLANT |
| UC-12M |
| 3 |
| NAS Corpus Christi, Texas* |
| CNATRA |
| TC-12B |
| 25* |
| NSA Guantanamo Bay, Cuba |
| AIRLANT |
| UC-12M |
| 3 |
| MCAS Beaufort, South Carolina |
| EAST MARINES |
| UC-12M |
| 2 |
| MCAS New River, North Carolina |
| EAST MARINES |
| UC-12F |
| 2 |
| NAF Atsugi, Japan (JP) |
| AIRPAC |
| UC-12F |
| 3 |
| Kadena AB, JP |
| AIRPAC |
| UC-12F |
| 2 |
| NAF Misawa, JP |
| AIRPAC |
| UC-12F |
| 1 |
| MCAS Yuma, Arizona |
| WEST MARINES |
| UC-12F |
| 2 |
| MCAS Iwakuni, JP |
| WEST MARINES |
| UC-12W |
| 2 |
| MCAS Miramar, California |
| WEST MARINES |
| UC-12W |
| 1 |
| MCAS Futenma, JP |
| WEST MARINES |
| UC-12W |
| 1 |
| JRB New Orleans, Louisiana |
| RESERVES |
| UC-12W |
| 2 |
| NAS Patuxent River, Maryland |
| NAVAIR AIR OPS |
| UC-12M |
| 2 |
| NAS Patuxent River, Maryland |
| VXS-1 / NRL |
| RC-12M |
| 1 |
| Manassas, Virginia |
| NAVY |
| UC-12B |
| 1 |
| PMRF Barking Sands, Hawaii |
| AIRPAC |
| EC-26 & RC-26D |
| 3 |
| NAS Sigonella, Italy |
| AIRLANT |
| C-26D |
| 2 |
| NSA Naples, Italy |
| AIRLANT |
| C-26D |
| 2 |
*NOTE: A potential exists for divestiture of all of these aircraft by 1 October 2016, removing Corpus Christi, TX from site support requirement.
1.4 Maintenance Concept
Depot-level maintenance of airframes, engines, propellers, accessories, and all logistics support are provided through a CLS service contract. The C-12D aircraft are under a Federal Aviation Administration (FAA) FAR Part 21. The C-26 aircraft are under a FAA FAR Part 21. Maintenance or repair may be accomplished by the site maintainers, an OEM authorized Service Center, or an FAA-certified or European Aviation Safety Agency (EASA) - certified Part 145 repair station.
As of 1 November 2014, Department of the Navy (DoN) Utility Lift (UL) aircraft are configured with the following turboprop engine and propellers types:
Table 2
| T/M/S |
| Engine T/M/S |
| Propeller Type, Manufacturer & Part No. |
| C-26D |
| Honeywell TPE331-12 |
| 4-Bladed McCauley, 4HRF34C652 |
| EC-26D |
| Honeywell TPE331-12 |
| 4-Bladed McCauley, 4HRF34C652 |
| RC-26D |
| Honeywell TPE331-12 |
| 4-Bladed McCauley, 4HRF34C652 |
| TC-12B |
| Pratt & Whitney PT6A-41 |
| 3-Bladed Hartzell, HCB3TN3GT10178B3R or HCB3TN3GT10178K3R |
| UC-12B |
| Pratt & Whitney PT6A-41 |
| 3-Bladed Hartzell, HCB3TN3GT10178B3R or HCB3TN3GT10178K3R |
| UC-12F |
| Pratt & Whitney PT6A-42 |
| 3-Bladed Hartzell, HCB3TN3GT10178B3R or HCB3TN3GT10178K3R |
| RC-12M |
| Pratt & Whitney PT6A-42 |
| 3-Bladed McCauley, P7025423-0150 |
| UC-12M |
| Pratt & Whitney PT6A-42 |
| 3-Bladed McCauley, P7025423-0150 |
| UC-12W |
| Pratt & Whitney PT6A-60A |
| 4-Bladed Hartzell, HCB4MP3C/M10476NSK |
1.5 Government Responsibilities
Each site’s TPOC is the key individual responsible for verifying that the Contractor is providing supplies and services in accordance with this PWS.
1.6 Flight Hour Estimate
The estimated average of flight hours per month per aircraft at each site is in accordance with Appendix A, Estimated Site Flight Hours.
2.0 APPLICABLE DOCUMENTS and CERTIFICATIONS
The Contractor shall comply with the following documents to the extent necessary to maintain airworthiness certification. The following documents and certifications apply to this PWS:
Aircraft Condition Inspection (ACI) Specification Maintenance Engineering Directive (MED) (C-12)-065 (all revisions) Automated Weight and Balance System, Air Force/Navy (AWBS) Beechcraft Super King Air B-200 and B-300-series Maintenance Manuals COMNAVAIRFORINST (CNAF Instruction) 4790.2B, Naval Aviation Maintenance Plan (NAMP), Chapter 11 DoD 4160.21–M, Defense Materiel Disposition Manual (Precious Metals) DoD Joint Travel Regulations (JTR) Volume 2, Civilian Employees DoD 8570.01-M, Information Assurance Workforce Improvement Program EC-26 and RC-26 Special Mission Equipment Manuals Honeywell TPE-series Engine Maintenance Manuals International Organization for Standardization (ISO) 9000 M7 (SA227) Aerospace Original Equipment Manufacturer (OEM) Maintenance Manuals MIL-STD-2161C(AS) Paint Schemes and Exterior Markings for US Navy and Marine Corps Aircraft National Aerospace Standard (NAS) 411 (Hazardous Materials Management…) National Aerospace Standard (NAS) 412 (FOD Prevention and Tool Control) National Industrial Security Program Operating Manual (NISPOM) NATOPS Manual NAVAIR A1-C12BM-NFM-000 NATOPS Manual NAVAIR A1-C12WA-NFM-000 NATOPS Manual A1-C26DA-NFM-000 NAVAIR Manual 01-1A-509 (Corrosion) NAVAIR Manual 01-1B-50 Joint Service Technical Manual Aircraft (Weight and Balance) NAVY Super King Air B-200 and B-300-series Supplemental Maintenance Manuals OPNAVINST 3710.7 series, NATOPS General Flight and Operations Instructions OPNAVINST 3750.6 series, The Naval Aviation Safety Program OPNAVINST 8023.24B, Navy Personnel Ammunition and Explosives (A&E) Handling Qualification and Certification Program Pratt & Whitney PT6A-series Engine Maintenance Manuals RANSAC AN/APS-140 (V)5 Radar and Radome OEM Maintenance Manuals USMC Order (MCO) 8023.3B, Personnel Qualification and Certification Program for Class V Ammunition and Explosives (A&E)
3.0 GENERAL REQUIREMENTS (Applicable to all CLINS)
3.1 Certifications
The Contractor shall perform all on-site maintenance and flight support of C-12 and C-26 T/M/S in accordance with Chapter 11 of Commander, Naval Air Forces (CNAF) Instruction 4790.2B, OEM maintenance instructions, and Title 14 Code of Federal Regulations (CFR) Federal Aviation Administration Regulations applicable to maintenance of each type of UL aircraft, based upon their specific and unique configurations.
3.2 Site Level Maintenance Certification
The Contractor shall ensure all personnel performing aircraft and engine maintenance are FAA certified and possess a current Airframe and Power Plant (A&P) License. The Contractor shall provide trained, licensed, qualified, and certified Airframe and PowerPlant (A&P) mechanics to maintain DoN C-12 and C-26 aircraft systems and their respective power and propulsion systems, subsystems, ordnance, and support equipment under varying conditions worldwide.
3.3 Quality Assurance Program
The Contractor shall maintain an effective Quality Assurance Program to ensure proper compliance with the maintenance requirements, practices, and procedures with emphasis on material condition of the aircraft. The Contractor’s Quality Assurance Program shall be part of the Contractor’s Federal Aviation Regulation (FAR) Part 145 operations.
3.4 Commercial Quality System
The Contractor shall provide and use a commercial quality system that demonstrates a systems approach for managing quality, safety, and its compliance with all contractual requirements in accordance with ANSI/ISO/ASQ 9001-2008 and 14 CFR Part 145. The Contractor is accountable for all Sub-Contractors and vendors, and as such, shall require a quality system achieving control of the quality of the services and supplies. The Government will perform any necessary inspections, verifications, and evaluations to the Contractor’s overhaul and repair facilities, and operating sites to ascertain the adequacy of the quality system.
3.4.1 Corrosion Control
The Contractor shall implement Corrosion Control that complies with OEM maintenance requirements and the Naval Air Systems (NAVAIR) Corrosion Manual #01-1A-509.
3.4.2 Tool Control
The Contractor shall implement Tool Control that complies with Chapter 11 of CNAF Instruction 4790.2B (NAMP) and meets the National Aerospace Standard (NAS) 412.
3.4.3 Foreign Object Damage Control
The Contractor shall maintain and enforce Tool and Foreign Object Damage (FOD) control programs that meet the requirements of National Aerospace Standard (NAS) 412 and Commander, Naval Air Force Instruction (CNAFINST) 4790.2 series. The Contractor is responsible to ensure that a FOD prevention program, meeting requirements of 14 CFR Part 145, is documented and in effect within the Contractor’s spaces and sub-Contractor facilities, if applicable.
3.5 Hazardous Material and Waste
The Contractor shall implement Hazardous Material (HazMat) handling procedures that comply with local, state and federal laws and regulations concerning the use of Class I Ozone Depleting Compounds (ODC) and Ozone Depleting Substances (ODS). Meet the NAS 411 and comply with and participate in each operating site’s HazMat program(s). Halon has been authorized for use in the engine fire extinguishing systems of C-12 and C-26 via NAVAIR waiver. If and when a substitute becomes available for replacing the Halon, the Contractor shall submit a proposal for its incorporation use an Over and Above (O&A) (CLINs 0X15 and 0X16).
3.6 Precious Metals Recovery
The Contractor shall comply with DoD 4160.21–M, Defense Materiel Disposition Manual (Precious Metals) at each operating site.
3.7 Operations Security Program
The Contractor shall maintain and abide an Operations Security Program as required by DD Form 254. There is no classified material requirement within the scope of the contract.
3.8 Government and Contractor Property
3.8.1 Management of Government Furnished Property
The Contractor shall manage and use all Government Furnished Property (GFP) identified in Appendix B, Government Furnished Property without rental charge in the performance of this contract. The GFP provided under the contract shall not be installed or constructed or otherwise affixed to property not owned by the Government in such a fashion as to be non-severable unless prior written authorization has been obtained from the Procuring Contracting Officer (PCO). The Contractor shall schedule the use of all property covered by this paragraph and the Government will not be responsible for conflicts, delays, or disruptions to any work performed by the Contractor due to contractor use of any or all such property, either under this contract or any other contract under which use of such property is authorized. The Contractor shall procure all additional Support Equipment (SE) not provided by the Government for maintenance. Any misuse or abuse of SE shall be reported in accordance with OPNAV Form 4790/108.
3.8.2 Government Furnished Property Delivery and Transportation The Government will furnish to the Contractor for use in connection with this contract the GFP identified under Appendix B, Government Furnished Property no later than the end of the Transition Phase-in period. The GFP will be delivered at the Government’s expense to the location designated in the Contractor’s proposal for performance.
3.8.3 Contractor Equipment
The Contractor shall provide all administrative office supplies and equipment necessary, for their use, in the performance of the work of this contract unless otherwise specified. Any items not expressly stated as Government furnished shall be the responsibility of the Contractor.
3.8.4 Lost, Damaged, or Destroyed Government Property
The Contractor shall notify the PCO and Contracting Officer Representative (COR) in writing within 24 hours of discovery of lost, damaged, destroyed, or stolen Government Property and submit a Financial Liability Investigation of Property Loss form (DD FORM 200) within five business days of discovery to the PCO and COR.
3.8.5 Disposal of Government Property
The Contractor shall turn in surveyed Government Property into Defense Reutilization and Marketing Office (DRMO) in accordance with DODINST 4160.21-M. The Government Property shall be documented by the Contractor via DD FORM 1149 with a copy provided to the PCO and COR.
3.8.6 Fuel
The Government will provide fuel in support of the DoN UL program. The Contractor shall allow access to the aircraft by Government contract fuel vendors. In the event that Government contract fuel vendors are not available, the Contractor shall immediately notify the PCO and COR for direction.
3.8.7 Material
The Government will provide line fire extinguishers, oxygen, and nitrogen at the sites and deployment sites.
3.9 Government Provided Services
3.9.1The Government will provide the following services and logistics support items:
· Physical security, fire protection, law enforcement
· Building and grounds maintenance
· Emergency medical treatment (if available)
· Hazardous material storage and hazardous waste disposal in accordance with operating site instructions
· Basic telephone and data transmission lines on base
· Post- crash damage aircraft recovery
· On-site security briefings
3.9.2 Security Brief
All site-level contractor personnel shall attend security briefings conducted by the site security officer upon initial check-in and final check-out. These briefings shall be administered in accordance with local directives at the site and existing U.S. Government security manuals and regulations
3.10 Access to Federally Controlled Facilities, Unclassified Sensitive or Non-Sensitive Information, and Unclassified Information Technology System
3.10.1 Base Installation Security Requirements
The Contractor shall comply with applicable DOD, DON, installation, and command security requirements, adhere to installation traffic regulations, and observe installation military law enforcement personnel and facility security official direction.
3.10.2 Base Access Identification
In accordance with SECNAVINST 5510.30B, the Contractor's security representative or the Contractor's Facility Security Officer (FSO) shall coordinate and ensure the provision of security badges required to allow contractor personnel access to designated workspaces and databases as required by the position. Common Access Cards (CAC) may not be issued solely for base access; an alternate base access ID card will be issued for personnel not requiring a CAC.
3.10.3 CAC Identification
A CAC will only be issued to contractor personnel that require access to both a DOD facility and DOD networks on site or remotely, or require remote access to DOD networks that use only the CAC log-on for user authentication. In order to obtain a CAC:
3.2.3.1 The Contractor shall complete an FBI fingerprint check with favorable results.
3.2.3.2 The Contractor shall submit a National Agency Check with Inquiries to the Office of Personnel Management (OPM), or a DOD-determined equivalent investigation.
3.10.4 Control of Common Access Card
The Contractor's security representative/FSO shall repossess and return all CAC to the Government Security Manager or Representative (i.e. COR, Alternate Contracting Officer’s Representative (ACOR), Government Technical Point of Contact (TPOC), Trusted Agent (TA), or Government Sponsor) upon contractor employee change in status, expiration of the CAC, or completion or expiration of the contract.
3.10.5 Security Requirement
The Contractor shall secure required background clearances and access badges to meet operational requirements. The Contractor shall also secure passports, country clearances, VISAs and physical examinations to meet operational requirements. In accordance with Department of the Navy implementation of Homeland Security Presidential Directive 12 and Department of Defense Standardized Investigation Request Procedures, Non National Industrial Security Program (Non-NISP) Investigations are to be conducted for contractors requiring access to an installation, require a CAC and access an IT-II level system, but who DO NOT require security clearance eligibility or access to classified information. The Government security manager will submit an Electronic Questionnaire for Investigations Processing (SF 86), National Agency Check with Local Agency Check and Credit Checks (NACLC) for IT II system access to OPM. The Government security manager will submit required fingerprints for a contractor requiring this Non-NISP process. Once OPM has completed the initial background check, the determination will come back as "Favorable" or "No Determination Made" in the Joint Personnel Adjudication System (JPAS). The Government security manager will notify the COR, ACOR, TPOC, TA, and the Contractor's security representative or FSO if a background investigation returns with No Determination Made or derogatory information. All issues regarding derogatory information (i.e. Medical Evaluations, Letter of Intent, Statement of Reasons, 30 Day JPAS messages, base access, CAC, SAAR-N forms, IT system access) shall be addressed between the COR/ACOR/TPOC/TA, and representative/FSO. No contractor personnel shall have access to any IT system until resolution of derogatory information. All reinvestigations for non-critical sensitive IT-II designated positions are required every 10 years and will be received via JPAS Network by the Government security manager and contractor security representative or FSO. ONLY THE GOVERNMENT SECURITY MANAGER WILL SERVICE THE CONTRACTOR IN JPAS. The Contractor shall ensure the employee maintains a current, favorably adjudicated Personnel Security Investigation (PSI), at the appropriate level, throughout the order performance period of the contract.
3.10.6 JPAS Record Maintenance
The Contractor shall maintain an accurate account of the employee's JPAS record for the submission of visit requests as required. The Contractor's security representative or FSO shall provide the Governments security manager and the COR, the name, title, address and phone number for the Contractor's security representative or FSO. The Contractor's security representative or FSO shall be the primary point of contact on any security matter. When an unfavorable adjudication is returned by Department of the Navy Central Adjudication Facility (DONCAF), the employee shall not be permitted to work on this order effort and if already working, shall be removed without delay. The potential consequences of any requirements under this clause, including denial of access for a current or proposed employee who fails to obtain a favorably adjudicated PSI, in no way relieves the Contractor from the requirement to execute performance under the order within the timeframes specified in the order.
3.10.7 Security Violations
The Contractor shall notify the Utility Lift’s Contracting Officer Representative (COR) or On-Site Government TPOC and installation Security Department within one hour of discovery of a security violation, suspected security violation, or unauthorized site entry.
3.10.8 Information Assurance
The Contractor shall ensure that personnel accessing information systems have the proper and current Information Assurance (IA) certification to perform IA functions in accordance with DOD 8570.01-M. The Contractor shall meet the applicable IA certification requirements to include:
· DOD-approved IA workforce certifications appropriate for each category and level as listed in the current version of DOD 8570.01-M; and appropriate operating system certification for IA technical positions as required by DOD 8570.01-M.
· Documentation validating the IA certification status of personnel performing IA functions.
Contractor personnel who do not have proper and current certifications will be denied access to DOD information systems for the purpose of performing IA functions. DON no longer permits assignment of non-U.S. citizen contractor personnel to IT-II designated positions. Requests to waive the U.S. citizenship requirements for designated IT-II positions may be submitted through the Government Command Security Manager to The Deputy under Secretary of the Navy for Plans, Policy, Oversight and Integration. Failure to provide necessary security and IT documentation in a timely manner will prevent proper in-processing and system access for the employee prior to their reporting date.
3.11 PROJECT MANAGEMENT
3.11.1 Project and Risk Management
The Contractor shall provide Project Management to meet the performance requirements of the PWS. The Contractor shall be responsible for work requirements and work in progress at the start of full contract performance with the exception of any work in progress at a depot facility. Accountability in this case shall transfer from the incumbent provider (outgoing contractor) to the Contractor after delivery from Return to Service (RTS). The Contractor shall establish and maintain a risk management program for the purpose of early identification and mitigation of program risks and mitigation of risk as to not negatively impact contract performance.
3.11.2 Project Manager
The Contractor shall designate a single point of contact responsible for the overall management and performance of the PWS. The Contractor designee shall be responsible for all contractual and operational requirements of the contract. The Contractor shall provide the name and contact information of the designee to the PCO within ten working days of contract award by contracts letter. Any change to this Point of Contact (POC) shall be submitted within five business days.
3.12 Web-Based Information System
3.12.1 Management Information System, Data Collection, Documentation and Reporting Requirements
The Contractor shall provide and maintain a secure Web-Based Information System (WIS) that provides computerized storage of supply logistics support information with on-line web based accessible interactive query and update capability on a real-time basis. This system shall be capable of tracking all supply logistics requirements to include parts repair cycle of Government Property, and inventory management to include spares usage. It shall be capable of performing full supply logistics queries of all Government owned aircraft and engines, inventories, and support equipment by site. The Contractor shall develop and maintain this data for the life of the contract. The Contractor shall provide the Government access to this WIS through a web site via the Internet. The Contractor shall manage the accessibility of the identified Government personnel authorized to use the WIS. The WIS shall be able to be accessed through secure Navy Marine Corps Intranet (NMCI) computers. The Contractor shall provide the Government the ability to print view-only reports from the WIS. The Contractor shall initiate and keep current all records and technical data identified in this PWS, including Supplemental Type Certificate (STC), Major Repair and Alteration (FAA Form 337), and Authorized Release Certificates/Airworthiness Approval Tags (FAA Form 8130 series).
3.12.2 WIS Performance
This WIS shall provide real-time accurate information and documentation to include the following:
· Over and Above labor and material costs accumulated against the NTE as defined in the task order and in accordance with Appendix C, Over and Above Procedures
· CDRL and non-CDRL deliverables
· Daily status information: aircraft Bureau Number (BUNO), serial number, site identifier, aircraft status to include maintenance and supply data (if applicable), estimated time for Full Mission Capable (FMC), current aircraft hours, and comments
· High time removal components, aircraft and engine to include time installed and time remaining as referenced in the applicable maintenance manual
· Projected scheduled maintenance
• Stock Inventory Report of all GFP that shall include Part Number, Serial or Lot Number, Type, Description, Property Tag or Barcode, Nomenclature, Quantity and Units of Issue, Stock Site Code, Storage Location, and Status
3.12.3 WIS Government Unlimited Rights
The Contractor shall provide the Government unlimited rights to all information maintained on the WIS that was procured by the Government. Information maintained in the WIS shall be considered delivered to the Government upon posting to the WIS. When Contract Data Requirement List (CDRL) deliverables are posted on the WIS, the Contractor shall notify the Government upon posting via email in accordance with CDRL Exhibits (A), (B), and (C).
3.13 Essential Personnel
3.13.1 Essential Personnel Positions
The Contractor shall ensure the following job positions in accordance with Appendix D, Essential Personnel positions are manned: The Contractor shall ensure the essential personnel positions are not vacant for more than 30 consecutive days. Any change to these personnel shall be submitted to the Program Office within two business days after the official change.
3.13.2 Distinctive Attire and Safety Apparel
Contractor personnel directly associated with aircraft maintenance shall wear distinctive attire with the Contractor’s name or emblem that clearly identifies the Contractor and allows for easy identification from a distance. The Contractor shall be responsible for the requirements of, and ensuring the use of, safety shoes and all safety apparel and equipment by Contractor personnel as required by NOSH, OSHA, and other Government regulations.
3.13.3 Contractor Personnel Flying in Government Aircraft
Contractor personnel are authorized to fly in a passenger status in Government aircraft when such flights are in the best interest of the Government. It is the responsibility of the Contractor to ensure that the requirements of the Military Service are met in order to fly in Government aircraft.
3.14 Subcontractor Management
The Contractor (Prime) shall oversee and manage its subcontractors in a manner that complies with all requirements of this PWS and associated attachments. In particular, the Contractor shall ensure that subcontractor(s) problems are identified and resolved to minimize impact to the Government and meet readiness requirements. The Contractor shall ensure subcontractor compliance with labor and safety standards. If the subcontractor is identified as a small business set-aside, the Contractor shall assess the subcontractor’s compliance with specified small business guidelines.
3.15 Instruction Conflicts
If the Contractor encounters a conflict between this PWS and the documents cited in paragraph 2.0, contact the Program Management, Air (PMA) Utility Lift Team (C-12 and C-26), for instruction.
4.0 TRANSITION PHASE-IN (Option CLIN 0001) (FFP)
4.1 Transition Phase-In
The Transition Phase-In period is defined as the first 60 days of contract performance. The Transition Phase-In shall be the Contractor’s preparation period for the purpose of hiring, relocating, and training of personnel (including site familiarization), ordering material, inventorying GFP, and coordinating all Phase-In matters associated with the Contractor’s execution of the C-12 CLS maintenance and logistics functions to enable the Contractor’s personnel to perform the requirements specified in this contract. During the Transition Phase-In Period, the Incumbent Contractor shall continue to be fully responsible for continued operations. If there is a modification program in work, the Incumbent Contractor shall continue with the modification until all scheduled aircraft have been completed and accepted by the Government. The Incumbent Contractor shall continue to manage and maintain accountability of material in the pipeline until delivered and accepted by the Government.
4.1.1 Transition Plan
The Contractor, in conjunction with the Incumbent Contractor, shall implement its Transition Phase-In Plan with guidance provided by the Government.
4.1.2 Government Furnished Property Inventory
Within the Transition Phase-In period, the Contractor shall conduct an inventory with the Incumbent Contractor and a designated Government representative at each primary operating site. The Contractor shall inventory all GFP in accordance with Appendix A, Government Furnished Property. The Contractor shall submit the Material Utilization and Forecasting Report in accordance with CDRL A001.
4.1.3 Transition Phase-In Status Reporting
The Contractor shall report transition progress to the UL Integrated Product Team (IPT) Lead on a weekly basis via teleconference.
4.1.4 Post-Award Conference
The Contractor shall attend a Post-Award Conference at Government facility, to include no more than a total of four contracts and management personnel, with the Government no later than 30 days after contract award at Patuxent River, MD. The meeting will cover the topics as set forth in Federal Acquisition Regulation Subpart 42.5. Additionally, the Contractor shall demonstrate its management procedures, provide progress assessments, review technical and other specialty area status, and schedule dates for near term critical meetings and actions. An agenda detailing conference topics will be generated and disseminated by the Government.
4.1.5 Access and Site Familiarization Visits
The Government will allow the Contractor access to all primary operating sites. The Contractor shall make arrangements for this access through the Government. Designated Contractor personnel will be permitted access to observe all operations such as workflow, priorities, scheduling, equipment handling and processing, parts storage, safety and security. Familiarization visits shall not interfere with the activities of the Incumbent Contractor’s personnel or with squadron operations.
4.1.6 Operations
During the Transition Phase-In period, the Contractor shall coordinate with the Incumbent Contractor those activities required for turnover and continued operations in accordance with the PWS.
4.1.7 Material Accountability
During the Transition Phase-In period, the Contractor shall coordinate with the Incumbent Contractor all activities required for turnover and continued accountability of material ordered and in shipment until delivered and accepted by the Government.
4.1.8 Export Control Licenses
The Contractor shall have export license requests for Atsugi, Japan; Sigonella, Sicily, and Muharroq, Bahrain for the following items that are International Traffic in Arms Regulation (ITAR) controlled no later than 30 days after contract award:
| NOMENCLATURE | PART NUMBER | ||||
| TACAN Transceiver | ARN-154 | 805D0602-43 | |||
| TACAN Control Panel | 805D0660-32 | ||||
| TACAN Transceiver | ARN-153 | 622-8149-002 | |||
| TACAN Transceiver ARN-154 | 805D602-43 | ||||
| TACAN Control Panel | 622-2511-003 | ||||
| TACAN Transceiver ARN-154 | 805D602-43 | ||||
| TACAN Control Panel | 805D603-12 | ||||
| IFF Transponder | 4079100-0509 | ||||
| IFF Transponder | 4079100-0514 | ||||
| IFF Transponder XS-950 | 7519350-70051 | ||||
| IFF Control Panel | 4077156-0504 | ||||
| IFF Control Panel | G7300-01 | ||||
| IFF Appliqué (KIV-119) | 4079080-0501 | ||||
| IFF Appliqué (KIV-77) | ON696419 | ||||
| TA-24 Precise Positioning System | 24835-41-U50G | ||||
| ARC-210 1851A(C) Transceiver | 822-1707-002 | ||||
| ARC-210 Control Panel | 822-1276-002 |
AN/AAR-47B(V)2 Sensor System:
| Computer Processor | 3313-AS-300-5 | ||
| Optical Sensors | 3313-AS-700-3 | ||
| Control Indicator | 3313-AS-450-1 | ||
| Countermeasure Signal Simulator (Test Set) | 3313-AS-C01-5 |
AN/ALE-47(V) Dispenser System:
| Control Display Unit | 179740-0002 | ||
| Programmer | 179730-0006 | ||
| Sequencer | 179250-0003 | ||
| Safety Switch | 179720-0001 | ||
| Dispenser | 179750-0001 | ||
| AN/ALM-290 Test Set | 3738AS100-001 |
SITE OPERATION REQUIREMENTS (CLIN 0X02) (FFP)
5.1 Utility Lift Aircraft Scheduled and Unscheduled Site Level Maintenance The Contractor shall perform all scheduled and unscheduled site-level maintenance on all aircraft, engines, propellers, and support equipment (SE). The Contractor shall perform phase maintenance, flight-line support, inspections, and Service Actions (SA) compliance actions, whether on-site or during a short-term deployment (30 days or less) or during a detachment, in accordance with applicable documents. Site support shall accommodate 25% temporary variances to flying hour estimates in Appendix A, Estimated Flight Hours. Flight hours in excess of the 25% variance will be charged to CLIN 0X42. The Contractor shall meet the performance requirements in accordance with Appendix E, Performance Metrics.
5.1.1 Service Action Compliance
The Contractor shall perform all maintenance for flight line-related evolutions and Government-directed compliance with Service Actions (SA), including and Service Bulletins (SB), Technical Directives (TD) and Maintenance Engineering Directives (MED).
5.1.2 Transient Aircraft
The Contractor shall provide scheduled and unscheduled maintenance for transient C-12 and C-26 aircraft on a non-interference basis with home-site mission readiness. Maintenance of transient aircraft encompasses the occasional or infrequent, not routine, support of C-12 and C-26 aircraft incoming, arriving and resulting in temporary stop-over (including nights and weekends) at another C-12 or C-26 site. Every effort shall be made to meet, service, safeguard and prepare the transient aircraft for departure acceptance on a non-interference basis with home-site mission readiness.
5.1.3 Aircraft Appearance and Servicing
The Contractor shall ensure that the aircraft’s interior and exterior are maintained in a serviceable condition, ensuring they are clean and free of safety hazards, FOD, and corrosion.
5.1.4 Aviation Life Support System and Propeller Maintenance
The Contractor shall maintain Aviation Life Support Systems (ALSS) (e.g. aircrew life vests and rafts, oxygen masks, survival radios and flares) and minor on-site propeller repair (e.g., feathering blade damage).
5.1.5 Mission Equipment
5.1.5.1 The Contractor shall maintain C-26 special mission radar equipment in accordance with OEM manuals. The Contractor shall remove and replace C-26 mission equipment as required.
5.1.5.2 The Contractor shall remove and replace the C-12 special mission equipment attached to the Manassas, VA aircraft and the VXS-1 Patuxent River, MD aircraft in accordance with OEM manuals. The repair or replacement of special mission equipment shall be addressed as an O&A effort under sections 13.0 and 14 (CLINs 0X15 and 0X16) of this PWS.
5.1.6 Ammunition and Explosives
The Contractor shall establish and maintain an Ordnance Qualification and Certification program. The program shall include management structure to ensure maintenance technicians are properly trained and certified for safe and secure handling and storage of Ammunition and Explosives (A&E) in accordance with OPNAV Instruction 8023.24B and USMC Order (MCO) 8023.3B. At present, C-12 and C-26 A&E includes the MK-79 Foliage penetrator (pencil flares) within survival equipment, fire (extinguisher) bottles for aircraft engines, and AAR-47/ALE-47 Aircraft Survivability Equipment (ASE) for the UC-12W aircraft. Training and handling shall include flare loading and unloading procedures. The Contractor shall submit an Ordnance Certification Status Report in accordance with CDRL A002/AA02/AB02/AC02/AD02.
5.1.7 Corrosion Control
The Contractor shall implement an integrated Corrosion Control Program at all sites.
5.1.8 Engine Changes
The Contractor shall remove and install engines and rental engines, including installing Quick Engine Change (QEC) parts when this work is required to be performed on site. The Contractor shall pre-position replacement engines for scheduled overhauls in order to meet mission requirements. Replacement engines shall be of the most current engine configuration at the time of installation.
5.1.9 Flight Operation Scheduling
The Contractor shall utilize a flexible work schedule for flight operations. Flight operations consist of scheduled and unscheduled flights any time, 24 hours a day and seven days a week. Each site ACOR will provide a flight schedule to the Contractor by 1630 hours (local time) the day before operations. (Exception: see 5.1.9.2 Holiday Scheduling).
5.1.9.1 Unscheduled Flight Operations
For unscheduled flights, the ACOR will provide the Contractor five-hour notice prior to flight. The Contractor shall provide a point of contact for notification of unscheduled flights to the site ACOR.
5.1.9.2 Holiday Scheduling
For flights occurring on U.S Government holidays, the ACOR will provide the Contractor 48-hour notice for scheduled flights and five-hour notice for unscheduled flights
5.1.9.3 Aircraft Launch Readiness
The Contractor shall ensure that the aircraft is ready for launch one hour before the scheduled departure time. The Contractor shall remain onsite until successful aircraft departure.
5.1.10 Site Operations Aircraft Recovery
The Contractor shall be on-site one hour before scheduled flight arrival to perform the following aircraft recovery procedures after mission completion, 24 hours a day and seven days a week:
5.1.10.1 Post-Flight debrief with the aircrew.
5.1.10.2 Post-Flight inspection of the aircraft.
5.1.10.3 Perform Aircraft Cleaning Checklist.
5.1.10.4 ITAR Removal. When required, the Contractor shall remove ITAR regulated items from the aircraft and store them at its base site while depot level maintenance is performed on the aircraft at OCONUS locations.
5.1.11 Functional Check Flights
The Contractor shall perform pre-flight briefings to the aircrew advising of all major work accomplished that may impact the flight characteristics of the aircraft prior to the Functional Check Flight (FCF). The Contractor shall perform a post-flight debriefing with the aircrew to address FCF discrepancies.
5.1.12 Weight and Balance
The Contractor shall perform aircraft Weight and Balance in accordance with NAVAIR Manual 01-1B-50 Joint Service Technical Manual Aircraft and FAA procedures.
5.1.12.1 Automated Weight and Balance System (AWBS). The Contractor shall use the Air Force/Navy Automated Weight and Balance System, Version 10.0 (AWBS 10.0) or higher, to document aircraft weight and balance.
5.1.12.2 Weight and Balance Records. The Contractor shall ensure that DD-365 copies are maintained in the aircraft and in the flight planning area for aircrew reference.
5.1.13 Short-Term Deployment
The Contractor shall maintain aircraft during short-term deployments. Short-term deployment is defined as any deployment up to 30 days away from the base sites. The aircraft’s home base site flight hour rate shall be used for short-term deployments. Travel and Per Diem for all short-term deployments will be funded under CLIN 0X04.
5.1.14 Aircraft Status
The Contractor shall track the status of each aircraft at each site. The Contractor shall report via the WIS the daily status of each aircraft at each site. The Contractor shall submit a monthly Aircraft Status Report in accordance with CDRL A003/AA03/AB03/AC03/AD03.
5.2 Site-Related Services
The Contractor shall provide housing (including utilities) and parts transport vehicles when these options do not exist due to the site location or circumstances (e.g., Guantanamo Bay). The Contractor shall establish and maintain site-related services including utilities such as electrical, computer, phone, and internet communications services.
5.3 Hazardous Materials
The Contractor shall comply with the health and safety requirements of all Bases and Sites, including those set forth for handling, use, disposal, and bulk storage of hazardous materials (HazMat). The Contractor shall ensure that Contractor-procured HazMat and GFP supplied for C-12 and C-26 are accounted for separately from non-C-12 and C-26-procured materials. The Contractor shall provide locked and segregated storage of small quantities of HazMat required for daily and weekly use at or near the aircraft maintenance spaces.
5.4 Overhaul and Rework Projections
The Contractor shall gather, sort, tabulate, and perform trend analysis of source maintenance and fatigue data, providing five-year aircraft, engine, and propeller overhaul and airframe rework projections. Airframe rework covers areas determined to extend the aircraft’s airworthiness and service life (e.g. wing spar replacement, adding strengthening doublers to the belly skin). The Contractor shall submit a Five Year Overhaul and Rework Projections Report in accordance with CDRL A004/AA04/AB04/AC04/AD04.
5.5 Tooling and Support Equipment Maintenance
The Contractor shall maintain all tools, test equipment, and support equipment in accordance with the respective OEMs publications. The Contractor shall replace GFP (Appendix B) valued below $1,000 that is no longer repairable. The Government will replace GFP (Appendix B) valued above $1,000, unless the damage or loss was due to Contractor negligence as determined under FAR 52.245-1. The Contractor shall provide the cost estimate to the C-12 or C-26 DAPML for the repair. The DAPML will disposition the cost estimate. The Contractor shall provide a Firm-fixed Price Proposal for the new GFP at the request of the PCO. These types of expenses shall be covered under CLIN 0X03.
5.6 Configuration Management
5.6.1 Configuration Status Accounting
The Contractor shall track configuration status of the UL aircraft, engine, systems, subsystems, and support equipment in accordance with ANSI/EIA-649B. The Contractor shall not perform any aircraft configuration modification without approval from the Procuring Contracting Officer (PCO) or the Administrative Contracting Officer (ACO). The Contractor shall submit a Configuration Status Accounting Report in accordance with CDRL A005/AA05/AB05/AC05/AD05.
5.6.2 Software Incorporations
The Contractor shall purchase and install FAA-approved software updates into all avionics system equipment and all Flight Management System (FMS) training devices per site. The Contractor shall submit the Configuration Status Accounting Report in accordance with CDRL A005/AA05/AB05/AC05/AD05.
5.6.3 Technical Directive Compliance
The Contractor shall track incorporations of all Government approved Technical Directives for the T/M/S aircraft, systems and components, including engines, propellers and support equipment. The Contractor shall submit the Technical Directive Compliance Report in accordance with CDRL A006/AA06/AB06/AC06/AD06.
5.7 Accident and Incident Reporting
The Contractor shall track and report all accidents and incidents that occur in the performance of this contract. The Contractor shall submit the Accident/Incident Report in accordance with CDRL A007/AA07/AB07/AC07/AD07.
5.8 PROPERTY AND PARTS MANAGEMENT
5.8.1 Property Management System
The Contractor shall possess and maintain a Property Management System in accordance with Federal Aviation Regulation Part 145 guidelines and Federal Acquisition Regulations Part 45. Such a system shall be used to maintain property control, procurement, packaging and packing, transportation, and quality assurance (including receiving inspection and positive control of all defective not suitable for flight items) for all parts and material used in support of UL aircraft.
5.8.2 Federal Aviation Administration Approved Parts and Material The Contractor shall provide FAA approved parts and materials, inspect the parts and materials, and maintain inventory control. All refurbished parts and material shall be refurbished in accordance with FAA standards and shall possess a FAA 8130 tag. Refurbished or repaired parts that do not have an 8130 tag shall not be installed on a Government aircraft.
5.8.3 Site-Level Maintenance Material
The Contractor shall track parts, stock, and provide consumable parts required to maintain the C-12 and C-26 aircraft, engine, systems, subsystems and support equipment. This is to include all material to accomplish Site-Level Inspections and Repair type Service Bulletins, on- and off-wing engine HSI and GBI, propellers, aircraft recovery, Temporary Duty (TDY) and extended detachments. The Contractor shall meet the Mission Capable Rate in accordance with Appendix E, Performance Metrics.
5.8.4 GFP Inventory
The Contractor shall conduct a semi-annual inventory of all GFP at all sites. The Contractor shall submit a Material Utilization and Forecasting Report in accordance with CDRL A001/AA01/AB01/AC01/AD01.
5.8.5 Cannibalization
The Contractor shall obtain TPOC and Program Office approval prior to any aircraft cannibalization actions. The Contractor shall document the cannibalization actions in the Aircraft Daily Status Report located on the WIS.
5.8.6 Obsolescence
The Contractor shall track and resolve parts obsolescence and Diminishing Manufacturing Sources and Material Shortages (DMSMS). The Contractor shall submit an Obsolescence and DMSMS Summary in accordance with CDRL A009/AA09/AB09/AC09/AD09.
5.9 Transportation
The Contractor shall ship and transport all parts and material worldwide in the execution of this contract. When commercial transportation is used, the Contractor shall meet the Appendix E, Performance Metrics.
5.9.1 Shipping
The Contractor shall ship by using best commercial practices to meet Appendix E, Performance Metrics. The Contractor shall be responsible for all packaging and handling.
5.9.2 Freight Forwarding
The Contractor shall provide freight forwarding and coordination capability to expedite UL parts through foreign customs when required.
5.9.3 Hazardous Material
The Contractor shall prepare and mark all hazardous material according to the requirements of the International Air Transportation Association and host country regulations for surface movement.
5.10 Maintenance Record Keeping
The Contractor shall maintain the following records and forms at each of the sites:
5.10.1 Naval Aircraft Flight Record, OPNAV Form 3710/4
This form will be completed in its entirety by the pilot and turned in to the Contractor. The Contractor shall verify the flight data and forward the form to each site ACOR for the UL aircraft.
5.10.2 Aircraft Inspection and Acceptance Record, OPNAV Form 4790/141 The Contractor shall complete the “Safe for Flight” certification portion of the form. After the pilot signs this document, the Contractor shall provide this form for each site ACOR. This form is signed by the person who performed the daily pre-flight inspection indicating the aircraft is safe for flight. The Contractor shall keep this completed form in the Aircraft Discrepancy Book for 10 flights in accordance with the COMNAVAIRFORINST 4790.2B.
5.10.3 Airworthiness Certification Letter
The Contractor shall write an annual Airworthiness Certification Letter that is carried on the aircraft at all times. The letter shall state that the aircraft meets continued airworthiness in accordance with OEM and FAA requirements.
5.10.4 Aircraft Logbooks
The Contractor shall maintain and update UL FAA logbooks in accordance with 14 CFR Part 43.
5.10.5 Engine Logbooks
The Contractor shall maintain and update FAA logbooks for the UL engines in accordance with 14 CFR Part 43. The Contractor shall maintain the appropriate records at each site for each engine.
5.11 Technical Data and Jeppesen Subscriptions
5.11.1 Subscriptions
The Contractor shall establish and maintain all C-12 and C-26 system and subsystem OEM (third party) subscriptions to include Operator, Technical, and Maintenance Manuals, Illustrated Parts Catalogs, Wiring Diagrams and Service Bulletins. Additionally, the Contractor shall establish and maintain monthly Jeppesen subscriptions; specifically a navigation subscription for the C-12F, C-12M, C-12W and C-26D aircraft; and an additional 14-day map update for the C-12W aircraft.
5.11.2 Libraries
The Contractor shall establish and maintain libraries of all manuals, publications, drawings and technical support data at each aircraft site. Additionally, updated publication copies shall be provided to each site and the Utility Lift Team at the PMA. (Updates to Navy Supplemental, Wiring, and Illustrated Parts Catalogs are covered in Section 25.0).
5.12 Meetings and Communication
5.12.1 Program Management Reviews
The Contractor shall coordinate and host an annual Program Management Review (PMR) at CONUS location as agreed upon with the Utility Lift Lead. The duration of each PMR shall be no more than three days with an additional two travel days and shall be conducted at a time mutually agreeable to the UL IPTL and the Contractor's Project Manager. The Contractor’s essential contracts, management, logistics, and engineering personnel shall attend.
5.12.1.1 Meeting Agendas
The UL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .