Exhibit_A_CDRLs.pdf

PDF 190 KB Posted

Attached to
C-26 CLS RFP Federal contract opportunity
Solicitation number
N00019-15-R-0089
Issued by
Department of the Navy Naval Air Systems Command

About this file

C-26 Exhibit A - CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to C-26 CLS RFP, newest first.
File Type Posted
Question_posed_Nov._18th..xlsx XLSX spreadsheet
Question_posted_Nov_16th..xlsx XLSX spreadsheet
Questions_posted_in_FBO_on_11-12-15.xlsx XLSX spreadsheet
Questions_posted_in_FBO_November_6th..xlsx XLSX spreadsheet
Att_2_-_QASP_(V4).pdf PDF
Att_1E_-_Performance_Metrics_(V3).pdf PDF
L-8_Vol_4_Price_Matrix.xls XLS spreadsheet
RFP_N00019-15-R-0089_Amendment_0003.pdf PDF
Questions_posted_in_FBO_on_10-29-15.xlsx XLSX spreadsheet
N00019-15-R-0089_Amendment_0002.pdf PDF
CDRL_A011_parts_Usage_List_for_1_March_-_31_May_2015.docx DOCX document
CDRL_A011_Parts_Usage_List_for_June_1_-_Aug_31_2015.docx DOCX document
CDRL_A011_Parts_Usage_List__1_Dec_2014_-_28_Feb_2015.docx DOCX document
CDRL_A011_Parts_Usage_List_for_Sept_1_-_Nov_30_2014.docx DOCX document
CDRL_A011_parts_Usage_List_for_1_March_-_31_May_2015.docx DOCX document
Batch_1_Answers.xlsx XLSX spreadsheet
CDRL_A011_Parts_Usage_List_for_Sept_1_-_Nov_30_2014.docx DOCX document
Att_1E_-_Performance_Metrics_(2).xlsx XLSX spreadsheet
Exhibit_C_CDRLs.pdf PDF
Att_1H_-_Depot_Schedule.xlsx XLSX spreadsheet
Att_1B_-_Government_Furnished_Property.xls XLS spreadsheet
L-6_Vol_3_Tech_MP_Chart.xls XLS spreadsheet
L-5_Vol_3_ExpTables.xls XLS spreadsheet
Att_1_-_C-26_CLS_PWS.pdf PDF
COMNAVAIRFORINST_4790.2_Chapter_11_15_May_12.pdf PDF
Exhibit_B_CDRLs.pdf PDF
L-8_Vol_4_Price_Matrix.xls XLS spreadsheet
Att_1A_-_Estimated_Flight_Hours.xlsx XLSX spreadsheet
L-3_Vol_2_PP-1_Contract_Data.xls XLS spreadsheet
SECNAVINST_5510.30B.pdf PDF
C-26_Aircraft_Top_Degraders.xlsx XLSX spreadsheet
C26_Annual_Inventory_OCT_31_2014.xls XLS spreadsheet
Att_1D_-_OAWR_Procedures_and_Form.doc DOC document
Att_1C_-_Critical_Job_Positions.docx DOCX document
Att_1G_-_CFSR_Format.xlsx XLSX spreadsheet
NAS_411_Hazardous_Materials.pdf PDF
RFP_(2015-09-10).pdf PDF
DoD_Joint_Travel_Regulations.pdf PDF
MIL-STD-2161C_Paint_Spec.pdf PDF
C26_Flt_Hrs__MC_Rates_by_Aircraft.xlsx XLSX spreadsheet
L-7_Vol_3_Tech_SB_Goals.xls XLS spreadsheet
L-4_Vol_3_Tech_CRM.docx DOCX document
C26_Parts_Usage_List_1_March_1May_2015.docx DOCX document
DCMA-INST-8210-1C.pdf PDF
DODI_5220.22-M_National_Industrial_Security_Program_Operating_Manual.pdf PDF
C-26_Technical_Library_Table_of_Contents.docx DOCX document
Att_1I_-_Paint_Specifications.doc DOC document
Att_2_-_QASP_(V3).docx DOCX document
DoD_4160.21-M__Defense_Materiel_Disposition_Manual_August97.pdf PDF
DoDD_5220.22_National_Industrial_Security_Program.pdf PDF
Show all 50

C-26 CLS RFP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Material Utilization and Forecasting Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81947 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 4.3 & 5.7.4

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

Two Times

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

31 December 2016

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 10 & 12: Semi-annual event. When CLIN 0001 is exercised, the Contractor shall submit the deliverable within 30 days after the materials inventory audit.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

Utility Lift IPTL

AIR 4.1.1.3

AIR 6.6.1.1

(See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

David A. Adams

J. DATE

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Ordnance Certification Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.1.6

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

40 DACS

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Block 13: Subsequent deliverables shall be submitted on the 10th of every month.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.

AIR 6.6.1.1

AIR 4.1.1.3

COR / TPOC

Utility Lift IPTL (See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

David Adams

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MISC

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Technical Report - Study/Services

3. SUBTITLE

Monthly Aircraft Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B(T) See Block 16

5. CONTRACT REFERENCE

PWS PARA 5.1.14

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

See Block16

8. APP CODE

A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable. Analytic effort is computation of monthly Mission Capability (MC) rate for each aircraft with substantiation.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: The Contractor shall submit the first deliverable on the 15th of the following month after the first full month of execution.

Subsequent deliverables shall be submit on the 15th of each month.

The USG has 10 days to review and to send any comments back to the Contractor. The Contractor has 5 days to submit the revised deliverable.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

Utility Lift IPTL

AIR 6.6.1.1

(See Block 16)

AIR 4.1.1.3

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Five Year Overhaul and Rework Projections Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.3

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ANNLY

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable. Shall be in MS Excel.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Block 12: Submit the first deliverable January 15th of the PoP.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for Operation, Maintenance, Installation, or Training (OMIT) of the C-26.

AIR 6.6.1.1

AIR 4.1.1.3

(See Block 16) Utility Lift IPTL

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

SESS

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Configuration Status Accounting Information

3. SUBTITLE

Configuration Status Accounting Report

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-81253A(T) (See Block 16)

5. CONTRACT REFERENCE

PWS para 5.5.1

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable. Tailor DID as follows.

Delete 2a, 2b, 2j, and 2i. Use and deliver in MS Excel.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: The Contractor shall submit the first deliverable on the 15th of the following month after the first full month of execution.

Subsequent deliverables shall be submitted on the 15th of each month.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

AIR 4.1.1.3

PMA207CM

AIR 6.6.1.1

(See Block 16)

COR / TPOC

Utility Lift IPTL

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Technical Directive Compliance Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80224B (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.5.2

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: The Contractor shall submit the first and subsequent deliverables within 15 days of incorporation or depot event completion.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

AIR 4.1.1.3

PMA207CM

(See Block 16)

AIR 6.6.1.1

COR / TPOC

Utility Lift IPTL

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

SAFT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Accident / Incident Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-81563 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.6

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: Deliverables shall be submitted within 24 hours after each accident and incident event.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for Operation, Maintenance, Installation, or Training (OMIT) of the C-26.

Utility Lift IPTL

AIR 4.1.1.3

AIR 6.6.1.1

COR / TPOC

(See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

SESS

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Source Data for Forecasting Diminishing Manufacturing Sources and Material Shortages

(DMSMS)

3. SUBTITLE

Obsolescence and DMSMS Summary

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81656 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.7.6

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

QTRLY

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: Submit the first deliverable within 15 calendar days after the first completed Government fiscal quarter of the contract.

Subsequent deliverables shall be submitted within 15 days of the completion of each Government fiscal quarter.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.

AIR 4.1.1.3

AIR 6.6.1.1

Utility Lift IPTL (See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

David A.Adams

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Briefing Material

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81605 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.11.1.2

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: Deliverables shall be submitted 10 days prior to every Program Management Review.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

(See Block 16)

AIR 6.6.1.1

AIR 4.1.1.3

Utility Lift IPTL

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA01

2. TITLE OF DATA ITEM

Material Utilization and Forecasting Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81947 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.7.4

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

Two Times

12. DATE OF FIRST

SUBMISSION

30 June 2017

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

31 December 2017

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

Utility Lift IPTL

AIR 4.1.1.3

AIR 6.6.1.1

(See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA02

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Ordnance Certification Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.1.6

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

40 DACS

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Block 13: Subsequent deliverables shall be submitted on the 10th of every month.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.

AIR 6.6.1.1

AIR 4.1.1.3

COR / TPOC

Utility Lift IPTL (See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MISC

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA03

2. TITLE OF DATA ITEM

Technical Report - Study/Services

3. SUBTITLE

Monthly Aircraft Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B(T) See Block 16

5. CONTRACT REFERENCE

PWS PARA 5.1.14

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

See Block16

8. APP CODE

A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable. Analytic effort is computation of monthly Mission Capability (MC) rate for each aircraft with substantiation.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: The Contractor shall submit the first deliverable on the 15th of the following month after the first full month of execution.

Subsequent deliverables shall be submit on the 15th of each month.

The USG has 10 days to review and to send any comments back to the Contractor. The Contractor has 5 days to submit the revised deliverable.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

Utility Lift IPTL

AIR 6.6.1.1

(See Block 16)

AIR 4.1.1.3

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA04

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Five Year Overhaul and Rework Projections Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.3

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ANNLY

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable. Shall be in MS Excel.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Block 12: Submit the first deliverable January 15th of the PoP.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for Operation, Maintenance, Installation, or Training (OMIT) of the C-26.

AIR 6.6.1.1

AIR 4.1.1.3

(See Block 16) Utility Lift IPTL

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

SESS

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA05

2. TITLE OF DATA ITEM

Configuration Status Accounting Information

3. SUBTITLE

Configuration Status Accounting Report

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-81253A(T) (See Block 16)

5. CONTRACT REFERENCE

PWS para 5.5.1

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable. Tailor DID as follows.

Delete 2a, 2b, 2j, and 2i. Use and deliver in MS Excel.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: The Contractor shall submit the first deliverable on the 15th of the following month after the first full month of execution.

Subsequent deliverables shall be submitted on the 15th of each month.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

AIR 4.1.1.3

PMA207CM

AIR 6.6.1.1- DAPML

(See Block 16)

COR / TPOC

Utility Lift IPTL

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA06

2. TITLE OF DATA ITEM

Technical Directive Compliance Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80224B (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.5.2

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: The Contractor shall submit the first and subsequent deliverables within 15 days of incorporation or depot event completion.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

AIR 4.1.1.3

PMA207CM

(See Block 16)

AIR 6.6.1.1

COR / TPOC

Utility Lift IPTL

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

SAFT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA07

2. TITLE OF DATA ITEM

Accident / Incident Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-81563 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.6

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: Deliverables shall be submitted within 24 hours after each accident and incident event.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for Operation, Maintenance, Installation, or Training (OMIT) of the C-26.

Utility Lift IPTL

AIR 4.1.1.3

AIR 6.6.1.1

COR / TPOC

(See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

SESS

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA08

2. TITLE OF DATA ITEM

Source Data for Forecasting Diminishing Manufacturing Sources and Material Shortages

(DMSMS)

3. SUBTITLE

Obsolescence and DMSMS Summary

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81656 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.7.6

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

QTRLY

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 18 May 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: Submit the first deliverable within 15 calendar days after the first completed Government fiscal quarter of the contract.

Subsequent deliverables shall be submitted within 15 days of the completion of each Government fiscal quarter.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.

AIR 4.1.1.3

AIR 6.6.1.1

Utility Lift IPTL (See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AA09

2. TITLE OF DATA ITEM

Briefing Material

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81605 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.11.1.2

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

See Block 16

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: Deliverables shall be submitted 10 days prior to every Program Management Review.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

(See Block 16)

AIR 6.6.1.1

AIR 4.1.1.3

Utility Lift IPTL

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AB01

2. TITLE OF DATA ITEM

Material Utilization and Forecasting Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81947 (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.7.4

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

Two Times

12. DATE OF FIRST

SUBMISSION

30 June 2018

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

31 December 2018

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

Utility Lift IPTL

AIR 4.1.1.3

AIR 6.6.1.1

(See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AB02

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Ordnance Certification Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A (See Block 16)

5. CONTRACT REFERENCE

PWS PARA 5.1.6

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

40 DACS

8. APP CODE

N/A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Block 13: Subsequent deliverables shall be submitted on the 10th of every month.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.

AIR 6.6.1.1

AIR 4.1.1.3

COR / TPOC

Utility Lift IPTL (See Block 16)

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MISC

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AB03

2. TITLE OF DATA ITEM

Technical Report - Study/Services

3. SUBTITLE

Monthly Aircraft Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B(T) See Block 16

5. CONTRACT REFERENCE

PWS PARA 5.1.14

6. REQUIRING OFFICE

PMA-207

7. DD 250

REQ

NO

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

See Block16

8. APP CODE

A C (See Block 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

16. REMARKS

Block 4: Contractor format is acceptable. Analytic effort is computation of monthly Mission Capability (MC) rate for each aircraft with substantiation.

Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.

Blocks 12 & 13: The Contractor shall submit the first deliverable on the 15th of the following month after the first full month of execution.

Subsequent deliverables shall be submit on the 15th of each month.

The USG has 10 days to review and to send any comments back to the Contractor. The Contractor has 5 days to submit the revised deliverable.

Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.

Utility Lift IPTL

AIR 6.6.1.1

(See Block 16)

AIR 4.1.1.3

15. TOTAL

G. PREPARED BY

Michelle Pedersen

H. DATE

4/30/2015

I. APPROVED BY

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

MGMT

D. SYSTEM/ITEM

C-26D

E. CONTRACT/PR NO.

N00019-15-R-0089

F. CONTRACTOR

1. DATA ITEM NO.

AB04

2. TITLE OF DATA ITEM

Stat…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .