Exhibit_B_CDRLs.pdf
PDF 111 KB Posted
- Attached to
- C-26 CLS RFP Federal contract opportunity
- Solicitation number
- N00019-15-R-0089
About this file
C-26 Exhibit B - CDRLs
View the file
Other files for this federal contract opportunity
Show all 50
C-26 CLS RFP has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Trip/Travel Report
3. SUBTITLE
Travel Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81943 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.13
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
AS PER OCCUR
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 30 calendar days after each travel event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
Utility Lift IPTL
COR / TPOC
AIR 6.6.1.1
AIR 4.1.1.3
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
David A. Adams
J. DATE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Contract Funds Status Report (CFSR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.14
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: The Contractor shall format in accordance with attached supplement.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Submit the first deliverable within 15 calendar days after the first completed Government fiscal quarter of the contract.
Subsequent deliverables shall be submitted within 15 calendar days of the completion of each Government Fiscal Quarter.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
AIR 4.1.1.3
AIR 6.6.1.1
Utility Lift IPTL
DCMA
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
5/5/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Teardown Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B (See Block 16)
5. CONTRACT REFERENCE
PWS Para 7.4, 8.4, 9.4, 10.5.1 & 10.6.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 18 May 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Reports are due 10 days after each teardown event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.
AIR 4.1.1.3
AIR 6.6.1.1
(See Block 16) Utility Lift IPTL
COR / TPOC
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Final Depot Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 7.5, 8.5, 9.5 &
10.5.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
See Block 16
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: The Contractor shall indicate compliance with Service Actions and Service Bulletins; indicate the overall condition and cycle (reset) information; and address applicable FAA documentation for both Functional Check Flight(s) and weight-and-balance.
Block 7: The Contractor shall include signed DD-250 and all documentation associated with completion of the inspection, overhaul, rework or repair action.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Submit the final report no later than 60 calendar days after each maintenance action is completed.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for Operation, Maintenance, Installation or Training (OMIT) of the C-26.
AIR 6.6.1.1
Utility Lift IPTL (See Block 16)
AIR 4.1.1.3
COR / TPOC
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Engineering Investigation Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 10.9
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 15 calendar days after the completion of each Engineering Investigation.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.
AIR 4.1.1.3
Utility Lift IPTL
AIR 6.6.1.1- DAPML
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BA01
2. TITLE OF DATA ITEM
Trip/Travel Report
3. SUBTITLE
Travel Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81943 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.13
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
AS PER OCCUR
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 18 May 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 30 calendar days after each travel event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
Utility Lift IPTL
COR / TPOC
AIR 6.6.1.1
AIR 4.1.1.3
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BA02
2. TITLE OF DATA ITEM
Contract Funds Status Report (CFSR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.14
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: The Contractor shall format in accordance with attached supplement.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Submit the first deliverable within 15 calendar days after the first completed Government fiscal quarter of the contract.
Subsequent deliverables shall be submitted within 15 calendar days of the completion of each Government Fiscal Quarter.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
AIR 4.1.1.3
AIR 6.6.1.1
Utility Lift IPTL
DCMA
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BA03
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Teardown Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B (See Block 16)
5. CONTRACT REFERENCE
PWS Para 7.4, 8.4, 9.4, 10.5.1 & 10.6.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Reports are due 10 days after each teardown event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.
AIR 4.1.1.3
AIR 6.6.1.1
(See Block 16) Utility Lift IPTL
COR / TPOC
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BA04
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Final Depot Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 7.5, 8.5, 9.5 &
10.5.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
See Block 16
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: The Contractor shall indicate compliance with Service Actions and Service Bulletins; indicate the overall condition and cycle (reset) information; and address applicable FAA documentation for both Functional Check Flight(s) and weight-and-balance.
Block 7: The Contractor shall include signed DD-250 and all documentation associated with completion of the inspection, overhaul, rework or repair action.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Submit the final report no later than 60 calendar days after each maintenance action is completed.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for Operation, Maintenance, Installation or Training (OMIT) of the C-26.
AIR 6.6.1.1
Utility Lift IPTL (See Block 16)
AIR 4.1.1.3
COR / TPOC
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BA05
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Engineering Investigation Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 10.9
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 15 calendar days after the completion of each Engineering Investigation.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.
AIR 4.1.1.3
Utility Lift IPTL
AIR 6.6.1.1- DAPML
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BB01
2. TITLE OF DATA ITEM
Trip/Travel Report
3. SUBTITLE
Travel Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81943 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.13
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
AS PER OCCUR
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 18 May 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 30 calendar days after each travel event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
Utility Lift IPTL
COR / TPOC
AIR 6.6.1.1
AIR 4.1.1.3
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BB02
2. TITLE OF DATA ITEM
Contract Funds Status Report (CFSR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.14
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: The Contractor shall format in accordance with attached supplement.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Submit the first deliverable within 15 calendar days after the first completed Government fiscal quarter of the contract.
Subsequent deliverables shall be submitted within 15 calendar days of the completion of each Government Fiscal Quarter.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
AIR 4.1.1.3
AIR 6.6.1.1
Utility Lift IPTL
DCMA
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BB03
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Teardown Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B (See Block 16)
5. CONTRACT REFERENCE
PWS Para 7.4, 8.4, 9.4, 10.5.1 & 10.6.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Reports are due 10 days after each teardown event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.
AIR 4.1.1.3
AIR 6.6.1.1
(See Block 16) Utility Lift IPTL
COR / TPOC
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BB04
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Final Depot Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 7.5, 8.5, 9.5 &
10.5.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
See Block 16
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: The Contractor shall indicate compliance with Service Actions and Service Bulletins; indicate the overall condition and cycle (reset) information; and address applicable FAA documentation for both Functional Check Flight(s) and weight-and-balance.
Block 7: The Contractor shall include signed DD-250 and all documentation associated with completion of the inspection, overhaul, rework or repair action.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Submit the final report no later than 60 calendar days after each maintenance action is completed.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for Operation, Maintenance, Installation or Training (OMIT) of the C-26.
AIR 6.6.1.1
Utility Lift IPTL (See Block 16)
AIR 4.1.1.3
COR / TPOC
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BB05
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Engineering Investigation Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 10.9
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 15 calendar days after the completion of each Engineering Investigation.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.
AIR 4.1.1.3
Utility Lift IPTL
AIR 6.6.1.1
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BC01
2. TITLE OF DATA ITEM
Trip/Travel Report
3. SUBTITLE
Travel Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81943 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.13
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
AS PER OCCUR
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 30 calendar days after each travel event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
Utility Lift IPTL
COR / TPOC
AIR 6.6.1.1
AIR 4.1.1.3
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BC02
2. TITLE OF DATA ITEM
Contract Funds Status Report (CFSR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.14
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: The Contractor shall format in accordance with attached supplement.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Submit the first deliverable within 15 calendar days after the first completed Government fiscal quarter of the contract.
Subsequent deliverables shall be submitted within 15 calendar days of the completion of each Government Fiscal Quarter.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
AIR 4.1.1.3
AIR 6.6.1.1
Utility Lift IPTL
DCMA
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BC03
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Teardown Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B (See Block 16)
5. CONTRACT REFERENCE
PWS Para 7.4, 8.4, 9.4, 10.5.1 & 10.6.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Reports are due 10 days after each teardown event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPTL.
AIR 4.1.1.3
AIR 6.6.1.1
(See Block 16) Utility Lift IPTL
COR / TPOC
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BC04
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Final Depot Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 7.5, 8.5, 9.5 &
10.5.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
See Block 16
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: The Contractor shall indicate compliance with Service Actions and Service Bulletins; indicate the overall condition and cycle (reset) information; and address applicable FAA documentation for both Functional Check Flight(s) and weight-and-balance.
Block 7: The Contractor shall include signed DD-250 and all documentation associated with completion of the inspection, overhaul, rework or repair action.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Submit the final report no later than 60 calendar days after each maintenance action is completed.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for Operation, Maintenance, Installation or Training (OMIT) of the C-26.
AIR 6.6.1.1
Utility Lift IPTL (See Block 16)
AIR 4.1.1.3
COR / TPOC
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BC05
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Engineering Investigation Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 10.9
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 15 calendar days after the completion of each Engineering Investigation.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-26.
AIR 4.1.1.3
Utility Lift IPTL
AIR 6.6.1.1
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
MISC
D. SYSTEM/ITEM
C-26D
E. CONTRACT/PR NO.
N00019-15-R-0089
F. CONTRACTOR
1. DATA ITEM NO.
BD01
2. TITLE OF DATA ITEM
Trip/Travel Report
3. SUBTITLE
Travel Summary Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81943 (See Block 16)
5. CONTRACT REFERENCE
PWS PARA 5.13
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
AS PER OCCUR
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 3 June 2015. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Deliverables shall be submitted within 30 calendar days after each travel event.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the UL IPT.
Utility Lift IPTL
COR / TPOC
AIR 6.6.1.1
AIR 4.1.1.3
(See Block 16)
15. TOTAL
G. PREPARED BY
Michelle Pedersen
H. DATE
4/30/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .