C-26_PWS_APPENDIX_E_PERFORMANCE_METRICS.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
C-26 CLS Draft RFP (N00019-15-R-0089)
Solicitation number
N00019-15-R-0089
Issued by

About this file

Appendix E- Performance Metrics

View the file

Other files

File Type Posted
L-7_Vol_3_Tech_SB_Goals.xls XLS spreadsheet
L-5_Vol_3_ExpTables.xls XLS spreadsheet
Attach_1_APPENDIX_B_GOVERNMENT_FURNISHED_PROPERTY.xls XLS spreadsheet
Attach_1_APPENDIX_C_CRITICAL_JOB_POSITIONS.docx DOCX document
Attach_1_APPENDIX_E_PERFORMANCE_METRICS.xlsx XLSX spreadsheet
Exhibit_A B C_-_CDRLs.pdf PDF
Attach_3_-_DD254.pdf PDF
Attach_1_APPENDIX_D_OAWR_FORM.doc DOC document
Attach_1_APPENDIX_F_AIRCRAFT_APPEARANCE_STANDARDS.docx DOCX document
L-4_Vol_3_Tech_CRM.docx DOCX document
L-8_Vol_4_Price_Matrix.xls XLS spreadsheet
L-6_Vol_3_Tech_MP_Chart.xls XLS spreadsheet
Attach_1_APPENDIX_G_CFSR_FORMAT.xlsx XLSX spreadsheet
Attach_2_-_QASP.docx DOCX document
Attach_1_APPENDIX_H_DEPOT_SCHEDULE.xlsx XLSX spreadsheet
DRAFT_RFP_(2015-07-10).xml XML file
Attach_1_APPENDIX_I_PAINT_SPECIFICATIONS.doc DOC document
L-2_Vol_2_PPQ.doc DOC document
L-1_Vol_1_ES_Tables.xls XLS spreadsheet
L-3_Vol_2_PP-1_Contract_Data.xls XLS spreadsheet
Attach_1_-_PWS.pdf PDF
Attach_1_APPENDIX_A_ESTIMATED_FLIGHT_HOURS.xlsx XLSX spreadsheet
C-26_PWS_APPENDIX_A_ESTIMATED_FLIGHT_HOURS.xlsx XLSX spreadsheet
C-26_PWS_APPENDIX_F_AIRCRAFT_APPEARANCE_STANDARDS.docx DOCX document
C-26_PWS_APPENDIX_B_GOVERNMENT_FURNISHED_PROPERTY.xls XLS spreadsheet
C-26_PWS_APPENDIX_G_CFSR_FORMAT.xlsx XLSX spreadsheet
C-26_PWS_APPENDIX_H_DEPOT_SCHEDULE.xlsx XLSX spreadsheet
C-26_PWS_APPENDIX_C_CRITICAL_JOB_POSITIONS.docx DOCX document
C-26_PWS_APPENDIX_I_PAINT_SPECIFICATIONS.doc DOC document
C-26_PWS_APPENDIX_D_RESERVED.doc DOC document
C-26_UC-35_pre-solic_brief_25June2015.pptx PPTX presentation
Pre-Solicitation_Conf_Attendee_List.xlsx XLSX spreadsheet
C-26_Draft_PWS_6_15_2015.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Metrics

DescriptionRFP/PWS RefPerformance Standard Quality MeasurementsSurveillance Method/MeasureIncentives
ObjectiveMarginal
Maintain Mission Capable Rate of 85% (MC Rate)PWS para 5.7.3Requirements and objectives met when the aircraft is Mission Capable 85% of the time (See Calculations tab for instructions)Requirements and objectives met when the aircraft is Mission Capable 80% to 84% of the timeSurveillance by COR(+) Contractor receives a positive assessment on CPAR, appropriate for quality of service provided

(-) Contractor receives a negative assessment on CPAR, appropriate for the quality of service provided

Provide aircraft for scheduled launch window
(Launch Window)PWS para 5.1.9.3Requirements and objectives met when the aircraft is ready for launch one hour prior to schedule time, 95% of the timeRequirements and objectives met when the aircraft is ready for launch one hour prior to schedule time 90% to 94% of the timeSurveillance by COR(+) Contractor receives a positive assessment on CPAR, appropriate for quality of service provided

(-) Contractor receives a negative assessment on CPAR, appropriate for the quality of service provided

Provide real-time accurate aircraft, engines and funds information and documentation
(WIS Performance)PWS para 3.12Requirements and objectives are met when the data is uploaded to the WIS on time 95% of the timeRequirements and objectives are met when the data is uploaded to the WIS on time 90% to 94% of the timeSurveillance by COR(+) Contractor receives a positive assessment on CPAR, appropriate for quality of service provided

(-) Contractor receives a negative assessment on CPAR, appropriate for the quality of service provided CDRL Delivery RFP Exhibit A CDRL, 95% of content acceptable on first submission to Government; submission delay less than 2 days; 100% acceptable on final submission to the Government CDRL, 90% to 94% of content acceptable on first submission to Government; submission delay less than 2 to 4 days; 100% acceptable on final submission to the Government Surveillance by COR (+) Contractor receives a positive assessment on CPAR, appropriate for quality of service provided

(-) Contractor receives a negative assessment on CPAR, appropriate for the quality of service provided C-26 Special Mission Radar equipment PWS para 5.1 RANSAC Surveillance Radar shall be fully operational during radar-specific missions to achieve aircraft fully mission capable status C-26 aircraft failing to meet radar-specific mission requirements shall be reported as non-mission capable for that period Surveillance by COR (+) Contractor receives a positive assessment on CPAR, appropriate for quality of service provided

(-) Contractor receives a negative assessment on CPAR, appropriate for the quality of service provided Contract Funds Status Report PWS para 6.3 CDRL, 95% of content acceptable on first submission to Government; submission delay less than 2 days; 100% acceptable on final submission to the Government CDRL, 90% to 94% of content acceptable on first submission to Government; submission delay less than 2 to 4 days; 100% acceptable on final submission to the Government Surveillance by COR (+) Contractor receives a positive assessment on CPAR, appropriate for quality of service provided

(-) Contractor receives a negative assessment on CPAR, appropriate for the quality of service provided Aircraft (Engine) Daily Status Report Para 3.12.2 CDRL, 95% of content acceptable on first submission to Government; submission delay less than 2 days; 100% acceptable on final submission to the Government CDRL, 90% to 94% of content acceptable on first submission to Government; submission delay less than 2 to 4 days; 100% acceptable on final submission to the Government Surveillance by COR (+) Contractor receives a positive assessment on CPAR, appropriate for quality of service provided

(-) Contractor receives a negative assessment on CPAR, appropriate for the quality of service provided

N00019-15-R-0089 Attachment 1, Appendix (E) Performance Metrics 27 May 2015

Calculations (Example) MC Computation Example (Aircraft #1):

The reporting period was 30 days: 30 X 24 hours = 720 hours Reporting Time (RT) The allowable Non-Reporting Time (NRT) for aircraft #1 was 7 days The Not or Non Mission Capable (NMC) time for aircraft #1 for the reporting period was 113 hours:

MC Rate Example Calculation:

30 days x 24 hours = 720 hours………………….……….Total RT hours 7 days NRT x 24 hours = 168 hours..…………………….Total NRT hours 720 (RT) – 168 (NRT) = 552 hours..……………….……..Total Possible MC hours 552 (Possible MC hrs) – 113 (NMC) = 439 hrs.………….Actual MC hours 470 (Actual MC hrs) ÷ 552 (Possible MC hrs) = .85 .85 x 100 = 85% MC for aircraft #1

MC Computation Example (Aircraft #2):

The reporting period was 30 days: 30 X 24 hours = 720 hours Reporting Time (RT) The allowable Non-Reporting Time (NRT) for aircraft #2 was 12 days The Not Mission Capable (NMC) time for aircraft #2 for the reporting period was 24 hours:

MC Rate Example Calculation:

30 days x 24 hours = 720 hours………………….……….Total RT hours 12 days NRT x 24 hours = 288 hours……………………Total NRT hours 720 (RT) – 288 (NRT) = 432 hours..……………………..Total Possible MC hours 432 (Possible MC hrs) – 24 (NMC) = 408 hours..………Actual MC hours 408 (Actual MC hrs) ÷ 432 (Possible MC hrs) = .94 .94 x 100 = 94% MC for aircraft #2

N00019-15-R-0089 Attachment 1, Appendix (E) Performance Metrics 27 May 2015

File details come from the government source that posted it. Updated .