GFI Questions Answers.xls

XLS spreadsheet 31 KB Posted

Attached to
E-6B Block II Federal contract opportunity
Solicitation number
N00019-09-R-0276
Issued by
Department of the Navy Naval Air Systems Command

About this file

GFI QUESTONS ANSWERS

View the file

Other files for this federal contract opportunity

Other files attached to E-6B Block II, newest first.
File Type Posted
Questions 5-25-10.doc DOC document
Questions_051310.docx DOCX document
E6BII Questions 3 May 2010.doc DOC document
CONTRACTOR BASE ACCESS REQUEST FORM.doc DOC document
locator_map.pdf PDF
MMP SCHEDULE.ppt PPT presentation
Block II ORG chart.ppt PPT presentation
Industry Day Questions Answers-RevA.doc DOC document
E-6B Program Manager Industry Day Brief.ppt PPT presentation
Block II Industry Day brief.ppt PPT presentation
DIRECTIONS TO THE DAUGHERTY CONFERENCE CENTER.ppt PPT presentation
Motels_01-07-08.ppt PPT presentation
Questions Answers-RevA.doc DOC document
Questions Answers.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GFI Request

Document Short TitleDocument TitleReasoningDisposition
CSCW-1 CONOPSConcept of OperationsWith this information the Contractor will be better able to integrate the Block II Modification so that it meets the customer's operational requirements.No such document currently in work by the wing. The STRATCOM OPORD is in draft form and is secret.
Weapons Systems Planning DocumentWith this information the Contractor will be better able to define and propose the logistics approach for the Block II Modification.This is a NAVAIR document with an E-6 portion. Investigating ability to release this.
N78-NTSP-A-50-8516G/ANavy Training Systems Plan for E-6B TACAMOIdentified in the Draft RFPWe will release the previous version. The previous version is in our library. N78-NTSP-A-50-8516G/A is in draft and not available.
OPNAVINST 5442.4ME-6B Mission Essential Subsystem MatrixIdentified in the Draft RFPThis is an overarching document without specific E-6B information. Should not have been included in SPEC and will be removed with next version. It will not be released
CSCW-1 MEECMMinimum Essential Equipment Communications MatrixWith this information the Contractor will be better able to engineer the Block II Modification to meet mission requirements.Does not exist.
PMA-271 CMPProgram Configuration Maintenance PlanWith this information the Contractor will be better able to align it's processes with the Government's Configuration Management activities for the E-6B weapons system.Yes, we will release. We have two: IPBE ref C of 27 Aug 09 and Block I Rev A of 25 Jun 09.
CSCW-1 TF-124 COGCommunication Operators Guide 1 October 2008This document is referenced in the Statement of Work paragraph 3.2.7.2, seventh paragraph. With this information the Contractor will be better able to meet the requirements stated in 3.2.7.2.This is a secret wing document over which we have no control. We will not release it.
A1E6 AAB XXXX E-6B ETM's MOB 000 WDM 000E-6B Electronic Technical Manuals - Maintenance publicationsIdentified in the Draft RFPYes, we will release.
TD-A00G-001Technical Directive - Digital North StarIdentified in the Draft RFPMR-T does not touch this. It should not have been included in the SOW and will be removed. It will not be released.
MILSTAR Antenna Installation Detail per E-6B Actual Weight Report (CDRL A00X001) dtd 2/12/98With this information the Contractor will be better able to determine how to implement a radome to support the Block II Modification requirements.We have referenced CDRL A00X001) but date does not match (1/23/98 vs. 2/12/98) and does not have Milstar antenna specifics.
Current E-6 Chart A - Weight and BalanceWith this information the Contractor will be better able to determine how to implement the Block II Modification and ensure it is designed for long-term producibility.Yes, we will release this.
E-6B 3-D Model with current antenna locationsWith this information the Contractor will be better able to determine the most effective antenna integration approach, define the best radome approach, and determine what testing/certification will be required as identified in the RFP. This will allow the Contractor to submit a compliant proposal with a lower price to the Government.Do not have a 3D model.

Sheet3

File details come from the government source that posted it. Updated .