GFI Questions Answers.xls
XLS spreadsheet 31 KB Posted
- Attached to
- E-6B Block II Federal contract opportunity
- Solicitation number
- N00019-09-R-0276
About this file
GFI QUESTONS ANSWERS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions 5-25-10.doc | DOC document | |
| Questions_051310.docx | DOCX document | |
| E6BII Questions 3 May 2010.doc | DOC document | |
| CONTRACTOR BASE ACCESS REQUEST FORM.doc | DOC document | |
| locator_map.pdf | ||
| MMP SCHEDULE.ppt | PPT presentation | |
| Block II ORG chart.ppt | PPT presentation | |
| Industry Day Questions Answers-RevA.doc | DOC document | |
| E-6B Program Manager Industry Day Brief.ppt | PPT presentation | |
| Block II Industry Day brief.ppt | PPT presentation | |
| DIRECTIONS TO THE DAUGHERTY CONFERENCE CENTER.ppt | PPT presentation | |
| Motels_01-07-08.ppt | PPT presentation | |
| Questions Answers-RevA.doc | DOC document | |
| Questions Answers.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GFI Request
| Document Short Title | Document Title | Reasoning | Disposition |
| CSCW-1 CONOPS | Concept of Operations | With this information the Contractor will be better able to integrate the Block II Modification so that it meets the customer's operational requirements. | No such document currently in work by the wing. The STRATCOM OPORD is in draft form and is secret. |
| Weapons Systems Planning Document | With this information the Contractor will be better able to define and propose the logistics approach for the Block II Modification. | This is a NAVAIR document with an E-6 portion. Investigating ability to release this. | |
| N78-NTSP-A-50-8516G/A | Navy Training Systems Plan for E-6B TACAMO | Identified in the Draft RFP | We will release the previous version. The previous version is in our library. N78-NTSP-A-50-8516G/A is in draft and not available. |
| OPNAVINST 5442.4M | E-6B Mission Essential Subsystem Matrix | Identified in the Draft RFP | This is an overarching document without specific E-6B information. Should not have been included in SPEC and will be removed with next version. It will not be released |
| CSCW-1 MEECM | Minimum Essential Equipment Communications Matrix | With this information the Contractor will be better able to engineer the Block II Modification to meet mission requirements. | Does not exist. |
| PMA-271 CMP | Program Configuration Maintenance Plan | With this information the Contractor will be better able to align it's processes with the Government's Configuration Management activities for the E-6B weapons system. | Yes, we will release. We have two: IPBE ref C of 27 Aug 09 and Block I Rev A of 25 Jun 09. |
| CSCW-1 TF-124 COG | Communication Operators Guide 1 October 2008 | This document is referenced in the Statement of Work paragraph 3.2.7.2, seventh paragraph. With this information the Contractor will be better able to meet the requirements stated in 3.2.7.2. | This is a secret wing document over which we have no control. We will not release it. |
| A1E6 AAB XXXX E-6B ETM's MOB 000 WDM 000 | E-6B Electronic Technical Manuals - Maintenance publications | Identified in the Draft RFP | Yes, we will release. |
| TD-A00G-001 | Technical Directive - Digital North Star | Identified in the Draft RFP | MR-T does not touch this. It should not have been included in the SOW and will be removed. It will not be released. |
| MILSTAR Antenna Installation Detail per E-6B Actual Weight Report (CDRL A00X001) dtd 2/12/98 | With this information the Contractor will be better able to determine how to implement a radome to support the Block II Modification requirements. | We have referenced CDRL A00X001) but date does not match (1/23/98 vs. 2/12/98) and does not have Milstar antenna specifics. | |
| Current E-6 Chart A - Weight and Balance | With this information the Contractor will be better able to determine how to implement the Block II Modification and ensure it is designed for long-term producibility. | Yes, we will release this. | |
| E-6B 3-D Model with current antenna locations | With this information the Contractor will be better able to determine the most effective antenna integration approach, define the best radome approach, and determine what testing/certification will be required as identified in the RFP. This will allow the Contractor to submit a compliant proposal with a lower price to the Government. | Do not have a 3D model. |