About this file

This solicitation seeks proposals for the operation and management of the Electronics Manufacturing Technology Center of Excellence. Offerors should provide one original and five paper copies of their technical, past performance, price, and conflict of interest proposals to the Office of Naval Research by 24 June 2020. Electronic versions in PDF and appropriate unlocked file formats should also be uploaded to the DoD SAFE system. The Center of Excellence will support manufacturing technology development for key Navy acquisition programs such as the CVN 78 aircraft carrier, DDG 51 destroyer, FFG(X) frigate, Virginia-class submarine, and Joint Strike Fighter. Its goals are to improve affordability through cost reduction and avoidance as well as accelerate capability delivery by transitioning new manufacturing technologies. The solicitation provides assumptions offerors should use in preparing their technical and cost proposals for operating the Center of Excellence and developing manufacturing technology projects.

View the file

Other files for this federal contract opportunity

Other files attached to MANUFACTURING TECHNOLOGY Electronics Manufacturing, newest first.
File Type Posted
Sol_N00014-20-R-0006_Amd_0004.pdf PDF
B2.01 A0004 RFP Sec J Attachment 1 SOW_0004.docx DOCX document
B2.01 A0002 RFP Sec J Attachment 1 SOW_0003.docx DOCX document
Sol_N00014-20-R-0006_Amd_0003.pdf PDF
B2.01 A0002 RFP Sec J Attachment 1 SOW_0002.docx DOCX document
B2.01 RFP Sec J Attachment 10 EMPF Q and A 20 May 2020_0002.docx DOCX document
B2. 01RFP Sec J Attachment 1 SOW EMPF_0001.docx DOCX document
Sol_N00014-20-R-0006_Amd_0001.pdf PDF
Sol_N00014-20-R-0006.pdf PDF
B2. 01RFP Sec J Attachment 2 Key Personnel.doc DOC document
B2. 01RFP Sec J Attachment 3 Report Format.doc DOC document
B2. 01 ENCLOSURE NUMBER 1.docx DOCX document
B2.01 Sec J Attachment 9 ONR Reps_Certs.docx DOCX document
B2. 01RFP Sec J Attachment 6 PPQ.docx DOCX document
B2. 01RFP Exhibit B Project CDRLS.docx DOCX document
B2. 01RFP Sec J Attachment 7 Price Information.docx DOCX document
B2. 01RFP Sec J Attachment 4 COR.docx DOCX document
B2. 01RFP Sec J Attachment 1 SOW EOCOE NEEDS PO.docx DOCX document
RFP Exhibit A CoE Level CDRLS.docx DOCX document
B2. 01RFP Sec J Attachment 8 CE Summary.xlsx XLSX spreadsheet
B2. 01RFP Sec J Attachment 5 PPIF.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

N00014-20-R-0006 x x

6 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Arlington VA 22203-1995

N00014

875 N. Randolph Street mary.dent@navy.mil Mary Helen Dent, 850-276-2279 Office of Naval Research (BD253)

04/27/20200002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/27/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment to N00014-20-R-0006 is to:

1) Revise the Section L, 1 General Instructions for Submission of Proposals Paragraphs (D) and (J) regarding delivery of the proposals;

2) Revise Section J, Attachment 1, Statement of Work; and

3) Provide all potential offerors with "Questions and Answers." The Q&A is listed in

Section J as Attachment 10.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Mary Helen Dent

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

TEL: EMAIL: 850-276-2279 Mary.Dent@navy.mil

[To Be Determined] 0002

Section J - List of Documents, Exhibits and Other Attachments

Number Title Number of Pages

1 RFP Sec J Attachment 1 SOW EMPF 13 10 Solicitation Questions and Answers 1

Section L - Instructions, Conditions, and Notices to Bidders

Summary of Clause Changes:

Clause Section L, 1 is incorporated as follows:

Section L, 1 General Instructions for Submission of Proposals

(A) Offerors are expected to be sufficiently knowledgeable of the missions and administrative procedures of the Navy ManTech Centers of Excellence to adequately prepare their offers and other proposal information to be submitted under this solicitation. Information relating to operational, strategic plans and technical programs is available from various documents, some of which can be accessed on the Internet at the Navy ONR Website: http://www.onr.navy.mil.

(B) The Technical Proposal shall be placed in Volume I. Signed copies of the SF33 and all amendment(s), if any, shall be included at the front of the Technical Volume binder. The Past Performance Proposal shall be placed in Volume II. The Price (Cost Plus Fixed Fee) Proposal shall be placed in Volume III.

Organizational and Personal Conflicts of Interest shall be placed in Volume IV. Offerors shall also include Attachment 9, ONR Specific Representations and Certifications (See Section J for a copy of the document) in their proposal submission behind Volume IV. Offerors who are required to submit a Compensation Plan, Small Business Subcontracting Plan, and/or filled out Section K Representations and Certifications shall place those documents behind Volume IV. Note that not all offerors will be required to submit these documents based on their business type.

(C) All volumes should be written and organized so as to be compatible with the RFP, the Statement of Work, and company's organization and accounting structure.

(D) As of Amendment A0002, the proposal submission process has changed. Changes are noted in bold.

Prime offerors shall provide one (1) original and five (5) paper copies of all Volumes (Technical, Past Performance, Price (Cost Plus Fixed Fee), and Organizational/Personal Conflict of interest) via hard copy. See the address below in paragraph

(I) for address of submission.

Electronic Versions of the proposal Volumes (Technical, Past Performance, Price (Cost Plus Fixed Fee), and Organizational/Personal Conflict of interest) shall be uploaded to the Department of Defense SAFE file exchange website at https://safe.apps.mil/.

Should the link not work type "DoD SAFE" into the web browser to locate the website. DoD SAFE can accept files up to 8 GB. Offerors are encouraged to send each Volume (I-IV) as separate uploads to the website; however, this is not required.

The Offeror shall address the DoD SAFE documents to the Contracting Officer only at https://safe.apps.mil/ mary.dent@navy.mil. Do not include any other personnel on the DoD SAFE submission.

The upload of Technical, Past Performance, and Organizational/Personal Conflict of interest volumes shall be in PDF and Microsoft Office formats. The upload of Price (Cost Plus Fixed Fee) shall be in PDF and Excel. All Word and Excel documents submitted via DoD SAFE shall be unlocked, i.e. not password protected.

The ONR Reps and Certs may be submitted as a signed PDF only.

Subcontractors who provide an unsuppressed copy to their Prime, for inclusion in the RFP response with no further information to be submitted to the Contracting Officer, shall provide include unlocked Word and Excel documents of their proposals for inclusion on the electronic copies.

Subcontractors who provide a suppressed copy to their Prime, for inclusion in the RFP response and intend to submit an unsuppressed submitted to the Contracting Officer, shall include unlocked Word and Excel documents of their proposals for inclusion on the electronic copies.

(E) Length.

(1) The length of Volume I, Technical Proposal shall not exceed 50 single-sided pages.

(2) There is no page limitation for Volume II, Past Performance Information Forms (PPIF).

(3) There is no page limitation on the length of Volume III, Price (Cost Plus Fixed Fee) Proposal.

(4) There is no page limitation on the length of Volume IV, Organizational and/or Personal Conflicts of Interest.

(5) Page limitations are maximums. If exceeded, the excess pages shall not be read or considered in the evaluation of the proposal and will be removed from the proposal. When both sides of a sheet display printed material, it shall be counted as two pages. Each page shall be counted except the following: Cover pages, page separators/tabs, glossaries, table of contents/indexes, past performance questionnaires and resumes. No material may be incorporated by reference as a means to circumvent the page limitations or for any other reason. If discussions occur prior to contract award, these page limitations do not apply for responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the Offerors.

(F) Page Size and Format shall be in accordance with the following:

(1) Proposals should be:

(a) Printed on plain white bond paper.

(b) Page size should be 8.5” X 11”, not including foldouts.

(c) Pages should be single spaced, and except for the reproduced section of the solicitation document, the text size should be no less than 12 point in Times New Roman font, with the exception of charts and graphs, which must be in 10-point font or larger.

(d) Use at least 1-inch margins on the top, bottom, and sides.

(e) Pages should be numbered sequentially by volume (i.e., Volume 1, Page 1).

(f) Foldouts of charts, tables, diagrams, or drawings should not exceed 11” X 17”, if used and should be 10 pt font or larger. Foldout pages shall fold entirely within the volume, and each side (front or back) of a foldout is considered two pages for purposes of determining the number of pages. When both sides (front and back) of a foldout display contain printed material, they will be counted as four pages. Page margins for the foldouts should be a minimum of one inch at the top, bottom, and each side. Foldouts may only be used for large tables, charts, graphs, diagrams, and other schematics, and not for pages of text.

(g) For Excel files that use currency, please round all values to the nearest whole dollar. Cents shall not be mailto:mary.dent@navy.mil used.

(G) Binding and Labeling. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.

(H) Disposition of Offers and Proposal Information. Offers and proposal information will not be returned (except for timely withdrawals).

(I) Proposal Identification/Mailing. Offerors should assign their own identifying number to their proposal.

The proposal should be packaged for delivery so as to permit safe and timely arrival at destination. The proposal package should be sent to the address shown in Block 7 of the RFP face page and marked:

RFP: Enter RFP Number assigned on page 1 of this solicitation

Office of Naval Research One Liberty Center 875 North Randolph St.

Arlington, VA 22203-1995

Attn: Ms. Mary Helen Dent, Contracting Officer Email: mary.dent@navy.mil Telephone: (850) 276-2279

(J) As of Amendment A0002, the proposal submission process has changed. Changes are noted in bold.

Due to changes in security procedures since September 11, 2001, the time required for hard-copy written materials to be received at the Office of Naval Research has increased. Thus it is recommended that any hard-copy proposal be mailed several days before the deadline established in the solicitation so that it will not be received late and thus be ineligible for award consideration.

Hand delivery of hard copy proposals is no longer allowed. Delivery of the hard copy proposals will only be accepted via recognized delivery services, i.e. US Mail, FedEx, UPS, etc.

All proposals are due via DoD SAFE and at the physical location at the Office of Naval Research NLT the deadline for the proposal due date of 24 Jun 2020 at 1200 ET.

(K) Assumptions for Technical and Cost Proposals.

For the purposes of the COE Operations and Management (First Task Order) proposal, the Offeror shall use the following assumptions when preparing technical and cost proposals:

-One Special Project per year (see table below for estimating purposes) -One Rapid Response project(s); (see table below for estimating purposes) shall be shown separately from COE Operations and Management Costs.

-COE-level deliverables as referenced in Section J.

For Special Projects, the First Task Order shall include ALL project management hours for execution of Special Projects. Offerors shall not include labor hours for Special Project Development/Management in the individual proposed Special Project.

For the purposes of the Project Development and Management (Second Task Order) proposal, the Offeror shall use the following assumptions when preparing cost proposals:

Project Type Number of Projects Per Year Estimated Dollar Value per Project Estimated Period of Performance per Project

ManTech Projects 2 $7,500,000.00 2 years

Rapid Response 1 $200,000.00 6 months

Mega Rapid Response 1 $750,000.00 6 months

Special Projects 1 $200,000.00 6 months

The Project Development Task Order includes ALL project management hours for execution of ManTech projects. Offerors shall not include labor hours for Project Development/Management in the individual project plan.

(L) Proposal Compliance to the Solicitation

Upon receipt of proposals, a compliance check with Section L will be performed on all proposal submissions to verify compliance with the General Instructions. Offerors that do not comply with Section L will not receive an evaluation and will result in a disqualification for award.

(M) Submission of Subcontractor Proprietary Information

Subcontractors may provide their detailed cost information to their prime contractor; however, should a subcontractor not wish to provide this information to their prime, the subcontractor shall provide their proprietary information to the Contracting Officer, via email, no later than the deadline imposed on the prime contractors for submission of their proposals (see page 1, SF 33 of the RFP).

Subcontractors that do not provide their proprietary information to the Contracting Officer by the date and time as specified for proposal responses will not be evaluated. Subcontractor information submitted to the Contracting Officer shall follow the same instructions as noted in paragraph (D) above as it pertains to subcontractors.

Subcontractors that do not provide the information risk violation of paragraph (L) above. It is highly recommended that all Subcontractors proactively discuss their strategy with their Prime to assure compliance with Section L and to meet the deadlines in the RFP.

In the event that a Prime offeror has met the RFP response deadline (which includes a suppressed subcontractor proposal), and the Subcontractor has not submitted their proprietary information to the Contracting Officer after the RFP response deadline, the Government will consider the RFP package incomplete and any/all information submitted after the response date shall not be used in the evaluation.

The Contracting Officer notes that Subcontractor submissions that are not submitted in a timely manner shall not be analyzed regardless of email latency delays on either the Subcontractor or Navy servers.

As noted in paragraph (D), unlocked versions of Word and/or Excel are to be submitted from subcontractors to the Contracting Officer. Subcontractors that use file extensions which violate Navy server policies will not be analyzed.

Except as modified herein, all other terms and conditions remain unchanged and in full force and effort under award number [To Be Determined].

File details come from the government source that posted it. Updated .