This document appears to be a site plan for the refurbishment and replacement of the parking lot, gutters, curbs, and sidewalks at the Myrtle Air Traffic Control Tower (MYR ATCT) in Myrtle Beach, SC. The project scope includes adding/extending asphalt, raising existing manholes, replacing existing parking lot light poles, removing vegetation and installing geotextile with stone, removing/replacing concrete, and installing a new prefabricated concrete downspout diffuser/splashpad.

The related federal contract opportunity is Solicitation Number 6973GH-24-R-00240 for the "MYR TOWB Parking Lot Replacement" project. This is a requirement of the Federal Aviation Administration (FAA) with a NAICS code of 238990 and a $19M business size standard. Contractors must be registered in the System for Award Management (SAM) by the established offer receipt date. There is a site visit scheduled for October 23, 2024, and all questions must be received in writing one week prior to the closing date. This project is intended to be funded by the Bipartisan Infrastructure Law (BIL) and will be subject to associated reporting requirements.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND:

1. Add/extend asphalt approximately 5'-0" x 150'-0"

2. Existing manholes to be raised. Three (3) total. to elevation even with existing grade.

3. Existing parking lot light poles to be replaced.

Eighteen (18) total.

4. Remove vegetation and Install geotextile w/ 4" #57 stone

5. Approximate location of concrete to be removed/replaced and added.

6. Photo identifier, location is approximate.

7. Install erosion control system

Install new prefabricated concrete downspout Diffuser/splashpad to prevent erosion

Existing precast concrete wheel stop to be cleaned and painted.

Forty-seven (47) total. (Typ.)

Note: Twenty (20) existing wheel stops are damaged and shall be replaced.

Coordinate with COR for wheel stops requiring replacement.

# 35

# 63# 34

# 24

# 24

# 26 # 25

# 39 # 40

# 59

# 58 # 57

# 45 # 44 # 43

# 53

# 54

# 46

# 48

# 55 # 56

# XX

clear and grub, install geotextile and rip rap to prevent erosion

# 59

# 58 # 57

# 44 # 43

Install new prefabricated concrete downspout Diffuser/ splashpad at fire pump drain to eliminate erosion

New concrete pad to be installed for motorcycle parking.

Precast concrete wheel stops to be relocated at 5' new asphalt extension.