MYR TOWB - Refurbish Parking Lot Project Site Plan.pdf

PDF 3 MB Posted

Attached to
MYR TOWB Parking Lot Replacement
Solicitation number
2401038
Issued by

About this file

This document is a Pre-Solicitation for the refurbishment and replacement of the parking lot, gutters, curbs, and sidewalks at the Myrtle Beach Air Traffic Control Tower (MYR ATCT) operated by the Federal Aviation Administration (FAA). The FAA is conducting a market survey to identify interested vendors, including service-disabled veteran-owned small businesses (SDVOSB) and 8(a) certified small businesses, to assist with acquisition planning. The work includes adding/extending asphalt, raising manholes, replacing parking lot light poles, removing vegetation and installing geotextile and stone, and replacing/adding concrete. The FAA has not yet determined the nature of the competition, which may be a full and open competition or a set-aside for small businesses. Interested vendors are required to submit a capability statement, point of contact information, and SBA certification if applicable, by September 27, 2023. The FAA will use the responses to this market survey to inform the procurement strategy.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND:

1. Add/extend asphalt approximately 5'-0" x 150'-0"

2. Existing manholes to be raised. Three (3) total. to elevation even with existing grade.

3. Existing parking lot light poles to be replaced.

Eighteen (18) total.

4. Remove vegetation and Install geotextile w/ 4" #57 stone

5. Approximate location of concrete to be removed/replaced and added.

6. Photo identifier, location is approximate.

7. Install erosion control system

Install new prefabricated concrete downspout Diffuser/splashpad to prevent erosion

Existing precast concrete wheel stop to be cleaned and painted.

Forty-seven (47) total. (Typ.)

Note: Twenty (20) existing wheel stops are damaged and shall be replaced.

Coordinate with COR for wheel stops requiring replacement.

# 35

# 63# 34

# 24

# 24

# 26 # 25

# 39 # 40

# 59

# 58 # 57

# 45 # 44 # 43

# 53

# 54

# 46

# 48

# 55 # 56

# XX

clear and grub, install geotextile and rip rap to prevent erosion

# 59

# 58 # 57

# 44 # 43

Install new prefabricated concrete downspout Diffuser/ splashpad at fire pump drain to eliminate erosion

New concrete pad to be installed for motorcycle parking.

Precast concrete wheel stops to be relocated at 5' new asphalt extension.

Twelve (12) total. (Typ.)