MVY RFQ 2021-06 AMENDMENT 2 - Updated Airport CIP 9-30-2021.pdf
PDF 251 KB Posted
- Attached to
- MVY RFQ 2021-06 On-Call General Airport Architectural, Engineering and Planning Consulting Services
- Solicitation number
- BD-21-1461-MVYAP-MVYAP-65985
- Issued by
- Dukes County, Massachusetts
About this file
This document is an amendment to Request for Qualifications #MVY RFQ 2021-06 issued by the Martha's Vineyard Airport Commission for On-Call General Airport Architectural, Engineering and Planning Consulting Services. The amendment provides an updated Airport Capital Improvement Plan (CIP) for 2022 through 2030, detailing various airport improvement projects such as obstruction removal, runway rehabilitation, terminal building upgrades, and equipment purchases. The CIP outlines the available entitlement funding and MASSDOT ASMP project funding for these initiatives. Qualifications statements and salary requirements are due for this on-call contract, which will serve the Martha's Vineyard Airport located in Massachusetts.
The amended CIP covers a wide range of projects over the next 9 years, with funding sources identified. It appears the airport is seeking architectural, engineering, and planning consulting services to support the implementation of these capital improvements. The contract will likely be awarded to a qualified firm or team that can provide the necessary expertise and services to the Martha's Vineyard Airport Commission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
#MVY RFQ 2021-06 AMENDMENT #2
On-Call General Airport Architectural, Engineering and Planning Consulting Services
p. 1
AMENDMENT #2
September 30, 2021
Request for Qualifications
#MVY RFQ 2021-06
Solicitation Coordinator: Joan Shemit, Chief Procurement Officer Contact Information: 508-693-7022 ext. 206 jshemit@mvyairport.com
1.0 PURPOSE OF THIS AMENDMENT
The Martha’s Vineyard Airport is issuing this Amendment for:
Updated Airport Capital Improvement Plan (CIP) 2022 through 2030
This chart replaces the chart included in #MVY RFQ 2021-06 On-Call General Airport Architectural, Engineering and Planning Consulting Services, Section 1.3 Current Airport Improvements and Master Plan
Year Description
Available Entitlement
2022 Avigation Easement for Obstruction Removal - RW 24
2022 Part 150 Noise Study, Public Outreach
MASSDOT ASMP Projects
2022 Crack Seal Equipment and Sealant (80/20)
2022 SCBA Gear (80/20)
2022 WWTP (10% ASMP Request) mailto:jshemit@mvyairport.com
p. 2
2023 OBSTRUCTION REMOVAL - 6/24
New Twy E & Reconstruct RWY 15/33; Remove RW 15/33 Shoulder Pavement and Regrade Side RSA's (PCI (2016) = 67) Projected PCI (2023) = 58
MASSDOT ASMP Projects
2023 Terminal Building - Temporary Modular Hold Room (20% ASMP Request)
2024 T-Hangar Taxilane Rehabilitation (Design & Construction) [PCI (2022) = TBD]
2025 Master Plan Update (Address Seasonal Challenges)
MASSDOT ASMP Projects
2025 Improve Fuel Farm Access and Safety
2025 Security System Replacement and Upgrade
2026 EA for Master Plan Improvements
ASMP Projects
p. 3
2027 Access Road (Eligibility to be determined)
Terminal Building Renovation - Phase I - Hold Room & TSA Check Point (Review Eligibility %)
Improve Aircraft Parking & Movement Alt. 3 Reconfigure Southwest Ramp
2029 Southeast Ramp Access Stub Taxiway
2030 SRE SNOW BLOWER/BROOM