MTMS HVAC Controls RFP Sept 2024.pdf
PDF 20 MB Posted
- Attached to
- RFP for HVAC Controls
- Solicitation number
- RFP-CADI-240000003164-2
- Issued by
- Wexford County, Burt CDP, Michigan
About this file
This document is a Request for Proposals (RFP) issued by the Metropolitan Transit Management System (MTMS) for HVAC controls system upgrades and maintenance. The project involves the installation, configuration, programming, and ongoing support of HVAC control systems at multiple MTMS facilities throughout the state. The RFP outlines the required scope of work, equipment specifications, and quantities, and requests proposals from qualified vendors. Responses are due on September 30, 2024, and a mandatory pre-proposal conference is scheduled for September 10, 2024. The contract term is for 5 years, with options to renew for up to 3 additional 1-year terms.
The RFP provides detailed pricing instructions, requiring vendors to submit both firm fixed prices and time and materials rates for the various products and services requested. Small and disadvantaged business set-asides are included, and the incumbent contractor is identified. Funding for the project is provided through state and local transportation budgets, with a total project value estimated at $8 million over the initial 5-year term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 MTMS HVAC Controls RFP Sept 25 2024.pdf | ||
| Legal Notice Ad-MTMS HVAC Controls RFP.docx.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
HVAC Controls
September 23, 2024
Prepared by:
Cadillac Area Public Schools
421 S Mitchell Street
Cadillac, MI 49601
REQUEST FOR PROPOSAL - HVAC Controls Cadillac Area Public Schools September 23, 2024
REQUEST FOR PROPOSAL - HVAC CONTROLS
Overview
Cadillac Area Public Schools (the “District”) is seeking proposals from a contractor (each a “Bidder’) for HVAC controls at Mackinaw Trail Middle School located at 8401 S Mackinaw Trail, Cadillac, MI 49601.
Specifications
Refer to Appendix A - Project Specifications.
Additional Information
Non-Mandatory Walk-Throughs Walk-throughs can be scheduled with Paul Higgins via email paul.higgins@cadillacschools.org and are recommended.
Desired Installation Time-Line The work shall be completed by January 1, 2025.
Proposal Timeline
1. RFP released on September 23, 2024.
2. Non-mandatory walk-throughs can happen between September 23, 2024 and October 4, 2024. Please schedule with Paul Higgins via email paul.higgins@cadillacschools.org.
3. Proposals are due on October 7 at 10:00 am. Bids are to be submitted via mail to: Cadillac Area Public
Schools, Attn: Paul Higgins, 421 S Mitchell St, Cadillac, MI 49601 with a subject line of “HVAC Controls”.
4. Post bid interviews to be conducted between October 8, 2024 and October 11, 2024.
5. The CAPS Board of Education will tentatively take action on the lowest qualified bidder at the October or November board meeting. The District will notify the company the following day.
6. This project needs to be completed by January 1, 2025.
Proposal Requirements
1. Proposals shall be prepared in compliance with provisions of this RFP. All provisions and specifications are in Appendix A. Failure to comply may result in the disqualification of the proposal.
2. Interested Bidders are strongly encouraged to submit an intent to respond to Paul Higgins via paul.higgins@cadillacschools.org to ensure that the Bidder receives all addenda or communications regarding this RFP.
3. Late Proposals will not be accepted.
4. Each Bidder, before submitting a proposal, shall, if it is uncertain of the conditions, requirements, and/or obstacles that might impact the provision of the project, request further information. Failure to make such inquiry or receive an answer shall not relieve the selected Bidder from the obligation to comply, in every detail, with all provisions and requirements of the RFP nor shall it be a basis for any claim whatsoever for alteration in any term or payment required by the eventual contract between the selected Bidder and the District (the “Contract”).
5. If a Bidder discovers any ambiguity, conflict, discrepancy, omission or other error in the RFP, they shall immediately notify the District of such error in writing and request modification or clarification of the document. Modifications will be made by issuing a revision and will be given by written notice to all
September 23, 2024 parties who have submitted an intent to respond. The Bidder is responsible for clarifying any ambiguity, conflict, discrepancy, omission or other error in the RFP prior to submitting the proposal or it shall be deemed waived.
6. All proposals and any accompanying documents become the property of the District and will not be returned.
7. The District reserves the right to waive irregularities in this RFP, the bid process, or the proposals. Any such waiver shall not modify any remaining RFP requirements or excuse a Bidder from full compliance with the RFP specifications and other Contract requirements if the Bidder is awarded the Contract.
8. Each Bidder who submits a bid, by submitting a bid, agrees to indemnify and hold harmless the District and its employees, board members, and consultants for any claim against the District involving the Bidder and arising out of the bid process. By submitting a bid, each Bidder agrees that it will make no claim against the District regarding this RFP or the bid process.
9. All Bidders, by submitting proposals, agree that they have read and are familiar with all the terms and conditions of the RFP and applicable federal and state laws, rules and regulations and will abide by the terms and conditions thereof.
10. Each Bidder completes Appendix D as the three forms are the proposal bidding documents. The documents include Affidavit of Bidder, Iran Economic Sanctions Act Certification, and the bid proposal sheet.
Attachments to RFP:
● Attachment A – Project Overview
● Attachment B – Familial Disclosure Form
● Attachment C – Iran Business Relationship Affidavit
● Attachment D – Proposal Form
● Attachment E – Specifications
September 23, 2024
Attachment A – Project Overview
Project The goal of this project is to expand the functionality of the Tridium Web-Based graphics driven Building Management System graphics (BMS). Contractors shall provide and install new VAV box controllers consistent and compatible with the installed system, all required temperature sensors and switches, and hot water valves.
The new controllers will seamlessly integrate into Cadillac Area Public Schools Tridium BMS for on-site and remote graphical access to all system information. This project will eliminate all existing 25-year old Trane VAV Box controls and provide/install new Belimo valves/actuators for all reheat coils. Control system price should include new controllers, temperature sensors, valves, actuators, graphics, mechanical set of CAD drawings from original engineer, custom programming, documentation package, commissioning and start-up.
Equipment
● (64) New VAV Boxes with Reheat Coils
Prevailing Wage The District's obligations under M.C.L. 480.1101, et seq. include ensuring the following:
● Contractor shall determine the prevailing rates of wages and fringe benefits for all classes of construction mechanics called for in the contract.
● A schedule of these rates shall be made part of the contract for work to be performed and shall be printed on the bidding forms.
● Every contractor and subcontractor must fulfill its obligations under the statute relating to prevailing wage.
● The contract must contain the statutory language providing that construction mechanics are intended beneficiaries of the contractual prevailing wage, fringe benefit, and non-discrimination, non-retaliation requirements, and provide that any construction mechanic aggrieved by the failure of a contractor or subcontractor to pay prevailing wages or benefits as specified in the contract or retaliation associated therewith, may bring an action in a court of competent jurisdiction against the contractor or subcontractor for damages or injunctive relief along with other remedies prescribed by statute.
● The Contractor shall provide the District certified payroll records and other records required by law.
Contracts on State Projects which contain provisions regarding payment of prevailing wages as determined by the United States Secretary of Labor or which contain minimum wage schedules which are the same as prevailing wages in the Locality as determined by collective bargaining agreements or understandings between bona fide organizations of Construction Mechanics and their employers are exempt from the above requirements.
September 23, 2024
Attachment B – Familial Disclosure Form
AFFIDAVIT OF ______________________________
(insert name of affiant)
STATE OF MICHIGAN )
)ss
COUNTY OF _________________ )
___________________________________ makes this Affidavit under oath and states as follows:
(insert name of affiant)
1. I am a/the:
President Vice-President Chief Executive Officer Member Partner Owner Other (please specify) ________________________ of , ____________________________ a bidder for custodial services for Cadillac Area Public Schools.
(insert name of contractor)
2. I have personal knowledge and/or I have personally verified that the following are all of the familial relationships existing between the owner(s) and the employee(s) of the aforementioned contractor and the school district's superintendent and/or board members:
3. I have authority to bind the aforementioned contractor with the representations contained herein, and I am fully aware that the school district will rely on my representations in evaluating bids for the custodial services.
4. I declare the above information to be true to the best of my knowledge, information and belief. I could completely and accurately testify regarding the information contained in this affidavit if requested to do so.
(signature of affiant)
Dated: ________________
Subscribed and sworn before me in _________________ County, Michigan, on the ___ day of _________________, 2024
____________________________________________(signature)
_____________________________________________ (printed)
Notary public, State of Michigan, County of ________________
My Commission expires on _____________________________
Acting in the County of ________________________________
September 23, 2024
Attachment C - AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of the below-named contractor (the “Contractor”), pursuant to the compliance certification requirement provided in the Cadillac Area Public Schools (the “School District”) Request For Proposals (the “RFP”), hereby certified, represents and warrants that the Contractor *(including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Contractor is awarded a contract as a result of the aforementioned RFP, the Contractor will not become an “Iran linked business” at any time during the course of performing any services under the contract.
CONTRACTOR:
Name of Contractor
By: ____________________________
Signature:_______________________
Its: ____________________________
Date:___________________________
STATE OF ________________________________)
)ss.
COUNTY OF ______________________________)
This instrument was acknowledged before me on the _____day of ________________, 2024.
by________________________________.
,Notary Public
____________County, Michigan
My Commission Expires:______________
Acting in the County of ______________
September 23, 2024
Attachment D – Proposal Form
Proposal
Please make sure that all specifications outlined in Appendix A are accounted for.
Prevailing Wage Familial Disclosure Form Affidavit of Compliance – Iran Economic Sanctions Act Proposal Form
BASE BID $
ALTERNATES (if applicable) $
Contractor
Primary Contact
Primary Contact Email
September 23, 2024
23 09 00-1
Attachment E – Specifications
SECTION 23 09 00
BUILDING MANAGEMENT SYSTEM
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Building Management System (BMS), utilizing direct digital controls.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Products Supplied But Not Installed Under This Section:
1. Control valves.
2. Flow switches.
3. Wells, sockets and other inline hardware for water sensors (temperature, pressure, flow).
4. Automatic control dampers, where not supplied with equipment.
5. Airflow measuring stations.
6. Terminal unit controllers and actuators, when installed by terminal unit manufacturer.
7. Variable frequency drives. (This does not include VFDs integral to machinery such as chillers or boilers).
B. Products Installed But Not Supplied Under This Section:
1. None.
C. Products Not Furnished or Installed But Integrated with the Work of This Section:
1. Chiller control systems.
2. Boiler control systems.
3. Pump control packages.
4. In-line meters (gas, water, power).
5. Refrigerant monitors.
6. Chemical water treatment.
7. Smoke detectors (through alarm relay contacts).
D. Work Required Under Other Divisions Related to This Section:
1. Power wiring to line side of motor starters, disconnects or variable frequency drives.
2. Provision and wiring of smoke detectors and other devices relating to fire alarm system.
3. Campus LAN (Ethernet) connection adjacent to JACE network management controller.
1.3 RELATED SECTIONS
A. Section 23 05 00 - Basic Mechanical Materials and Methods: Performance and reference standards for products and materials required for the Project.
1.4 SYSTEM DESCRIPTION
A. Scope: Furnish all labor, materials and equipment necessary for a complete and operating
23 09 00-2
Building Management System (BMS), utilizing Direct Digital Controls as described herein.
Drawings are diagrammatic only. All controllers furnished in this section shall communicate on a peer-to-peer bus over an open protocol bus (Examples: LonTalk, BACnet, MODBUS).
1. The intent of this specification is to provide a system that is consistent with BMS systems throughout the owner's facilities running the Niagara 4 Framework.
2. System architecture shall fully support a multi-vendor environment and be able to integrate third party systems via existing vendor protocols including, as a minimum, LonTalk, BACnet and MODBUS.
3. System architecture shall provide secure Web access using any of the current versions of Microsoft Internet Explorer, Mozilla Firefox, or Google Chrome browsers from any computer on the owner's LAN.
4. All control devices furnished with this Section shall be programmable directly from the Niagara 4 Workbench embedded toolset upon completion of this project. The use of configurable or programmable controllers that require additional software tools for post-installation maintenance shall not be acceptable.
5. Any control vendor that shall provide additional BMS server software shall be unacceptable. Only systems that utilize the Niagara 4 Framework shall satisfy the requirements of this section.
6. The BMS server shall host all graphic files for the control system. All graphics and navigation schemes for this project shall match those that are on the existing campus NiagaraAX or Niagara 4 Framework server.
7. A laptop computer including engineering/programming software to modify Operating System Server BMS programs and graphics shall be included.
8. Owner shall receive all Administrator level login and passwords for engineering toolset at first training session. The Owner shall have full licensing and full access rights for all network management, operating system server, engineering and programming software required for the ongoing maintenance and operation of the BMS.
9. OPEN NIC STATEMENTS - All Niagara 4 software licenses shall have the following NiCS: "accept.station.in=*"; "accept.station.out=*"; "accept.wb.in=*";
"accept.wb.out=*". All open NIC statements shall follow Niagara Open NIC specifications.
10. All JACE hardware licenses and certificates shall be stored on local MicroSD memory card employing encrypted “safe boot” technology.
11. To ensure quality, any JACE 3E, 6E, or 7 hardware products used on this project shall come through the Tridium Richmond, VA shipping facility. JACE hardware products not meeting this requirement will not be allowed.
B. All products of the BMS shall be provided with the following agency approvals. Verification that the approvals exist for all submitted products shall be provided on request, with the submittal package. Systems or products not currently offering the following approvals are not acceptable.
1. Federal Communications Commission (FCC), Rules and Regulations, Volume II -July
1986 Part 15 Class A Radio Frequency Devices.
2. FCC, Part 15, Subpart B, Class B
3. FCC, Part 15, Subpart C
4. FCC, Part 15, Subpart J, Class A Computing Devices.
5. UL 504 - Industrial Control Equipment.
6. UL 506 - Specialty Transformers.
7. UL 910 - Test Method for Fire and Smoke Characteristics of Electrical and Optical-
Fiber Cables Used in Air-Handling Spaces.
8. UL 916 - Energy Management Systems All.
9. UL 1449 - Transient Voltage Suppression.
23 09 00-3
10. Standard Test for Flame Propagation Height of Electrical and Optical - Fiber Cables Installed Vertically in Shafts.
11. EIA/ANSI 232-E - Interface Between Data Technical Equipment and Data Circuit Terminal Equipment Employing Serial Binary Data Interchange.
12. EIA 455 - Standard Test Procedures for Fiber Optic Fibers, Cables, Transducers, Connecting and Terminating Devices.
13. IEEE C62.41- Surge Voltages in Low-Voltage AC Power Circuits.
14. IEEE 142 - Recommended Practice for Grounding of Industrial and Commercial
Power Systems.
a. NEMA 250 - Enclosures for Electrical Equipment.
15. NEMA ICS 1 - Industrial Controls and Systems.
16. NEMA ST 1 - Specialty Transformers.
17. NCSBC Compliance, Energy: Performance of control system shall meet or surpass the requirements of ASHRAE/IESNA 90.1-1999.
18. CE 61326
19. C-Tick
20. cUL
1.5 SPECIFICATION NOMENCLATURE
A. Acronyms used in this specification are as follows:
1. Actuator: Control device that opens or closes valve or damper in response to control signal.
2. AI: Analog Input.
3. AO: Analog Output.
4. Analog: Continuously variable state over stated range of values.
5. BMS: Building Management System.
6. DDC: Direct Digital Control.
7. Discrete: Binary or digital state.
8. DI: Discrete Input.
9. DO: Discrete Output.
10. FC: Fail Closed position of control device or actuator. Device moves to closed position on loss of control signal or energy source.
11. FO: Fail open (position of control device or actuator). Device moves to open position on loss of control signal or energy source.
12. GUI: Graphical User Interface.
13. HVAC: Heating, Ventilating and Air Conditioning.
14. IDC: Interoperable Digital Controller.
15. ILC: Interoperable Lon Controller.
16. LAN: Local Area Network.
17. Modulating: Movement of a control device through an entire range of values, proportional to an infinitely variable input value.
18. Motorized: Control device with actuator.
19. NAC: Network Area Controller.
20. NC: Normally closed position of switch after control signal is removed or normally closed position of manually operated valves or dampers.
21. NO: Normally open position of switch after control signal is removed; or the open position of a controlled valve or damper after the control signal is removed; or the usual position of a manually operated valve.
22. OSS: Operating System Server, host for system graphics, alarms, trends, etc.
23. Operator: Same as actuator.
24. PC: Personal Computer.
23 09 00-4
25. Peer-to-Peer: Mode of communication between controllers in which each device connected to network has equal status and each shares its database values with all other devices connected to network.
26. P: Proportional control; control mode with continuous linear relationship between observed input signal and final controlled output element.
27. PI: Proportional-Integral control, control mode with continuous proportional output plus additional change in output based on both amount and duration of change in controller variable (reset control).
28. PICS: BACnet Product Interoperability Compliance Statement.
29. PID: Proportional-Integral-Derivative control, control mode with continuous correction of final controller output element versus input signal based on proportional error, its time history (reset) and rate at which it's changing (derivative).
30. Point: Analog or discrete instrument with addressable database value.
31. WAN: Wide Area Network.
1.6 SUBMITTALS
A. Submit under provisions of Section 01 30 00.
B. Product Data: Manufacturer's data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation methods.
C. Submit documentation of contractor qualifications, including those indicated in "Quality Assurance" if requested by the A-E.
D. 5 copies of shop drawings of the entire control system shall be submitted and shall consist of a complete list of equipment and materials, including manufacturers' catalog data sheets and installation instructions. Submit in printed electronic format. Samples of written Controller Checkout Sheets and Performance Verification Procedures for applications similar in scope shall be included for approval.
E. Shop drawings shall also contain complete wiring and schematic diagrams, sequences of operation, control system bus layout and any other details required to demonstrate that the system has been coordinated and will properly function as a system. Terminal identification for all control wiring shall be shown on the shop drawings.
F. Upon completion of the work, provide 5 complete sets of ' as-built' drawings and other project-specific documentation in 3-ring hard-backed binders and on Flash media.
G. Any deviations from these specifications or the work indicated on the drawings shall be clearly identified in the Submittals.
1.7 QUALITY ASSURANCE
A. The Control System Contractor shall have a full service DDC office within 50 miles of the job site. This office shall be staffed with applications engineers, software engineers and field technicians. This office shall maintain parts inventory and shall have all testing and diagnostic equipment necessary to support this work, as well as staff trained in the use of this equipment. This office shall NOT be the only office within 50 miles of the job site, from which parts, software, and authorized service can be provided by the system manufacturer.
This office will employ at least eight certified NiagaraN4 programmer.
23 09 00-5
B. Single Source Responsibility of Supplier: The Control System Contractor shall be responsible for the complete installation and proper operation of the control system. The Control System Contractor shall exclusively be in the regular and customary business of design, installation and service of computerized building management systems similar in size and complexity to the system specified. The Control System Contractor shall be the manufacturer of the primary DDC system components or shall have been the authorized representative for the primary DDC components manufacturer for at least 15 years. At least two other approved/authorized Control System Contractors providing the same DDC system components, software and support shall have an office located within 50 miles of the job site.
All control panels shall be assembled by the Control System Contractor in a UL-Certified 508A panel shop.
C. Equipment and Materials: Equipment and materials shall be cataloged products of manufacturers regularly engaged in the production and installation of HVAC control systems.
Products shall be manufacturer's latest standard design and have been tested and proven in actual use.
1.8 PRE-INSTALLATION MEETINGS
A. Convene minimum two weeks prior to starting work of this section.
1.9 DELIVERY, STORAGE AND HANDLING
A. Maintain integrity of shipping cartons for each piece of equipment and control device through shipping, storage and handling as required to prevent equipment damage. Store equipment and materials inside and protected from weather.
1.10 JOB CONDITIONS
A. Cooperation with Other Trades: Coordinate the Work of this section with that of other sections to ensure that the Work will be carried out in an orderly fashion. It shall be this Contractor's responsibility to check the Contract Documents for possible conflicts between his Work and that of other crafts in equipment location, pipe, duct and conduit runs, electrical outlets and fixtures, air diffusers and structural and architectural features.
1.11 SEQUENCING
A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
PART 2 PRODUCTS
2.1 PRODUCT MANUFACTURERS AND CONTRACTORS
A. Acceptable Niagara N4 Manufacturers: Honeywell Optimizer Building Control Systems.
Others not permitted.
B. Acceptable Field Controllers: Field controllers must be available from local supply house to multiple contractors: Honeywell WEBS Spyder. Others not permitted.
C. Acceptable Contractors: Control Resource – Denny Moline 616-291-7125 dmoline@hurstind.com; Controlnet – Jeff Tibbs 616-836-1326 jtibbs@control-net.com;
Smart Building Services – Randy Stockfish 231-357-1650 randys@sbsmi.com Others not permitted without written approval from Emily Kearney CFO, MBA at Cadillac Area Public mailto:dmoline@hurstind.com mailto:jtibbs@control-net.com mailto:randys@sbsmi.com
23 09 00-6
Schools.
2.2 GENERAL
A. The Building Management System (BMS) shall be comprised of a network of interoperable, stand-alone digital controllers, a network area controller, graphics and programming and other control devices for a complete system as specified herein.
B. The installed system shall provide secure password access to all features, functions and data contained in the overall BMS.
2.3 OPEN, INTEROPERABLE, INTEGRATED ARCHITECTURE
A. The intent of this specification is to provide a peer-to-peer networked, stand-alone, distributed control system utilizing Open protocols in one open, interoperable system.
B. The supplied computer software shall employ object-oriented technology (OOT) for representation of all data and control devices within the system. Physical connection of any BACnet control equipment, such as chillers, shall be via Ethernet or IP.
C. All components and controllers supplied under this contract shall be true "peer-to-peer" communicating devices. Components or controllers requiring "polling" by a host to pass data shall not be acceptable.
D. The supplied system shall incorporate the ability to access all data using HTML5 enabled browsers without requiring proprietary operator interface and configuration programs or browser plug-ins. An Open Database Connectivity (ODBC) or Structured Query Language (SQL) compliant server database is required for all system database parameter storage.
This data shall reside on the Operating System Server located in the Facilities Office on the LAN. Systems requiring proprietary database and user interface programs shall not be acceptable.
E. A hierarchical topology is required to assure reasonable system response times and to manage the flow and sharing of data without unduly burdening the customer's internal Intranet network. Systems employing a "flat" single tiered architecture shall not be acceptable.
1. Maximum acceptable response time from any alarm occurrence (at the point of origin) to the point of annunciation shall not exceed 5 seconds for network connected user interfaces.
2. Maximum acceptable response time from any alarm occurrence (at the point of origin) to the point of annunciation shall not exceed 60 seconds for remote or dial-up connected user interfaces.
2.4 BAS SERVER HARDWARE
A. Minimum Computer Configuration (Hardware Independent).
1. Central Server. Owner shall provide a dedicated BAS server with configuration that includes the following components as a minimum:
2. Processor: Intel Xeon CPU E5-2640 x64 (or better), compatible with dual- and quad-core processors.
3. Memory: 2 GB or more recommended for large systems, 8 GB or more recommended for the Windows 64-bit version.
4. Hard Drive: 4 GB minimum, more recommended depending on archiving
23 09 00-7 requirements.
5. Display: Video card and monitor capable of displaying 1024 x 768 pixel resolution or greater.
6. Network Support: Ethernet adapter (10/100 Mb with RJ-45 connector).
7. Connectivity: Full-time high-speed ISP connection recommended for remote site access (i.e. T1, ADSL, cable modem).
B. Standard Client: The thin-client Web Browser BAS GUI shall be Microsoft Internet Explorer (10.0 or later) running on Microsoft 7+. No special software shall be required to be installed on the PCs used to access the BAS via a web browser.
2.5 SYSTEM NETWORK CONTROLLER (SNC)
A. These controllers are designed to manage communications between the programmable equipment controllers (PEC), application specific controllers (ASC) and advanced unitary controllers (AUC) which are connected to its communications trunks, manage communications between itself and other system network controllers (SNC) and with any operator workstations (OWS) that are part of the BAS, and perform control and operating strategies for the system based on information from any controller connected to the BAS.
B. The controllers shall be fully programmable to meet the unique requirements of the facility it shall control.
C. The controllers shall be capable of peer-to-peer communications with other SNC's and with any OWS connected to the BAS, whether the OWS is directly connected, connected via cellular modem or connected via the Internet.
D. The communication protocols utilized for peer-to-peer communications between SNC's will be Niagara 4 Fox, BACnet TCP/IP and SNMP. Use of a proprietary communication protocol for peer-to-peer communications between SNC's is not allowed.
E. The SNC shall employ a device count capacity license model that supports expansion capabilities.
F. The SNC shall be enabled to support and shall be licensed with the following Open protocol drivers (client and server) by default:
1. BACnet
2. Lon
3. MODBUS
4. SNMP
5. KNX
G. The SNC shall be capable of executing application control programs to provide:
1. Calendar functions.
2. Scheduling.
3. Trending.
4. Alarm monitoring and routing.
5. Time synchronization.
6. Integration of LonWorks, BACnet, and MODBUS controller data.
7. Network management functions for all SNC, PEC and ASC based devices.
H. The SNC shall provide the following hardware features as a minimum:
1. Two 10/100 Mbps Ethernet ports.
23 09 00-8
2. Two Isolated RS-485 ports with biasing switches.
3. 1 GB RAM
4. 4 GB Flash Total Storage / 2 GB User Storage
5. Wi-Fi (Client or WAP)
6. USB Flash Drive
7. High Speed Field Bus Expansion
8. -20-60°C Ambient Operating Temperature
9. Integrated 24 VAC/DC Global Power Supply
10. MicroSD Memory Card Employing Encrypted Safe Boot Technology
I. The SNC shall support standard Web browser access via the Intranet/Internet. It shall support a minimum of 16 simultaneous users.
J. The SNC shall provide alarm recognition, storage, routing, management and analysis to supplement distributed capabilities of equipment or application specific controllers.
K. The SNC shall be able to route any alarm condition to any defined user location whether connected to a local network or remote via cellular modem, or wide-area network.
1. Alarm generation shall be selectable for annunciation type and acknowledgement requirements including but not limited to:
a. Alarm.
b. Return to normal.
c. To default.
2. Alarms shall be annunciated in any of the following manners as defined by the user:
a. Screen message text.
b. Email of complete alarm message to multiple recipients.
c. Pagers via paging services that initiate a page on receipt of email message.
d. Graphics with flashing alarm object(s).
3. The following shall be recorded by the SNC for each alarm (at a minimum):
a. Time and date.
b. Equipment (air handler #, access way, etc.).
c. Acknowledge time, date, and user who issued acknowledgement.
L. Programming software and all controller "Setup Wizards" shall be embedded into the SNC.
M. The SNC shall support the following security functions.
1. Module code signing to verify the author of programming tool and confirm that the code has not been altered or corrupted.
2. Role-Based Access Control (RBAC) for managing user roles and permissions.
3. Require users to use strong credentials.
4. Data in Motion and Sensitive Data at Rest be encrypted.
5. LDAP and Kerberos integration of access management.
N. The SNC shall support the following data modeling structures to utilize Search; Hierarchy;
Template; and Permission functionality:
1. Metadata: Descriptive tags to define the structure of properties.
2. Tagging: Process to apply metadata to components
3. Tag Dictionary
O. The SNC shall employ template functionality. Templates are a containerized set of configured data tags, graphics, histories, alarms... that are set to be deployed as a unit based upon manufacturer’s controller and relationships. All lower level communicating controllers (PEC, AUC, AVAV, VFD…) shall have an associated template file for reuse on
23 09 00-9 future project additions.
P. The SNC shall be provided with a 5 Year Software Maintenance license. Labor to implement not included.
2.6 PROGRAMMABLE EQUIPMENT CONTROLLER (PEC)
A. HVAC control shall be accomplished using LonMark or BACnet based devices where the application has a LonMark profile or BTL Listed PICS defined. Where LonMark devices are not available for a particular application, devices based on LonWorks shall be acceptable.
For each LonWorks device that does not have LonMark certification, the device supplier shall provide an XIF file for the device. The controller platform shall provide options and advanced system functions, programmable and configurable using Niagara 4 Framework, that allow standard and customizable control solutions required in executing the "Sequence of Operation".
B. All PECs shall be application programmable and shall at all times maintain their certification.
All control sequences within or programmed into the PEC shall be stored in non-volatile memory, which is not dependent upon the presence of a battery to be retained.
C. The PEC shall provide LED indication of communication and controller performance to the technician, without cover removal.
D. The PEC shall not require any external configuration tool or programming tool. All configuration and programming tasks shall be accomplished and accessible from within the Niagara 4 environment.
E. The following integral and remote Inputs/Outputs shall be supported per each PEC:
1. Eight integral dry contact digital inputs.
2. Any two digital inputs may be configured as pulse counters with a maximum pulse read rate of 15 Hz.
3. Eight integral analog inputs (configurable as 0-10V, 0-10,000 ohm or, 20K NTC).
4. Six integral 4-20 ma analog outputs.
5. Eight integral 24 Vac Triac digital outputs, configurable as maintained or floating motor control outputs.
6. One integral 20 Vdc, 65-mA power supply for auxiliary devices.
7. If a 20 Vdc 65-mA power supply terminal is not integral to the PEC, provide at each
PEC a separate, fully isolated, enclosed, current limited and regulated UL listed auxiliary power supply for power to auxiliary devices.
F. Each PEC shall have expansion ability to support additional I/O requirements through the use of remote input/output modules.
G. PEC Controllers shall support at minimum the following control techniques:
1. General-purpose control loops that can incorporate Demand Limit Control strategies, Set point reset, adaptive intelligent recovery, and time of day bypass.
2. General-purpose, non-linear control loops.
3. Start/stop Loops.
4. If/Then/Else logic loops.
5. Math Function loops (MIN, MAX, AVG, SUM, SUB, SQRT, MUL, DIV, ENTHALPY).
2.7 ADVANCED UNITARY CONTROLLER (AUC)
23 09 00-10
A. The advanced unitary controller (AUC) platform shall be designed specifically to control HVAC - ventilation, filtration, heating, cooling, humidification, and distribution. Equipment includes: constant volume air handlers, VAV air handlers, packaged RTU, heat pumps, unit vents, fan coils, natural convection units and radiant panels. The control shall use LonMark or BACnet based devices where the application has a LonMark profile or BTL Listed PICS defined. Where LonMark devices are not available for a particular application, devices based on LonWorks shall be acceptable. For each LonWorks device that does not have LonMark certification, the device supplier shall provide an XIF file for the device. The controller platform shall provide options and advanced system functions, programmable and configurable using Niagara 4 Framework, that allow standard and customizable control solutions required in executing the "Sequence of Operation".
B. Minimum Requirements:
1. The controller shall be fully programmable with full functionality on any Niagara 4 brand platform.
a. Support downloads to the controller from any brand of Niagara 4 platform.
b. Support uploads from the controller to any brand of Niagara 4 platform.
c. Support simulation/debug mode of the controller.
d. Maintain native GUI.
e. Native function-block programming software and all controller “Setup Wizards” shall be embedded within the Niagara 4 environment.
2. The controller shall be capable of either integrating with other devices or stand-alone operation.
3. The controller shall have two microprocessors. The Host processor contains on-chip
FLASH program memory, FLASH information memory, and RAM to run the main HVAC application. The second processor for network communications. Controller memory minimum requirements include:
a. FLASH Memory Capacity: 60 Kilobytes with 8 Kilobytes for application program.
b. FLASH Memory settings retained for ten years.
c. RAM: 2 Kilobytes.
4. The controller shall have an internal time clock with the ability to automatically revert from a master time clock on failure.
a. Operating Range: 24 hour, 365 day, multi-year calendar including day of week and configuration for automatic day-light savings time adjustment to occur on configured start and stop dates.
b. Accuracy: ±1 minute per month at 77 degrees F (25 degrees C).
c. Power Failure Backup: 24 hours at 32 degrees to 122 degrees F (0 degrees to
50 degrees C).
5. The controller shall have Significant Event Notification, Periodic Update capability, and Failure Detect when network inputs fail to be detected within their configurable time frame.
6. The controller shall have an internal DC power supply to power external sensors.
a. Power Output: 20 VDC ±10% at 75 mA.
7. The controller shall have a visual indication (LED) of the status of the devise:
a. Controller operating normally.
b. Controller in process of download.
c. Controller in manual mode under control of software tool.
d. Controller lost its configuration.
e. No power to controller, low voltage, or controller damage.
f. Processor and/or controller are not operating.
8. The minimum controller Environmental ratings.
23 09 00-11
a. Operating Temperature Ambient Rating: -40 degrees to 150 degrees F (-40 degrees to 65.5 degrees C).
b. Storage Temperature Ambient Rating: -40 degrees to 150 degrees F (-40 degrees to 65.5 degrees C).
c. Relative Humidity: 5% to 95% non-condensing.
9. The controller shall have the additional approval requirements, listings, and approvals:
a. UL/cUL (E87741) listed under UL916 (Standard for Open Energy Management Equipment) with plenum rating.
b. CSA (LR95329-3) Listed.
c. Meets FCC Part 15, Subpart B, Class B (radiated emissions) requirements.
d. Meets Canadian standard C108.8 (radiated emissions).
e. Conforms requirements European Consortium standard EN 61000-6-1; 2001
(EU Immunity).
f. Conforms requirements European Consortium standard EN 61000-6-3; 2001
(EU Emission).
10. The controller housing shall be UL plenum rated mounting to either a panel or DIN rail
(standard EN50022; 7.5mm x 35mm).
11. The controller shall have a mix of digital inputs (DI), digital Triac outputs (DO), analog outputs (AO), and universal inputs (UI).
a. Analog outputs (AO) shall be capable of being configured as digital outputs
(DO).
b. Input and Output wiring terminal strips shall be removable from the controller without disconnecting wiring.
c. Input and Output wiring terminals shall be designated with color coded labels.
d. Universal inputs shall be capable of being configured as binary inputs, resistive inputs, voltage inputs (0-10 VDC), or current inputs (4-20 mA).
12. The controller shall provide "continuous" automated loop tuning with an Adaptive
Integral Algorithm Control Loop.
13. The controller platform shall have standard HVAC application programs that are modifiable to support both the traditional and specialized "sequence of operations" as outlined in Section 4.
a. Discharge air control and low limit.
b. Pressure-dependent dual duct without flow mixing.
c. Variable air volume with return flow tracking.
d. Economizer with differential enthalpy.
e. Minimum airflow coordinated with CO2.
f. Unit ventilator cycle (1, 2, 3) 2-pipe.
g. Unit ventilator cycle (1, 2, 3) 2-pipe with face/bypass.
h. Unit ventilator cycle (1, 2, 3) 4-pipe.
i. Unit ventilator cycle (1, 2, 3) 4-pipe with EOC valve.
2.8 ADVANCED VARIABLE AIR VOLUME CONTROLLER (AVAV)
A. The advanced VAV controller platform shall be designed specifically for room-level VAV control - pressure-independent air flow control, pressure dependent damper control, supply and exhaust pressurization/de-pressurization control; temperature, humidity, complex CO2, occupancy, and emergency control. Equipment includes: VAV terminal unit, VAV terminal unit with reheat, Series fan powered terminal unit, Parallel fan powered terminal unit, Supply and Exhaust air volume terminals and Constant volume dual-duct terminal unit. Control shall be accomplished using LonMark or BACnet based devices where the application has a LonMark profile or BTL Listed PICS defined. Where LonMark devices are not available for a particular application, devices based on LonWorks shall be acceptable. For each LonWorks
23 09 00-12 device that does not have LonMark certification, the device supplier shall provide an XIF file for the device. The controller platform shall provide options and advanced system functions, programmable and configurable using Niagara 4 Framework, that allow standard and customizable control solutions required in executing the "Sequence of Operation".
B. Minimum Requirements:
1. The controller shall be fully programmable with full functionality on any Niagara 4 brand platform.
a. Support downloads to the controller from any brand of Niagara 4 platform.
b. Support uploads from the controller to any brand of Niagara 4 platform.
c. Support simulation/debug mode of the controller.
d. Maintain native GUI.
e. Native function-block programming embedded software and all controller
“Setup Wizards” shall be embedded within the Niagara 4 environment.
2. The controller shall be capable of either integrating with other devices or stand-alone room-level control operation.
3. The controller shall have an internal velocity pressure sensor.
a. Sensor Type: Microbridge air flow sensor with dual integral restrictors.
b. Operating Range: 0 to 1.5 inch H2O (0 to 374 Pa).
c. Accuracy: ±2% of full scale at 32 degrees to 122 degrees F (0 degrees to 50 degrees C); ±1% of full scale at null pressure.
4. The controller shall have two microprocessors. The Host processor contains on-chip
FLASH program memory, FLASH information memory, and RAM to run the main HVAC application. The second processor for network communications.
a. FLASH Memory Capacity: 60 Kilobytes with 8 Kilobytes for application program.
b. FLASH Memory settings retained for ten years.
c. RAM: 2 Kilobytes.
5. The controller shall have an internal time clock with the ability to automatically revert from a master time clock on failure.
a. Operating Range: 24 hour, 365 day, multi-year calendar including day of week and configuration for automatic day-light savings time adjustment to occur on configured start and stop dates.
b. Accuracy: ±1 minute per month at 77 degrees F (25 degrees C).
c. Power Failure Backup: 24 hours at 32 degrees to 122 degrees F (0 degrees to
50 degrees C).
6. The controller shall have Significant Event Notification, Periodic Update capability and
Failure Detect when network inputs fail to be detected within their configurable time frame.
7. The controller shall have an internal DC power supply to power external sensors.
a. Power Output: 20 VDC ±10% at 75 mA.
8. The controller shall have a visual indication (LED) of the status of the devise:
a. Controller operating normally.
b. Controller in process of download.
c. Controller in manual mode under control of software tool.
d. Controller lost its configuration.
e. No power to controller, low voltage, or controller damage.
f. Processor and/or controller are not operating.
9. The minimum controller Environmental ratings:
a. Operating Temperature Ambient Rating: 32 degrees to 122 degrees F (0 degrees to 50 degrees C).
b. Storage Temperature Ambient Rating: 32 degrees to 122 degrees F (0 degrees
23 09 00-13 to 50 degrees C).
c. Relative Humidity: 5% to 95% non-condensing.
10. The controller shall have the additional approval requirements, listings, and approvals:
a. UL/cUL (E87741) listed under UL916 (Standard for Open Energy Management
Equipment) with plenum rating.
b. CSA (LR95329-3) Listed.
c. Meets FCC Part 15, Subpart B, Class B (radiated emissions) requirements.
d. Meets Canadian standard C108.8 (radiated emissions).
e. Conforms requirements European Consortium standard EN 61000-6-1; 2001
(EU Immunity).
f. Conforms requirements European Consortium standard EN 61000-6-3; 2001
(EU Emission).
11. The controller housing shall be UL plenum rated mounting to either a panel or DIN rail
(standard EN50022; 7.5mm x 35mm).
12. The controller shall provide an integrated actuator option.
a. Actuator type: Series Floating.
b. Rotation stroke: 95 degrees ±3 degrees for CW or CCW opening dampers.
c. Torque rating: 44 lb-inch (5 Nm).
d. Run time for 90 degrees rotation: 90 seconds at 60 Hz.
13. The controller shall have digital inputs (DI), digital Triac outputs (DO), three analog outputs (AO), and universal inputs (UI).
a. Analog outputs (AO) shall be capable of being configured as digital outputs
(DO).
b. Input and Output wiring terminal strips shall be removable from the controller without disconnecting wiring.
c. Input and Output wiring terminals shall be designated with color coded labels.
14. The controller shall provide "continuous" automated loop tuning with an Adaptive Integral Algorithm Control Loop.
15. The controller shall have a loop execution response time of 1 second.
16. The controller platform shall have standard HVAC application programs that are modifiable to support both the traditional and specialized "sequence of operations" as outlined in Section 4.
a. VAV terminal unit.
b. VAV terminal unit fan speed control.
c. Series fan.
d. Parallel fan.
e. Regulated air volume (room pressurization/de-pressurization).
f. CV dual-duct.
g. Room CO2 control.
h. Room Humidity.
i. TOD occupancy sensor stand-by set points.
2.9 TOUCHSCREEN COMMUNICATING THERMOSTAT
A. BACnet Conformance
1. Touchscreen communicating thermostats shall be approved by the BTL as meeting the BACnet Application Specific Controller requirements.
2. Touchscreen Communicating Thermostats shall, at a minimum, support MS/TP
BACnet LAN types. They shall communicate directly through this BACnet LAN at 9.6, 19.2, 38.4 and 76.8 Kbps, as a native BACnet device.
3. Standard BACnet object types supported shall include, as a minimum, Analog Input, 23 09 00-14
Analog Output, Analog Value, Binary Input, Binary Output, Binary Value, Device, File, and Program Object Types.
4. All proprietary object types, if used in the system, shall be thoroughly documented and provided as part of the submittal data. All necessary tools shall be supplied for working with proprietary information.
B. Touch screen Communicating Thermostat hardware shall:
1. Include a 32 Bit processor
2. Include a backlit touchscreen for the user interface, buttons are not allowed.
3. Include Three (3) universal inputs with 12-bit resolution that can accept 3K and 10K
Type II thermistors, 0-10VDC, 0–5 VDC, 4-20mA, and dry contact signals. Inputs on controller may be either analog or digital.
4. Include built-in temperature sensor.
5. Include built-in humidity sensor.
6. Include Six (6) relay outputs on board.
7. Include Two (2) analog outputs with 12-bit resolution. Each auto-detecting for 0-10 V or 4-20 mA control signals.
8. Meet the requirements of Listed Underwriters Laboratory for Open Energy
Management Equipment (PAZX) under the UL Standard for Safety 916.
9. Meet the requirements of EMC Directive (European CE Mark) EN 60950.
10. Meet the requirements for FCC Part 15, Class B.
11. Be powered by 24VAC power.
C. Wireless sensors shall be supported by the Touchscreen Communicating Thermostat
1. Support up to eight (8) magnetic contact switches with CR2032-battery powered wireless transmitter.
2. Support up to three (3) passive infrared (PIR) motion detectors with 140-degree detection angle and AAA battery-powered wireless transmitter.
3. Meet the requirements for FCC Part 15, Class B.
4. Individual wireless sensor inputs can be used by fully programmable DDC to create custom sequence of operations in controller.
5. Sensors operate in the 433.92 MHz wireless frequency with 50-foot range
2.10 OTHER CONTROL SYSTEM HARDWARE
A. Motorized control dampers that will not be integral to the equipment shall be furnished by the Control System Contractor. Control damper frames shall be constructed of galvanized steel, formed into changes and welded or riveted. Dampers shall be galvanized, with nylon bearings. Blade edge seals shall be vinyl. Blade edge and tip seals shall be included for all dampers. Blades shall be 16-gauge minimum and 6 inches wide maximum and frame shall be of welded channel iron. Damper leakage shall not exceed 10 CFM per square foot, at 1.5 inches water gauge static pressure. Honeywell is basis of design.
B. Control damper actuators shall be furnished by the Control System Contractor. Two-position or proportional electric actuators shall be direct-mount type sized to provide a minimum of 5 in-lb torque per square foot of damper area. Damper actuators shall be spring return type.
Operators shall be heavy-duty electronic type for positioning automatic dampers in response to a control signal. Motor shall be of sufficient size to operate damper positively and smoothly to obtain correct sequence as indicated. All applications requiring proportional operation shall utilize truly proportional electric actuators. Honeywell is basis of design.
C. Control Valves: Control valves shall be 2-way or 3-way pattern as shown and constructed for
23 09 00-15 tight shutoff at the pump shut-off head or steam relief valve pressure. Control valves shall operate satisfactorily against system pressures and differentials. Two-position valves shall be ' line' size. Proportional control valves shall be sized for a maximum pressure drop of 5.0 psi at rated flow (unless otherwise noted or scheduled on the drawings). Valves with sizes up to and including 2 inches (51 mm) shall be "screwed" configuration and 2-1/2 inches (63.5 mm) and larger valves shall be "flanged" configuration. All control valves, including terminal unit valves, less than 2 inches (51 mm) shall be globe valves.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .