EDWARD S
HAMMONTREE
Digitally signed by EDWARD S
HAMMONTREE
Date: 2020.01.29 15:11:34 -08'00'
Sheet and Description
SECTION C SECTION E SECTION F SECTION G
TYPICAL
SECTIONS
APPROACH
ROADS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 20402-0000 SUBEXCAVATION CUYD 1,452 98 1,550
A0140 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C (NONWOVEN) SQYD 1,811 64 1,875
A0160 20703-2000 GEOGRID, STABILIZATION SQYD 3,389 111 3,500
A0180 30202-2000 ROADWAY AGGREGATE, METHOD 2 (SUBEXCAVATION) TON 2,651 49 2,700
A0200 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 218 12 230
A0220 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 12.72 12.72 Contract Quantity
A0240 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
(SUBEXCAVATION) TON 206 9 215
A0260 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (LEVELING
COURSE) TON 4,439 211 4,650
A0280 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 8,856 11 168 9,035
A0300 41201-0000 TACK COAT TON 68 2 70
A0320 41402-1000 CRACKS, ROUTING, CLEANING AND SEALING MILE 6.4 0.1 6.5
A0340 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 10
A0360 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 24-INCH WIDTH HOUR 10
A0380 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 10
A0400 62301-0000 GENERAL LABOR HOUR 20
A0420 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 134,820 180 135,000
A0440 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 124,820 180 125,000
A0460 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW) LNFT 4,760 240 5,000
A0480 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER,
TYPE 42-INCH EACH 200 200
A0500 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 64,790 60 64,850
A0520 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 162 36 198
A0540 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,500 1,500
A0560 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 350 350
MileStone: Signoff Date Completed: 01/22/20 Report Date: 01/22/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-J an
-2
9:
A
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
F:
\h ig hw ay s\
FH
W
A\
_m t-a6
_O ld D iv id e& S Fa tt ig
C rR d\ Es tim at e\ Q
A R ev ie w m t-a6
_S ec tio nB
.x ls m ]S he et
STATE PROJECT
B.1MUSSELSHELL 192(1)MT
SHEET
NUMBER
Sheet and Description
SECTION C SECTION E SECTION F SECTION G
TYPICAL
SECTIONS
APPROACH
ROADS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 20402-0000 SUBEXCAVATION CUYD 1,492 108 1,600
B0140 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C (NONWOVEN) SQYD 1,916 84 2,000
B0160 20703-2000 GEOGRID, STABILIZATION SQYD 3,456 144 3,600
B0180 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 218 12 230
B0200 30202-2000 ROADWAY AGGREGATE, METHOD 2 (SUBEXCAVATION) TON 2,718 182 2,900
B0220 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 12.72 12.72 Contract Quantity
B0240 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
(SUBEXCAVATION) TON 217 13 230
B0260 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (LEVELING
COURSE) TON 4,439 211 4,650
B0280 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 8,856 11 203 9,070
B0300 40702-0300 CHIP SEAL, TYPE 1C SQYD 32,853 997 33,850
B0320 40711-0000 EMULSIFIED ASPHALT TON 36 1 37
B0340 41201-0000 TACK COAT TON 68 2 70
B0360 41402-1000 CRACKS, ROUTING, CLEANING AND SEALING MILE 6.4 0.1 6.5
B0380 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 10
B0400 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 24-INCH WIDTH HOUR 10
B0420 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 10
B0440 62301-0000 GENERAL LABOR HOUR 20
B0460 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 177,060 440 177,500
B0480 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 167,060 440 167,500
B0500 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW) LNFT 4,760 240 5,000
B0520 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER,
TYPE 42-INCH EACH 200 200
B0540 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 85,910 90 86,000
B0560 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 162 36 198
B0580 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,600 1,600
B0600 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 400 400
-J an -2
9:
A M
MileStone: Signoff Date Completed: 01/22/20 Report Date: 01/22/20
F:
\h ig hw ay s\
FH
W
A\
_m t-a6
_O ld D iv id e& S Fa tt ig
C rR d\ Es tim at e\ Q
A R ev ie w m t-a6
_S ec tio nB
.x ls m ]S he et
2)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2MUSSELSHELL 192(1)MT
SHEET
NUMBER
DIVIDE LT
[1] 2,100 TON estimated roadway aggregate quantity.
[2] Based on 1.94 TON/CUYD.
[3] Based on 0.1 GAL/SQYD and 240 GAL/TON.
[4] See sheet C.6 for details. 12,500 LNFT estimated length of cracks.
[5] Based on 0.26 GAL/SQYD and 240 GAL/TON.
[6] See sheet C.5 for details.
[7] Subexcavation includes existing surfacing.
[8] Based on 1.97 TON/CUYD.
FOOTNOTE:
SIDE
SCHEDULES A & B TOTAL
12.72
ITEM 30202-2000
ROADWAY AGGREGATE,
METHOD 2 (SUBEXCAVATION)
(TON) [8]
DEEP PATCH QUANTITIES - SCHEDULES A & B [6]
704 2,110
MILEPOST ROAD
ITEM 20402-0000
SUBEXCAVATION
(CUYD) [7]
ITEM 20703-2000
GEOGRID, STABILIZATION
(SQYD)
2.3 704 2,110 1,386 1,386
ROAD TYPICAL
NO.
ITEM 30205-0500
ROADWAY AGGREGATE,
SHOULDER FINISHING
(MILE) [1]
ITEM 40301-0100
ASPHALT CONCRETE PAVEMENT,
TYPE 1 (LEVELING COURSE)
(TON) [2]
DIVIDE 12.72 8,856 4,439
FATTIG 32,853 36
ITEM 40301-0100
ASPHALT CONCRETE
PAVEMENT, TYPE 1
(TON) [2]
ITEM 41201-0000
TACK COAT
(TON) [3]
ITEM 41402-1000
CRACKS, ROUTING,
CLEANING, AND SEALING
(MILE) [4]
ITEM 40702-0300
CHIP SEAL,
TYPE 1C
(SQYD)
ITEM 40711-0000
EMULSIFIED
ASPHALT
(TON) [5]
68 6.4
TYPICAL SECTION QUANTITIES
12.72 8,856 4,439 68 6.4 32,853 36
SCHEDULE A TOTAL
SCHEDULE B TOTAL
8,856 4,439 68 6.4
STATE PROJECT
MUSSELSHELL 192(1) C.1MT
F:
\h ig hw ay s\
FH
W A\
_m t-a6
_O ld
D iv id e&
SF
at tig C rR d\ D es ig n\ Ty pi ca l S ec ti on s\ [m t- 6-
Ja n-
1:
A
M B
TH
O
M
PS
O N
/2
N
B
EL
L
/2
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
TABULATION OF TYPICAL
SECTION QUANTITIES
DIVIDE RT
DIVIDE RT
DIVIDE RT
DIVIDE BOTH
DIVIDE RT
DIVIDE RT
DIVIDE RT
DIVIDE RT
DIVIDE LT
DIVIDE RT
DIVIDE BOTH
DIVIDE BOTH
DIVIDE RT
DIVIDE BOTH
DIVIDE LT
DIVIDE LT
DIVIDE LT
DIVIDE RT
DIVIDE RT
DIVIDE RT
DIVIDE LT
DIVIDE RT
DIVIDE RT
FATTIG RT
FATTIG LT
FATTIG LT
[1] See sheet C.4 for details.
[2] Based on 1.97 TON/CUYD.
[3] Based on 1.94 TON/CUYD.
[4] Subexcavation includes existing surfacing.
SCHEDULE A TOTAL 748 1,811 1,279 1,265
SCHEDULE B TOTAL 788 1,916 1,346 1,332
1.8 11 31 18 18
FOOTNOTE:
1.8 3 10 5 5
1.2 26 64 44 44
5.7 12 31 20 20
5.5 31 87 53 53 9
5.3 19 48 33 33
5.3 66 151 113 112 18
4.9 105 237 180 177
4.9 5 15 8 8 1
4.7 22 57 37 37
4.6 37 87 64 63 10
4.5 37 87 64 63
4.3 23 55 40 39 6
4.2 19 55 33 33
4.2 8 22 13 13 2
4.2 31 70 53 53
4.0 128 289 220 217 36
3.6 17 45 29 29
3.6 11 31 18 18 3
2.8 13 37 22 22
2.8 47 108 80 79 13
2.7 10 30 17 17
2.1 47 101 80 79 13
1.8 5 15 8 8
1.5 4 13 7 7 1
ITEM 30202-2000
ROADWAY AGGREGATE,
METHOD 2 (SUBEXCAVATION)
(TON) [2]
1.1 51 140 87 85
MILEPOST ROAD SIDE
ITEM 20402-0000
SUBEXCAVATION
(CUYD) [4]
ITEM 20701-0300
SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(NONWOVEN) (SQYD)
ITEM 20703-2000
GEOGRID, STABILIZATION
(SQYD)
SUBEXCAVATION QUANTITIES [1]
ITEM 40301-0100
ASPHALT CONCRETE PAVEMENT,
TYPE 1 (SUBEXCAVATION)
(TON) [3]
STATE PROJECT
MUSSELSHELL 192(1) C.2MT
F:
\h ig hw ay s\
FH
W A\
_m t-a6
_O ld
D iv id e&
SF
at tig C rR d\ D es ig n\ Ty pi ca l S ec ti on s\ [m t-
-J an
-2
9:
A
M B
TH
O
M
PS
O N
/2
N
B
EL
L
/2
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
TABULATION OF TYPICAL
SECTION QUANTITIES
FERGUS ELECTRIC COOPERATIVE 84423 U.S. HIGHWAY 87, LEWISTOWN, MT 59457 MELANIE FORAN (406) 538-3465
UTILITY CONTACT INFORMATION
MID-RIVERS COMMUNICATIONS 904 C AVENUE, CIRCLE, MT 59215 DAN BURLEY (406) 535-7519
COMPANY ADDRESS CONTACT PHONE NUMBER
STATE PROJECT
MUSSELSHELL 192(1) D.1MT
F:
\h ig hw ay s\
FH
W A\
_m t-a6
_O ld
D iv id e&
SF
at tig C rR d\ D es ig n\ Pl an a nd P ro fil e\ [m t- 6-
Ja n-
1:
A
M B
TH
O
M
PS
O N
/2
N
B
EL
L
/2
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
UTILITY CONTACT
INFORMATION
1 G20-1 ROAD WORK NEXT 7 MILES [1] 36 x 18 3 13.5 2 G20-2 END ROAD WORK [1] 36 x 18 3 13.5 3 W20-1 ROAD WORK AHEAD 36 x 36 3 27.0 4 W20-4 ONE LANE ROAD AHEAD 36 x 36 4 36.0 5 W20-7 FLAGGER (SYMBOL) 36 x 36 4 36.0 6 W3-4 BE PREPARED TO STOP 36 x 36 4 36.0 7 G20-4 PILOT CAR FOLLOW ME [2] 36 x 18 2
[1] Install signs on Old Divide Road at north and south ends, and on northern end of S Fattig Creek Road.
[2] For information only.
SUMMARY OF TEMPORARY TRAFFIC CONTROL QUANTITIES
FOOTNOTE:
ITEM 63504-1000
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SCHEDULES A & B
SCHEDULES A & B TOTAL
SIGN
NUMBER
MUTCD
NUMBER DESCRIPTION SIGN SIZE
(IN X IN)
NUMBER
OF SIGNS
QUANTITY
(SQFT)
ITEM 63502-1250
TEMPORARY TRAFFIC
CONTROL, TUBULAR MARKER,
TYPE 42-INCH
(EACH)
ITEM 63503-0700
TEMPORARY TRAFFIC
CONTROL, PAVEMENT
MARKINGS
(LNFT)
ROAD
ITEM 63506-0500
TEMPORARY TRAFFIC
CONTROL, FLAGGER
(HOUR)
ITEM 63506-0600
TEMPORARY TRAFFIC
CONTROL, PILOT CAR
(HOUR)
DIVIDE 1,500
1,500
200 64,790
21,120
SCHEDULE A TOTAL 200 64,790
SCHEDULE B TOTAL 200 85,910
FATTIG 100
1,600
STATE PROJECT
MUSSELSHELL 192(1) F.1MT
F:
\h ig hw ay s\
FH
W A\
_m t-a6
_O ld
D iv id e&
SF
at tig C rR d\ D es ig n\ Te m po ra ry
T ra ff ic
6-
Ja n-
1:
A
M B
TH
O
M
PS
O N
/2
N
B
EL
L
/2
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
TABULATION OF TEMPORARY
TRAFFIC CONTROL
QUANTITIES
[1] See sheet G.2 for pavement marking details.
[2] Quantities reflect double application in accordance with Subsection 634.05.
[3] Includes equivalent length of 4-inch stripe for 12-inch stop lines on paved public approaches.
SCHEDULE B TOTAL
124,820 134,820
DIVIDE
DIVIDE
DIVIDE
FATTIG
SCHEDULE A TOTAL
177,060
14,784 14,784 15,024
0.36 TO 4.87
4.87 TO 5.10
47,866
PAVEMENT MARKING QUANTITIES [1]
ROAD
DIVIDE
4,760
FOOTNOTE:
167,060
0.14 TO 0.36
5.10 TO 6.50 14,784
0.00 TO 2.00 21,120 21,120 21,120
4,760
2,300
ITEM 63401-0400
PAVEMENT MARKINGS,
TYPE B, BROKEN (YELLOW)
(LNFT) [2]
ITEM 63401-0300
PAVEMENT MARKINGS,
TYPE B, SOLID (WHITE)
(LNFT) [2]
RIGHT SHOULDERLEFT SHOULDER
2,300 2,300 47,626
2,460
LEFT CENTER RIGHT CENTER
ITEM 63401-0300
PAVEMENT MARKINGS,
TYPE B, SOLID (YELLOW)
(LNFT) [2]
21,120
47,626 47,626
M.P. TO M.P.
CENTER
2,460 2,460
STATE PROJECT
MUSSELSHELL 192(1) G.1MT
F:
\h ig hw ay s\
FH
W A\
_m t-a6
_O ld
D iv id e&
SF
at tig C rR d\ D es ig n\ Pe rm an en t T ra ff ic
6- Ja n-
2:
P M
B
TH
O
M
PS
O N
/2
N
B
EL
L
/2
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
TABULATION OF PERMANENT
TRAFFIC CONTROL
QUANTITIES
[3]
[3]
File details come from the government source that posted it. Updated .