QA_04-02-2020.pdf

PDF 99 KB Posted

Attached to
MT Musselshell 192(1), Old Divide & Fattig Creek Road
Solicitation number
69056720r000002
Issued by

View the file

Other files

File Type Posted
mt-a6501951_plans_flat.pdf PDF
Plan Request form_Old Divide.pdf PDF
RFP_Old Divide.pdf PDF
FinalGeotechReport.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT Musselshell 192(1) Old Divide & Fattig Creek Road

# General Technical Question Answer Date

1 X Please provide a digital copy of the plans, specs, and planholder’s list. We would also like to be added to the planholder’s list.

The plans/specs/planholders list is available at the link below.

You’ll need to log in to add yourself to the plansholder list, I can’t do it for you and we don’t maintain a separate one outside of beta.sam.

Let me know if you have any other questions.

https://beta.sam.gov/opp/645f1b734e5d43 4987006bc88cbb50db/view

3/11/2020

2 X

In talking with local suppliers Montana State Dot asphalt mixes In this geographical region are usually PG 64‐28, the PG 58‐28 is a softer oil and would more than likely not be able to pass the required Montana State Rut testing requirements. Therefore, given the requirements of Section 403, would a Montana State JMF approved within the past 12 months with PG‐64‐28 be acceptable on this project?

In accordance with Subsections 105.01 and 403.01, Asphalt binder grade PG 58‐28 or better is acceptable.

4/1/2020

Check General or Technical

3 X

I don’t believe you have enough Quantity in the Emulsified Asphalt Bid Item! Plan Sheet C.1 specifies [5] Based on 0.26 GAL/SQYD and 240 GAL/TON. Per FP‐14 the spread rate should be between .27 ‐ .43; and usually we run in the range of .41 ‐.43. Please advise.

Submit bids for the quantities shown in the bid schedule.

4/1/2020

4 X

The bid item B03320 EMULSIFIED ASPHALT quantity seems extremely low. At an industry standard shot rate of .45 gallons per SY I would anticipate this to be closer to 64 tons.

Submit bids for the quantities shown in the bid schedule.

4/2/2020