MSTUDIO_FAQ_03.20.2024.pdf

PDF 98 KB Posted

Attached to
Material Synthesis Technologies for Universal and Diverse Integration Opportunities (M-STUDIO)
Opportunity number
HR001124S0019
Issued by

About this file

This document is a Frequently Asked Questions (FAQ) related to the Material Synthesis Technologies for Universal and Diverse Integration Opportunities (M-STUDIO) Broad Agency Announcement (BAA) solicitation from the Defense Advanced Research Projects Agency (DARPA).

The FAQ addresses various aspects of the M-STUDIO program, including whether slides or video will be available, substrate size requirements, preferred approaches, CMOS compatibility, funding availability, and eligibility for international entities. It also provides clarification on the Phase 2 requirements for a 10-layer stack and acceptable devices and measurements. The M-STUDIO BAA solicitation is seeking innovative proposals for the development of nano-scale heterogeneous material synthesis on lattice mismatch substrates to realize defect-free multi-layer heterogenous junctions. The program is funded under DARPA's Research and Technology Development grant program (CFDA 12.910).

Answers to submitted questions as of 20 Mar 2024

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-STUDIO Frequently Asked Ques�ons (FAQ)

1. Will slides or video be posted of the proposer’s day?

a. Video of the presenta�ons can be found at:

htps://www.youtube.com/watch?v=UjOrrQv8YZs

2. Is there a minimum substrate size required by the program?

a. No minimum substrate size is defined as a metric in the Broad Agency Announcement

(BAA).

3. Are there any preferred approaches to achieving the program goals?

a. Any approach that can provide a credible pathway towards achieving the program metrics and goals will be considered viable. This includes recent published approaches or new innova�ve ideas that can be substan�ated by evidence and simula�on.

4. Is it important for the approach to be complementary metal-oxide semiconductor (CMOS) compa�ble and/or u�lize CMOS process flows?

a. Transi�on of the M-STUDIO technology is important, therefore CMOS integra�on was men�oned because it may have significant impact on the future microelectronics industry. However, any material system that would have high impact for DoD and industry will be considered.

5. Has guidance been posted on how much funding is available or how many teams will be selected for funding?

a. No an�cipated funding level will be provided.

6. Do you expect large industrial fabs including interna�onal fabs to propose?

a. The M-STUDIO program is open to any proposal from any en�ty that can comply with the eligibility sec�on of the BAA, to include non-U.S. en��es that are able to comply with export control regula�ons.

7. Are there any guidelines related to the 10-layer Phase 2 metrics? More specifically, are there a required number of dis�nct materials, or do all 10 layers need to to be high electron mobility?

a. There are no restric�ons on the total number of dis�nct materials as long as each material reaches 95% of the SOA for each layer mobility. A two-material system (ABAB) is acceptable as long as it reaches the criteria specified in the BAA.

8. Is it acceptable to create a 10-layer lateral stack, mee�ng the program dimensions and requirements?

a. No, it is expected that the 10 layers must be stacked ver�cally.

9. Will you accept submissions to the first phase only?

a. No. proposals must address both phases to be considered compliant with the BAA requirements and reviewed.

10. What are the types of acceptable devices and measurements in each phase?

a. These measurements and devices are defined by the proposer to demonstrate measured results mee�ng the program metrics. In addi�on, the proposer should discuss why their chosen devices and results are sufficient to demonstrate the achieved mobili�es are > 95% of SOA.

https://www.youtube.com/watch?v=UjOrrQv8YZs

File details come from the government source that posted it. Updated .