This document is a Project Manual for the MS-531-200-003 Replace Boiler Room Floor Drain project in Jessup, Maryland. The project is being solicited by the state of Maryland and involves the replacement of the boiler room floor drain at the Clifton T. Perkins facility in Howard County. The Project Manual provides details on the scope of work, required products and materials, and project timeline. The project requires the selected contractor to perform all demolition, installation, and related work necessary to complete the boiler room floor drain replacement. Bids for this project are due by a specific date, and a mandatory pre-bid conference is scheduled for interested contractors. The contract is expected to be awarded shortly after the bid due date, with the successful contractor required to complete the work within a defined timeframe.

The Project Manual does not provide specific pricing terms or set-aside requirements. It also does not identify any incumbent contractors or discuss the current environment or funding sources for the project. The document focuses solely on the technical requirements and logistics of the boiler room floor drain replacement work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .