MPCS 24027RFP- MPHS Chillers Replacement 2024_Addendum 1.pdf

PDF 153 KB Posted

Attached to
CHILLER REPLACEMENT - MANASSAS PARK HIGH SCHOOL (MPHS)
Solicitation number
58541
Issued by
Manassas Park City, Virginia

About this file

This document is an addendum to a Request for Proposals (RFP) issued by Manassas Park City Schools (MPCS) for the replacement of chillers at Manassas Park High School (MPHS) in Manassas Park, Virginia. The RFP seeks qualified vendors to furnish all labor and materials to replace an aging chiller unit that must be energy efficient, have a life expectancy of at least 15 years, carry a warranty exceeding the industry standard, and be compatible with the existing automatic logic system. The addendum provides updates to the proposal format and content, including the addition of requirements for performance and labor/material payment bonds. It also addresses questions and answers related to the RFP, such as the circuit breaker size, electrical feed, and installation timelines.

The RFP does not require a bid bond, but the successful vendor will need to provide the specified performance and payment bonds. MPCS recommends bidding the project using standard hours and workdays, with the option to include weekend and holiday rates in case a change order is needed for premium time work. The chilled water loop that the chiller serves contains an ethylene glycol mixture, and respondents should reference the school system's calendars for implementation planning purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANASSAS PARK CITY SCHOOLS

RFP# 24027RFP – CHILLER REPLACEMENT

MANASSAS PARK HIGH SCHOOL (MPHS)

RFP ADDENDUM #1

RFP Issue Date: February 8, 2024 Date of Addendum: February 15, 2024

NOTICE TO ALL POTENTIAL RESPONDENTS

The Request for Proposals (RFP) is modified as set forth in this Addendum. The original RFP Documents and any previously issued addenda remain in full force and effect, except as modified by this Addendum, which is hereby made part of the RFP. Respondents shall take this Addendum into consideration when preparing and submitting its Proposal. Acknowledgement of this Addendum 1 must be made with your submittal.

PROPOSAL SUBMITTAL DEADLINE

The proposal submittal deadline remains the same and is not changed by this Addendum.

1.0 - RFP

The following modifications are hereby incorporated into the RFP. Changes should be in the order they appear in the RFP to make it easier to read.

Item Section(s) Description of Change

1.1 Proposal Format and Content (Section 4, page 11)

Add the following bullet items under Tab 1: Administrative o Standard Performance Bond (Appendix D) o Standard Labor and Material Payment Bond

(Appendix E)

1.2 Add Performance and Payment Bonds

(Section 4.5, page 13)

Section 4.5 updated to add Performance and Payment Bonds

1.3 Exceptions to MPCS Contract Terms and

Conditions (Section 4.12, page 15)

Replace “Appendix D” with “Appendix F”

1.4 Appendix D: Standard Performance Bond Add

1.5 Add Appendix E: Standard Labor and

Material Payment Bond

Add

2.0 – QUESTIONS AND ANSWERS

The following questions and answers are provided as a matter of information to clarify issues raised about the RFP. To the extent that changes to the RFP are required based on the questions received, the RFP has been modified as noted above in the RFP section of this Addendum.

Item Questions and Answers

2.1 Question: Will a Bid Bond be required?

Answer: A bid bond will not be required for this RFP solicitation.

MPCS Chiller Replacement - MPHS

2.2

Question: Will a Payment & Performance Bond be required?

Answer: Yes, Section 4.5 Performance and Payment Bonds has been added to address the required bonds. All vendors must submit completed Appendix D: Standard Performance Bond and Appendix E:

Standard Labor and Material Payment Bond as outlined in Section 4.0 Proposal Format and Content.

2.3 Question: What is the size of the circuit breaker?

Answer: It is 225 amp Square D type HACR

2.4 Question: Where is the electrical feed for the chiller being fed from?

Answer: Electric feed is from panel BH1 in the lower Mechanical Room 001.

2.5

Question: If Manufacturer cannot meet the installation dates in the specifications will a change order be issued for overtime for a weekend or holiday shut down.

Answer: If the manufacturer’s lead time necessitates a change in our target completion date, we will issue a change order to adjust our target completion date to ensure the project is completed. However, a responsive proposal that meets our target complete date or is closest to our target date, will score higher when evaluated.

2.6

Question: Should the job be bid to cover premium time?

Answer: We recommend bidding the project using standard hours and workdays. Include as an informational item your weekend and holiday rates if a change order is needed for work performed during premium times.

3.0 - INFORMATION

The following item(s) are provided as a matter of information only to all respondents and do not modify or become part of the Contract Documents.

Item Description

3.1 Please reference our 2023-2024 and 2024-2025 school calendars for implementation planning purposes.

Click here to view calendars.

3.2 Please be advised the chilled water loop that the chiller serves contains an ethylene glycol mixture https://mpark.ss20.sharpschool.com/about_mpcs/calendar