Morning Star Mine Closure Project_Part2.pdf
PDF 911 KB Posted
- Attached to
- PKAA, 1000, Morning Star Mine Closure Project
- Solicitation number
- IFB1 PKAA 2016000289 2
- Issued by
- Summit County, Colorado
About this file
Morning Star Mine Closure Project_Part2.pdf Summary
This document is a project description and scope of work for the Morning Star Mine Closure Project, a remediation and closure initiative for a historical mining site. The project involves comprehensive environmental restoration activities including mine waste characterization, tailings stabilization, water treatment infrastructure development, and long-term monitoring protocols. The scope encompasses site assessment, engineering design, construction of containment and treatment systems, and establishment of post-closure maintenance procedures. Specific deliverables include detailed closure plans, engineering reports, environmental compliance documentation, and operational manuals for treatment systems. The project requires coordination between state and local agencies overseeing mining operations and environmental protection, with defined milestones for completion of each project phase. The contract term extends through multiple fiscal years to accommodate the phased nature of mine closure activities, including final site certification and transition to long-term stewardship.
The project is funded through state appropriations designated for environmental remediation of abandoned mining operations, with budget allocations distributed across multiple phases of closure and restoration work. Pricing for services is structured on a phase-by-phase basis, with costs tied to specific deliverables and measurable outcomes at each stage of the project. The work requires specialized expertise in mine reclamation, hydrogeological assessment, environmental engineering, and regulatory compliance. Bidders must demonstrate experience with similar large-scale mining closure projects and possess necessary certifications for environmental remediation work. The project prioritizes sustainable closure methods that minimize long-term environmental liability and establish conditions suitable for eventual site reuse or natural recovery.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .