MODOT 0000000291SL_SUPPLIER.pdf

PDF 629 KB Posted

Attached to
(IDC) Fuel Pump Dispenser Services
Solicitation number
300000237018340
Issued by
Missouri

About this file

This is an Invitation for Bid (IFB) issued by the Missouri Department of Transportation (MoDOT) and the Missouri Highways and Transportation Commission (MHTC) for fuel pump dispenser maintenance and repair services. MoDOT seeks to establish multiple Time-and-Material Price Agreements for fuel system services to be provided across all Missouri counties organized by five districts: Northwest (NW), Northeast (NE), Kansas City (KC), Central District (CD), St. Louis (SL), Southwest (SW), and Southeast (SE). The services include calibration of fuel islands, repair of electrical issues, replacement or repair of fuel pumps and motors, replacement or repair of pulsers, fuel tank repair, and fuel tank cleaning. Emergency service response is required within six business hours of notification. Bidders must submit pricing for each county where they wish to work, with the option to enter $1.00 for counties where they do not wish to bid. The solicitation opened on April 23, 2026, and closes on May 12, 2026, at 2:00 PM Central Time. The contract award period runs from July 1, 2026, through June 30, 2029, with MoDOT holding the right to extend the contract for up to two additional one-year periods. No pre-bid conference or site tour is scheduled.

Pricing shall be submitted as a fixed hourly maintenance rate (in dollars) and a supplies mark-up percentage not to exceed 15 percent of actual material costs. Cost evaluation assigns 60 percent weight to the fixed hourly rate and 40 percent weight to the materials and supplies mark-up, with points awarded to the lowest bid in each category. All contractors must maintain General Liability insurance of not less than $600,000 per occurrence and $4,000,000 aggregate, Business Automobile Liability insurance of $600,000 per occurrence and $4,000,000 aggregate, and Missouri Workers' Compensation coverage with $1,000,000 employer's liability insurance. A contract bond equal to the contract price is required upon execution of the agreement. Contractors must be enrolled and participate in the E-Verify federal work authorization program and provide sworn affidavits of lawful presence. The contract is structured on an as-needed, if-needed basis with no guaranteed minimum services. Payment terms are Net 45 days. Contractors may charge $0.75 per mile for one round trip from their business address to the MoDOT job site for mobilization, with disputes settled by Google Maps mileage. MoDOT reserves the right to award multiple contractors per district or county to ensure uninterrupted service delivery, designating contractors as either prime or contingency. No price increases are permitted during the first six months of the original contract period or any renewal period.

View the file

Other files

File Type Posted
MoDOT District Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID (IFB) MODOT 0000000291SL

If you have any questions, please contact:

Procurement Entity State of Missouri

Buyer LOGAN WILBERS Location

Phone Fax

E-mail Logan.Wilbers@modot.mo.gov

State of Missouri

Missouri Department of Transportation

Responses are preferred to be submitted electronically via MissouriBUYS, powered by MOVERS.

ATTENTION:

1. After reviewing the solicitation, the vendor must complete and return all necessary exhibits.

2. Due to lead times for obtaining the information needed to complete the various Business Compliance

Exhibits herein as explained in the solicitation's Supplier Response Exhibits, suppliers are encouraged to IMMEDIATELY begin securing these verifications.

3. The supplier must be registered in MissouriBUYS (Powered by MOVERS) to be considered for contract award.

INSTRUCTIONS:

1. From the Table of Contents on the left-hand side of this screen, navigate to the Contract Terms section and click the Download Contract button to review the solicitation terms in its entirety.

2. Navigate to the Lines and Requirements sections to review and download any available attachments.

3. Click Create Response to enter your response.

Table of Contents

1 Overview

1.1 General Information

1.2 Schedule

1.3 Additional Information

1.4 Solicitation Controls

1.5 Terms

1.6 Attachments

2 Requirements

2.1 Section 1. M/WBE Participation

2.2 Section 2. SDV/E Preference

2.3 Section 3. DocuSign Information

2.4 Section 4. Required Completed Documents

3 Lines

3.1 Line Information

3.2 Line Details

3.2.1 Line 1

3.2.2 Line 2

3.2.3 Line 3

3.2.4 Line 4

3.2.5 Line 5

3.2.6 Line 6

3.2.7 Line 7

3.2.8 Line 8

3.2.9 Line 9

3.2.10 Line 10

3.2.11 Line 11

3.2.12 Line 12

3.2.13 Line 13

3.2.14 Line 14

3.2.15 Line 15

3.2.16 Line 16

3.2.17 Line 17

3.2.18 Line 18

3.2.19 Line 19

3.2.20 Line 20

3.2.21 Line 21

3.2.22 Line 22

3.2.23 Line 23

3.2.24 Line 24

3.2.25 Line 25

3.2.26 Line 26

3.2.27 Line 27

3.2.28 Line 28

3.2.29 Line 29

3.2.30 Line 30

3.2.31 Line 31

3.2.32 Line 32

3.2.33 Line 33

3.2.34 Line 34

3.2.35 Line 35

3.2.36 Line 36

3.2.37 Line 37

3.2.38 Line 38

3.2.39 Line 39

3.2.40 Line 40

3.2.41 Line 41

3.2.42 Line 42

3.2.43 Line 43

3.2.44 Line 44

3.2.45 Line 45

3.2.46 Line 46

3.2.47 Line 47

3.2.48 Line 48

3.2.49 Line 49

3.2.50 Line 50

3.2.51 Line 51

3.2.52 Line 52

3.2.53 Line 53

3.2.54 Line 54

3.2.55 Line 55

3.2.56 Line 56

3.2.57 Line 57

3.2.58 Line 58

3.2.59 Line 59

3.2.60 Line 60

3.2.61 Line 61

3.2.62 Line 62

3.2.63 Line 63

3.2.64 Line 64

3.2.65 Line 65

3.2.66 Line 66

3.2.67 Line 67

3.2.68 Line 68

3.2.69 Line 69

3.2.70 Line 70

3.2.71 Line 71

3.2.72 Line 72

3.2.73 Line 73

3.2.74 Line 74

3.2.75 Line 75

3.2.76 Line 76

3.2.77 Line 77

3.2.78 Line 78

3.2.79 Line 79

3.2.80 Line 80

3.2.81 Line 81

3.2.82 Line 82

3.2.83 Line 83

3.2.84 Line 84

3.2.85 Line 85

3.2.86 Line 86

3.2.87 Line 87

3.2.88 Line 88

3.2.89 Line 89

3.2.90 Line 90

3.2.91 Line 91

3.2.92 Line 92

3.2.93 Line 93

3.2.94 Line 94

3.2.95 Line 95

3.2.96 Line 96

3.2.97 Line 97

3.2.98 Line 98

3.2.99 Line 99

3.2.100 Line 100

3.2.101 Line 101

3.2.102 Line 102

3.2.103 Line 103

3.2.104 Line 104

3.2.105 Line 105

3.2.106 Line 106

3.2.107 Line 107

3.2.108 Line 108

3.2.109 Line 109

3.2.110 Line 110

3.2.111 Line 111

3.2.112 Line 112

3.2.113 Line 113

3.2.114 Line 114

3.2.115 Line 115

3.2.116 Line 116

3.2.117 Line 117

3.2.118 Line 118

3.2.119 Line 119

3.2.120 Line 120

3.2.121 Line 121

3.2.122 Line 122

3.2.123 Line 123

3.2.124 Line 124

3.2.125 Line 125

3.2.126 Line 126

3.2.127 Line 127

3.2.128 Line 128

3.2.129 Line 129

3.2.130 Line 130

3.2.131 Line 131

3.2.132 Line 132

3.2.133 Line 133

3.2.134 Line 134

3.2.135 Line 135

3.2.136 Line 136

3.2.137 Line 137

3.2.138 Line 138

3.2.139 Line 139

3.2.140 Line 140

3.2.141 Line 141

3.2.142 Line 142

3.2.143 Line 143

3.2.144 Line 144

3.2.145 Line 145

3.2.146 Line 146

3.2.147 Line 147

3.2.148 Line 148

3.2.149 Line 149

3.2.150 Line 150

3.2.151 Line 151

3.2.152 Line 152

3.2.153 Line 153

3.2.154 Line 154

3.2.155 Line 155

3.2.156 Line 156

3.2.157 Line 157

3.2.158 Line 158

3.2.159 Line 159

3.2.160 Line 160

3.2.161 Line 161

3.2.162 Line 162

3.2.163 Line 163

3.2.164 Line 164

3.2.165 Line 165

3.2.166 Line 166

3.2.167 Line 167

3.2.168 Line 168

3.2.169 Line 169

3.2.170 Line 170

3.2.171 Line 171

3.2.172 Line 172

3.2.173 Line 173

3.2.174 Line 174

3.2.175 Line 175

3.2.176 Line 176

3.2.177 Line 177

3.2.178 Line 178

3.2.179 Line 179

3.2.180 Line 180

3.2.181 Line 181

3.2.182 Line 182

3.2.183 Line 183

3.2.184 Line 184

3.2.185 Line 185

3.2.186 Line 186

3.2.187 Line 187

3.2.188 Line 188

3.2.189 Line 189

3.2.190 Line 190

3.2.191 Line 191

3.2.192 Line 192

3.2.193 Line 193

3.2.194 Line 194

3.2.195 Line 195

3.2.196 Line 196

3.2.197 Line 197

3.2.198 Line 198

3.2.199 Line 199

3.2.200 Line 200

3.2.201 Line 201

3.2.202 Line 202

3.2.203 Line 203

3.2.204 Line 204

3.2.205 Line 205

3.2.206 Line 206

3.2.207 Line 207

3.2.208 Line 208

3.2.209 Line 209

3.2.210 Line 210

3.2.211 Line 211

3.2.212 Line 212

3.2.213 Line 213

3.2.214 Line 214

3.2.215 Line 215

3.2.216 Line 216

3.2.217 Line 217

3.2.218 Line 218

3.2.219 Line 219

3.2.220 Line 220

3.2.221 Line 221

3.2.222 Line 222

3.2.223 Line 223

3.2.224 Line 224

3.2.225 Line 225

3.2.226 Line 226

3.2.227 Line 227

3.2.228 Line 228

3.2.229 Line 229

3.2.230 Line 230

4 Contract Terms

1 Overview

1.1 General Information

Title (IDC) Fuel Pump Dispenser Services

Synopsis MoDOT seeks to establish multiple Time-and-Material Price Agreement(s) for the possible procurement of fuel pump dispenser services. The pricing being solicited under this Invitation to Bid are for services to be rendered to the Missouri Highways and Transportation Commission (MHTC) and Missouri Department of Transportation (MoDOT). The award period shall commence on July 1, 2026 through June 30, 2029. MoDOT has the right, at its sole discretion, to extend the contract period for up to two (2) additional one-year periods, or any portion therein.

If the option for renewal is exercised by MoDOT, the bidder shall agree to all terms and conditions of the IFB and all subsequent amendments.

Buyer LOGAN WILBERS Outcome Blanket Purchase Agreement

E-Mail Logan.Wilbers@modot.

mo.gov

1.2 Schedule

Close Date 05/12/2026 2:00 PM Open Date 04/23/2026 4:00 PM Time Zone Central Time

1.3 Additional Information

Pre-Bid/Pre-Proposal Conference Date and Time 00+00:00

Pre-Bid/Pre-Proposal Conference Location Tour Date and Time 00+00:00

Tour Location Tour Contact Name

Tour Contact Phone # Tour Contact Email

1.4 Solicitation Controls

Response Visibility Sealed

Lines Settings Rank Indicator No indicator displayed

Ranking Method Multiattribute scoring

1.5 Terms

Agreement Start Date Agreement End Date Agreement Amount

(USD)

Minimum Release

Amount (USD) Payment Terms Net 45 Freight Terms

Shipping Method FOB Solicitation Currency USD (US Dollar)

Price Precision 2

1.6 Attachments

File Name or URL Type Description MoDOT District Map.pdf File

2 Requirements *Response is required

M/WBE Participation Bidders are encouraged to obtain minority business enterprise (MBE) and women business enterprise (WBE) participation in this work through the use of subcontractors, suppliers, joint ventures, or other arrangements that afford meaningful participation for M/WBEs.

SDV/E Preference Service-Disabled Veteran (SDV) is defined as any individual who is disabled as certified by the appropriate federal agency responsible for the administration of veterans' affairs. A Service- Disabled Veteran Business (SDVE) is defined as a business whereby not less than fifty-one (51) percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than fifty-one (51) percent of the stock of which is owned by one or more service-disabled veterans; and the management and daily business operations of which are controlled by one or more service-disabled veterans.

DocuSign Information MoDOT utilizes DocuSign as the method to secure electronic signatures for all contract agreements.

Documents Required to be Completed by Suppliers Specific exhibits, affidavits and various documents should be attached that require completion in order for bid response to be considered for award.

2.1 Section 1. M/WBE Participation

*1. List all certified M/WBE vendors utilized in the fulfillment of this bid. If not applicable, enter N/A in the required field.

2.2 Section 2. SDV/E Preference

*1. List the names and addresses of an SDV or SDVE providing products or services in relation to this bid. If not applicable, enter N/A in the required field.

2.3 Section 3. DocuSign Information

*1. Provide the name, e-mail address, and cell phone number of the person(s) authorized to sign an agreement resulting from this solicitation.

2.4 Section 4. Required Completed Documents

*1. The following required information should be submitted as an attachment to the submitted bid. The forms, if not, attached, must be provided upon contract award.

1. Completed and signed forms:

a. Exhibit A - Annual Worker Eligibility Verification Affidavit

b. Exhibit B - Affidavit of Lawful Presence for Sole-Proprietorship or Partnership

2. Bidders should provide a copy of their Certificate of Insurance.

3. Bidder should provide a copy of their E-Verify Memorandum of Understand

a. The certificate, if not attached to this bid must be provided upon contract award.

Attachments:

File Name or URL Type Description Exhibit A and B.pdf File

Response attachments are required.

3 Lines Instructions Maintenance Hourly Rate:

Bidders must state their fixed hourly rate. See section 5.4 for further explanation

(HUR)

Supplies Mark-Up:

Percentage (Max. 15%) Entry of 10%=110%. See section 5.4 for further explanation (LS)

The vendor should enter a $1.00 on the "Fixed Hourly Maintenance Rate" for a given county they wish to NO BID. You are NOT required to bid every county, only where you wish to work.

Note: The system requires a response to every line item to avoid submission error.

3.1 Line Information

Line Estimated Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

1-NW Andrew DOL

LAR

2-NW Andrew Mark-Up

PER

CEN

T

3-NW Atchison DOL

4-NW Atchison

PER

5-NW Buchanan DOL

6-NW Buchanan

PER

7-NW Caldwell DOL

8-NW Caldwell

PER

9-NW Carroll DOL

10-NW Carroll

PER

11-NW Chariton DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

12-NW Chariton Mark-Up

PER

13-NW Clinton DOL

14-NW Clinton

PER

15-NW Daviess DOL

16-NW Daviess

PER

17-NW DeKalb DOL

18-NW DeKalb

PER

19-NW Gentry DOL

20-NW Gentry

PER

21-NW Grundy DOL

22-NW Grundy

PER

23-NW Harrison DOL

24-NW Harrison

PER

25-NW Holt DOL

26-NW Holt

PER

27-NW Linn DOL

28-NW Linn

PER

29-NW

Livingston

DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

30-NW

Livingston Mark- Up

PER

31-NW Mercer DOL

32-NW Mercer

PER

33-NW Nodaway DOL

34-NW Nodaway

PER

35-NW Putnam DOL

36-NW Putnam

PER

37-NW Sullivan DOL

38-NW Sullivan

PER

39-NW Worth DOL

40-NW Worth

PER

41-NE Adair DOL

42-NE Adair

PER

43-NE Audrain DOL

44-NE Audrain

PER

45-NE Clark DOL

46-NE Clark

PER

47-NE Knox DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

48-NE Knox Mark-Up

PER

49-NE Lewis DOL

50-NE Lewis

PER

51-NE Lincoln DOL

52-NE Lincoln

PER

53-NE Macon DOL

54-NE Macon

PER

55-NE Marion DOL

56-NE Marion

PER

57-NE Monroe DOL

58-NE Monroe

PER

59-NE

Montgomery

60-NE

Montgomery Mark-Up

PER

61-NE Pike DOL

62-NE Pike

PER

63-NE Ralls DOL

64-NE Ralls

PER

65-NE Randolph DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

66-NE Randolph Mark-Up

PER

67-NE Schuyler DOL

68-NE Schuyler

PER

69-NE Scotland DOL

70-NE Scotland

PER

71-NE Shelby DOL

72-NE Shelby

PER

73-NE Warren DOL

74-NE Warren

PER

75-KC Cass DOL

76-KC Cass

PER

77-KC Clay DOL

78-KC Clay

PER

79-KC Jackson DOL

80-KC Jackson

PER

81-KC Johnson DOL

82-KC Johnson

PER

83-KC Lafayette DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

84-KC Lafayette Mark-Up

PER

85-KC Pettis DOL

86-KC Pettis

PER

87-KC Platte DOL

88-KC Platte

PER

89-KC Ray DOL

90-KC Ray Mark- Up

PER

91-KC Saline DOL

92-KC Saline

PER

93-CD Boone DOL

94-CD Boone

PER

95-CD Callaway DOL

96-CD Callaway

PER

97-CD Camden DOL

98-CD Camden

PER

99-CD Cole DOL

100-CD Cole

PER

101-CD Cooper DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

102-CD Cooper Mark-Up

PER

103-CD Crawford DOL

104-CD Crawford

PER

105-CD Dent DOL

106-CD Dent

PER

107-CD

Gasconade

108-CD

Gasconade Mark- Up

PER

109-CD Howard DOL

110-CD Howard

PER

111-CD Laclede DOL

112-CD Laclede

PER

113-CD Maries DOL

114-CD Maries

PER

115-CD Miller DOL

116-CD Miller

PER

117-CD Moniteau DOL

118-CD Moniteau

PER

119-CD Morgan DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

120-CD Morgan Mark-Up

PER

121-CD Osage DOL

122-CD Osage

PER

123-CD Phelps DOL

124-CD Phelps

PER

125-CD Pulaski DOL

126-CD Pulaski

PER

127-CD

Washington

128-CD

Washington Mark- Up

PER

129-SL Franklin DOL

130-SL Franklin

PER

131-SL Jefferson DOL

132-SL Jefferson

PER

133-SL St.

Charles

134-SL St.

Charles Mark-Up

PER

135-SL St. Louis DOL

136-SL St. Louis

PER

137-SL St. Louis City

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

138-SL St. Louis City Mark-Up

PER

139-SW Barry DOL

140-SW Barry

PER

141-SW Barton DOL

142-SW Barton

PER

143-SW Bates DOL

144-SW Bates

PER

145-SW Benton DOL

146-SW Benton

PER

147-SW Cedar DOL

148-SW Cedar

PER

149-SW Christian DOL

150-SW Christian

PER

151-SW Dade DOL

152-SW Dade

PER

153-SW Dallas DOL

154-SW Dallas

PER

155-SW Greene DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

156-SW Greene Mark-Up

PER

157-SW Henry DOL

158-SW Henry

PER

159-SW Hickory DOL

160-SW Hickory

PER

161-SW Jasper DOL

162-SW Jasper

PER

163-SW

Lawrence

164-SW

Lawrence Mark- Up

PER

165-SW

McDonald

166-SW

McDonald Mark- Up

PER

167-SW Newton DOL

168-SW Newton

PER

169-SW Polk DOL

170-SW Polk

PER

171-SW St. Clair DOL

172-SW St. Clair

PER

173-SW Stone DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

174-SW Stone Mark-Up

PER

175-SW Taney DOL

176-SW Taney

PER

177-SW Vernon DOL

178-SW Vernon

PER

179-SW Webster DOL

180-SW Webster

PER

181-SE Bollinger DOL

182-SE Bollinger

PER

183-SE Butler DOL

184-SE Butler

PER

185-SE Cape Girardeau

186-SE Cape Girardeau Mark- Up

PER

187-SE Carter DOL

188-SE Carter

PER

189-SE Douglas DOL

190-SE Douglas

PER

191-SE Dunklin DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

192-SE Dunklin Mark-Up

PER

193-SE Howell DOL

194-SE Howell

PER

195-SE Iron DOL

196-SE Iron

PER

197-SE Madison DOL

198-SE Madison

PER

199-SE

Mississippi

200-SE

Mississippi Mark- Up

PER

201-SE New Madrid

202-SE New Madrid Mark-Up

PER

203-SE Oregon DOL

204-SE Oregon

PER

205-SE Ozark DOL

206-SE Ozark

PER

207-SE Pemiscot DOL

208-SE Pemiscot

PER

209-SE Perry DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

210-SE Perry Mark-Up

PER

211-SE Reynolds DOL

212-SE Reynolds

PER

213-SE Ripley DOL

214-SE Ripley

PER

215-SE Scott DOL

216-SE Scott

PER

217-SE Shannon DOL

218-SE Shannon

PER

219-SE St.

Francois

220-SE St.

Francois Mark-Up

PER

221-SE St.

Genevieve

222-SE St.

Geneviene Mark- Up

PER

223-SE Stoddard DOL

224-SE Stoddard

PER

225-SE Texas DOL

226-SE Texas

PER

227-SE Wayne DOL

Quantity

UOM Response Price

Line Amount

Response Minimum

Release Amount

228-SE Wayne Mark-Up

PER

229-SE Wright DOL

230-SE Wright

PER

3.2 Line Details

3.2.1 Line 1 NW Andrew

Category Name 40151532 - FUEL

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

Start Price (USD)

3.2.2 Line 2 NW Andrew Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.3 Line 3 NW Atchison

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.4 Line 4 NW Atchison Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.5 Line 5 NW Buchanan

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.6 Line 6 NW Buchanan Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.7 Line 7 NW Caldwell

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.8 Line 8 NW Caldwell Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.9 Line 9 NW Carroll

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.10 Line 10 NW Carroll Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.11 Line 11 NW Chariton

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.12 Line 12 NW Chariton Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.13 Line 13 NW Clinton

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.14 Line 14 NW Clinton Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.15 Line 15 NW Daviess

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.16 Line 16 NW Daviess Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.17 Line 17 NW DeKalb

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.18 Line 18 NW DeKalb Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.19 Line 19 NW Gentry

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.20 Line 20 NW Gentry Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.21 Line 21 NW Grundy

Item Revision

Amount (USD)

3.2.22 Line 22 NW Grundy Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.23 Line 23 NW Harrison

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.24 Line 24 NW Harrison Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.25 Line 25 NW Holt

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.26 Line 26 NW Holt Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.27 Line 27 NW Linn

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.28 Line 28 NW Linn Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.29 Line 29 NW Livingston

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.30 Line 30 NW Livingston Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.31 Line 31 NW Mercer

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.32 Line 32 NW Mercer Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.33 Line 33 NW Nodaway

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.34 Line 34 NW Nodaway Mark-Up

Item Revision

Amount (USD)

3.2.35 Line 35 NW Putnam

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.36 Line 36 NW Putnam Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.37 Line 37 NW Sullivan

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.38 Line 38 NW Sullivan Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.39 Line 39 NW Worth

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.40 Line 40 NW Worth Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.41 Line 41 NE Adair

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.42 Line 42 NE Adair Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.43 Line 43 NE Audrain

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.44 Line 44 NE Audrain Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.45 Line 45 NE Clark

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.46 Line 46 NE Clark Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.47 Line 47 NE Knox

Item Revision

Amount (USD)

3.2.48 Line 48 NE Knox Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.49 Line 49 NE Lewis

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.50 Line 50 NE Lewis Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.51 Line 51 NE Lincoln

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.52 Line 52 NE Lincoln Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.53 Line 53 NE Macon

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.54 Line 54 NE Macon Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.55 Line 55 NE Marion

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.56 Line 56 NE Marion Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.57 Line 57 NE Monroe

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.58 Line 58 NE Monroe Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.59 Line 59 NE Montgomery

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.60 Line 60 NE Montgomery Mark-Up

Item Revision

Amount (USD)

3.2.61 Line 61 NE Pike

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.62 Line 62 NE Pike Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.63 Line 63 NE Ralls

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.64 Line 64 NE Ralls Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.65 Line 65 NE Randolph

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.66 Line 66 NE Randolph Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.67 Line 67 NE Schuyler

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.68 Line 68 NE Schuyler Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.69 Line 69 NE Scotland

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.70 Line 70 NE Scotland Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.71 Line 71 NE Shelby

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.72 Line 72 NE Shelby Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.73 Line 73 NE Warren

Item Revision

Amount (USD)

3.2.74 Line 74 NE Warren Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.75 Line 75 KC Cass

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.76 Line 76 KC Cass Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.77 Line 77 KC Clay

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.78 Line 78 KC Clay Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.79 Line 79 KC Jackson

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.80 Line 80 KC Jackson Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.81 Line 81 KC Johnson

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.82 Line 82 KC Johnson Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.83 Line 83 KC Lafayette

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.84 Line 84 KC Lafayette Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.85 Line 85 KC Pettis

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.86 Line 86 KC Pettis Mark-Up

Item Revision

Amount (USD)

3.2.87 Line 87 KC Platte

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.88 Line 88 KC Platte Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.89 Line 89 KC Ray

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.90 Line 90 KC Ray Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.91 Line 91 KC Saline

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.92 Line 92 KC Saline Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.93 Line 93 CD Boone

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.94 Line 94 CD Boone Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.95 Line 95 CD Callaway

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.96 Line 96 CD Callaway Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.97 Line 97 CD Camden

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.98 Line 98 CD Camden Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.99 Line 99 CD Cole

Item Revision

Amount (USD)

3.2.100 Line 100 CD Cole Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.101 Line 101 CD Cooper

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.102 Line 102 CD Cooper Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.103 Line 103 CD Crawford

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.104 Line 104 CD Crawford Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.105 Line 105 CD Dent

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.106 Line 106 CD Dent Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.107 Line 107 CD Gasconade

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.108 Line 108 CD Gasconade Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.109 Line 109 CD Howard

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.110 Line 110 CD Howard Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.111 Line 111 CD Laclede

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.112 Line 112 CD Laclede Mark-Up

Item Revision

Amount (USD)

3.2.113 Line 113 CD Maries

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.114 Line 114 CD Maries Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.115 Line 115 CD Miller

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.116 Line 116 CD Miller Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.117 Line 117 CD Moniteau

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.118 Line 118 CD Moniteau Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.119 Line 119 CD Morgan

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.120 Line 120 CD Morgan Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.121 Line 121 CD Osage

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.122 Line 122 CD Osage Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.123 Line 123 CD Phelps

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.124 Line 124 CD Phelps Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.125 Line 125 CD Pulaski

Item Revision

Amount (USD)

3.2.126 Line 126 CD Pulaski Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.127 Line 127 CD Washington

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.128 Line 128 CD Washington Mark- Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.129 Line 129 SL Franklin

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.130 Line 130 SL Franklin Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.131 Line 131 SL Jefferson

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.132 Line 132 SL Jefferson Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.133 Line 133 SL St. Charles

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.134 Line 134 SL St. Charles Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.135 Line 135 SL St. Louis

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.136 Line 136 SL St. Louis Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.137 Line 137 SL St. Louis City

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.138 Line 138 SL St. Louis City Mark-Up

Item Revision

Amount (USD)

3.2.139 Line 139 SW Barry

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.140 Line 140 SW Barry Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.141 Line 141 SW Barton

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.142 Line 142 SW Barton Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.143 Line 143 SW Bates

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.144 Line 144 SW Bates Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.145 Line 145 SW Benton

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.146 Line 146 SW Benton Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.147 Line 147 SW Cedar

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.148 Line 148 SW Cedar Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.149 Line 149 SW Christian

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.150 Line 150 SW Christian Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.151 Line 151 SW Dade

Item Revision

Amount (USD)

3.2.152 Line 152 SW Dade Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.153 Line 153 SW Dallas

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.154 Line 154 SW Dallas Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.155 Line 155 SW Greene

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.156 Line 156 SW Greene Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.157 Line 157 SW Henry

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.158 Line 158 SW Henry Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.159 Line 159 SW Hickory

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.160 Line 160 SW Hickory Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.161 Line 161 SW Jasper

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.162 Line 162 SW Jasper Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.163 Line 163 SW Lawrence

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.164 Line 164 SW Lawrence Mark-Up

Item Revision

Amount (USD)

3.2.165 Line 165 SW McDonald

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.166 Line 166 SW McDonald Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.167 Line 167 SW Newton

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.168 Line 168 SW Newton Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.169 Line 169 SW Polk

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.170 Line 170 SW Polk Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.171 Line 171 SW St. Clair

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.172 Line 172 SW St. Clair Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.173 Line 173 SW Stone

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.174 Line 174 SW Stone Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.175 Line 175 SW Taney

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.176 Line 176 SW Taney Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.177 Line 177 SW Vernon

Item Revision

Amount (USD)

3.2.178 Line 178 SW Vernon Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.179 Line 179 SW Webster

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.180 Line 180 SW Webster Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.181 Line 181 SE Bollinger

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.182 Line 182 SE Bollinger Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.183 Line 183 SE Butler

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.184 Line 184 SE Butler Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.185 Line 185 SE Cape Girardeau

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.186 Line 186 SE Cape Girardeau Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.187 Line 187 SE Carter

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.188 Line 188 SE Carter Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.189 Line 189 SE Douglas

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.190 Line 190 SE Douglas Mark-Up

Item Revision

Amount (USD)

3.2.191 Line 191 SE Dunklin

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.192 Line 192 SE Dunklin Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.193 Line 193 SE Howell

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.194 Line 194 SE Howell Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.195 Line 195 SE Iron

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.196 Line 196 SE Iron Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.197 Line 197 SE Madison

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.198 Line 198 SE Madison Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.199 Line 199 SE Mississippi

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.200 Line 200 SE Mississippi Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.201 Line 201 SE New Madrid

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.202 Line 202 SE New Madrid Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.203 Line 203 SE Oregon

Item Revision

Amount (USD)

3.2.204 Line 204 SE Oregon Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.205 Line 205 SE Ozark

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.206 Line 206 SE Ozark Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.207 Line 207 SE Pemiscot

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.208 Line 208 SE Pemiscot Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.209 Line 209 SE Perry

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.210 Line 210 SE Perry Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.211 Line 211 SE Reynolds

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.212 Line 212 SE Reynolds Mark-Up

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.213 Line 213 SE Ripley

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.214 Line 214 SE Ripley Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.215 Line 215 SE Scott

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.216 Line 216 SE Scott Mark-Up

Item Revision

Amount (USD)

3.2.217 Line 217 SE Shannon

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.218 Line 218 SE Shannon Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.219 Line 219 SE St. Francois

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.220 Line 220 SE St. Francois Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.221 Line 221 SE St. Genevieve

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.222 Line 222 SE St. Geneviene Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.223 Line 223 SE Stoddard

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.224 Line 224 SE Stoddard Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.225 Line 225 SE Texas

PUMPS

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.226 Line 226 SE Texas Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.227 Line 227 SE Wayne

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.228 Line 228 SE Wayne Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

3.2.229 Line 229 SE Wright

Item Revision

Amount (USD)

3.2.230 Line 230 SE Wright Mark-Up

Item Revision Allow Alternate Lines No

Target Minimum Release Amount (USD)

4 Contract Terms

MODOT 0000000291SL

Contract Terms and Conditions

1. MoDOT STANDARD SOLICITATION PROVISIONS

1.1. Solicitation Authority

1.2. Bids / Quotes to be Submitted by Officer or Employee

1.3. MHTC Rights Reserved

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .