Modified Exhibit C Draft Statement of Work.pdf

PDF 165 KB Posted

Attached to
California Gulch Groundwater Monitoring
Solicitation number
RFP FAAA 2027000068 2
Issued by
Denver County, Denver City, Colorado

About this file

This is a Draft Statement of Work for a technical support contract issued by the Colorado Department of Public Health and Environment (CDPHE) in partnership with the United States Environmental Protection Agency (EPA) for groundwater monitoring activities at the California Gulch Superfund Site near Leadville, Colorado. The project encompasses approximately 18 square miles and involves continuous monitoring and assessment of groundwater conditions affected by historical mining and mineral processing activities. The contractor shall perform groundwater monitoring using transducers and water level meters, maintain stream gauge stations, operate the GAW pump system, update the California Gulch website at calforniagulch.us, maintain the Early Alert System at designated groundwater monitoring locations, and download quarterly monitoring data. Key deliverables include quarterly Groundwater Level Monitoring Reports submitted to the CDPHE Project Manager no later than one month following each quarter, with reports required to include summaries of groundwater level data and elevation plots. The contractor must attend a kick-off meeting within 60 days of contract execution. The CDPHE Project Manager must approve all deliverables or request changes within 21 calendar days, with contractors required to implement approved changes within 14 calendar days.

The statement of work does not contain pricing terms, set-asides, incumbent information, or specific funding amounts. Performance will be monitored throughout the contract period through review of documentation including progress reports, quarterly reports, and fiscal and programmatic materials. Compliance issues discovered during the contract term must be communicated to the contractor in writing within ten calendar days, with the contractor and State collaborating to determine corrective actions within fifteen calendar days. The contractor may request deadline extensions through email to the CDPHE Project Manager for extenuating circumstances. This document represents Version 01.11.19 of the draft statement of work, with all changes indicated in blue text, and is intended to be read in conjunction with other contract provisions not included in this exhibit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modified EXHIBIT C

Choose an item.Click or tap here to enter text. Ver. 01.11.19

DRAFT STATEMENT OF WORK

All changes in Blue

These provisions are to be read and interpreted in conjunction with the provisions of the contract specified above.

I. Project Description:

This project serves to provide technical support of activities at the California Gulch Superfund Site. The activities will include support services for monitoring and assessing groundwater conditions across CalGulch.

Placer gold was discovered in the California Gulch area in 1860. Subsequent discovery of silver bearing lead carbonate ore initiated over 100 years of heavy industrial mining, mineral processing and smelting. Acidic, metal laden water from the historically mined area flows through the shallow groundwater and down

California Gulch approximately six miles to its confluence with the Arkansas River.

The California Gulch was placed on the National Priorities List (Superfund) in 1983. The California Gulch

Superfund Site (“CalGulch”) encompasses about 18 square miles in and around Leadville, in Lake County, Colorado, at an elevation of about 10,000 feet. The United States Environmental Protection Agency (EPA) is the lead agency for CalGulch and the Colorado Department of Public Health and Environment (CDPHE) is the cooperating agency. Colorado Mountain College’s Natural Resource Management Program provides field and logistical services to both the EPA and CDPHE.

CalGulch was divided into 12 Operable Units. Additional work of this project is to provide recommendations for the improvement of the monitoring program and for Operable Units to maintain effectiveness. The majority of the Record of Decision mandated activities have been completed at CalGulch. The Record of

Decision is a publicly accessible document.

II. Definitions:

1. CDPHE Colorado Department of Public Health and Environment

2. CalGulch California Gulch Superfund Site

3. EPA United States Environmental Protection Agency

4. O&M Operations and Maintenance

III. Work Plan:

Goal #1: To improve the quality of the environment and public health for the citizens of Colorado by continuously improving efforts to for proper management of hazardous materials and waste.

Objective #1: No later than the expiration of this contract, the Contractor shall provide technical support for activities at

CalGulch.

Primary Activity #1

The Contractor shall attend a kick off meeting no later than 60 days following the execution of this contract.

Primary Activity #2

The Contractor shall conduct groundwater monitoring

Sub-Activities #2

1. The Contractor shall maintain and operate continuous groundwater monitoring equipment.

2. The Contractor shall download continuous groundwater level monitoring data quarterly.

3. The Contractor shall provide a quarterly report of continuous groundwater level monitoring data.

4. The Contractor shall update the California Gulch Website at calforniagulch.us.

5. The Contractor shall maintain the Geostationary Operational Environmental Satellites agreement with Upper Arkansas Water Conservancy District, National Oceanic and

Atmospheric Administration, and Data Collection System

6. The Contractor shall maintain and monitor stream gauge stations.

7. The Contractor shall maintain and monitor the GAW pump system.

8. The Contractor shall maintain the Early Alert System.

Standards and

Requirements

1. The content of electronic documents located on CDPHE and non-CDPHE websites and information contained on CDPHE and non-CDPHE websites may be updated periodically during the contract term. The contractor shall monitor documents and website content for updates and comply with all updates.

2. The Contractor shall submit all deliverables and correspondence to the CDPHE Project

Manager via email.

a. The CDPHE Project Manager will approve the deliverable or request changes within 21 calendar days.

b. The Contractor shall update the deliverable to include any requested changes within 14 calendar days.

c. The Contractor shall submit the updated deliverable to the CDPHE Project

Manager by the close of business on the 14th day following the receipt of requested changes from the CDPHE Project Manager.

d. The CDPHE Project Manager may approve extensions to the Contractor’s deliverables schedule via email for extenuating circumstances.

3. The continuous groundwater monitoring equipment shall include:

a. Transducers

b. Water level meters

4. The Contractor shall include at a minimum the following in the Quarterly Groundwater

Level Monitoring Report:

a. A summary of groundwater level data.

b. Groundwater elevation plots.

5. The Contractor shall maintain the California Gulch Stream Data website located at calforniagulch.us and provide updated site data of the following:

a. California Gulch near Malta

b. Gaw Shaft Well, SPR-23

c. Leadville Mine Drainage Tunnel 36+77

d. Leadville Mine Drainage Tunnel 46+66

e. Marian Ditch Near Leadville

6. The contractor shall maintain and monitor stream gauge stations at California Gulch

Site.

7. The contractor shall maintain and monitor the GAW pump system including but not limited to:

a. Regular pump maintenance

b. Pump house system maintenance

c. Security access maintenance

d. Groundwater and pump monitoring

8. The Early Alert System shall be at the following groundwater monitoring locations:

a. LDT36+77 about:blank about:blank

b. LDT46+66

Expected Results of

Activity(s)

1. Real-time monitoring of groundwater conditions at the Site.

Measurement of Expected

Results

1. Quarterly reporting.

Completion Date

Deliverables

The Contractor shall submit quarterly Groundwater Level Monitoring

Reports to the CDPHE Project Manager.

No later than 1 month following the quarter being reported, not to exceed the expiration of this

IV. Monitoring:

CDPHE’s monitoring of this contract for compliance with performance requirements will be conducted throughout the contract period by the CDPHE Project Manager. Methods used will include a review of documentation determined by CDPHE to be reflective of performance to include progress reports, quarterly reports and other fiscal and programmatic documentation as applicable. The Contractor’s performance will be evaluated at set intervals and communicated to the contractor. A Final Contractor Performance

Evaluation will be conducted at the end of the life of the contract.

V. Resolution of Non-Compliance:

The Contractor will be notified in writing within ten (10) calendar days of discovery of a compliance issue.

Within fifteen (15) calendar days of discovery, the Contractor and the State will collaborate, when appropriate, to determine the action(s) necessary to rectify the compliance issue and determine when the action(s) must be completed. The action(s) and time line for completion will be documented in writing and agreed to by both parties. If extenuating circumstances arise that requires an extension to the time line, the

Contractor must email a request to the CDPHE Project Manager and receive approval for a new due date.

The State will oversee the completion/implementation of the action(s) to ensure time lines are met and the issue(s) is resolved. If the Contractor demonstrates inaction or disregard for the agreed upon compliance resolution plan, the State may exercise its rights under the provisions of this contract.

File details come from the government source that posted it. Updated .