MOD 4 DRAWINGS BINDER.pdf
PDF 4 MB Posted
- Solicitation number
- 36C24225Q0636
About this file
These are engineering and plumbing demolition and new work plan drawings for the Batavia VA Medical Center's potable water distribution system improvement project. The documents detail complex plumbing modifications across multiple buildings (Building 1 and Building 30), including demolition and new installation of water monitoring systems, temperature sensors, domestic hot water recirculation infrastructure, and associated mechanical room equipment. The project involves comprehensive water system upgrades with specific requirements for temperature monitoring, sensor placement, and integration with building management systems.
Key technical specifications include installing Phigenics water monitoring panels (WM-1-1, WM-1-2), temperature sensors at various locations using WME-2910 components, and connecting systems to enable building management system (BMS) interface. The project is set aside for Service-Disabled Veteran-Owned Small Businesses, with a planned start date of approximately June 24, 2025. The solicitation (36C24225Q0636) is for commercial items under NAICS code 541620, with a small business size standard of $16.5 million, and will evaluate quotes based on price and technical acceptability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01 00 00.pdf | ||
| 02 82 11 Asbestos abatements.pdf | ||
| 36C24225Q0636.docx | DOCX document | |
| 01 35 26 safety requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
::,n.
1l i,;- "' N
E
F n.
1 2 3 4
NEW WATER MONITORING PANEL SCHEDULE
TAG BASIS OF DESIGN SYSTEM QUANTITY BUILDING FLOOR ROOM REMARKS DRAWING NUMBER
WM-1-1 PHIGENICS WME-1175 cw 1 1 GROUND GS 1,2,3
WM-1-2 PHIGENICS PDX DOMESTIC 2 1 GROUND G5 1,2,3
WM-2-1 PHIGENICS WME-1175 CW 1 30 BASEMENT B001 1,2,3
REMARKS:
1. CONNECT ASSOCIATED WATER TEMPERATURE SENSORS TO PANEL. SEE NEW WORK PLUMBING PLANS FOR TEMPERATURE SENSOR LOCATIONS.
2. INTERFACE INTO BMS.
3. CONTRACTOR SHALL TAG EQUIPMENT AS DEFINED BY SPECIFICATIONS.
BASIS OF DESIGN KEY:
PHIGENICS WME-2910 - WATER TEMPERATURE SENSOR WITH 4-20MA AND THERMOWELL
PHIGENICS WME-1175 PWA - ADVANCED MONITORING SYSTEM
PHIGENICS PDX - ALLLOWS TEMPERATURE CONNECTION AS WELL AS COMMUNICATION WITH BMS
PWA TEMPERATURE SENSORS SCHEDULE
Building Item# Floor ROOM{WING) Quanity Water Source Part# Description
1 TS-1-1 G GS 1 DHWR WME-2910 RETURN FROM EAST WING
1 TS-1-2 G GS 1 DHWR WME-2910 RETURN FROM WEST WING
1 TS-1-3 G G3 1 DHW WME-2910 RISERS TO FIXTURES ABOVE
1 TS-1-4 G Gll 1 DHWR WME-2910 EAST SIDE BATHROOM, 1ST FL TELEHEALTH LOOP RETURN 1 TS-1-S G Gll 1 DHW WME-2910 EAST SIDE BATHROOM, CANTEEN STORE, AND PT/OT 1 TS-1-6 G G12 1 DHWR WME-2910 EAST WING - GROUND AND 1ST - SPECIALTY CLINICS LOOP RETURN
TS-1-7 G G25A 1 DHWR WME-2910 RISERS TO PT/OT LOOP RETURN
TS-1-8 G G25A 1 DHWR WME-2910 CANTEEN STORE AND PT/OT SOUTH SINK LOOP RETURN
TS-1-9 G G30 1 DHWR WME-2910 4TH FLOOR WEST BATHROOM RETURN
TS-1-10 G G4S 1 DHWR WME-2910 A-WARD RETURN
TS-1-11 G GS0 1 DHWR WME-2910 WEST PRIMARY CARE LOOP RETURN
TS-1-12 G GS0 1 DHWR WME-2910 SOUTH PRIMARY CARE LOOP RETURN
TS-1-13 G GS0 1 DHWR WME-2910 PHARMACY LOOP RETURN
TS-1-14 G GS0 1 DHW WME-2910 PRIMARY CARE, PHARMCY, MAPLE, PINE DISTRIBUTION
TS-1-15 G GSOB 1 DHWR WME-2910 1ST FL TELEHEALTH, 2ND FL WASHER, 4TH FL SINK RETURN
TS-1-16 G G56 1 DHWR WME-2910 G56 BATHROOM, MAPLE, PINE LOOP RETURN
TS-1-17 2 B281 1 DHWR WME-2910 MAPLE LODGE LOOP RETURN
TS-1-18 2 C206 1 DHWR WME-2910 SPRUCE LODGE LOOP RETURN
TS-1-19 3 MECH ROOM 1 DHWR WME-2910 OAK LODGE LOOP RETURN
TS-1-20 3 D344 1 DHWR WME-2910 PINE LODGE LOOP RETURN
TS-30-1 B B001 1 DCW WME-2910 INCOMING COLD WATER
TS-30-2 B B00l 1 DCW WME-2910 COLD WATER AT END OF EAST WING
TS-30-3 B B001 1 DHW WME-2910 HOT WATER AT END OF EAST WING
TS-30-4 B B001 1 DHWR WME-2910 RETURN FROM EAST WING
TS-30-5 B B001 1 DHWR WME-2910 RETURN FROM WEST WING
TS-30-6 B CRAWLSPACE 1 DCW WME-2910 CW AT END OF WEST WING
TS-30-7 B CRAWLSPACE 1 DHW WME-2910 HW AT END OF WEST WING
MM -
73 M M----i
15.9 MM 7
1- 48
- DIAMETER
[DI I
LE D-
18.7 MM DIAMETER - l 1 /2" NPT NOTE: ANALOG WITH TWISTED PAIR IN
COMPLETE AND WORKING SYSTEM.
1 TEMPERATURE SENSOR
PL-300 SCALE: N.T.S.
TEMPERATURE SENSORS KEY NOTES
CONTRACTOR SHALL PROVIDE THERMOWELL CONNECTION ONTO THE DEDICATED PIPING WITH A 1/2" MNPT CONNECTION
THE THERMOWELL INSTALLATION LENGTH (EL) IS 74MM OR ~3"
1/2" T'S CAN BE ADDED SO THE TIP OF THE THERMOWELL IS WITHIN THE WATER FLOW BUT NOT OBSTRUCTING WATER FLOW AS SHOWN SENSOR SHALL BE CONNECT TO PDX OR PWA-1175 TO CONTINUOUSLY REPORT DATA READING TO BMS
ASBESTOS INSULATIONS REMOVAL
NUMBER
BUILDING FLOOR ROOM
A1 1 G G25A, G25B, G25C
A2 1 G G25A, G25B, G25C
A3 1 G G61
A4 1 G G61
A5 1 G G61
A6 1 2 201
Al 1 3 352 / 352A
SCHEDULE
TYPE
DCW
DHW
DCW
DHW
DHWR
DCW/DHW
DCW/DHW
SIZE
o·-1 o' -1" o·-1 o' -1
II
o'-o o'-1
0'-1
1 /2"
1 /2"
1 /2"
1 /2"
1 /2"
2 ASBESTOS ABATEMENT SCHEDULE
PL-300 SCALE:N/A
LENGTH
120·
1 oo· -o"
30' -o" so' -o"
20· -o"
2· -o" 4' -0"
JOB: 528A4-16-205
BUILDING: BUILDING 1 AND 30
ROOM G5
SYSTEM: WATER MONITORING PANEL &
PDX
rf
POINT
LEGEND
SYSTEM
OUTPUTS
BINARY ANA
LOG
SYSTEM INPUTS
BINARY ANALOG
SYSTEM SOFTWARE/CONTROL
ALARM
PROCESSING APPLICATION/FUNCTION
SYSTEM COMPONENT: rs � REMARKS
Q pH Al-1 pHcw • • 4-20mA SIGNAL Cold Water Temperature Al-2 Tew • • 4-20mA SIGNAL Cold Water Pressure Al-3 Pew • • 4-20mA SIGNAL Cold Water Turbidity Al-4 NTUcw • • 4-20mA SIGNAL
Cold Water Free Chlorine Al-5 Cl2cw • • 4-20mA SIGNAL
Communications Error Dl-1 COMM ERROR •
BMS EQUIPMENT SCHEDULE
EQUIPMENT BASIS OF DESIGN MODEL NO. VOLTAGE WATTS REMARKS
IP CONTROLLER AS-P SMART X CONTROLLER SXWASPXXX1000 24V 10W PROVIDE ASSOCIATED TERMINAL BASE
POWER SUPPLY MODULE POWER SUPPLY PS-24V SXWPS24VX1001 24V 30W PROVIDE ASSOCIATED 120V POWER BASE SXWTBPSW110001
NOTE:
ALL WORK SHALL BE COORDINATED WITH THE VA COR. CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM AT THE COMPLETION OF CONSTRUCTION. PROVIDE
SHOP DRAWINGS SHOWING ALL ASSOCIATED MATERIALS AND CONNECTIONS FOR INSTALLATION.
DOMESTIC WATER TEMPERATURE MONITORING NOTES:
GENERAL:
•THE HOT WATER TEMPERATURE SHALL BE SET TO 150'F (ADJ.) MANUALLY VIA WATER HEATER'S BLENDING VALVE.
DOMESTIC HOT WATER RECIRCULATION PUMPS: (TYPICAL)
• DOMESTIC HOT WATER RECIRCULATION PUMP SHALL BE ENABLED/DISABLED VIA A MANUAL STARTER
• DOMESTIC HOT WATER RECIRCULATION PUMP SHALL OPERATE CONTINUOUSLY.
• INSTALL A CURRENT STATUS SWITCH TO PROVE RECIRCULATION PUMP OPERATION.
DOMESTIC WATER TEMPERATURE MONITORING:
• INSTALL TEMPERATURE SENSORS AND DOWNSTREAM OF EACH MIXING VALVE STATION AND ALL WATER HEATERS, AND MOST REMOTE FIXTURE
• INSTALL TEMPERATURE SENSORS IN EXISTING STORAGE TANKS.
ALARMS. INTERLOCKS. AND SAFETIES:
• SEND AN ALARM TO THE FMCS UPON THE OCCURRENCE OF ANY OF THE FOLLOWING CONDITIONS:
.. IF A DOMESTIC (HOT) WATER RECIRCULATION PUMP CURRENT STATUS SWITCH DOES NOT PROVE PUMP OPERATION.
.. IF ANY DOMESTIC HOT WATER SUPPLY TEMPERATURE DEVIATES 5"F (ADJ.) ABOVE OR BELOW SET POINT FOR MORE THAN 10 MINUTES (ADJ.)
.. IF ANY DOMESTIC HOT WATER DISTRIBUTION TEMPERATURE IS BELOW 130'F (ADJ) FOR MORE THAN 10 MINUTES (ADJ.) ON THE PRIMARY HWR OR BELOW 120'F (ADJ.)FOR
MORE THAN TEN MINUTES (ADJ.) ON THE FLOOR HWR.
.. IF ANY DOMESTIC COLD WATER SUPPLY TEMPERATURE IS ABOVE 65'F (ADJ) FOR MORE THAN 10 MINUTES (ADJ.)
REPORT GENERATION
• FMCS SHALL MONITOR THE FOLLOWING POINTS ON 5 MINUTE (ADJ.) INTERVALS WITHIN A SINGLE TREND. THE TREND SHALL RUN FOR A 14-DAY (ADJ.) DURATION AT WHICH
POINT THE NEWEST VALUES SHALL OVERWRITE THE OLDEST VALUES:
.. DATE
.. TIME
.. STATUS OF ALL CIRCULATION PUMPS (ON/OFF)
.. DOMESTIC HOT WATER CIRCULATION RETURN TEMP (F)
.. DOMESTIC HOT WATER SUPPLY TEMP (F)
.. DOMESTIC COLD WATER SUPPLY TEMP (F)
• THIS INFORMATION SHALL BE ACCESSIBLE TO VIEW IN TABULAR AND GRAPHICAL FORM ON THE FMCS OPERATOR INTERFACE.
JOB: 528A4-16-205
BUILDING: 2 - PLUMBING HOT WATER MONITORING
DDC POINTS LIST
SYSTEM:
DIGITAL MIXING VALVE
STATION (TYP.)
""' i:::g-
SYSTEM SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
POINT OUTPUTS
LEGEND BINARY ANA- BINARY ANALOG ALARM APPLICATION/FUNCTION LOG PROCESSING
if; ij � �iJ I Lf"'�
§ irv�t; ,ff.,::;
f;;, f) �o':;::, 0 6
0 �" �� U �
� u "",;,"' § $� , ? ! Ai_§ " ,§�';_& ';t 0 tw ;:;� # rJ.
'if7 � ;::; ,.., C4 <> "' a -.., ;:; " s:1 � SJ �,?0 tc., Q.� � � Q. f::, SJ wew �wr}j o'�«-.g
� ��00' Uq_� g'l:' ;:;�� �g§ �Q.� �#�'t�� �&C�Q.�,;i� Q. giv ;,..;&�
� ff r::f ? SYSTEM COMPONENT:
� iJ,g &"r§Q.
0 iv�'I::!� .£:iiv le� f'-f',�t::-'-- SJ a'.f:ici._ �:!�rf!J iv���(:)
" '-- )_ iv !<, c::, � 0 ;,..; 0 � "1 So- 't i; --., --., <:l R' !<;�'"' !<; "" !<; v 0 g;c iv Q � ( �!<;� !<Jcs�9. Oc.00;,:,;,:,� �9.0"'0'�0cu�, • ._ -,c,c;�;,:,� ;f!<J�v,::::�9."�9.�l<'.�9.<::' 0"';:;c,___,!<;"" :-::: ; Z. I � Z. (j(j I O :'10, ,-x· CJ 0gic; / / Z./ I ��'::,,./ ,,_Ge. /J,.v;t;;-8, /), '/-'.'t<:)"<J_ ;;i;,,_0c� iJ!s, 1 .;fiq_Ocq_
O,;:'Q,'4:; ";/c"" ] °"' .}¼, � � -9 1 1 0 ,i?�,}fi�,}fi!ji,}fi lf I I Q.<ic"-.'t Q. i;?lf REMARKS Q.
Mixed HW Outlet Temperature Al-1 MhwT • •
HW Recirculation Temperature Al-2 hwRT • •
HW Inlet Temperature Al-3 hwlT • • •
CW Inlet Temperature Al-4 cwlT • •
Mixed Outlet HW Pressure Al-5 MhwP • •
HW Recirculation Pressure Al-6 hwRP • • •
HW Inlet Pressure Al-7 hwlP • •
CW Inlet Pressure Al-8 cwlP • • •
Mixed HW Outlet Flow Rate Al-9 MhwF • •
HW Recirculation Flow Rate Al-10 hwRP • • •
Mixed HW Setpoint Target Al-11 Mhp SP •
HW/CW Mix Percentage Al-12 hwcwP •
HW Circulator Status Dl-1 hwCSTS Communications Error Dl-2 COMM ERROR •
3 POINTS LIST FOR PLUMBING HOT WATER MONITORING
PL-300 SCALE: NO SCALE
lel BACNet lel BACNet lel BACNet lel BACNet lel BACNet 191 BACNet 91 BACNet 191 BACNet 191 BACNet
• BACNet signal si□nal sianal sianal sianal sianal sianal sinnal siqnal sianal
• RA/:No> �innnl
• BACNet sianal
• BACNet sianal
• BACNet sinnal
CONSULTANT ARCHITECT/ENGINEER OF RECORD
Drawing TIiie Phase Project THle
STAMP Office of SCHEDULES AND DETAILS CONSTRUCTION DOCUMENTS IMPROVE POTABLE WATER
Construction DISTRIBUTION SYSTEM and Facilities Management Approved: Project Diractor Location 222 RICHMOND AVENUE
VA NEW YORK BATAVIA, NY 14020
HEALTHCARE SYSTEM Issue Date CJ Drawn
VA
U.S. Department 08/06/2024 B.V.NRevisions: Date: of Veterans Affairs
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Project Number
528A4-16-205
Building Number
ALL
Drawing Number
PL-300
REFER TO SCOPE OF WORK
ABATEMENT SCHEDULE
FOR UPDATES
VHAWNYNguyeB Line
VHAWNYNguyeB Line
| PL-100 - B.1-G-FL |
| PL-101 - B.1-G-FL-WEST |
| PL-102 - B.1-G-FL-DETAILS |
| PL-103 - B.1-G-FL-EAST-NEWWORK |
| PL-104 - B.1-G-FL-WEST-NEWWORK |
| PL-105 - B.1-G-FL-DETAILS-NEWWORK |
| PL-106 - B.1-1-FL-DEMO-NEWWORK |
| PL-108 - B.1-2-FL-DEMO-NEWWORK |
| PL-110 - B.1-3-FL-DEMO-NEWWORK |
| PL-114 - B.2-G-FL-DEMO-NEWWORK |
| PL-124 - B.30-G-FL-DEMO-NEWWORK |
| PL-300 SCHEDULES AND DETAILS |
File details come from the government source that posted it. Updated .