MNT-Specs-CBC and SAM 2023-03-13.pdf
PDF 8 MB Posted
- Attached to
- Construction of a New Lock Chamber at Montgomery Locks & Dam - 100% Design Documents for Industry Feedback
- Solicitation number
- W911WN23ID8002
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911WN23B####
Upper Ohio Navigation Project New River Chamber Montgomery Locks & Dam Beaver County, PA
CBC AND SAM.GOV SUBMISSION
PRELIMINARY NOT FOR CONSTRUCTION
TECHNICAL SPECIFICATIONS
MARCH 2023
Upper Ohio Montgomery Locks and Dam Lock Chamber Contract
Bid Schedule/Specifications Section Cross Reference
Bid Items
Item Description Measurement Unit of Measure
0001 REIMBURSEMENT FOR ACTUAL
PERFORMANCE AND PAYMENT BONDS
PREMIUMS
1 JOB
0002 DIGITAL PROGRESS IMAGES, MONTHLY 96 SET
0003 DIGITAL AERIAL PROGRESS IMAGES,
QUARTERLY
32 SET
0004 MOBILIZATION AND PREPATORY WORK 1 JOB
0005 DEMOBILIZATION 1 JOB
0006 MAINTAIN GOVERNMENT FIELD OFFICES 96 MONTHS
0007 RECONSTRUCTION STATE ROUTE,
MONTGOMERY DAM ROAD
SQUARE YARDS
0008 POST CONSTRUCTION MILL AND OVERLAY
MONTGOMERY DAM ROAD
SQUARE YARDS
0009 EXPLORATORY PROGRAM 1 JOB
0010 INSTRUMENTATION INSTALLATION 1 JOB
0011 INSTRUMENTATION MONITORING PROGRAM 96 MONTHS
0012 RELOCATE GOVERNMENT TRAILER 1 JOB
0013 DEVELOP DATA MANAGEMENT SYSTEM 1 JOB
0014 MAINTAIN DATA MANAGEMENT SYSTEM 96 MONTHS
0015 ENVIRONMENTAL COMPLIANCE
MEASUREMENTS, SAMPLING, TESTING AND
REPORTING, CONCRETE BATCH PLANT
96 MONTHS
0016 REMOVE AND DISPOSE EXISTING
FOOTBRIDGE
1 JOB
0017 DEMOLITION OF FIXED CREST WEIR 1 JOB
0018 DEMOLITION OF APRON 1 JOB
0019 REMOVAL OF EXISTING TIMBER PILES, DAM
APRON
136 EACH
0020 REMOVAL OF GRANUAL FILL UNDER APRON 1 JOB
0021 REMOVE DERRICK STONE 1 JOB
0022 INSTALLATION OF FLASHBOARDS 1 JOB
0023 COMBINATION WALL, JET GROUTING CUBIC YARDS
0024 COMBINATION WALL, 48-INCH DIAMETER BY
1/2-INCH THICK PIPE PILE
LINEAR FEET
0025 COMBINATION WALL, PZ 27 METAL SHEET
PILING
LINEAR FEET
0026 COMBINATION WALL, W24x162 KING PILES EACH
0027 COMBINATION WALL, ALLUVIUM EXCAVATION LINEAR FEET
Bid Schedule/Specifications Section Cross Reference
Bid Items
Item Description Measurement Unit of Measure
0028 COMBINATION WALL, 42-INCH DIAMETER
ROCK SOCKET
LINEAR FEET
0029 COMBINATION WALL, CONCRETE FOR CAST-
IN-PLACE CONCRETE PILES
CUBIC YARDS
0030 REMOVE AND DISPOSE OF EXISTING
SHEETPILING AT APRON TOE
2115 LINEAR FEET
0031 REMOVAL OF EXISTING RIVER CHAMBER
FLOOR PAVERS
1 JOB
0032 DEMOLITION OF UPPER GUARD WALL
EXTENSION CELLS
1 JOB
0033 DEMOLITION OF UPPER GUARD WALL 1 JOB
0034 DEMOLITION OF LOWER GUARD WALL 1 JOB
0035 CLOSE UPPER AND LOWER FILLING AND
EMPTYING PORTS
1 JOB
0036 REMOVE AND SALVAGE FILLING AND
EMPTYING SYSTEM
1 JOB
0037 FILL DOWNSTREAM RIVERSIDE MITER GATES
AND OTHER RECESSES WITH CONCRETE ON
EXISTING MIDDLE WALL.
CUBIC YARDS
0038 TEMPORARY DOWNSTREAM BRIDGE 1 JOB
0039 DEMOLITION OF RIVER WALL BUILDING 1 JOB
0040 DEMOLITION OF RIVER WALL 1 JOB
0041 REMOVAL OF EXISTING TIMBER PILES, LOCK
RIVER WALL
1766 EACH
0042 REMOVE AND DISPOSE UPPER MITER GATE 1 JOB
0043 REMOVE AND DISPOSE LOWER MITER GATE 1 JOB
0044 DEMOLITION OF LOCK FLOOR CONCRETE 1 JOB
0045 DREDGE RIVER ALLUVIUM 336290 CUBIC YARDS
0046 DEMOLITION OF SILLS 1 JOB
0047 EXCAVATE ALLUVIUM INSIDE COFFERDAM
CELLS
7449 CUBIC YARDS
0048 CONSTRUCT PERMANENT DRILLED SHAFTS,
TYPE RC-1
197 EACH
0049 CONSTRUCT PERMANENT DRILLED SHAFTS,
TYPE RC-2
EACH
0050 CONSTRUCT PERMANENT DRILLED SHAFTS,
TYPE RC-3
EACH
0051 PORTLAND CEMENT CWT
0052 FLY ASH CWT
Bid Schedule/Specifications Section Cross Reference
Bid Items
Item Description Measurement Unit of Measure
0053 BLAST FURNACE SLAG CWT
0054 SILICA FUME CWT
0055 TREMI MASS CONCRETE FOR NEW LOCK
MONOLITHS, PRODUCE, DELIVER AND PLACE
CUBIC YARDS
0056 EXTERIOR MASS CONCRETE FOR NEW LOCK
MONOLITHS, PRODUCE, DELIVER AND PLACE
CUBIC YARDS
0057 INTERIOR MASS CONCRETE FOR NEW LOCK
MONOLITHS, PRODUCE, DELIVER AND PLACE
CUBIC YARDS
0058 INTERIOR STRUCTURAL CONCRETE FOR
NEW LOCK MONOLITHS, PRODUCE, DELIVER
CUBIC YARDS
0059 TOP OF WALL MASS CONCRETE FOR NEW
LOCK MONOLITHS, DESIGN, PRODUCE,
DELIVER AND PLACE
CUBIC YARDS
0060 DENTAL EXACAVATION AND DENTAL
CONCRETE, EXCAVATE,PRODUCE, DELIVER
AND PLACE DENTAL CONCRETE
100 CUBIC YARDS
0061 MUD MATT CONCRETE, PRODUCE, DELIVER
AND PLACE
CUBIC YARDS
0062 REINFORCING STEEL, NEW LOCK WALL
MONOLITHS
3925 TONS
0063 REINFORCING STEEL, SILLS TONS
0064 COFFERDAM SHEETPILING, FURNISH AND
INSTALL
LINEAR FEET
0065 EXCAVATE ALLUVIUM INSIDE COFFERDAM
AREA
116402 CUBIC YARDS
0066 COFFERDAM TREMIE SEAL, PRODUCE,
DELIVER AND PLACE
18168 CUBIC YARDS
0067 INSTALL COFFERDAM PIPE PILES EACH
0068 COFFERDAM CONNECTION ARC CONCRETE,
PRODUCE, DELIVER AND PLACE
CUBIC YARDS
0069 PLACE COFFERDAM FREE DRAINING
FILL(ALLUVIUM ON SITE)
227828 CUBIC YARDS
0070 COFFERDAM CELL DEWATERING SYSTEM 1 JOB
Bid Schedule/Specifications Section Cross Reference
Bid Items
Item Description Measurement Unit of Measure
0071 DEWATERING COFFERDAM CELLS 72 MONTHS
0072 INITIAL UNWATER COFFERDAM 1 JOB
0073 DEWATER COFFERDAM AREA 72 MONTHS
0074 COFFERDAM AGGREGATE CAP, PENNDOT 3A,
INSTALL
CUBIC YARDS
0075 PLACE FILL WITHIN CHAMBER - MISC
CHAMBER FLOOR FILL
20100 CUBIC YARDS
0076 PLACE R-5 RIPRAP FOR LOCK FLOOR
BACKFILL
5171 CUBIC YARDS
0077 BEDDING UNDER LOCK FLOOR 5464 CUBIC YARDS
0078 NEW STAIR TOWER DRILLED SHAFTS 6 EACH
0079 INSTALL NEW PERMANENT STAIR TOWERS 1 JOB
0080 INSTALL PERMANENT UTILITY BRIDGE 1 JOB
0081 CONSTRUCT COFFERDAM SPLASH PAD AND
FLOOD WAY
1 JOB
0082 DRILL EXISTING RIVER WALL WEEP HOLES LINEAR FEET
0083 PVC WATERSTOPS 6984 LINEAR FEET
0084 MIDDLE WALL EQUIPMENT BUILDING 1 JOB
0085 LAND WALL EQUIPMENT BUILDING 1 JOB
0086 RIVER WALL EQUIPMENT BUILDING 1 JOB
0087 MIDDLE WALL CONTROL SHELTERS
STRUCTURES
1 JOB
0088 CONCRETE CHAMBER CULVERT
FOUNDATION, PRODUCE, DELIVER AND
PLACE
CUBIC YARDS
0089 CONSTRUCT CHAMBER CULVERTS 1 JOB
0090 CONCRETE LOCK FLOOR, PRODUCE,
DELIVER AND PLACE
5909 CUBIC YARDS
0091 FILLING AND EMPTYING VALVES, FABRICATE
AND INSTALL
4 EACH
0092 FILLING AND EMPTYING VALVE OPERATING
MACHINERY, FABRICATE AND INSTALL
4 EACH
0093 FILLING AND EMPTYING CULVERT
BULKHEADS, FABRICATE AND DELIVER
8 EACH
Bid Schedule/Specifications Section Cross Reference
Bid Items
Item Description Measurement Unit of Measure
0094 CULVERT BULKHEAD RECESS LINERS,
FABRICATE AND INSTALL
1 JOB
0095 UPSTREAM CHAMBER STOPLOG RECESS
LINERS, FABRICATE AND INSTALL
1 JOB
0096 UPSTREAM CHAMBER STOPLOG RECESS
FILLERS, FABRICATE AND INSTALL
1 JOB
0097 DOWNSTREAM CHAMBER STOPLOG RECESS
LINERS, FABRICATE AND INSTALL
1 JOB
0098 DOWNSTREAM CHAMBER STOPLOG RECESS
FILLERS, FABRICATE AND INSTALL
1 JOB
0099 MITER GATE OPERATING MACHINERY,
FABRICATE AND INSTALL
4 EACH
0100 MITER GATES, FABRICATE AND DELIVER 1 JOB
0101 MITER GATES - ASSOCIATED
APPURTENANCES, FABRICATE AND DELIVER
1 JOB
0102 SILL SEAL ANGLE, WALL QUOIN POSTS,
PINTLE BASE AND PINTLE, INSTALLATION
1 JOB
0103 MITER GATE LEAVES, INSTALLATION 4 EACH
0104 COMPRESSED AIR PIPING SYSTEM 1 JOB
0105 POTABLE WATER PIPING SYSTEM 1 JOB
0106 SERVICE WATER PIPING SYSTEM 1 JOB
0107 SANITARY SEWAGE PIPING SYSTEM 1 JOB
0108 ELECTRICAL WORK 1 JOB
0109 INTAKE SCREEN ASSEMBLIES 1 JOB
0110 WALL ARMOR, FABRICATE AND INSTALL 29582 LINEAR FEET
0111 R3 HORIZONTAL CORNER PROTECTION,
FABRICATE AND INSTALL
1940 LINEAR FEET
0112 R8 VERTICAL CORNER PROTECTION,
FABRICATE AND INSTALL
2060 LINEAR FEET
0113 R24 VERTICAL CORNER PROTECTION,
FABRICATE AND INSTALL
143 LINEAR FEET
0114 CORNER CASTINGS, FABRICATE AND INSTALL EACH
0115 DEMOLITION OF COFFERDAM 1 JOB
0116 REMOVAL OF PROTECTION CELLS IN
NAVIGATION CHANEL
1 JOB
Bid Schedule/Specifications Section Cross Reference
Bid Items
Item Description Measurement Unit of Measure
0117 REPLACE DERRICK STONE PROTECTION
PREVIOUSLY REMOVED FOR COFFERDAM
CONSTRUCTION
1 JOB
0118 FLOATING MOORING BITT ANCHORAGES,
FABRICATE AND INSTALL
1 JOB
0119 FLOATING MOORING BITTS, FABRICATE AND
INSTALL
8 EACH
0120 LINE HOOKS AND GUARDS, FABRICATE AND
INSTALL
65 EACH
0121 CHECK POSTS, FABRICATE AND INSTALL 35 EACH
0122 LOCK WALL RECESS LADDERS, FABRICATE
AND INSTALL
10 EACH
0123 UTILITY ACCESS SHAFT LADDERS,
FABRICATE AND INSTALL
11 EACH
0124 HANDRAIL - WIRE RAIL, FABRICATE AND
INSTALL
1 JOB
0125 HANDRAIL - TUBE RAIL, FABRICATE AND
INSTALL
1 JOB
0126 TOW HAULAGE SYSTEM, FABRICATE AND
INSTALL
1 JOB
0127 RIVER WALL CRANE, FABRICATE AND
INSTALL
1 JOB
0128 EXCAVATE ALLUVIUM INSIDE NOSE CELLS CUBIC YARDS
0129 NOSE CELLS SHEETPILING, FURNISH AND
INSTALL
LINEAR FEET
0130 NOSE CELLS TREMI CONCRETE, PRODUCE,
DELIVER AND PLACE
CUBIC YARDS
0131 NOSE CELLS MASS CONCRETE, PRODUCE,
DELIVER AND PLACE
CUBIC YARDS
0132 UPPER GUARD WALL DRILLED SHAFTS 16 EACH
0133 PRECAST CAP BEAM UPPER GUARD WALL,
FABRICATE, DELIVER AND INSTALL
1 JOB
0134 PRECAST BOX BEAMS UPPER GUARD WALL,
FABRICATE, DELIVER AND INSTALL
1 JOB
0135 PRECAST SKIRT PANEL UPPER GUARD WALL,
FABRICATE, DELIVER AND INSTALL
1 JOB
0136 LOWER GUARD WALL DRILLED SHAFTS 22 EACH
0137 PRECAST SHAFT ENCLOSURE LOWER GUARD
WALL, FABRICATE, DELIVER AND INSTALL
1 JOB
0138 PRECAST WALL PANEL LOWER GUARD WALL,
FABRICATE, DELIVER AND INSTALL
1 JOB
Bid Schedule/Specifications Section Cross Reference
Bid Items
Item Description Measurement Unit of Measure
0139 RETAINING WALL SECTION LOWER GUARD
WALL
1 JOB
0140 SHEETPILE CUT OFF WALL GUARD WALLS LINEAR FEET
0141 EXCAVATE ALLUVIUM INSIDE MIDDLE WALL
BULL NOSE
CUBIC YARDS
0142 MIDDLE WALL BULL NOSE SHEETPILING,
FURNISH AND INSTALL
4000 LINEAR FEET
0143 MIDDLE WALL BULL NOSE TREMI CONCRETE,
PRODUCE, DELIVER AND PLACE
CUBIC YARDS
0144 MIDDLE WALL BULL NOSE MASS CONCRETE,
PRODUCE, DELIVER AND PLACE
CUBIC YARDS
0145 ON SITE PAINTING 1 JOB
0146 CONSTRUCTION OF TRANSITION WALL 1 JOB
0147 INSTALL UPSTREAM ROCK DIKES CUBIC YARDS
0148 INSTALL DOWNSTREAM ROCK DIKE CUBIC YARDS
0149 INSTALL LOCK SIGNAGE 1 JOB
0150 STOPLOGS, TEST FIT 1 JOB
0151 DEWATER AND CLEANUP OF COFFERDAM
POST FLOOD EVENT
1 EACH
0152 GOVERNMENT DIRECTED EVACUATION OF
COFFERDAM
2 EACH
0153 COMMISSIONING - FULLY INTEGRATED
SYSTEM TESTING
1 JOB
0154 SITE RESTORATION 1 JOB
0155 AS-BUILT DRAWINGS 1 JOB
Montgomery Locks and Dam New River Chamber
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 13.00 08 SUMMARY OF WORK
01 22 00.00 08 PRICE AND PAYMENT PROCEDURES
01 30 00.00 08 ADMINISTRATIVE REQUIREMENTS
01 31 00.00 08 DATA MANAGEMENT
01 32 01.00 08 PROJECT SCHEDULE NETWORK ANALYSIS
01 32 23.00 08 SURVEY AND ALIGNMENT CONTROL
01 32 25.00 08 LiDAR AND IMAGERY
01 32 33.00 08 DIGITAL PROGRESS IMAGES
01 33 00 SUBMITTAL PROCEDURES
01 35 00.00 08 SPECIAL PROCEDURES
01 35 26.00 08 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 26.13 08 DIVING SERVICES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 08 QUALITY CONTROL
01 45 00.15 08 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 50 10.00 08 PROJECT AND SAFETY SIGNS
01 54 00.00 08 GOVERNMENT EQUIPMENT AVAILABLE FOR USE IN PERFORMANCE OF
CONTRACT
01 57 19.00 08 TEMPORARY ENVIRONMENTAL CONTROLS
01 73 19.00 08 GOVERNMENT-FURNISHED PROPERTY
01 74 19.00 08 DISPOSAL
01 78 02.00 08 CLOSEOUT SUBMITTALS (AS-BUILT DRAWINGS)
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.00 08 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 32 00 FOUNDATION VERIFICATION DRILLING, SAMPLING, AND RECORDING
02 41 00.00 08 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 00 00 GENERAL CONCRETE REQUIREMENTS
03 11 14.01 CONCRETE: FORMWORK (IN-THE-WET)
03 11 14.02 CONCRETE: FORMWORK (IN-THE-DRY)
03 15 14 WATERSTOPS IN CONCRETE FOR CIVIL WORKS
03 20 02 CONCRETE REINFORCEMENT FOR CIVIL WORKS
03 23 00 STRESSED TENDON REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 30 00.20 08 CONCRETE: FIELD DEMONSTRATIONS
03 37 06.00 08 JET GROUTING
03 37 26.10 08 CONCRETE: UNDERWATER AND FLOWABLE
03 37 26.20 08 TEMPORARY UNDERWATER CONCRETE
03 41 33.02 PRECAST STRUCTURAL PRETENSIONED CONCRETE (VERTICAL
CONSTRUCTION)
03 45 33 PRECAST PRESTRESSED STRUCTURAL CONCRETE
03 62 16 METALLIC NON-SHRINK GROUTING
PROJECT TABLE OF CONTENTS Page 1
CBC AND SAM.GOV SUBMISSION - PRELIMINARY NOT FOR CONSTRUCTION
03 70 00 MASS CONCRETE
03 70 05.00 08 ALTERNATE COLD WEATHER PROTECTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS FOR LOCK
CONSTRUCTION
05 05 20.01 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS (VERTICAL
CONSTRUCTION)
05 12 00 GENERAL STRUCTURAL STEEL - VERTICAL CONSTRUCTION
05 12 00.02 BRIDGE STRUCTURAL STEEL - VERTICAL CONSTRUCTION
05 12 10 ELASTOMERIC BEARING PADS
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 15 CIVIL WORKS FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
05 59 20 FABRICATION OF HYDRAULIC STEEL STRUCTURES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING AND TREADS
06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 19 00 WATER REPELLENTS
07 22 00 RIGID INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 36 13 SECTIONAL OVERHEAD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 45 23 INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL WALL SYSTEM
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 90 00 PAINTS AND COATINGS
09 97 02 PAINTING: HYDRAULIC STEEL STRUCTURES AND APPURTENANCES
PROJECT TABLE OF CONTENTS Page 2
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 13 - SPECIAL CONSTRUCTION
13 50 00 INSTRUMENTATION PROGRAM
13 50 10 MOVEMENT PINS
13 50 15 AUTOMATED SURVEY EQUIPMENT
13 50 20 ELECTRONIC INCLINOMETERS
13 50 30 ELECTRONIC PIEZOMETERS
13 50 35 MANUAL PIEZOMETERS
13 50 45 MANUAL CRACKMETERS
13 50 50 AUTOMATED CRACKMETERS
13 53 20 LOAD CELLS MOUNTED ON ROCK ANCHORS
13 70 00 AUTOMATED DATA ACQUISITION SYSTEM (ADAS)
DIVISION 14 - CONVEYING EQUIPMENT
14 46 00 VERTICAL RECIPROCATING CONVEYOR
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 11 13.00 08 PLUMBING, SERVICE WATER SYSTEM
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
22 15 19.19 08 AIR COMPRESSOR
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 46.00 40 ELECTRIC UNIT HEATERS
23 82 46.00 41 ELECTRIC UNIT HEATERS - RECIRCULATION AIR ONLY
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 28 CYBERSECURITY
25 05 11.02 28 CYBERSECURITY FOR CIVIL WORKS OPERATIONAL TECHNOLOGY
25 05 11.03 28 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 19.10 08 INSULATED WIRE AND CABLE
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 32 14.00 10 ELECTRIC GENERATOR SET
PROJECT TABLE OF CONTENTS Page 3
26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00.00 08 EXTERIOR LIGHTING
26 56 13.00 POLES AND STANDARDS
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 13 23.00 08 COMMUNICATIONS OPTICAL BACKBONE CABLING
27 21 10.00 08 FIBER OPTIC DATA TRANSMISSION SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 10 05.00 08 CLOSED CIRCUIT TELEVISION (CCTV)
28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19.13 GEOTEXTILES FOR EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 05 MASS EXCAVATION
31 23 06 BLASTING
31 41 16 METAL SHEET PILING
31 42 00 COFFERDAM
31 45 00 DIVERSION AND CARE OF WATER
31 60 00 FOUNDATION PREPARATION
31 62 16.13 DRILLED IN PLACE STEEL PIPE PILES
31 62 23.13 CAST-IN-PLACE CONCRETE PILES
31 63 29 DRILLED CONCRETE PIERS AND SHAFTS
31 68 13 SOIL AND ROCK ANCHORS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 FIELD MOLDED JOINT SEALANTS FOR CIVIL WORKS
32 11 23 AGGREGATE BASE COURSES
32 11 25 LOCK FLOOR DRAINAGE LAYER
32 13 73.19 COMPRESSION JOINT SEALS FOR CIVIL WORKS
32 15 00 AGGREGATE SURFACING
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 40 00 STORMWATER UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 4
35 01 41.00 10 ELECTROMECHANICAL OPERATING MACHINERY FOR LOCKS AND DAMS
35 05 40.14 10 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
35 08 40 MITER GATE COMMISSIONING
35 11 50 TOW HAULAGE MACHINERY
35 20 13.17 STOPLOG RECESS FILLERS AND LINERS
35 20 13.27 INTAKE SCREENS
35 20 16.33 MITER GATES
35 20 16.45 MITER GATE ANCHORAGE
35 20 16.46 CULVERT VALVES
35 20 19.17 CULVERT BULKHEADS
35 20 23 COFFERDAM AND CHANNEL EXCAVATION
35 31 19 STONE, CHANNEL, SHORELINE PROTECTION FOR STRUCTURES
35 49 23.23 25 UPPER GUARD WALL
35 59 29 FLOATING MOORING BITTS
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13.96 WELDING PROCESS PIPING
40 60 00 PROCESS CONTROL
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.16 JIB CRANES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 13.00 08
SUMMARY OF WORK
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 BASE CONTRACT
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 13.00 08 Page 1
SECTION 01 11 13.00 08
SUMMARY OF WORK
PART 1 GENERAL
1.1 GENERAL INFORMATION
This contract is for a new lock chamber and has no options. The Government is currently considering structuring this contract as a Base plus Awardable Options. This section will be updated to reflect these options in the future.
1.2 BASE CONTRACT
The Contract consists of completion of a new Lock Chamber. Specific features of work under the contract include, but are not limited to the following:
a. Pre-excavate as needed for construction.
b. Install temporary service bridge.
c. Disconnect dam side power while maintaining lock power.
d. Intall flashboards.
e. Construction the in water combination wall.
f. Demolition Upper and Lower Guard walls.
g. Construct foundation drilled shafts, and in the wet monoliths.
Construction of monoliths includes all concrete, reinforcing steel, waterstops, and associated embedded metal items.
h. Installation of drilled shafts, towers and permanent utility bridge.
i. Construct cofferdam.
j. Dewater the coffer area.
k. Construct Middle Wall , Land wall and River Wall Equipment Buildings.
l. Construct Middle Wall Control Shelters.
m. Construct in the dry monoliths. Construction of monoliths includes all concrete, reinforcing steel, waterstops, and associated embedded metal items.
n. Furnish and install filling and emptying valves, bulkheads and related features.
o. Install Construction Instrumentation.
SECTION 01 11 13.00 08 Page 2
p. Demolition of original River Wall and Fixed Crest Weir.
q. Excavate alluvium and rock for emptying and filling culverts.
r. Construct River Wall facing.
s. Construct upper miter sill and bulkhead sill.
t. Construct emptying and filling culverts.
u. Construct lower miter/bulkhead sill.
v. Furnish and install miter gates and related features including.
w. Construct chamber floor.
x. Flood the coffer area.
y. Remove cofferdam.
z. Install electrical, mechanical and plumbing systems for lock and verify operation.
aa. Install handrails, and top of wall features and waterway signs on lock structure.
bb. Install permanent instrumentation.
cc. Flood River Chamber area.
dd. Construction of Middle wall bull nose cell.
ee. Complete Upper and Lower Guard Walls, including structural and electrical features.
ff. Test fit of existing Stoplogs.
gg. Install waterway signs upstream and downstream of the lock.
hh. Install upstream dikes.
ii. Install downstream dikes.
jj. Demolition of temporary downstream bridge.
kk. Construct downstream transition wall.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
-- End of Section --
SECTION 01 11 13.00 08 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 08
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SINGLE JOB PAYMENT ITEMS
1.3.1 Reimbursement For Actual Performance And Payment Bond Premiums
1.3.2 Mobilization and Prepatory Work
1.3.2.1 Payment
1.3.2.2 Unit of Measure
1.3.2.3 Payment Item (s)
1.3.3 Demobilization
1.3.3.1 Payment
1.3.3.2 Unit of Measure
1.3.3.3 Payment Item (s)
1.3.4 Exploratory Program
1.3.4.1 Payment
1.3.4.2 Unit of Measure
1.3.4.3 Payment Item (s)
1.3.5 Instrumentation Installation
1.3.5.1 Payment
1.3.5.2 Unit of Measure
1.3.5.3 Payment Item (s)
1.3.6 Relocate Government Trailer
1.3.6.1 Payment
1.3.6.2 Unit of Measure
1.3.6.3 Payment Item (s)
1.3.7 Develop Data Management System
1.3.7.1 Payment
1.3.7.2 Unit of Measure
1.3.7.3 Payment Item (s)
1.3.8 Demolition of Existing Lock Structure
1.3.8.1 Payment
1.3.8.2 Unit of Measure
1.3.8.3 Payment Items
1.3.9 Demolition
1.3.9.1 Payment
1.3.9.2 Unit of Measure
1.3.9.3 Payment Items
1.3.10 Underwater Excavation
1.3.10.1 Payment
1.3.10.2 Unit of Measure
1.3.10.3 Payment Items
1.3.11 Remove Derrick Stone
1.3.11.1 Payment
1.3.11.2 Unit of Measure
1.3.11.3 Payment Items
SECTION 01 22 00.00 08 Page 1
1.3.12 Install Flashboards
1.3.12.1 Payment
1.3.12.2 Payment Item (s)
1.3.12.3 Unit of Measure
1.3.13 Removal of existing river chamber floor pavers
1.3.13.1 Payment
1.3.13.2 Unit of Measure
1.3.13.3 Payment Items
1.3.14 Removal and Salvage Filling and Emptying System
1.3.14.1 Payment
1.3.14.2 Unit of Measure
1.3.14.3 Payment Items
1.3.15 Port Closures
1.3.15.1 Payment
1.3.15.2 Unit of Measure
1.3.15.3 Payment Item
1.3.16 Temporary Service Bridge
1.3.16.1 Payment
1.3.16.2 Unit of Measure
1.3.16.3 Payment Item
1.3.17 Demolition of Sills
1.3.17.1 Payment
1.3.17.2 Unit of Measure
1.3.17.3 Payment Items
1.3.18 Miter Gate Removal
1.3.18.1 Payment
1.3.18.2 Unit of Measure
1.3.18.3 Payment Items
1.3.19 Cofferdams and Closures
1.3.19.1 Payment
1.3.19.2 Unit of Measure
1.3.19.3 Payment Items
1.3.20 Cofferdam and Chamber Dewatering
1.3.20.1 Payment
1.3.20.2 Unit of Measure
1.3.20.3 Payment Items
1.3.21 New Stair Tower
1.3.21.1 Payment
1.3.21.2 Unit of Measure
1.3.21.3 Payment Items
1.3.22 Permanent Utility Bridge
1.3.22.1 Payment
1.3.22.2 Unit of Measure
1.3.22.3 Payment Item
1.3.23 Middle Wall Control Shelters
1.3.23.1 Payment
1.3.23.2 Unit of Measure
1.3.23.3 Payment Items
1.3.24 Buildings
1.3.24.1 Payment
1.3.24.2 Unit of Measure
1.3.24.3 Payment Items
1.3.25 Construct Chamber Culverts
1.3.25.1 Payment
1.3.25.2 Unit of Measure
1.3.25.3 Payment Items
1.3.26 Fabricate and Deliver Miter Gates
1.3.26.1 Payment
1.3.26.2 Unit of Measure
SECTION 01 22 00.00 08 Page 2
1.3.26.3 Payment Item (s)
1.3.27 Fabricate and Deliver Miter Gate Appurtenances
1.3.27.1 Payment
1.3.27.2 Unit of Measure
1.3.27.3 Payment Item (s)
1.3.28 Installation of Sill Seal Angle, Wall Quoin Posts, Pintle
Base and Pintle
1.3.28.1 Payment
1.3.28.2 Unit of Measure
1.3.28.3 Payment Items
1.3.29 Miscellaneous Metals
1.3.29.1 Payment
1.3.29.2 Unit of Measure
1.3.29.3 Payment Items
1.3.30 Piping Systems
1.3.30.1 Payment
1.3.30.2 Unit of Measure
1.3.30.3 Payment Item
1.3.31 Electrical Work
1.3.31.1 Payment
1.3.31.2 Unit of Measure
1.3.31.3 Payment Item
1.3.32 Intake Screen Assemblies
1.3.32.1 Payment
1.3.32.2 Unit of Measure
1.3.32.3 Payment Item
1.3.33 Removal of Protection Cell in Navigation Chanel
1.3.33.1 Payment
1.3.33.2 Unit of Measure
1.3.33.3 Payment Items
1.3.34 Replace Derrick Stone
1.3.34.1 Payment
1.3.34.2 Unit of Measure
1.3.34.3 Payment Item (s)
1.3.35 Tow Haulage System
1.3.35.1 Payment
1.3.35.2 Unit of Measure
1.3.35.3 Payment Item
1.3.36 Jib Crane
1.3.36.1 Payment
1.3.36.2 Unit of Measure
1.3.36.3 Payment Item
1.3.37 Guard Wall Precast Items
1.3.37.1 Payment
1.3.37.2 Unit of Measure
1.3.37.3 Payment Items
1.3.38 Construction of Retaining Wall
1.3.38.1 Payment
1.3.38.2 Unit of Measure
1.3.38.3 Payment Items
1.3.39 Floating Mooring Bitt Anchorages
1.3.39.1 Payment
1.3.39.2 Unit of Measure
1.3.39.3 Payment Items
1.3.40 Handrail
1.3.40.1 Payment
1.3.40.2 Unit of Measure
1.3.40.3 Payment Items
1.3.41 On Site Painting
SECTION 01 22 00.00 08 Page 3
1.3.41.1 Payment
1.3.41.2 Unit of Measure
1.3.41.3 Payment Items
1.3.42 Construction of Transition Wall
1.3.42.1 Payment
1.3.42.2 Unit of Measure
1.3.42.3 Payment Items
1.3.43 Safety Critical Waterway Signs
1.3.43.1 Payment
1.3.43.2 Unit of Measure
1.3.43.3 Payment Items
1.3.44 Test Fitting of Stoplogs
1.3.44.1 Payment
1.3.44.2 Unit of Measure
1.3.44.3 Payment Item
1.3.45 Commissioning
1.3.45.1 Payment
1.3.45.2 Unit of Measure
1.3.45.3 Payment Item
1.3.46 Site Restoration
1.3.46.1 Payment
1.3.46.2 Unit of Measure
1.3.46.3 Payment Item (s)
1.3.47 Preparation of Final As-Built Drawings
1.3.47.1 Payment
1.3.47.2 Unit of Measure
1.4 UNIT PRICE PAYMENT ITEMS
1.4.1 Digital Progress Images
1.4.1.1 Payment
1.4.1.2 Measurement
1.4.1.3 Unit of Measure
1.4.1.4 Payment Items
1.4.2 Maintain Government Facilities and Government Access
1.4.2.1 Payment
1.4.2.2 Measurement
1.4.2.3 Unit of Measure
1.4.2.4 Payment Items
1.4.3 Instrumentation Monitoring Program
1.4.3.1 Payment
1.4.3.2 Measurement
1.4.3.3 Unit of Measure
1.4.3.4 Payment Items
1.4.4 Maintaining Data Management System
1.4.4.1 Payment
1.4.4.2 Measurement
1.4.4.3 Unit of Measure
1.4.4.4 Payment Items
1.4.5 Environmental Compliance Measurement, Sampling, Testing and
Reporting
1.4.5.1 Payment
1.4.5.2 Measurement
1.4.5.3 Unit of Measure
1.4.5.4 Payment Items
1.4.6 Underwater Excavation
1.4.6.1 Payment
1.4.6.2 Measurement
1.4.6.3 Unit of Measure
1.4.6.4 Payment Items
1.4.7 Timber Pile Removal
SECTION 01 22 00.00 08 Page 4
1.4.7.1 Payment
1.4.7.2 Measurement
1.4.7.3 Unit of Measure
1.4.7.4 Payment Item (s)
1.4.8 Jet Grouting
1.4.8.1 Payment
1.4.8.2 Measurement
1.4.8.3 Unit of Measure
1.4.8.4 Payment Items
1.4.9 Combination wall Sheet and Pipe Piles
1.4.9.1 Payment
1.4.9.2 Measurement
1.4.9.3 Unit of Measure
1.4.9.4 Payment Items
1.4.10 Combination Wall King Piles
1.4.10.1 Payment
1.4.10.2 Measurement
1.4.10.3 Unit of Measure
1.4.10.4 Payment Item
1.4.11 Combination Wall Alluvium Excavation and Rock Sockets
1.4.11.1 Payment
1.4.11.2 Measurement
1.4.11.3 Unit of Measure
1.4.11.4 Payment Item
1.4.12 Combination Wall Concrete Infill
1.4.12.1 Payment
1.4.12.2 Measurement
1.4.12.3 Unit of Measure
1.4.12.4 Payment Items
1.4.13 Drilled Shafts
1.4.13.1 Payment
1.4.13.2 Measurement
1.4.13.3 Unit of Measure
1.4.13.4 Payment Items
1.4.14 Pipe Piles
1.4.14.1 Payment
1.4.14.2 Measurement
1.4.14.3 Unit of Measure
1.4.14.4 Payment Items
1.4.15 Portland Cement
1.4.15.1 Payment
1.4.15.2 Measurement
1.4.15.3 Unit of Measure
1.4.15.4 Payment Items
1.4.16 Fly Ash
1.4.16.1 Payment
1.4.16.2 Measurement
1.4.16.3 Unit of Measure
1.4.16.4 Payment Items
1.4.17 Blast Furnace Slag
1.4.17.1 Payment
1.4.17.2 Measurement
1.4.17.3 Unit of Measure
1.4.17.4 Payment Items
1.4.18 Silica Fume
1.4.18.1 Payment
1.4.18.2 Measurement
1.4.18.3 Unit of Measure
1.4.18.4 Payment Items
SECTION 01 22 00.00 08 Page 5
1.4.19 Production, Transportation and Placement of Concrete
1.4.19.1 Payment
1.4.19.2 Measurement
1.4.19.3 Unit of Measure
1.4.19.4 Payment Items
1.4.20 Design, Production, Transportation and Placement of Concrete
1.4.20.1 Payment
1.4.20.2 Measurement
1.4.20.3 Unit of Measure
1.4.20.4 Payment Items
1.4.21 Dental Excavation and Dental Concrete
1.4.21.1 Payment
1.4.21.2 Measurement
1.4.21.3 Unit of Measure
1.4.21.4 Payment Items
1.4.22 Steel Piling
1.4.22.1 Payment
1.4.22.2 Measurement
1.4.22.3 Unit of Measure
1.4.22.4 Payment Items
1.4.23 Rock Fill
1.4.23.1 Payment
1.4.23.2 Measurement
1.4.23.3 Unit of Measure
1.4.24 Aggregate Cap
1.4.24.1 Payment
1.4.24.2 Measurement
1.4.24.3 Unit of Measure
1.4.25 Monthly Dewatering
1.4.25.1 Payment
1.4.25.2 Measurement
1.4.25.3 Unit of Measure
1.4.25.4 Payment Items
1.4.26 Drill Weep Holes
1.4.26.1 Payment
1.4.26.2 Measurement
1.4.26.3 Unit of Measure
1.4.26.4 Payment Items
1.4.27 Waterstops
1.4.27.1 Payment
1.4.27.2 Measurement
1.4.27.3 Unit of Measure
1.4.27.4 Payment Items
1.4.28 Furnish and Install Filling and Emptying Valves
1.4.28.1 Payment
1.4.28.2 Measurement
1.4.28.3 Unit of Measure
1.4.28.4 Payment Items
1.4.29 Fabricate and Deliver Bulkheads
1.4.29.1 Payment
1.4.29.2 Measurement
1.4.29.3 Unit of Measure
1.4.29.4 Payment Items
1.4.30 Furnish and Install Gate Operating Machinery
1.4.30.1 Payment
1.4.30.2 Measurement
1.4.30.3 Unit of Measure
1.4.30.4 Payment Item
1.4.31 Miter Gates
SECTION 01 22 00.00 08 Page 6
1.4.31.1 Payment
1.4.31.2 Measurement
1.4.31.3 Unit of Measure
1.4.31.4 Payment Items
1.4.32 Wall Armor
1.4.32.1 Payment
1.4.32.2 Measurement
1.4.32.3 Unit of Measure
1.4.32.4 Payment Items
1.4.33 Corner Protection
1.4.33.1 Payment
1.4.33.2 Measurement
1.4.33.3 Unit of Measure
1.4.33.4 Payment Items
1.4.34 Corner Castings
1.4.34.1 Payment
1.4.34.2 Measurement
1.4.34.3 Unit of Measure
1.4.34.4 Payment Items
1.4.35 Floating Mooring Bitts
1.4.35.1 Payment
1.4.35.2 Measurement
1.4.35.3 Unit of Measure
1.4.35.4 Payment Items
1.4.36 Line Hooks and Guards
1.4.36.1 Payment
1.4.36.2 Measurement
1.4.36.3 Unit of Measure
1.4.36.4 Payment Items
1.4.37 Check Posts
1.4.37.1 Payment
1.4.37.2 Measurement
1.4.37.3 Unit of Measure
1.4.37.4 Payment Items
1.4.38 Riprap
1.4.38.1 Payment
1.4.38.2 Measurement
1.4.38.3 Unit of Measure
1.4.38.4 Payment Item (s)
1.4.39 Deformed Steel Bars for Concrete Reinforcement
1.4.39.1 Payment
1.4.39.2 Measurement
1.4.39.3 Unit of Measure
1.4.39.4 Payment Item (s)
1.4.40 Bituminous Pavement
1.4.40.1 Payment
1.4.40.2 Measurement
1.4.40.3 Unit of Measure
1.4.40.4 Payment Item
1.4.41 Ladders
1.4.41.1 Payment
1.4.41.2 Measurement
1.4.41.3 Unit of Measure
1.4.41.4 Payment Item
1.4.42 Rock Dikes
1.4.42.1 Payment
1.4.42.2 Measurement
1.4.42.3 Unit of Measure
1.4.42.4 Payment Items
SECTION 01 22 00.00 08 Page 7
1.4.43 Dewater and Cleanup of Cofferdam Post Flood Event
1.4.43.1 Payment
1.4.43.2 Measurement
1.4.43.3 Unit of Measure
1.4.43.4 Payment Items
1.4.44 Government Directed Evacuation of Cofferdam
1.4.44.1 Payment
1.4.44.2 Measurement
1.4.44.3 Unit of Measure
1.4.44.4 Payment Items
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONTRACT COST BREAKDOWN
-- End of Section Table of Contents --
SECTION 01 22 00.00 08 Page 8
SECTION 01 22 00.00 08
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Weight Certificates
1.3 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the SCHEDULE and described below.
All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.3.1 Reimbursement For Actual Performance And Payment Bond Premiums
Payment for reimbursement for actual performance and payment bond premiums will be made as specified in 00 70 00 CONDITIONS OF THE CONTRACT, clause
PAYMENT FOR PERFORMANCE AND PAYMENT BONDS.
0001 REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS
SECTION 01 22 00.00 08 Page 9
1.3.2 Mobilization and Prepatory Work
1.3.2.1 Payment
Payment will be made for costs associated with mobilization of plant equipment for work preparatory to beginning actual construction of the cutoff wall, as defined in Section 00 73 00 SUPPLEMENTARY CONDITIONS, paragraph DFARS 252.236-7003 PAYMENT FOR MOBILIZATION AND PREPARATORY WORK.
The Contractor shall provide supporting documentation for payment of each item in accordance with Section 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph DFARS 252.236-7003 PAYMENT FOR MOBILIZATION AND PREPARATORY WORK, and shall not receive payment until the Contracting Officer has receipts to prove that payment for all items claimed have been validated.
All construction plant, material, equipment, and the mobilization and preparatory work shall be performed and determined to be suitable for efficiency in performing the work before payment is made.
Payment for mobilization and preparatory work will include, but not limited to:
a. Mobilization and setup of Contractor-furnished plant and equipment
b. Furnishing and setup of temporary Contractor facilities including offices, storage, and testing facilities (including furnishing and validating QC/QA Lab)
d. Construction of temporary access and haul roads
e. Construction of slurry ponds, and associated facilities
f. Development of laydown areas
g. Initial survey and mapping
h. Construction of environmental protection and temporary storm water pollution control features and instrumentation
i. Other site development needed for the job prior to construction of the new lock chamber and other associated features
j. Disposal of any necessary materials associated with mobilization and preparatory work in accordance with Section 01 74 19.00 08 DISPOSAL
k. Development of major submittals in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Payment for development of a submittal will not be made until approval of the submittal by the Contrating Officer or designated representative.
1.3.2.2 Unit of Measure
Unit of measure: Job.
1.3.2.3 Payment Item (s)
0004 MOBILIZATION AND PREPATORY WORK
1.3.3 Demobilization
1.3.3.1 Payment
Payment will be made for costs associated with removal and demobilization of plant, equipment and temporary facilities upon completion of construction of the required features. Payment shall include disassembly and removal from the site of plant, equipment and facilities and transportation of excess and unused materials. Payment shall also include removal of the three Government field office trailers. Payment for restoration of work areas will be made as specified for Site Restoration
SECTION 01 22 00.00 08 Page 10
1.3.3.2 Unit of Measure
Unit of measure: Job.
1.3.3.3 Payment Item (s)
0005 DEMOBILIZATION
1.3.4 Exploratory Program
1.3.4.1 Payment
Payment will as specified in Section 02 32 00 FOUNDATION VERIFICATION DRILLING, SAMPLING, AND RECORDING and be made for costs associated with operations necessary for all exploratory drilling the contractor has to conduct prior to construction.
1.3.4.2 Unit of Measure
Unit of measure: Job.
1.3.4.3 Payment Item (s)
0009 EXPLORATORY PROGRAM
1.3.5 Instrumentation Installation
1.3.5.1 Payment
Payment will be made for costs associated with installation of instrumentation equipment, as specified in Section 13 50 00 INSTRUMENTATION PROGRAM. Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs to install all required monitoring instrumentation.
1.3.5.2 Unit of Measure
Unit of measure: Job.
1.3.5.3 Payment Item (s)
0010 INSTRUMENTATION INSTALLATION
1.3.6 Relocate Government Trailer
1.3.6.1 Payment
Payment will be made for costs associated with operations necessary for relocation of the existing single wide government trailer that is already on site. Payment will constitute full compensation all labor, equipment, materials and supplies required to move the trailer, reconnect electrical and telecom lines to the trailer.
1.3.6.2 Unit of Measure
Unit of measure: Job.
SECTION 01 22 00.00 08 Page 11
1.3.6.3 Payment Item (s)
0012 RELOCATE GOVERNMENT TRAILER
1.3.7 Develop Data Management System
1.3.7.1 Payment
Payment will be made for costs associated with developing the data management system, as specified in Section 01 31 00.00 08 DATA MANAGEMENT.
Related costs include development of the enterprise database, uploading all existing data into the data management system, and transferring the automated data acquisition system into the enterprise database.
1.3.7.2 Unit of Measure
Unit of measure: Job.
1.3.7.3 Payment Item (s)
0013 DEVELOP DATA MANAGEMENT SYSTEM
1.3.8 Demolition of Existing Lock Structure
1.3.8.1 Payment
Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the features as indicated and specified to the extent shown, and to protect adjacent features to remain. Payment shall also include all costs for transporting and disposal of all debris. Payment shall include all advanced planning and engineering and all other incidental costs to perform the demolition, as shown on the contract drawings and specified. The individual demolition items are defined as follows:
a. REMOVE FOOTBRIDGE SPAN includes termination of existing electrical and communications lines, modifying and recapping the existing compressed air line, removal of the footbridge from the original Middle Wall support tower to Dam Pier 1, and removal of support beams as indicated.
b. DEMOLITION OF RIVER WALL BUILDING includes removal of the River Wall building and all associated utilities.
1.3.8.2 Unit of Measure
Unit of Measure: JOB
1.3.8.3 Payment Items
0016 REMOVE AND DISPOSE EXISTING FOOTBRIDGE
0039 DEMOLITION OF RIVER WALL BUILDING
1.3.9 Demolition
1.3.9.1 Payment
Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the features
SECTION 01 22 00.00 08 Page 12 as indicated and specified in Section 02 41 00.00 08 DEMOLITION and to the extent shown, and to protect adjacent features to remain. Payment shall also include all costs for removal of the rubble from the river and transporting and disposal of all debris per specification 01 74 19.00 08 DISPOSAL. Payment shall include all advanced planning and engineering and all other incidental costs to perform the demolition, as shown on the contract drawings and specified. Payment shall also include removal of miscellaneous metals, steel H-piles, and steel sheet piling.
1.3.9.2 Unit of Measure
Unit of Measure: Job.
1.3.9.3 Payment Items
0017 DEMOLITION OF FIXED CREST WEIR
0018 DEMOLITION OF APRON
0032 DEMOLITION OF UPPER GUARD WALL EXTENSION CELLS
0033 DEMOLITION OF UPPER GUARD WALL
0034 DEMOLITION OF LOWER GUARD WALL
0040 DEMOLITION OF RIVER WALL
0044 DEMOLITION OF LOCK FLOOR CONCRETE
1.3.10 Underwater Excavation
1.3.10.1 Payment
Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs for performing the work including:
excavating; transportation and disposal of material as described in 31 23 05 MASS EXCAVATION, control of effluents from the Contractor's operations; performing measurements for payment; and all other incidental costs in connection with these aspects of the work under this contract.
1.3.10.2 Unit of Measure
Unit of Measure: Job.
1.3.10.3 Payment Items
0020 REMOVAL OF GRANUAL FILL UNDER APRON
1.3.11 Remove Derrick Stone
1.3.11.1 Payment
Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs for performing the excavating of derrick stone; transportation and temporarily storing of excavated materials, control of effluents from the Contractor's operations;
performing measurements for payment; and all other incidental costs in connection with these aspects of the work under this contract.
1.3.11.2 Unit of Measure
Unit of Measure: Job.
SECTION 01 22 00.00 08 Page 13
1.3.11.3 Payment Items
0021 REMOVE DERRICK STONE
1.3.12 Install Flashboards
1.3.12.1 Payment
Payment will be made for resuse of existing flashboards or the costs associated with purchasing all supplies, as the contractor chooses, and installation of flashboards on top of fixed crest portion of the dam and removal upon completion of work and placement in Government designated area on-site.
1.3.12.2 Payment Item (s)
0022 INSTALLATION OF FLASHBOARDS
1.3.12.3 Unit of Measure
Unit of measure: job.
1.3.13 Removal of existing river chamber floor pavers
1.3.13.1 Payment
Payment for this items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the features as specified and as shown on the contract drawings.
1.3.13.2 Unit of Measure
Unit of Measure: JOB
1.3.13.3 Payment Items
0031 REMOVAL OF EXISTING RIVER CHAMBER FLOOR PAVERS
1.3.14 Removal and Salvage Filling and Emptying System
1.3.14.1 Payment
Payment for this items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the features as specified and as shown on the contract drawings.
1.3.14.2 Unit of Measure
Unit of Measure: JOB
1.3.14.3 Payment Items
0036 REMOVE AND SALVAGE FILLING AND EMPTYING SYSTEM
1.3.15 Port Closures
1.3.15.1 Payment
Payment for construction of the port closures at original Middle Wall
SECTION 01 22 00.00 08 Page 14 shall constitute full compensation for all labor, equipment, material and supply costs for shop and field fabrications; performing measurements for payment; testing of materials and products incorporated into the work; all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract.
1.3.15.2 Unit of Measure
Unit of measure: JOB.
1.3.15.3 Payment Item
0035 CLOSE UPPER AND LOWER FILLING AND EMPTYING PORTS
1.3.16 Temporary Service Bridge
1.3.16.1 Payment
Payment for contractor designed temporary service bridge shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install, test and remove at end of use, these items as shown on the contract drawings and specified, including all metalwork fabrication, including cable trays and pipe supports, shop assembly, delivery and field erection. These payments shall also include all costs required for testing of materials and products incorporated into the work;
required shop and field tests; galvanizing or metallizing; painting;
temporary scaffolds and supports; all advanced planning and engineering;
and all other incidental costs to furnish and install the items, as shown on the contract drawings and specified.
1.3.16.2 Unit of Measure
Unit of measure: Job.
1.3.16.3 Payment Item
0038 TEMPORARY DOWNSTREAM BRIDGE
1.3.17 Demolition of Sills
1.3.17.1 Payment
Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the upper gate sill, lower gate sill and needle dam sill as specified in Section 02 41 00.00 08 DEMOLITION and to the extent shown, and to protect adjacent features to remain. Payment shall also include all costs for removal of the rubble from the river and transporting and disposal of all debris per specification 01 74 19.00 08 DISPOSAL. Payment shall include all advanced planning and engineering and all other incidental costs to perform the demolition, as shown on the contract drawings and specified. Payment shall also include removal of miscellaneous metals, steel H-piles, and steel sheet piling.
1.3.17.2 Unit of Measure
Unit of Measure: Job.
SECTION 01 22 00.00 08 Page 15
1.3.17.3 Payment Items
0046 DEMOLITION OF SILLS
1.3.18 Miter Gate Removal
1.3.18.1 Payment
Payment for these items shall also include costs for demolition and disposal of demolished materials; all advanced planning and engineering;
and all other incidental costs in connection with removing the specified items for closure of the existing Land Chamber.
1.3.18.2 Unit of Measure
Unit of measure: Job.
1.3.18.3 Payment Items
0042 REMOVE AND DISPOSE UPPER MITER GATE
0043 REMOVE AND DISPOSE LOWER MITER GATE
1.3.19 Cofferdams and Closures
1.3.19.1 Payment
Payment for construction of these items shall constitute full compensation for all labor, equipment, material and supply costs for the sheet pile cells as shown on the contract drawings and as specified. Payments shall include costs for guide templates; frames and supports to stabilize the piling during erection operations; removal of obstructions; sheet pile materials and installation; pile removal and redriving; excavation and granular fill; grout; and all other incidental costs in connection with these aspects of the work under this contract. Payment for these items shall also include costs for shop and field fabrications; performing measurements for payment; testing of materials and products incorporated into the work; all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract.
Payment for removal of these items, where applicable, shall constitute full compensation for all labor, equipment, material and supply costs for removing and disposing of cell fill; removing, transporting and stockpiling of cell fill, removal and disposal of concrete, miscellaneous metal items and other materials, and all other incidental costs in connection with these aspects of the work under this contract.
1.3.19.2 Unit of Measure
Unit of measure: Job.
1.3.19.3 Payment Items
0070 COFFERDAM CELL DEWATERING SYSTEM
0081 CONSTRUCT COFFERDAM SPLASH PAD AND FLOOD WAY
0115 DEMOLITION OF COFFERDAM
SECTION 01 22 00.00 08 Page 16
1.3.20 Cofferdam and Chamber Dewatering
1.3.20.1 Payment
Payment for initial dewatering shall constitute full compensation for all labor, equipment, material and supply costs for the initial dewatering the cofferboxes, cofferdam, or chamber and continuous dewatering of these areas, including installing, removing, transporting, and storing valve and chamber maintenance bulkheads, as shown on the contract drawings and specified in Section 31 45 00 DIVERSION AND CARE OF WATER. Payment for these items shall also include costs for all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract.
1.3.20.2 Unit of Measure
Unit of measure: Job.
1.3.20.3 Payment Items
0072 INITIAL UNWATER COFFERDAM
1.3.21 New Stair Tower
1.3.21.1 Payment
Payment for the new stair towers shall constitute full compensation for all labor, equipment, material and supply costs to construct the stair towers as shown on plans and specified.
1.3.21.2 Unit of Measure
Unit of measure: Job.
1.3.21.3 Payment Items
0079 INSTALL NEW PERMANENT STAIR TOWERS
1.3.22 Permanent Utility Bridge
1.3.22.1 Payment
Payment for permanent utility bridge shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install and test these items as shown on the contract drawings and specified, including all metalwork fabrication, including cable trays and pipe supports, shop assembly, delivery and field erection. These payments shall also include all costs required for testing of materials and products incorporated into the work; required shop and field tests;
galvanizing or metallizing; painting; temporary scaffolds and supports;
all advanced planning and engineering; and all other incidental costs to furnish and install the items, as shown on the contract drawings and specified. Payment for foundation and bridge towers is paid elsewhere.
1.3.22.2 Unit of Measure
Unit of measure: Job.
SECTION 01 22 00.00 08 Page 17
1.3.22.3 Payment Item
0080 INSTALL PERMANENT UTILITY BRIDGE
1.3.23 Middle Wall Control Shelters
1.3.23.1 Payment
Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to construct the Middle Wall Control Shelters
a. Payment for CONTROL SHELTERS shall include the structure, walls, floors, roofing, stairways, heating and ventilating systems for the Control Shelters, as specified in 23 82 46.00 40 ELECTRIC UNIT HEATERS, and all other costs to provide completed buildings, as shown on drawings. Payment for electrical equipment will be included in the Job price for ELECTRICAL WORK.
1.3.23.2 Unit of Measure
Unit of measure: Job.
1.3.23.3 Payment Items
0087 MIDDLE WALL CONTROL SHELTERS STRUCTURES
1.3.24 Buildings
1.3.24.1 Payment
Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to construct the equipment buildings and service building. The work shall include, but not be limited to, the structure, walls, floors, roofing, sun control devices, stairways, railings, embedded conduits, piping, interior finishes, furnishings and equipment and interior electrical and mechanical work, package lift station and force main (including the portion of the line outside the building, across the footbridges to the existing connection stub-up above the slope paving), and exterior lighting and wiring, and all other costs to provide a completed building.
1.3.24.2 Unit of Measure
Unit of measure: Job.
1.3.24.3 Payment Items
0084 MIDDLE WALL EQUIPMENT BUILDING
0085 LAND WALL EQUIPMENT BUILDING
0086 RIVER WALL EQUIPMENT BUILDING
1.3.25 Construct Chamber Culverts
1.3.25.1 Payment
Payment for the new chamber culverts shall constitute full compensation for all labor, equipment, material and supply costs to construct the culverts as shown on plans and specified.
SECTION 01 22 00.00 08 Page 18
1.3.25.2 Unit of Measure
Unit of measure: Job.
1.3.25.3 Payment Items
0089 CONSTRUCT CHAMBER CULVERTS
1.3.26 Fabricate and Deliver Miter Gates
1.3.26.1 Payment
Payment shall constitute full compensation for all labor, equipment, material and supply costs to fabricate and deliver the new miter gate…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .