W911WN23B####

Upper Ohio Navigation Project New River Chamber Montgomery Locks & Dam Beaver County, PA

CBC AND SAM.GOV SUBMISSION

PRELIMINARY NOT FOR CONSTRUCTION

TECHNICAL SPECIFICATIONS

MARCH 2023

Upper Ohio Montgomery Locks and Dam Lock Chamber Contract

Bid Schedule/Specifications Section Cross Reference

Bid Items

Item Description Measurement Unit of Measure

0001 REIMBURSEMENT FOR ACTUAL

PERFORMANCE AND PAYMENT BONDS

PREMIUMS

1 JOB

0002 DIGITAL PROGRESS IMAGES, MONTHLY 96 SET

0003 DIGITAL AERIAL PROGRESS IMAGES,

QUARTERLY

32 SET

0004 MOBILIZATION AND PREPATORY WORK 1 JOB

0005 DEMOBILIZATION 1 JOB

0006 MAINTAIN GOVERNMENT FIELD OFFICES 96 MONTHS

0007 RECONSTRUCTION STATE ROUTE,

MONTGOMERY DAM ROAD

SQUARE YARDS

0008 POST CONSTRUCTION MILL AND OVERLAY

MONTGOMERY DAM ROAD

SQUARE YARDS

0009 EXPLORATORY PROGRAM 1 JOB

0010 INSTRUMENTATION INSTALLATION 1 JOB

0011 INSTRUMENTATION MONITORING PROGRAM 96 MONTHS

0012 RELOCATE GOVERNMENT TRAILER 1 JOB

0013 DEVELOP DATA MANAGEMENT SYSTEM 1 JOB

0014 MAINTAIN DATA MANAGEMENT SYSTEM 96 MONTHS

0015 ENVIRONMENTAL COMPLIANCE

MEASUREMENTS, SAMPLING, TESTING AND

REPORTING, CONCRETE BATCH PLANT

96 MONTHS

0016 REMOVE AND DISPOSE EXISTING

FOOTBRIDGE

1 JOB

0017 DEMOLITION OF FIXED CREST WEIR 1 JOB

0018 DEMOLITION OF APRON 1 JOB

0019 REMOVAL OF EXISTING TIMBER PILES, DAM

APRON

136 EACH

0020 REMOVAL OF GRANUAL FILL UNDER APRON 1 JOB

0021 REMOVE DERRICK STONE 1 JOB

0022 INSTALLATION OF FLASHBOARDS 1 JOB

0023 COMBINATION WALL, JET GROUTING CUBIC YARDS

0024 COMBINATION WALL, 48-INCH DIAMETER BY

1/2-INCH THICK PIPE PILE

LINEAR FEET

0025 COMBINATION WALL, PZ 27 METAL SHEET

PILING

LINEAR FEET

0026 COMBINATION WALL, W24x162 KING PILES EACH

0027 COMBINATION WALL, ALLUVIUM EXCAVATION LINEAR FEET

Bid Schedule/Specifications Section Cross Reference

Bid Items

Item Description Measurement Unit of Measure

0028 COMBINATION WALL, 42-INCH DIAMETER

ROCK SOCKET

LINEAR FEET

0029 COMBINATION WALL, CONCRETE FOR CAST-

IN-PLACE CONCRETE PILES

CUBIC YARDS

0030 REMOVE AND DISPOSE OF EXISTING

SHEETPILING AT APRON TOE

2115 LINEAR FEET

0031 REMOVAL OF EXISTING RIVER CHAMBER

FLOOR PAVERS

1 JOB

0032 DEMOLITION OF UPPER GUARD WALL

EXTENSION CELLS

1 JOB

0033 DEMOLITION OF UPPER GUARD WALL 1 JOB

0034 DEMOLITION OF LOWER GUARD WALL 1 JOB

0035 CLOSE UPPER AND LOWER FILLING AND

EMPTYING PORTS

1 JOB

0036 REMOVE AND SALVAGE FILLING AND

EMPTYING SYSTEM

1 JOB

0037 FILL DOWNSTREAM RIVERSIDE MITER GATES

AND OTHER RECESSES WITH CONCRETE ON

EXISTING MIDDLE WALL.

CUBIC YARDS

0038 TEMPORARY DOWNSTREAM BRIDGE 1 JOB

0039 DEMOLITION OF RIVER WALL BUILDING 1 JOB

0040 DEMOLITION OF RIVER WALL 1 JOB

0041 REMOVAL OF EXISTING TIMBER PILES, LOCK

RIVER WALL

1766 EACH

0042 REMOVE AND DISPOSE UPPER MITER GATE 1 JOB

0043 REMOVE AND DISPOSE LOWER MITER GATE 1 JOB

0044 DEMOLITION OF LOCK FLOOR CONCRETE 1 JOB

0045 DREDGE RIVER ALLUVIUM 336290 CUBIC YARDS

0046 DEMOLITION OF SILLS 1 JOB

0047 EXCAVATE ALLUVIUM INSIDE COFFERDAM

CELLS

7449 CUBIC YARDS

0048 CONSTRUCT PERMANENT DRILLED SHAFTS,

TYPE RC-1

197 EACH

0049 CONSTRUCT PERMANENT DRILLED SHAFTS,

TYPE RC-2

EACH

0050 CONSTRUCT PERMANENT DRILLED SHAFTS,

TYPE RC-3

EACH

0051 PORTLAND CEMENT CWT

0052 FLY ASH CWT

Bid Schedule/Specifications Section Cross Reference

Bid Items

Item Description Measurement Unit of Measure

0053 BLAST FURNACE SLAG CWT

0054 SILICA FUME CWT

0055 TREMI MASS CONCRETE FOR NEW LOCK

MONOLITHS, PRODUCE, DELIVER AND PLACE

CUBIC YARDS

0056 EXTERIOR MASS CONCRETE FOR NEW LOCK

MONOLITHS, PRODUCE, DELIVER AND PLACE

CUBIC YARDS

0057 INTERIOR MASS CONCRETE FOR NEW LOCK

MONOLITHS, PRODUCE, DELIVER AND PLACE

CUBIC YARDS

0058 INTERIOR STRUCTURAL CONCRETE FOR

NEW LOCK MONOLITHS, PRODUCE, DELIVER

CUBIC YARDS

0059 TOP OF WALL MASS CONCRETE FOR NEW

LOCK MONOLITHS, DESIGN, PRODUCE,

DELIVER AND PLACE

CUBIC YARDS

0060 DENTAL EXACAVATION AND DENTAL

CONCRETE, EXCAVATE,PRODUCE, DELIVER

AND PLACE DENTAL CONCRETE

100 CUBIC YARDS

0061 MUD MATT CONCRETE, PRODUCE, DELIVER

AND PLACE

CUBIC YARDS

0062 REINFORCING STEEL, NEW LOCK WALL

MONOLITHS

3925 TONS

0063 REINFORCING STEEL, SILLS TONS

0064 COFFERDAM SHEETPILING, FURNISH AND

INSTALL

LINEAR FEET

0065 EXCAVATE ALLUVIUM INSIDE COFFERDAM

AREA

116402 CUBIC YARDS

0066 COFFERDAM TREMIE SEAL, PRODUCE,

DELIVER AND PLACE

18168 CUBIC YARDS

0067 INSTALL COFFERDAM PIPE PILES EACH

0068 COFFERDAM CONNECTION ARC CONCRETE,

PRODUCE, DELIVER AND PLACE

CUBIC YARDS

0069 PLACE COFFERDAM FREE DRAINING

FILL(ALLUVIUM ON SITE)

227828 CUBIC YARDS

0070 COFFERDAM CELL DEWATERING SYSTEM 1 JOB

Bid Schedule/Specifications Section Cross Reference

Bid Items

Item Description Measurement Unit of Measure

0071 DEWATERING COFFERDAM CELLS 72 MONTHS

0072 INITIAL UNWATER COFFERDAM 1 JOB

0073 DEWATER COFFERDAM AREA 72 MONTHS

0074 COFFERDAM AGGREGATE CAP, PENNDOT 3A,

INSTALL

CUBIC YARDS

0075 PLACE FILL WITHIN CHAMBER - MISC

CHAMBER FLOOR FILL

20100 CUBIC YARDS

0076 PLACE R-5 RIPRAP FOR LOCK FLOOR

BACKFILL

5171 CUBIC YARDS

0077 BEDDING UNDER LOCK FLOOR 5464 CUBIC YARDS

0078 NEW STAIR TOWER DRILLED SHAFTS 6 EACH

0079 INSTALL NEW PERMANENT STAIR TOWERS 1 JOB

0080 INSTALL PERMANENT UTILITY BRIDGE 1 JOB

0081 CONSTRUCT COFFERDAM SPLASH PAD AND

FLOOD WAY

1 JOB

0082 DRILL EXISTING RIVER WALL WEEP HOLES LINEAR FEET

0083 PVC WATERSTOPS 6984 LINEAR FEET

0084 MIDDLE WALL EQUIPMENT BUILDING 1 JOB

0085 LAND WALL EQUIPMENT BUILDING 1 JOB

0086 RIVER WALL EQUIPMENT BUILDING 1 JOB

0087 MIDDLE WALL CONTROL SHELTERS

STRUCTURES

1 JOB

0088 CONCRETE CHAMBER CULVERT

FOUNDATION, PRODUCE, DELIVER AND

PLACE

CUBIC YARDS

0089 CONSTRUCT CHAMBER CULVERTS 1 JOB

0090 CONCRETE LOCK FLOOR, PRODUCE,

DELIVER AND PLACE

5909 CUBIC YARDS

0091 FILLING AND EMPTYING VALVES, FABRICATE

AND INSTALL

4 EACH

0092 FILLING AND EMPTYING VALVE OPERATING

MACHINERY, FABRICATE AND INSTALL

4 EACH

0093 FILLING AND EMPTYING CULVERT

BULKHEADS, FABRICATE AND DELIVER

8 EACH

Bid Schedule/Specifications Section Cross Reference

Bid Items

Item Description Measurement Unit of Measure

0094 CULVERT BULKHEAD RECESS LINERS,

FABRICATE AND INSTALL

1 JOB

0095 UPSTREAM CHAMBER STOPLOG RECESS

LINERS, FABRICATE AND INSTALL

1 JOB

0096 UPSTREAM CHAMBER STOPLOG RECESS

FILLERS, FABRICATE AND INSTALL

1 JOB

0097 DOWNSTREAM CHAMBER STOPLOG RECESS

LINERS, FABRICATE AND INSTALL

1 JOB

0098 DOWNSTREAM CHAMBER STOPLOG RECESS

FILLERS, FABRICATE AND INSTALL

1 JOB

0099 MITER GATE OPERATING MACHINERY,

FABRICATE AND INSTALL

4 EACH

0100 MITER GATES, FABRICATE AND DELIVER 1 JOB

0101 MITER GATES - ASSOCIATED

APPURTENANCES, FABRICATE AND DELIVER

1 JOB

0102 SILL SEAL ANGLE, WALL QUOIN POSTS,

PINTLE BASE AND PINTLE, INSTALLATION

1 JOB

0103 MITER GATE LEAVES, INSTALLATION 4 EACH

0104 COMPRESSED AIR PIPING SYSTEM 1 JOB

0105 POTABLE WATER PIPING SYSTEM 1 JOB

0106 SERVICE WATER PIPING SYSTEM 1 JOB

0107 SANITARY SEWAGE PIPING SYSTEM 1 JOB

0108 ELECTRICAL WORK 1 JOB

0109 INTAKE SCREEN ASSEMBLIES 1 JOB

0110 WALL ARMOR, FABRICATE AND INSTALL 29582 LINEAR FEET

0111 R3 HORIZONTAL CORNER PROTECTION,

FABRICATE AND INSTALL

1940 LINEAR FEET

0112 R8 VERTICAL CORNER PROTECTION,

FABRICATE AND INSTALL

2060 LINEAR FEET

0113 R24 VERTICAL CORNER PROTECTION,

FABRICATE AND INSTALL

143 LINEAR FEET

0114 CORNER CASTINGS, FABRICATE AND INSTALL EACH

0115 DEMOLITION OF COFFERDAM 1 JOB

0116 REMOVAL OF PROTECTION CELLS IN

NAVIGATION CHANEL

1 JOB

Bid Schedule/Specifications Section Cross Reference

Bid Items

Item Description Measurement Unit of Measure

0117 REPLACE DERRICK STONE PROTECTION

PREVIOUSLY REMOVED FOR COFFERDAM

CONSTRUCTION

1 JOB

0118 FLOATING MOORING BITT ANCHORAGES,

FABRICATE AND INSTALL

1 JOB

0119 FLOATING MOORING BITTS, FABRICATE AND

INSTALL

8 EACH

0120 LINE HOOKS AND GUARDS, FABRICATE AND

INSTALL

65 EACH

0121 CHECK POSTS, FABRICATE AND INSTALL 35 EACH

0122 LOCK WALL RECESS LADDERS, FABRICATE

AND INSTALL

10 EACH

0123 UTILITY ACCESS SHAFT LADDERS,

FABRICATE AND INSTALL

11 EACH

0124 HANDRAIL - WIRE RAIL, FABRICATE AND

INSTALL

1 JOB

0125 HANDRAIL - TUBE RAIL, FABRICATE AND

INSTALL

1 JOB

0126 TOW HAULAGE SYSTEM, FABRICATE AND

INSTALL

1 JOB

0127 RIVER WALL CRANE, FABRICATE AND

INSTALL

1 JOB

0128 EXCAVATE ALLUVIUM INSIDE NOSE CELLS CUBIC YARDS

0129 NOSE CELLS SHEETPILING, FURNISH AND

INSTALL

LINEAR FEET

0130 NOSE CELLS TREMI CONCRETE, PRODUCE,

DELIVER AND PLACE

CUBIC YARDS

0131 NOSE CELLS MASS CONCRETE, PRODUCE,

DELIVER AND PLACE

CUBIC YARDS

0132 UPPER GUARD WALL DRILLED SHAFTS 16 EACH

0133 PRECAST CAP BEAM UPPER GUARD WALL,

FABRICATE, DELIVER AND INSTALL

1 JOB

0134 PRECAST BOX BEAMS UPPER GUARD WALL,

FABRICATE, DELIVER AND INSTALL

1 JOB

0135 PRECAST SKIRT PANEL UPPER GUARD WALL,

FABRICATE, DELIVER AND INSTALL

1 JOB

0136 LOWER GUARD WALL DRILLED SHAFTS 22 EACH

0137 PRECAST SHAFT ENCLOSURE LOWER GUARD

WALL, FABRICATE, DELIVER AND INSTALL

1 JOB

0138 PRECAST WALL PANEL LOWER GUARD WALL,

FABRICATE, DELIVER AND INSTALL

1 JOB

Bid Schedule/Specifications Section Cross Reference

Bid Items

Item Description Measurement Unit of Measure

0139 RETAINING WALL SECTION LOWER GUARD

WALL

1 JOB

0140 SHEETPILE CUT OFF WALL GUARD WALLS LINEAR FEET

0141 EXCAVATE ALLUVIUM INSIDE MIDDLE WALL

BULL NOSE

CUBIC YARDS

0142 MIDDLE WALL BULL NOSE SHEETPILING,

FURNISH AND INSTALL

4000 LINEAR FEET

0143 MIDDLE WALL BULL NOSE TREMI CONCRETE,

PRODUCE, DELIVER AND PLACE

CUBIC YARDS

0144 MIDDLE WALL BULL NOSE MASS CONCRETE,

PRODUCE, DELIVER AND PLACE

CUBIC YARDS

0145 ON SITE PAINTING 1 JOB

0146 CONSTRUCTION OF TRANSITION WALL 1 JOB

0147 INSTALL UPSTREAM ROCK DIKES CUBIC YARDS

0148 INSTALL DOWNSTREAM ROCK DIKE CUBIC YARDS

0149 INSTALL LOCK SIGNAGE 1 JOB

0150 STOPLOGS, TEST FIT 1 JOB

0151 DEWATER AND CLEANUP OF COFFERDAM

POST FLOOD EVENT

1 EACH

0152 GOVERNMENT DIRECTED EVACUATION OF

COFFERDAM

2 EACH

0153 COMMISSIONING - FULLY INTEGRATED

SYSTEM TESTING

1 JOB

0154 SITE RESTORATION 1 JOB

0155 AS-BUILT DRAWINGS 1 JOB

Montgomery Locks and Dam New River Chamber

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 13.00 08 SUMMARY OF WORK

01 22 00.00 08 PRICE AND PAYMENT PROCEDURES

01 30 00.00 08 ADMINISTRATIVE REQUIREMENTS

01 31 00.00 08 DATA MANAGEMENT

01 32 01.00 08 PROJECT SCHEDULE NETWORK ANALYSIS

01 32 23.00 08 SURVEY AND ALIGNMENT CONTROL

01 32 25.00 08 LiDAR AND IMAGERY

01 32 33.00 08 DIGITAL PROGRESS IMAGES

01 33 00 SUBMITTAL PROCEDURES

01 35 00.00 08 SPECIAL PROCEDURES

01 35 26.00 08 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 26.13 08 DIVING SERVICES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 08 QUALITY CONTROL

01 45 00.15 08 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 50 10.00 08 PROJECT AND SAFETY SIGNS

01 54 00.00 08 GOVERNMENT EQUIPMENT AVAILABLE FOR USE IN PERFORMANCE OF

CONTRACT

01 57 19.00 08 TEMPORARY ENVIRONMENTAL CONTROLS

01 73 19.00 08 GOVERNMENT-FURNISHED PROPERTY

01 74 19.00 08 DISPOSAL

01 78 02.00 08 CLOSEOUT SUBMITTALS (AS-BUILT DRAWINGS)

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 FACILITY DATA REQUIREMENTS

01 91 00.00 08 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 32 00 FOUNDATION VERIFICATION DRILLING, SAMPLING, AND RECORDING

02 41 00.00 08 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)

DIVISION 03 - CONCRETE

03 00 00 GENERAL CONCRETE REQUIREMENTS

03 11 14.01 CONCRETE: FORMWORK (IN-THE-WET)

03 11 14.02 CONCRETE: FORMWORK (IN-THE-DRY)

03 15 14 WATERSTOPS IN CONCRETE FOR CIVIL WORKS

03 20 02 CONCRETE REINFORCEMENT FOR CIVIL WORKS

03 23 00 STRESSED TENDON REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 30 00.20 08 CONCRETE: FIELD DEMONSTRATIONS

03 37 06.00 08 JET GROUTING

03 37 26.10 08 CONCRETE: UNDERWATER AND FLOWABLE

03 37 26.20 08 TEMPORARY UNDERWATER CONCRETE

03 41 33.02 PRECAST STRUCTURAL PRETENSIONED CONCRETE (VERTICAL

CONSTRUCTION)

03 45 33 PRECAST PRESTRESSED STRUCTURAL CONCRETE

03 62 16 METALLIC NON-SHRINK GROUTING

PROJECT TABLE OF CONTENTS Page 1

CBC AND SAM.GOV SUBMISSION - PRELIMINARY NOT FOR CONSTRUCTION

03 70 00 MASS CONCRETE

03 70 05.00 08 ALTERNATE COLD WEATHER PROTECTION

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS FOR LOCK

CONSTRUCTION

05 05 20.01 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS (VERTICAL

CONSTRUCTION)

05 12 00 GENERAL STRUCTURAL STEEL - VERTICAL CONSTRUCTION

05 12 00.02 BRIDGE STRUCTURAL STEEL - VERTICAL CONSTRUCTION

05 12 10 ELASTOMERIC BEARING PADS

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 15 CIVIL WORKS FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

05 59 20 FABRICATION OF HYDRAULIC STEEL STRUCTURES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING AND TREADS

06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE RAILINGS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 19 00 WATER REPELLENTS

07 22 00 RIGID INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 36 13 SECTIONAL OVERHEAD DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 45 23 INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL WALL SYSTEM

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 90 00 PAINTS AND COATINGS

09 97 02 PAINTING: HYDRAULIC STEEL STRUCTURES AND APPURTENANCES

PROJECT TABLE OF CONTENTS Page 2

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 50 00 INSTRUMENTATION PROGRAM

13 50 10 MOVEMENT PINS

13 50 15 AUTOMATED SURVEY EQUIPMENT

13 50 20 ELECTRONIC INCLINOMETERS

13 50 30 ELECTRONIC PIEZOMETERS

13 50 35 MANUAL PIEZOMETERS

13 50 45 MANUAL CRACKMETERS

13 50 50 AUTOMATED CRACKMETERS

13 53 20 LOAD CELLS MOUNTED ON ROCK ANCHORS

13 70 00 AUTOMATED DATA ACQUISITION SYSTEM (ADAS)

DIVISION 14 - CONVEYING EQUIPMENT

14 46 00 VERTICAL RECIPROCATING CONVEYOR

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 11 13.00 08 PLUMBING, SERVICE WATER SYSTEM

22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

22 15 19.19 08 AIR COMPRESSOR

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 46.00 40 ELECTRIC UNIT HEATERS

23 82 46.00 41 ELECTRIC UNIT HEATERS - RECIRCULATION AIR ONLY

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 28 CYBERSECURITY

25 05 11.02 28 CYBERSECURITY FOR CIVIL WORKS OPERATIONAL TECHNOLOGY

25 05 11.03 28 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 19.10 08 INSULATED WIRE AND CABLE

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS

26 32 14.00 10 ELECTRIC GENERATOR SET

PROJECT TABLE OF CONTENTS Page 3

26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00.00 08 EXTERIOR LIGHTING

26 56 13.00 POLES AND STANDARDS

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 13 23.00 08 COMMUNICATIONS OPTICAL BACKBONE CABLING

27 21 10.00 08 FIBER OPTIC DATA TRANSMISSION SYSTEM

27 51 16 PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 10 05.00 08 CLOSED CIRCUIT TELEVISION (CCTV)

28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19.13 GEOTEXTILES FOR EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 23 05 MASS EXCAVATION

31 23 06 BLASTING

31 41 16 METAL SHEET PILING

31 42 00 COFFERDAM

31 45 00 DIVERSION AND CARE OF WATER

31 60 00 FOUNDATION PREPARATION

31 62 16.13 DRILLED IN PLACE STEEL PIPE PILES

31 62 23.13 CAST-IN-PLACE CONCRETE PILES

31 63 29 DRILLED CONCRETE PIERS AND SHAFTS

31 68 13 SOIL AND ROCK ANCHORS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 FIELD MOLDED JOINT SEALANTS FOR CIVIL WORKS

32 11 23 AGGREGATE BASE COURSES

32 11 25 LOCK FLOOR DRAINAGE LAYER

32 13 73.19 COMPRESSION JOINT SEALS FOR CIVIL WORKS

32 15 00 AGGREGATE SURFACING

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING

33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS

33 40 00 STORMWATER UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

PROJECT TABLE OF CONTENTS Page 4

35 01 41.00 10 ELECTROMECHANICAL OPERATING MACHINERY FOR LOCKS AND DAMS

35 05 40.14 10 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES

35 08 40 MITER GATE COMMISSIONING

35 11 50 TOW HAULAGE MACHINERY

35 20 13.17 STOPLOG RECESS FILLERS AND LINERS

35 20 13.27 INTAKE SCREENS

35 20 16.33 MITER GATES

35 20 16.45 MITER GATE ANCHORAGE

35 20 16.46 CULVERT VALVES

35 20 19.17 CULVERT BULKHEADS

35 20 23 COFFERDAM AND CHANNEL EXCAVATION

35 31 19 STONE, CHANNEL, SHORELINE PROTECTION FOR STRUCTURES

35 49 23.23 25 UPPER GUARD WALL

35 59 29 FLOATING MOORING BITTS

DIVISION 40 - PROCESS INTERCONNECTIONS

40 05 13.96 WELDING PROCESS PIPING

40 60 00 PROCESS CONTROL

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.16 JIB CRANES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 13.00 08

SUMMARY OF WORK

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 BASE CONTRACT

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 13.00 08 Page 1

SECTION 01 11 13.00 08

SUMMARY OF WORK

PART 1 GENERAL

1.1 GENERAL INFORMATION

This contract is for a new lock chamber and has no options. The Government is currently considering structuring this contract as a Base plus Awardable Options. This section will be updated to reflect these options in the future.

1.2 BASE CONTRACT

The Contract consists of completion of a new Lock Chamber. Specific features of work under the contract include, but are not limited to the following:

a. Pre-excavate as needed for construction.

b. Install temporary service bridge.

c. Disconnect dam side power while maintaining lock power.

d. Intall flashboards.

e. Construction the in water combination wall.

f. Demolition Upper and Lower Guard walls.

g. Construct foundation drilled shafts, and in the wet monoliths.

Construction of monoliths includes all concrete, reinforcing steel, waterstops, and associated embedded metal items.

h. Installation of drilled shafts, towers and permanent utility bridge.

i. Construct cofferdam.

j. Dewater the coffer area.

k. Construct Middle Wall , Land wall and River Wall Equipment Buildings.

l. Construct Middle Wall Control Shelters.

m. Construct in the dry monoliths. Construction of monoliths includes all concrete, reinforcing steel, waterstops, and associated embedded metal items.

n. Furnish and install filling and emptying valves, bulkheads and related features.

o. Install Construction Instrumentation.

SECTION 01 11 13.00 08 Page 2

p. Demolition of original River Wall and Fixed Crest Weir.

q. Excavate alluvium and rock for emptying and filling culverts.

r. Construct River Wall facing.

s. Construct upper miter sill and bulkhead sill.

t. Construct emptying and filling culverts.

u. Construct lower miter/bulkhead sill.

v. Furnish and install miter gates and related features including.

w. Construct chamber floor.

x. Flood the coffer area.

y. Remove cofferdam.

z. Install electrical, mechanical and plumbing systems for lock and verify operation.

aa. Install handrails, and top of wall features and waterway signs on lock structure.

bb. Install permanent instrumentation.

cc. Flood River Chamber area.

dd. Construction of Middle wall bull nose cell.

ee. Complete Upper and Lower Guard Walls, including structural and electrical features.

ff. Test fit of existing Stoplogs.

gg. Install waterway signs upstream and downstream of the lock.

hh. Install upstream dikes.

ii. Install downstream dikes.

jj. Demolition of temporary downstream bridge.

kk. Construct downstream transition wall.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

NOT USED

-- End of Section --

SECTION 01 11 13.00 08 Page 3

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 08

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 SINGLE JOB PAYMENT ITEMS

1.3.1 Reimbursement For Actual Performance And Payment Bond Premiums

1.3.2 Mobilization and Prepatory Work

1.3.2.1 Payment

1.3.2.2 Unit of Measure

1.3.2.3 Payment Item (s)

1.3.3 Demobilization

1.3.3.1 Payment

1.3.3.2 Unit of Measure

1.3.3.3 Payment Item (s)

1.3.4 Exploratory Program

1.3.4.1 Payment

1.3.4.2 Unit of Measure

1.3.4.3 Payment Item (s)

1.3.5 Instrumentation Installation

1.3.5.1 Payment

1.3.5.2 Unit of Measure

1.3.5.3 Payment Item (s)

1.3.6 Relocate Government Trailer

1.3.6.1 Payment

1.3.6.2 Unit of Measure

1.3.6.3 Payment Item (s)

1.3.7 Develop Data Management System

1.3.7.1 Payment

1.3.7.2 Unit of Measure

1.3.7.3 Payment Item (s)

1.3.8 Demolition of Existing Lock Structure

1.3.8.1 Payment

1.3.8.2 Unit of Measure

1.3.8.3 Payment Items

1.3.9 Demolition

1.3.9.1 Payment

1.3.9.2 Unit of Measure

1.3.9.3 Payment Items

1.3.10 Underwater Excavation

1.3.10.1 Payment

1.3.10.2 Unit of Measure

1.3.10.3 Payment Items

1.3.11 Remove Derrick Stone

1.3.11.1 Payment

1.3.11.2 Unit of Measure

1.3.11.3 Payment Items

SECTION 01 22 00.00 08 Page 1

1.3.12 Install Flashboards

1.3.12.1 Payment

1.3.12.2 Payment Item (s)

1.3.12.3 Unit of Measure

1.3.13 Removal of existing river chamber floor pavers

1.3.13.1 Payment

1.3.13.2 Unit of Measure

1.3.13.3 Payment Items

1.3.14 Removal and Salvage Filling and Emptying System

1.3.14.1 Payment

1.3.14.2 Unit of Measure

1.3.14.3 Payment Items

1.3.15 Port Closures

1.3.15.1 Payment

1.3.15.2 Unit of Measure

1.3.15.3 Payment Item

1.3.16 Temporary Service Bridge

1.3.16.1 Payment

1.3.16.2 Unit of Measure

1.3.16.3 Payment Item

1.3.17 Demolition of Sills

1.3.17.1 Payment

1.3.17.2 Unit of Measure

1.3.17.3 Payment Items

1.3.18 Miter Gate Removal

1.3.18.1 Payment

1.3.18.2 Unit of Measure

1.3.18.3 Payment Items

1.3.19 Cofferdams and Closures

1.3.19.1 Payment

1.3.19.2 Unit of Measure

1.3.19.3 Payment Items

1.3.20 Cofferdam and Chamber Dewatering

1.3.20.1 Payment

1.3.20.2 Unit of Measure

1.3.20.3 Payment Items

1.3.21 New Stair Tower

1.3.21.1 Payment

1.3.21.2 Unit of Measure

1.3.21.3 Payment Items

1.3.22 Permanent Utility Bridge

1.3.22.1 Payment

1.3.22.2 Unit of Measure

1.3.22.3 Payment Item

1.3.23 Middle Wall Control Shelters

1.3.23.1 Payment

1.3.23.2 Unit of Measure

1.3.23.3 Payment Items

1.3.24 Buildings

1.3.24.1 Payment

1.3.24.2 Unit of Measure

1.3.24.3 Payment Items

1.3.25 Construct Chamber Culverts

1.3.25.1 Payment

1.3.25.2 Unit of Measure

1.3.25.3 Payment Items

1.3.26 Fabricate and Deliver Miter Gates

1.3.26.1 Payment

1.3.26.2 Unit of Measure

SECTION 01 22 00.00 08 Page 2

1.3.26.3 Payment Item (s)

1.3.27 Fabricate and Deliver Miter Gate Appurtenances

1.3.27.1 Payment

1.3.27.2 Unit of Measure

1.3.27.3 Payment Item (s)

1.3.28 Installation of Sill Seal Angle, Wall Quoin Posts, Pintle

Base and Pintle

1.3.28.1 Payment

1.3.28.2 Unit of Measure

1.3.28.3 Payment Items

1.3.29 Miscellaneous Metals

1.3.29.1 Payment

1.3.29.2 Unit of Measure

1.3.29.3 Payment Items

1.3.30 Piping Systems

1.3.30.1 Payment

1.3.30.2 Unit of Measure

1.3.30.3 Payment Item

1.3.31 Electrical Work

1.3.31.1 Payment

1.3.31.2 Unit of Measure

1.3.31.3 Payment Item

1.3.32 Intake Screen Assemblies

1.3.32.1 Payment

1.3.32.2 Unit of Measure

1.3.32.3 Payment Item

1.3.33 Removal of Protection Cell in Navigation Chanel

1.3.33.1 Payment

1.3.33.2 Unit of Measure

1.3.33.3 Payment Items

1.3.34 Replace Derrick Stone

1.3.34.1 Payment

1.3.34.2 Unit of Measure

1.3.34.3 Payment Item (s)

1.3.35 Tow Haulage System

1.3.35.1 Payment

1.3.35.2 Unit of Measure

1.3.35.3 Payment Item

1.3.36 Jib Crane

1.3.36.1 Payment

1.3.36.2 Unit of Measure

1.3.36.3 Payment Item

1.3.37 Guard Wall Precast Items

1.3.37.1 Payment

1.3.37.2 Unit of Measure

1.3.37.3 Payment Items

1.3.38 Construction of Retaining Wall

1.3.38.1 Payment

1.3.38.2 Unit of Measure

1.3.38.3 Payment Items

1.3.39 Floating Mooring Bitt Anchorages

1.3.39.1 Payment

1.3.39.2 Unit of Measure

1.3.39.3 Payment Items

1.3.40 Handrail

1.3.40.1 Payment

1.3.40.2 Unit of Measure

1.3.40.3 Payment Items

1.3.41 On Site Painting

SECTION 01 22 00.00 08 Page 3

1.3.41.1 Payment

1.3.41.2 Unit of Measure

1.3.41.3 Payment Items

1.3.42 Construction of Transition Wall

1.3.42.1 Payment

1.3.42.2 Unit of Measure

1.3.42.3 Payment Items

1.3.43 Safety Critical Waterway Signs

1.3.43.1 Payment

1.3.43.2 Unit of Measure

1.3.43.3 Payment Items

1.3.44 Test Fitting of Stoplogs

1.3.44.1 Payment

1.3.44.2 Unit of Measure

1.3.44.3 Payment Item

1.3.45 Commissioning

1.3.45.1 Payment

1.3.45.2 Unit of Measure

1.3.45.3 Payment Item

1.3.46 Site Restoration

1.3.46.1 Payment

1.3.46.2 Unit of Measure

1.3.46.3 Payment Item (s)

1.3.47 Preparation of Final As-Built Drawings

1.3.47.1 Payment

1.3.47.2 Unit of Measure

1.4 UNIT PRICE PAYMENT ITEMS

1.4.1 Digital Progress Images

1.4.1.1 Payment

1.4.1.2 Measurement

1.4.1.3 Unit of Measure

1.4.1.4 Payment Items

1.4.2 Maintain Government Facilities and Government Access

1.4.2.1 Payment

1.4.2.2 Measurement

1.4.2.3 Unit of Measure

1.4.2.4 Payment Items

1.4.3 Instrumentation Monitoring Program

1.4.3.1 Payment

1.4.3.2 Measurement

1.4.3.3 Unit of Measure

1.4.3.4 Payment Items

1.4.4 Maintaining Data Management System

1.4.4.1 Payment

1.4.4.2 Measurement

1.4.4.3 Unit of Measure

1.4.4.4 Payment Items

1.4.5 Environmental Compliance Measurement, Sampling, Testing and

Reporting

1.4.5.1 Payment

1.4.5.2 Measurement

1.4.5.3 Unit of Measure

1.4.5.4 Payment Items

1.4.6 Underwater Excavation

1.4.6.1 Payment

1.4.6.2 Measurement

1.4.6.3 Unit of Measure

1.4.6.4 Payment Items

1.4.7 Timber Pile Removal

SECTION 01 22 00.00 08 Page 4

1.4.7.1 Payment

1.4.7.2 Measurement

1.4.7.3 Unit of Measure

1.4.7.4 Payment Item (s)

1.4.8 Jet Grouting

1.4.8.1 Payment

1.4.8.2 Measurement

1.4.8.3 Unit of Measure

1.4.8.4 Payment Items

1.4.9 Combination wall Sheet and Pipe Piles

1.4.9.1 Payment

1.4.9.2 Measurement

1.4.9.3 Unit of Measure

1.4.9.4 Payment Items

1.4.10 Combination Wall King Piles

1.4.10.1 Payment

1.4.10.2 Measurement

1.4.10.3 Unit of Measure

1.4.10.4 Payment Item

1.4.11 Combination Wall Alluvium Excavation and Rock Sockets

1.4.11.1 Payment

1.4.11.2 Measurement

1.4.11.3 Unit of Measure

1.4.11.4 Payment Item

1.4.12 Combination Wall Concrete Infill

1.4.12.1 Payment

1.4.12.2 Measurement

1.4.12.3 Unit of Measure

1.4.12.4 Payment Items

1.4.13 Drilled Shafts

1.4.13.1 Payment

1.4.13.2 Measurement

1.4.13.3 Unit of Measure

1.4.13.4 Payment Items

1.4.14 Pipe Piles

1.4.14.1 Payment

1.4.14.2 Measurement

1.4.14.3 Unit of Measure

1.4.14.4 Payment Items

1.4.15 Portland Cement

1.4.15.1 Payment

1.4.15.2 Measurement

1.4.15.3 Unit of Measure

1.4.15.4 Payment Items

1.4.16 Fly Ash

1.4.16.1 Payment

1.4.16.2 Measurement

1.4.16.3 Unit of Measure

1.4.16.4 Payment Items

1.4.17 Blast Furnace Slag

1.4.17.1 Payment

1.4.17.2 Measurement

1.4.17.3 Unit of Measure

1.4.17.4 Payment Items

1.4.18 Silica Fume

1.4.18.1 Payment

1.4.18.2 Measurement

1.4.18.3 Unit of Measure

1.4.18.4 Payment Items

SECTION 01 22 00.00 08 Page 5

1.4.19 Production, Transportation and Placement of Concrete

1.4.19.1 Payment

1.4.19.2 Measurement

1.4.19.3 Unit of Measure

1.4.19.4 Payment Items

1.4.20 Design, Production, Transportation and Placement of Concrete

1.4.20.1 Payment

1.4.20.2 Measurement

1.4.20.3 Unit of Measure

1.4.20.4 Payment Items

1.4.21 Dental Excavation and Dental Concrete

1.4.21.1 Payment

1.4.21.2 Measurement

1.4.21.3 Unit of Measure

1.4.21.4 Payment Items

1.4.22 Steel Piling

1.4.22.1 Payment

1.4.22.2 Measurement

1.4.22.3 Unit of Measure

1.4.22.4 Payment Items

1.4.23 Rock Fill

1.4.23.1 Payment

1.4.23.2 Measurement

1.4.23.3 Unit of Measure

1.4.24 Aggregate Cap

1.4.24.1 Payment

1.4.24.2 Measurement

1.4.24.3 Unit of Measure

1.4.25 Monthly Dewatering

1.4.25.1 Payment

1.4.25.2 Measurement

1.4.25.3 Unit of Measure

1.4.25.4 Payment Items

1.4.26 Drill Weep Holes

1.4.26.1 Payment

1.4.26.2 Measurement

1.4.26.3 Unit of Measure

1.4.26.4 Payment Items

1.4.27 Waterstops

1.4.27.1 Payment

1.4.27.2 Measurement

1.4.27.3 Unit of Measure

1.4.27.4 Payment Items

1.4.28 Furnish and Install Filling and Emptying Valves

1.4.28.1 Payment

1.4.28.2 Measurement

1.4.28.3 Unit of Measure

1.4.28.4 Payment Items

1.4.29 Fabricate and Deliver Bulkheads

1.4.29.1 Payment

1.4.29.2 Measurement

1.4.29.3 Unit of Measure

1.4.29.4 Payment Items

1.4.30 Furnish and Install Gate Operating Machinery

1.4.30.1 Payment

1.4.30.2 Measurement

1.4.30.3 Unit of Measure

1.4.30.4 Payment Item

1.4.31 Miter Gates

SECTION 01 22 00.00 08 Page 6

1.4.31.1 Payment

1.4.31.2 Measurement

1.4.31.3 Unit of Measure

1.4.31.4 Payment Items

1.4.32 Wall Armor

1.4.32.1 Payment

1.4.32.2 Measurement

1.4.32.3 Unit of Measure

1.4.32.4 Payment Items

1.4.33 Corner Protection

1.4.33.1 Payment

1.4.33.2 Measurement

1.4.33.3 Unit of Measure

1.4.33.4 Payment Items

1.4.34 Corner Castings

1.4.34.1 Payment

1.4.34.2 Measurement

1.4.34.3 Unit of Measure

1.4.34.4 Payment Items

1.4.35 Floating Mooring Bitts

1.4.35.1 Payment

1.4.35.2 Measurement

1.4.35.3 Unit of Measure

1.4.35.4 Payment Items

1.4.36 Line Hooks and Guards

1.4.36.1 Payment

1.4.36.2 Measurement

1.4.36.3 Unit of Measure

1.4.36.4 Payment Items

1.4.37 Check Posts

1.4.37.1 Payment

1.4.37.2 Measurement

1.4.37.3 Unit of Measure

1.4.37.4 Payment Items

1.4.38 Riprap

1.4.38.1 Payment

1.4.38.2 Measurement

1.4.38.3 Unit of Measure

1.4.38.4 Payment Item (s)

1.4.39 Deformed Steel Bars for Concrete Reinforcement

1.4.39.1 Payment

1.4.39.2 Measurement

1.4.39.3 Unit of Measure

1.4.39.4 Payment Item (s)

1.4.40 Bituminous Pavement

1.4.40.1 Payment

1.4.40.2 Measurement

1.4.40.3 Unit of Measure

1.4.40.4 Payment Item

1.4.41 Ladders

1.4.41.1 Payment

1.4.41.2 Measurement

1.4.41.3 Unit of Measure

1.4.41.4 Payment Item

1.4.42 Rock Dikes

1.4.42.1 Payment

1.4.42.2 Measurement

1.4.42.3 Unit of Measure

1.4.42.4 Payment Items

SECTION 01 22 00.00 08 Page 7

1.4.43 Dewater and Cleanup of Cofferdam Post Flood Event

1.4.43.1 Payment

1.4.43.2 Measurement

1.4.43.3 Unit of Measure

1.4.43.4 Payment Items

1.4.44 Government Directed Evacuation of Cofferdam

1.4.44.1 Payment

1.4.44.2 Measurement

1.4.44.3 Unit of Measure

1.4.44.4 Payment Items

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 CONTRACT COST BREAKDOWN

-- End of Section Table of Contents --

SECTION 01 22 00.00 08 Page 8

SECTION 01 22 00.00 08

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Weight Certificates

1.3 SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the SCHEDULE and described below.

All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.3.1 Reimbursement For Actual Performance And Payment Bond Premiums

Payment for reimbursement for actual performance and payment bond premiums will be made as specified in 00 70 00 CONDITIONS OF THE CONTRACT, clause

PAYMENT FOR PERFORMANCE AND PAYMENT BONDS.

0001 REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS

SECTION 01 22 00.00 08 Page 9

1.3.2 Mobilization and Prepatory Work

1.3.2.1 Payment

Payment will be made for costs associated with mobilization of plant equipment for work preparatory to beginning actual construction of the cutoff wall, as defined in Section 00 73 00 SUPPLEMENTARY CONDITIONS, paragraph DFARS 252.236-7003 PAYMENT FOR MOBILIZATION AND PREPARATORY WORK.

The Contractor shall provide supporting documentation for payment of each item in accordance with Section 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph DFARS 252.236-7003 PAYMENT FOR MOBILIZATION AND PREPARATORY WORK, and shall not receive payment until the Contracting Officer has receipts to prove that payment for all items claimed have been validated.

All construction plant, material, equipment, and the mobilization and preparatory work shall be performed and determined to be suitable for efficiency in performing the work before payment is made.

Payment for mobilization and preparatory work will include, but not limited to:

a. Mobilization and setup of Contractor-furnished plant and equipment

b. Furnishing and setup of temporary Contractor facilities including offices, storage, and testing facilities (including furnishing and validating QC/QA Lab)

d. Construction of temporary access and haul roads

e. Construction of slurry ponds, and associated facilities

f. Development of laydown areas

g. Initial survey and mapping

h. Construction of environmental protection and temporary storm water pollution control features and instrumentation

i. Other site development needed for the job prior to construction of the new lock chamber and other associated features

j. Disposal of any necessary materials associated with mobilization and preparatory work in accordance with Section 01 74 19.00 08 DISPOSAL

k. Development of major submittals in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Payment for development of a submittal will not be made until approval of the submittal by the Contrating Officer or designated representative.

1.3.2.2 Unit of Measure

Unit of measure: Job.

1.3.2.3 Payment Item (s)

0004 MOBILIZATION AND PREPATORY WORK

1.3.3 Demobilization

1.3.3.1 Payment

Payment will be made for costs associated with removal and demobilization of plant, equipment and temporary facilities upon completion of construction of the required features. Payment shall include disassembly and removal from the site of plant, equipment and facilities and transportation of excess and unused materials. Payment shall also include removal of the three Government field office trailers. Payment for restoration of work areas will be made as specified for Site Restoration

SECTION 01 22 00.00 08 Page 10

1.3.3.2 Unit of Measure

Unit of measure: Job.

1.3.3.3 Payment Item (s)

0005 DEMOBILIZATION

1.3.4 Exploratory Program

1.3.4.1 Payment

Payment will as specified in Section 02 32 00 FOUNDATION VERIFICATION DRILLING, SAMPLING, AND RECORDING and be made for costs associated with operations necessary for all exploratory drilling the contractor has to conduct prior to construction.

1.3.4.2 Unit of Measure

Unit of measure: Job.

1.3.4.3 Payment Item (s)

0009 EXPLORATORY PROGRAM

1.3.5 Instrumentation Installation

1.3.5.1 Payment

Payment will be made for costs associated with installation of instrumentation equipment, as specified in Section 13 50 00 INSTRUMENTATION PROGRAM. Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs to install all required monitoring instrumentation.

1.3.5.2 Unit of Measure

Unit of measure: Job.

1.3.5.3 Payment Item (s)

0010 INSTRUMENTATION INSTALLATION

1.3.6 Relocate Government Trailer

1.3.6.1 Payment

Payment will be made for costs associated with operations necessary for relocation of the existing single wide government trailer that is already on site. Payment will constitute full compensation all labor, equipment, materials and supplies required to move the trailer, reconnect electrical and telecom lines to the trailer.

1.3.6.2 Unit of Measure

Unit of measure: Job.

SECTION 01 22 00.00 08 Page 11

1.3.6.3 Payment Item (s)

0012 RELOCATE GOVERNMENT TRAILER

1.3.7 Develop Data Management System

1.3.7.1 Payment

Payment will be made for costs associated with developing the data management system, as specified in Section 01 31 00.00 08 DATA MANAGEMENT.

Related costs include development of the enterprise database, uploading all existing data into the data management system, and transferring the automated data acquisition system into the enterprise database.

1.3.7.2 Unit of Measure

Unit of measure: Job.

1.3.7.3 Payment Item (s)

0013 DEVELOP DATA MANAGEMENT SYSTEM

1.3.8 Demolition of Existing Lock Structure

1.3.8.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the features as indicated and specified to the extent shown, and to protect adjacent features to remain. Payment shall also include all costs for transporting and disposal of all debris. Payment shall include all advanced planning and engineering and all other incidental costs to perform the demolition, as shown on the contract drawings and specified. The individual demolition items are defined as follows:

a. REMOVE FOOTBRIDGE SPAN includes termination of existing electrical and communications lines, modifying and recapping the existing compressed air line, removal of the footbridge from the original Middle Wall support tower to Dam Pier 1, and removal of support beams as indicated.

b. DEMOLITION OF RIVER WALL BUILDING includes removal of the River Wall building and all associated utilities.

1.3.8.2 Unit of Measure

Unit of Measure: JOB

1.3.8.3 Payment Items

0016 REMOVE AND DISPOSE EXISTING FOOTBRIDGE

0039 DEMOLITION OF RIVER WALL BUILDING

1.3.9 Demolition

1.3.9.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the features

SECTION 01 22 00.00 08 Page 12 as indicated and specified in Section 02 41 00.00 08 DEMOLITION and to the extent shown, and to protect adjacent features to remain. Payment shall also include all costs for removal of the rubble from the river and transporting and disposal of all debris per specification 01 74 19.00 08 DISPOSAL. Payment shall include all advanced planning and engineering and all other incidental costs to perform the demolition, as shown on the contract drawings and specified. Payment shall also include removal of miscellaneous metals, steel H-piles, and steel sheet piling.

1.3.9.2 Unit of Measure

Unit of Measure: Job.

1.3.9.3 Payment Items

0017 DEMOLITION OF FIXED CREST WEIR

0018 DEMOLITION OF APRON

0032 DEMOLITION OF UPPER GUARD WALL EXTENSION CELLS

0033 DEMOLITION OF UPPER GUARD WALL

0034 DEMOLITION OF LOWER GUARD WALL

0040 DEMOLITION OF RIVER WALL

0044 DEMOLITION OF LOCK FLOOR CONCRETE

1.3.10 Underwater Excavation

1.3.10.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs for performing the work including:

excavating; transportation and disposal of material as described in 31 23 05 MASS EXCAVATION, control of effluents from the Contractor's operations; performing measurements for payment; and all other incidental costs in connection with these aspects of the work under this contract.

1.3.10.2 Unit of Measure

Unit of Measure: Job.

1.3.10.3 Payment Items

0020 REMOVAL OF GRANUAL FILL UNDER APRON

1.3.11 Remove Derrick Stone

1.3.11.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs for performing the excavating of derrick stone; transportation and temporarily storing of excavated materials, control of effluents from the Contractor's operations;

performing measurements for payment; and all other incidental costs in connection with these aspects of the work under this contract.

1.3.11.2 Unit of Measure

Unit of Measure: Job.

SECTION 01 22 00.00 08 Page 13

1.3.11.3 Payment Items

0021 REMOVE DERRICK STONE

1.3.12 Install Flashboards

1.3.12.1 Payment

Payment will be made for resuse of existing flashboards or the costs associated with purchasing all supplies, as the contractor chooses, and installation of flashboards on top of fixed crest portion of the dam and removal upon completion of work and placement in Government designated area on-site.

1.3.12.2 Payment Item (s)

0022 INSTALLATION OF FLASHBOARDS

1.3.12.3 Unit of Measure

Unit of measure: job.

1.3.13 Removal of existing river chamber floor pavers

1.3.13.1 Payment

Payment for this items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the features as specified and as shown on the contract drawings.

1.3.13.2 Unit of Measure

Unit of Measure: JOB

1.3.13.3 Payment Items

0031 REMOVAL OF EXISTING RIVER CHAMBER FLOOR PAVERS

1.3.14 Removal and Salvage Filling and Emptying System

1.3.14.1 Payment

Payment for this items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the features as specified and as shown on the contract drawings.

1.3.14.2 Unit of Measure

Unit of Measure: JOB

1.3.14.3 Payment Items

0036 REMOVE AND SALVAGE FILLING AND EMPTYING SYSTEM

1.3.15 Port Closures

1.3.15.1 Payment

Payment for construction of the port closures at original Middle Wall

SECTION 01 22 00.00 08 Page 14 shall constitute full compensation for all labor, equipment, material and supply costs for shop and field fabrications; performing measurements for payment; testing of materials and products incorporated into the work; all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract.

1.3.15.2 Unit of Measure

Unit of measure: JOB.

1.3.15.3 Payment Item

0035 CLOSE UPPER AND LOWER FILLING AND EMPTYING PORTS

1.3.16 Temporary Service Bridge

1.3.16.1 Payment

Payment for contractor designed temporary service bridge shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install, test and remove at end of use, these items as shown on the contract drawings and specified, including all metalwork fabrication, including cable trays and pipe supports, shop assembly, delivery and field erection. These payments shall also include all costs required for testing of materials and products incorporated into the work;

required shop and field tests; galvanizing or metallizing; painting;

temporary scaffolds and supports; all advanced planning and engineering;

and all other incidental costs to furnish and install the items, as shown on the contract drawings and specified.

1.3.16.2 Unit of Measure

Unit of measure: Job.

1.3.16.3 Payment Item

0038 TEMPORARY DOWNSTREAM BRIDGE

1.3.17 Demolition of Sills

1.3.17.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to demolish and remove the upper gate sill, lower gate sill and needle dam sill as specified in Section 02 41 00.00 08 DEMOLITION and to the extent shown, and to protect adjacent features to remain. Payment shall also include all costs for removal of the rubble from the river and transporting and disposal of all debris per specification 01 74 19.00 08 DISPOSAL. Payment shall include all advanced planning and engineering and all other incidental costs to perform the demolition, as shown on the contract drawings and specified. Payment shall also include removal of miscellaneous metals, steel H-piles, and steel sheet piling.

1.3.17.2 Unit of Measure

Unit of Measure: Job.

SECTION 01 22 00.00 08 Page 15

1.3.17.3 Payment Items

0046 DEMOLITION OF SILLS

1.3.18 Miter Gate Removal

1.3.18.1 Payment

Payment for these items shall also include costs for demolition and disposal of demolished materials; all advanced planning and engineering;

and all other incidental costs in connection with removing the specified items for closure of the existing Land Chamber.

1.3.18.2 Unit of Measure

Unit of measure: Job.

1.3.18.3 Payment Items

0042 REMOVE AND DISPOSE UPPER MITER GATE

0043 REMOVE AND DISPOSE LOWER MITER GATE

1.3.19 Cofferdams and Closures

1.3.19.1 Payment

Payment for construction of these items shall constitute full compensation for all labor, equipment, material and supply costs for the sheet pile cells as shown on the contract drawings and as specified. Payments shall include costs for guide templates; frames and supports to stabilize the piling during erection operations; removal of obstructions; sheet pile materials and installation; pile removal and redriving; excavation and granular fill; grout; and all other incidental costs in connection with these aspects of the work under this contract. Payment for these items shall also include costs for shop and field fabrications; performing measurements for payment; testing of materials and products incorporated into the work; all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract.

Payment for removal of these items, where applicable, shall constitute full compensation for all labor, equipment, material and supply costs for removing and disposing of cell fill; removing, transporting and stockpiling of cell fill, removal and disposal of concrete, miscellaneous metal items and other materials, and all other incidental costs in connection with these aspects of the work under this contract.

1.3.19.2 Unit of Measure

Unit of measure: Job.

1.3.19.3 Payment Items

0070 COFFERDAM CELL DEWATERING SYSTEM

0081 CONSTRUCT COFFERDAM SPLASH PAD AND FLOOD WAY

0115 DEMOLITION OF COFFERDAM

SECTION 01 22 00.00 08 Page 16

1.3.20 Cofferdam and Chamber Dewatering

1.3.20.1 Payment

Payment for initial dewatering shall constitute full compensation for all labor, equipment, material and supply costs for the initial dewatering the cofferboxes, cofferdam, or chamber and continuous dewatering of these areas, including installing, removing, transporting, and storing valve and chamber maintenance bulkheads, as shown on the contract drawings and specified in Section 31 45 00 DIVERSION AND CARE OF WATER. Payment for these items shall also include costs for all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract.

1.3.20.2 Unit of Measure

Unit of measure: Job.

1.3.20.3 Payment Items

0072 INITIAL UNWATER COFFERDAM

1.3.21 New Stair Tower

1.3.21.1 Payment

Payment for the new stair towers shall constitute full compensation for all labor, equipment, material and supply costs to construct the stair towers as shown on plans and specified.

1.3.21.2 Unit of Measure

Unit of measure: Job.

1.3.21.3 Payment Items

0079 INSTALL NEW PERMANENT STAIR TOWERS

1.3.22 Permanent Utility Bridge

1.3.22.1 Payment

Payment for permanent utility bridge shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install and test these items as shown on the contract drawings and specified, including all metalwork fabrication, including cable trays and pipe supports, shop assembly, delivery and field erection. These payments shall also include all costs required for testing of materials and products incorporated into the work; required shop and field tests;

galvanizing or metallizing; painting; temporary scaffolds and supports;

all advanced planning and engineering; and all other incidental costs to furnish and install the items, as shown on the contract drawings and specified. Payment for foundation and bridge towers is paid elsewhere.

1.3.22.2 Unit of Measure

Unit of measure: Job.

SECTION 01 22 00.00 08 Page 17

1.3.22.3 Payment Item

0080 INSTALL PERMANENT UTILITY BRIDGE

1.3.23 Middle Wall Control Shelters

1.3.23.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to construct the Middle Wall Control Shelters

a. Payment for CONTROL SHELTERS shall include the structure, walls, floors, roofing, stairways, heating and ventilating systems for the Control Shelters, as specified in 23 82 46.00 40 ELECTRIC UNIT HEATERS, and all other costs to provide completed buildings, as shown on drawings. Payment for electrical equipment will be included in the Job price for ELECTRICAL WORK.

1.3.23.2 Unit of Measure

Unit of measure: Job.

1.3.23.3 Payment Items

0087 MIDDLE WALL CONTROL SHELTERS STRUCTURES

1.3.24 Buildings

1.3.24.1 Payment

Payment for these items shall constitute full compensation for all labor, equipment, material and supply costs to construct the equipment buildings and service building. The work shall include, but not be limited to, the structure, walls, floors, roofing, sun control devices, stairways, railings, embedded conduits, piping, interior finishes, furnishings and equipment and interior electrical and mechanical work, package lift station and force main (including the portion of the line outside the building, across the footbridges to the existing connection stub-up above the slope paving), and exterior lighting and wiring, and all other costs to provide a completed building.

1.3.24.2 Unit of Measure

Unit of measure: Job.

1.3.24.3 Payment Items

0084 MIDDLE WALL EQUIPMENT BUILDING

0085 LAND WALL EQUIPMENT BUILDING

0086 RIVER WALL EQUIPMENT BUILDING

1.3.25 Construct Chamber Culverts

1.3.25.1 Payment

Payment for the new chamber culverts shall constitute full compensation for all labor, equipment, material and supply costs to construct the culverts as shown on plans and specified.

SECTION 01 22 00.00 08 Page 18

1.3.25.2 Unit of Measure

Unit of measure: Job.

1.3.25.3 Payment Items

0089 CONSTRUCT CHAMBER CULVERTS

1.3.26 Fabricate and Deliver Miter Gates

1.3.26.1 Payment

Payment shall constitute full compensation for all labor, equipment, material and supply costs to fabricate and deliver the new miter gate…