Middlefield Sidewalk Connectivity Grant RFP for Construction_Final.pdf
PDF 2 MB Posted
- Attached to
- Town Campus Sidewalk Connections Design
- Solicitation number
- 39247
- Issued by
- Middlesex County, Connecticut
About this file
This Request for Proposals is issued by the Town of Middlefield, Connecticut for engineering and design services to support sidewalk connectivity improvements within the Town Campus along Main Street (Route 157) and Jackson Hill Road. The project, designated as State Project No. 0170-3513GR, requires qualified firms to provide comprehensive surveying, civil engineering, traffic analysis, geometric roadway design, and related permitting services. Deliverables include construction-level engineering drawings, specifications, cost estimates, contract documents, property maps, street line maps, and bid documents suitable for public bidding. The Town requires the selected consultant to assign a Professional Engineer licensed by Connecticut to manage and oversee the project, and services must follow guidelines established in the Community Connectivity Grant Program (CCGP) Project Administration Guide. Electronic proposals are due October 21, 2026 at 12:00 p.m., with questions accepted until October 14, 2026 at 4:00 p.m. Proposals must remain valid for a minimum of 90 days from submission. No bidders conference or site visit is specified in the document, though review meetings with the Town and potentially a public information meeting are anticipated.
Construction phase funding of $581,256.00 has been secured through the Community Connectivity Grant Program, with the Town having executed a Commitment to Fund Letter with the Connecticut Department of Transportation. The Town reserves the right to reject any submissions and award the contract as deemed in its best interest. Selected consultants must demonstrate experience with CCGP funding, roadway design, Connecticut DOT coordination, utility coordination, right-of-way investigation and acquisition, and public outreach. Proof of Commercial General Liability Insurance with a minimum limit of One Million Dollars per occurrence and Two Million Dollars aggregate, naming the Town as an additional insured, is required. Submission requirements include a letter of interest with project understanding and improvement suggestions, firm experience documentation, resumes of key professional staff, three professional references, proposed project schedule with availability dates, detailed fee proposals addressing all project elements, subcontractor information, and any additional relevant qualifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 39247_Oct_6_26_solicitation_doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Town of Middlefield
Request for Proposals
Engineering and Design Services
For
Town Campus Sidewalk Connections
Online Submissions Due: October 21, 2026, at 12:00 p.m.
I. Introduction The Town of Middlefield (“Town”) is seeking to engage the services of a qualified firm or firms to provide survey, design, plan development, and permitting services related to State Project
No. 0170-3513GR. Construction phase funding has been secured through the Community
Connectivity Grant Program (CCGP) in the amount of $581,256.00 related to the construction of sidewalk installation within the Middlefield Town Campus, along Main Street (Route 157) and
Jackson Hill Road. The Town has recently executed a Commitment to Fund Letter with the CT
Department of Transportation. The Town now wishes to engage qualified firm(s) for the purpose of developing construction-level plan documents which will be submitted to CTDOT for review and used for construction of the improvements by a future contractor.
II. Scope of Required Services The Scope of Services is generally defined as noted below but is subject to change and final negotiation.
The selected consultant will provide comprehensive surveying and engineering services
(including civil, traffic, geotechnical etc.) for the preparation of complete engineering drawings, specifications, estimates, contract documents, property maps, street line maps and related services.
The selected firm will provide the Town of Middlefield with expertise in performing other functions, such as traffic analysis, geometric roadway design, plans, and permit applications.
The selected firm will have sufficient staff to ensure prompt delivery of services and completion of tasks assigned. The selected firm must assign a Professional Engineer licensed by the State of Connecticut to be responsible for the management and design of the project.
The scope of work shall follow the CCGP Project Administration Guide.
Firms submitting proposals are required to include information on how the Scope of Services will be addressed.
At a minimum, the selected firm will be expected to:
1. Review all necessary documentation related to the project including correspondence from the Town and CT DOT and project concept plans.
2. Perform right-of-way and topographic surveys of the project area.
3. Develop project level plans and specifications, in compliance with all CT DOT and CCGP
Administrative Guidelines using available survey data, information provided by the Town and the DOT endorsed concept plans.
4. Prepare a detailed cost estimate using the developed project plans.
5. Act as a Town representative for any necessary Right of Way acquisitions.
6. Act as a Town representative for any necessary CT DOT permit.
7. Act as a Town representative related to the submission, review, and revision of the submitted plans.
8. Maintenance and protection of traffic, if required.
9. Act as a Town Representative for all required Regulatory Approvals if needed.
10. Submit one set of final paper plans, an original copy of any other agency permits along with one mylar of the contract drawings for public bidding by the Town.
11. Prepare the bid and contract documents for the project.
12. Attend review meetings with the Town.
13. Prepare for, and attend a public information meeting, if necessary.
14. Review project bids received by the Town for accuracy and check references. Report to the
Town on a recommendation for selecting a contractor.
III. Submission Requirements Interested firms should submit:
1. Letter of interest, to include:
a. General information on the firm and any proposed subconsultants.
b. A brief narrative to demonstrate the firm’s understanding of the project.
c. A description of an improvement or unique feature or suggestion that if incorporated into the process, would improve the project overall.
2. Firm experience with similar projects and/or deliverables, including:
a. CCGP funding program
b. Roadway Design
c. CT DOT Coordination
d. Eversource/utility Coordination
e. Right of Way Investigation, impacts and acquisition.
f. Public Outreach
3. Resumes of key staff to participate in the project to demonstrate that all work performed under this contract will be at the direction of Professional Engineers and Licensed
Surveyors.
4. The names, titles, addresses and telephone or email addresses of three references who have been recipients of the firm’s services within the last three years.
5. Proposed Project Schedule including the Firm’s soonest date of availability.
6. Fee proposal which addresses all elements of the project to be performed and in sufficient detail to include the specific tasks related to the proposed project schedule.
7. A listing of any proposed subcontractors to be used for this work and the type of services the proposed subcontractor is proposed to perform.
8. Proof of Commercial General Liability Insurance, including Contractual Liability Insurance providing for a total limit of One Million Dollars ($1,000,000) for all damages arising out of bodily injuries to or death of all persons in any one accident or occurrence, and for all damages arising out of injuries to or destruction of property in any one accident or occurrence, and, subject to that limit per accident, a total (or aggregate) limit of Two
Million Dollars ($2,000,000) for all damages arising out of bodily injuries to or death of all persons in all accidents or occurrences and out of injury to or destruction of property during the policy period, naming the Town as an additional insured.
9. Any other information deemed relevant or necessary to adequately address how the respondent will provide the identified Scope of Services.
IV. Information Provided by The Town The following information can be obtained from the Town’s website:
1. CCGP Application and Concept Plans
2. CT DOT Commitment to Fund
3. CCGP Design Guidelines
V. Submissions:
Electronic submissions only will be accepted and must be received by the Town no later than
12:00pm on October 21, 2026. Email submission must go to rnewton@middlefieldct.org.
Questions may be submitted via email to rnewton@middlefieldct.org no later than October 14, 2026 by 4:00 p.m. Responses will be accumulated and posted on the Town’s website.
Proposals must be valid for a minimum of 90 days from the date of submission. Any responses received after 12:00 p.m. on, will not be considered.
VI. Award/Rejection/Other The Town reserves the right to reject any and all submissions, waive informalities, and to recommend the award of a contract as may be in the best interest of the Town. All submissions, materials, documents, etc. submitted in conjunction with the selection process shall become the property of the Town and may be disposed of without notification and shall be considered public information. The applicant selected by the Town shall be expected to comply with all applicable federal, state and local laws and regulations in the performance of services.
mailto:rnewton@middlefieldct.org mailto:rnewton@middlefieldct.org
Jackson H ill R oad
Town Hall
M ai n S tre et
Fire Station
Community/Senior Center
Children's Center
Federated Church
Levi E. Coe Library
Public Works
Public Works
R ou te
Community Garden
654321
B
A
E
D
C
CADD FILE:
DATE:
SCALE:
PROJECT No.:
DESIGNED:
DRAWN:
CHECKED:
SHEET No.:
CT REGISTRATION No.
C COPYRIGHT 2025 NATHAN L. JACOBSON & ASSOCIATES, INC.
ALL RIGHTS RESERVED.
MAY 2025
1"=50'
01020204
01020204SP
GLJ
AJG
BCC
GEOFFREY L. JACOBSON, P.E.
12363
050 50 100
SCALE: 1"=50'
GRAPHIC SCALE
ANY ALTERATIONS TO THIS DRAWING MADE WITHOUT THE EXPRESSED
WRITTEN APPROVAL OF NATHAN L. JACOBSON & ASSOCIATES, INC. WILL BE
AT THE SOLE RISK OF THE PERSON OR FIRM MAKING SUCH UNAUTHORIZED
ALTERATIONS AND NATHAN L. JACOBSON & ASSOCIATES, INC. WILL NEITHER
HAVE NOR ACCEPT ANY LIABILITY OR LEGAL EXPOSURE ARISING FROM SAID
UNAUTHORIZED ALTERATIONS.
MIDDLEFIELD
TOWN CENTER
COMMUNITY
CONNECTIVITY
GRANT PROJECT
TOWN HALL TO
PECKHAM PARK
DATENo. DESCRIPTION
REVISIONS
SIDEWALK PLAN
PHASE 1 & A PORTION
OF FUTURE PHASES
CONCEPT DRAWING
NOT VALID WITHOUT ORIGINAL SEAL
NOTES:
1. Aerial Images from CTECO 2016.
www.nlja.com
86 Main Street P.O. Box 337 Chester, Connecticut 06412-0337
Nathan L. Jacobson & Associates, Inc.
Consulting Civil and Environmental Engineers Since 1972
Tel: (860) 526-9591 Fax: (860) 526-5416
Jacobson
THIS DRAWING IS INTENDED TO BE USED FOR INFORMATION AND REVIEW
PURPOSES ONLY AND IS NOT INTENDED TO BE USED FOR CONSTRUCTION.
C T.
G R
ID
10203040
5' CONCRETE SIDEWALK WITH INTEGRAL CURB, (TYP.)
CURB RAMP WITH DETECTABLE WARNING STRIP, (TYP.)
CONCRETE ISLAND
5' CONCRETE SIDEWALK, (TYP.)
CONNECT TO EXISTING SIDEWALK
PAINTED CROSSWALK, (TYP.)
5' CONCRETE SIDEWALK WITH
INTEGRAL CURB
REMOVE SHRUB
5' CONCRETE SIDEWALK
TYPE "A" RECTANGULAR
RAPID FLASHING BEACON
ADVANCE PEDESTRIAN CROSSWALK SIGN
PAINTED CROSSWALK, (TYP.)
ADVANCE PEDESTRIAN CROSSWALK SIGN
TYPE "A" RECTANGULAR
RAPID FLASHING BEACON
ADVANCE PEDESTRIAN
CROSSWALK SIGN
NEW PAINTED STOP BAR
NEW STOP SIGN
PHASE 1
(C
CGP
PROJE
CT)
PHASE 2
(F
UTURE
PROJE
CT)
ADVANCE PEDESTRIAN CROSSWALK SIGN
NEW PAINTED STOP BAR
NEW STOP SIGN
CURB RAMP WITH DETECTABLE
WARNING STRIP, (TYP.)
CURB RAMP WITH DETECTABLE
WARNING STRIP, (TYP.)
5' CONCRETE SIDEWALK
CURB RAMP WITH DETECTABLE
WARNING STRIP, (TYP.)
TYPE "A" RECTANGULAR
RAPID FLASHING BEACON
I:\
AC
TI
VE
L D
D 2I
\0
4\ dw g\
SP
-1 .d w g, /1
3/
:4 4:
P
M , A ut oC
AD
P
D F
(G en er al
D oc um en ta tio
n) .p c3
| 2025-5 Sheet 1 of 1 Sidewalk Plan Phase 1 |
| Sheets and Views |
| 01020204SP-1-Sheet 1 |
File details come from the government source that posted it. Updated .