Solicitation 47PD0322R0007 Chambersburg SSA Schedule B .xlsx

XLSX spreadsheet 587 KB Posted

Attached to
Solicitation 47PD0322R0007 - Custodial and Related Services in Chambersburg, PA
Solicitation number
MH-001-2022-01-10
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Instructions

Section B
Custodial Services and Prices
Electronic Offer Sheet

The Contractor shall provide all Management, Supervision, Parts, Material, Labor, Supplies, Tools and Equipment for all of the services described in this solicitation. This contract is being solicited as a: one (1) year contract, with four (4) one (1) year option periods, for a potential contract period total of five (5) years. This electronic offer sheet shall be used to document the Contractor’s price to the Government for the required services. Prices are required for all line items contained on this electronic offer sheet.

The quantities specified in the above standard services section of this offer sheet are estimated and are provided for pricing purposes only. The Government may order any of the above standard services as deemed necessary and shall receive the unit price indicated on this offer sheet. The Contractor will be reimbursed at the unit price via a Government credit card or a separate task order.

This offer sheet is in electronic version, a paper copy will not be provided. Ensure you include a price in every yellow shaded area of the Unit Price Column (column F) of the worksheet. Do not insert prices of more than two decimal places (i.e. $2.339), as this will result in rounding errors. Extended amounts on the Roll-Up tab will calculate automatically throughout the worksheet. Ensure you click on each tab and complete all worksheets that comprise the offer sheet. After completion by your firm, print a hardcopy of the entire workbook and submit with your technical proposal.

Option To Extend Services: Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. This includes options under FAR clause 52.217-8, Option to Extend Services, which applies to this solicitation. Evaluation of options under FAR 52.217-8 will be accomplished by using the prices offered for the last option period to determine the price for a 6-month option period, which will be added to the base and other option years to arrive at the total price. Evaluation of options will not obligate the Government to exercise the option(s)

General Services Administration
Custodial and Related Services
Chambersburg SSA

Building 1

Location: Chambersburg SSA
Item NumberDescriptionQuantityUnit of IssueUnit of PriceExtended AmountRecurring Standard Services TotalsNon-Recurring Standard Services Totals
Recurring Standard Services
00001Monthly Price for Facility Cleaning and Related Services: all costs associated with cleaning the structure and related services, including service request response, integrated pest management, annual window cleaning, ect. GSA: Assign costs to PGA11Base Period12Month$ - 0$ - 0Base Period$ - 0Base Period$ - 0
01001Option 112Month$ - 0$ - 0Option 1$ - 0Option 1$ - 0
02001Option 212Month$ - 0$ - 0Option 2$ - 0Option 2$ - 0
03001Option 312Month$ - 0$ - 0Option 3$ - 0Option 3$ - 0
04001Option 412Month$ - 0$ - 0Option 4$ - 0Option 4$ - 0
00002Monthly Price for Trash Separation and Removal including Recycling: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA13.Base Period12Month$ - 0$ - 0
01002Option 112Month$ - 0$ - 0
02002Option 212Month$ - 0$ - 0
03002Option 312Month$ - 0$ - 0
04002Option 412Month$ - 0$ - 0

00003 Monthly Price for Grounds Maintenance Services: all costs related to exterior grounds services including policing. GSA: Assign costs to PGA12.

Base Period12Month$ - 0$ - 0
01003Option 112Month$ - 0$ - 0
02003Option 212Month$ - 0$ - 0
03003Option 312Month$ - 0$ - 0
04003Option 412Month$ - 0$ - 0
00004Monthly Price for Frequently Touched Surface Cleaning ABOVE the 85% occupancy threshold: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA11.Base Period12Month$ - 0
01004Option 112Month$ - 0$ - 0
02004Option 212Month$ - 0$ - 0
03004Option 312Month$ - 0$ - 0
04004Option 412Month$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Non-Recurring Standard Services
00005Price per Square Foot for Carpet Extraction GSA (See section C.15.1): Assign Costs to PGA 11.
Base Period1SF$ - 0$ - 0
01005Option 11SF$ - 0$ - 0
02005Option 21SF$ - 0$ - 0
03005Option 31SF$ - 0$ - 0
04005Option 41SF$ - 0$ - 0
00006Price per Occurrence for Interior Window Washing (See section C.15.2) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01006Option 11Occurrence$ - 0$ - 0
02006Option 21Occurrence$ - 0$ - 0
03006Option 31Occurrence$ - 0$ - 0
04006Option 41Occurrence$ - 0$ - 0
00007Price per Occurrence for Exterior Window Washing (See section C.15.3) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01007Option 11Occurrence$ - 0$ - 0
02007Option 21Occurrence$ - 0$ - 0
03007Option 31Occurrence$ - 0$ - 0
04007Option 41Occurrence$ - 0$ - 0

00008 Price per hour for Pressure Washing and Steam Cleaning (See section C.15.4) GSA: Assign costs to PGA12.

Base Period1Month$ - 0$ - 0
01008Option 11Month$ - 0$ - 0
02008Option 21Month$ - 0$ - 0
03008Option 31Month$ - 0$ - 0
04008Option 41Month$ - 0$ - 0

00009 Price Per hour for Tree Thinning Services (See section C.15.5)

Base Period1Hour$ - 0$ - 0
01009Option 11Hour$ - 0$ - 0
02009Option 21Hour$ - 0$ - 0
03009Option 31Hour$ - 0$ - 0
04009Option 41Hour$ - 0$ - 0

00010 Price per hour for planting government furnished trees and plants. (See section C.15.6)

Base Period1Hour$ - 0$ - 0
01010Option 11Hour$ - 0$ - 0
02010Option 21Hour$ - 0$ - 0
03010Option 31Hour$ - 0$ - 0
04010Option 41Hour$ - 0$ - 0

00011 Price per hour for Sub Contracted Graffiti removal (See section C.15.7) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01011Option 11Hour$ - 0$ - 0
02011Option 21Hour$ - 0$ - 0
03011Option 31Hour$ - 0$ - 0
04011Option 41Hour$ - 0$ - 0

00012 Price per hour for Above Standard High Cleaning (See section C.15.8) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01012Option 11Hour$ - 0$ - 0
02012Option 21Hour$ - 0$ - 0
03012Option 31Hour$ - 0$ - 0
04012Option 41Hour$ - 0$ - 0

00013 Price per hour for Machine Strip and Waxing of Resilient Flooring. (See section C.15.9) GSA: Assign Costs to PGA11 .

Base Period1Hour$ - 0$ - 0
01013Option 11Hour$ - 0$ - 0
02013Option 21Hour$ - 0$ - 0
03013Option 31Hour$ - 0$ - 0
04013Option 41Hour$ - 0$ - 0

00014 Price per hour for Cleaning and Disenfecting the Interior of Holding Cells. (See section C.15.10) GSA: Assign Costs to PGA11

Base Period1Hour$ - 0$ - 0
01014Option 11Hour$ - 0$ - 0
02014Option 21Hour$ - 0$ - 0
03014Option 31Hour$ - 0$ - 0
04014Option 41Hour$ - 0$ - 0

00015 Price per Occurrence of Cleaning/Polishing Exterior Brass Finishes. (See section C.15.11) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01015Option 11Occurrence$ - 0$ - 0
02015Option 21Occurrence$ - 0$ - 0
03015Option 31Occurrence$ - 0$ - 0
04015Option 41Occurrence$ - 0$ - 0

00016 Price per Occurrence for Postal Space Floor Sealing Service. (see section C.15.12) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01016Option 11Occurrence$ - 0$ - 0
02016Option 21Occurrence$ - 0$ - 0
03016Option 31Occurrence$ - 0$ - 0
04016Option 41Occurrence$ - 0$ - 0

00017 Price per Square foot of Additional Disinfecting of Frequently Touched Surfaces (see section C.15.13) GSA Assign Costs to PGA11

Base Period1SF$ - 0$ - 0
01017Option 11SF$ - 0$ - 0
02017Option 21SF$ - 0$ - 0
03017Option 31SF$ - 0$ - 0
04017Option 41SF$ - 0$ - 0
00018Price per Square Foot of Disinfecting In Response to a COVID-19 Event (See section C.15.14)Base Period1SF$ - 0$ - 0
01018Option 11SF$ - 0$ - 0
02018Option 21SF$ - 0$ - 0
03018Option 31SF$ - 0$ - 0
04018Option 41SF$ - 0$ - 0
00019Price per hour for Additional Labor Hours Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01019Option 11Hour$ - 0$ - 0
02019Option 21Hour$ - 0$ - 0
03019Option 31Hour$ - 0$ - 0
04019Option 41Hour$ - 0$ - 0
00020Price per hour for Additional Labor Hours Lead Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01020Option 11Hour$ - 0$ - 0
02020Option 21Hour$ - 0$ - 0
03020Option 31Hour$ - 0$ - 0
04020Option 41Hour$ - 0$ - 0
00021Price per hour for Additional Labor Hours Supervisor (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01021Option 11Hour$ - 0$ - 0
02021Option 21Hour$ - 0$ - 0
03021Option 31Hour$ - 0$ - 0
04021Option 41Hour$ - 0$ - 0
00022Price per hour for Additional Labor Hours Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01022Option 11Hour$ - 0$ - 0
02022Option 21Hour$ - 0$ - 0
03022Option 31Hour$ - 0$ - 0
04022Option 41Hour$ - 0$ - 0

00023 Price per hour for Additional Labor Hours Lead Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01023Option 11Hour$ - 0$ - 0
02023Option 21Hour$ - 0$ - 0
03023Option 31Hour$ - 0$ - 0
04023Option 41Hour$ - 0$ - 0

00024 Price per hour for Additional Labor Hours Supervisor-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01024Option 11Hour$ - 0$ - 0
02024Option 21Hour$ - 0$ - 0
03024Option 31Hour$ - 0$ - 0
04024Option 41Hour$ - 0$ - 0
00025Base Period1Occurrence$ - 0$ - 0
01025Option 11Occurrence$ - 0$ - 0
02025Option 21Occurrence$ - 0$ - 0
03025Option 31Occurrence$ - 0$ - 0
04025Option 41Occurrence$ - 0$ - 0
00026Base Period1SF$ - 0$ - 0
01026Option 11SF$ - 0$ - 0
02026Option 21SF$ - 0$ - 0
03026Option 31SF$ - 0$ - 0
04026Option 41SF$ - 0$ - 0

&A Page &P of

Building 2

Location:
Item NumberDescriptionQuantityUnit of IssueUnit of PriceExtended AmountRecurring Standard Services TotalsNon-Recurring Standard Services Totals
Recurring Standard Services
00001Monthly Price for Facility Cleaning and Related Services: all costs associated with cleaning the structure and related services, including service request response, integrated pest management, annual window cleaning, ect. GSA: Assign costs to PGA11Base Period12Month$ - 0$ - 0Base Period$ - 0Base Period$ - 0
01001Option 112Month$ - 0$ - 0Option 1$ - 0Option 1$ - 0
02001Option 212Month$ - 0$ - 0Option 2$ - 0Option 2$ - 0
03001Option 312Month$ - 0$ - 0Option 3$ - 0Option 3$ - 0
04001Option 412Month$ - 0$ - 0Option 4$ - 0Option 4$ - 0
00002Monthly Price for Trash Separation and Removal including Recycling: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA13.Base Period12Month$ - 0$ - 0
01002Option 112Month$ - 0$ - 0
02002Option 212Month$ - 0$ - 0
03002Option 312Month$ - 0$ - 0
04002Option 412Month$ - 0$ - 0

00003 Monthly Price for Grounds Maintenance Services: all costs related to exterior grounds services including policing. GSA: Assign costs to PGA12.

Base Period12Month$ - 0$ - 0
01003Option 112Month$ - 0$ - 0
02003Option 212Month$ - 0$ - 0
03003Option 312Month$ - 0$ - 0
04003Option 412Month$ - 0$ - 0
00004Monthly Price for Frequently Touched Surface Cleaning ABOVE the 85% occupancy threshold: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA11.Base Period12Month$ - 0$ - 0
01004Option 112Month$ - 0$ - 0
02004Option 212Month$ - 0$ - 0
03004Option 312Month$ - 0$ - 0
04004Option 412Month$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Non-Recurring Standard Services
00005Price per Square Foot for Carpet Extraction GSA (See section C.15.1): Assign Costs to PGA 11.
Base Period1SF$ - 0$ - 0
01005Option 11SF$ - 0$ - 0
02005Option 21SF$ - 0$ - 0
03005Option 31SF$ - 0$ - 0
04005Option 41SF$ - 0$ - 0
00006Price per Occurrence for Interior Window Washing (See section C.15.2) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01006Option 11Occurrence$ - 0$ - 0
02006Option 21Occurrence$ - 0$ - 0
03006Option 31Occurrence$ - 0$ - 0
04006Option 41Occurrence$ - 0$ - 0
00007Price per Occurrence for Exterior Window Washing (See section C.15.3) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01007Option 11Occurrence$ - 0$ - 0
02007Option 21Occurrence$ - 0$ - 0
03007Option 31Occurrence$ - 0$ - 0
04007Option 41Occurrence$ - 0$ - 0

00008 Price per hour for Pressure Washing and Steam Cleaning (See section C.15.4) GSA: Assign costs to PGA12.

Base Period1Month$ - 0$ - 0
01008Option 11Month$ - 0$ - 0
02008Option 21Month$ - 0$ - 0
03008Option 31Month$ - 0$ - 0
04008Option 41Month$ - 0$ - 0

00009 Price Per hour for Tree Thinning Services (See section C.15.5)

Base Period1Hour$ - 0$ - 0
01009Option 11Hour$ - 0$ - 0
02009Option 21Hour$ - 0$ - 0
03009Option 31Hour$ - 0$ - 0
04009Option 41Hour$ - 0$ - 0

00010 Price per hour for planting government furnished trees and plants. (See section C.15.6)

Base Period1Hour$ - 0$ - 0
01010Option 11Hour$ - 0$ - 0
02010Option 21Hour$ - 0$ - 0
03010Option 31Hour$ - 0$ - 0
04010Option 41Hour$ - 0$ - 0

00011 Price per hour for Sub Contracted Graffiti removal (See section C.15.7) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01011Option 11Hour$ - 0$ - 0
02011Option 21Hour$ - 0$ - 0
03011Option 31Hour$ - 0$ - 0
04011Option 41Hour$ - 0$ - 0

00012 Price per hour for Above Standard High Cleaning (See section C.15.8) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01012Option 11Hour$ - 0$ - 0
02012Option 21Hour$ - 0$ - 0
03012Option 31Hour$ - 0$ - 0
04012Option 41Hour$ - 0$ - 0

00013 Price per hour for Machine Strip and Waxing of Resilient Flooring. (See section C.15.9) GSA: Assign Costs to PGA11 .

Base Period1Hour$ - 0$ - 0
01013Option 11Hour$ - 0$ - 0
02013Option 21Hour$ - 0$ - 0
03013Option 31Hour$ - 0$ - 0
04013Option 41Hour$ - 0$ - 0

00014 Price per hour for Cleaning and Disenfecting the Interior of Holding Cells. (See section C.15.10) GSA: Assign Costs to PGA11

Base Period1Hour$ - 0$ - 0
01014Option 11Hour$ - 0$ - 0
02014Option 21Hour$ - 0$ - 0
03014Option 31Hour$ - 0$ - 0
04014Option 41Hour$ - 0$ - 0

00015 Price per Occurrence of Cleaning/Polishing Exterior Brass Finishes. (See section C.15.11) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01015Option 11Occurrence$ - 0$ - 0
02015Option 21Occurrence$ - 0$ - 0
03015Option 31Occurrence$ - 0$ - 0
04015Option 41Occurrence$ - 0$ - 0

00016 Price per Occurrence for Postal Space Floor Sealing Service. (see section C.15.12) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01016Option 11Occurrence$ - 0$ - 0
02016Option 21Occurrence$ - 0$ - 0
03016Option 31Occurrence$ - 0$ - 0
04016Option 41Occurrence$ - 0$ - 0

00017 Price per Square foot of Additional Disinfecting of Frequently Touched Surfaces (see section C.15.13) GSA Assign Costs to PGA11

Base Period1SF$ - 0$ - 0
01017Option 11SF$ - 0$ - 0
02017Option 21SF$ - 0$ - 0
03017Option 31SF$ - 0$ - 0
04017Option 41SF$ - 0$ - 0
00018Price per Square Foot of Disinfecting In Response to a COVID-19 Event (See section C.15.14)Base Period1SF$ - 0$ - 0
01018Option 11SF$ - 0$ - 0
02018Option 21SF$ - 0$ - 0
03018Option 31SF$ - 0$ - 0
04018Option 41SF$ - 0$ - 0
00019Price per hour for Additional Labor Hours Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01019Option 11Hour$ - 0$ - 0
02019Option 21Hour$ - 0$ - 0
03019Option 31Hour$ - 0$ - 0
04019Option 41Hour$ - 0$ - 0
00020Price per hour for Additional Labor Hours Lead Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01020Option 11Hour$ - 0$ - 0
02020Option 21Hour$ - 0$ - 0
03020Option 31Hour$ - 0$ - 0
04020Option 41Hour$ - 0$ - 0
00021Price per hour for Additional Labor Hours Supervisor (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01021Option 11Hour$ - 0$ - 0
02021Option 21Hour$ - 0$ - 0
03021Option 31Hour$ - 0$ - 0
04021Option 41Hour$ - 0$ - 0
00022Price per hour for Additional Labor Hours Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01022Option 11Hour$ - 0$ - 0
02022Option 21Hour$ - 0$ - 0
03022Option 31Hour$ - 0$ - 0
04022Option 41Hour$ - 0$ - 0

00023 Price per hour for Additional Labor Hours Lead Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01023Option 11Hour$ - 0$ - 0
02023Option 21Hour$ - 0$ - 0
03023Option 31Hour$ - 0$ - 0
04023Option 41Hour$ - 0$ - 0

00024 Price per hour for Additional Labor Hours Supervisor-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01024Option 11Hour$ - 0$ - 0
02024Option 21Hour$ - 0$ - 0
03024Option 31Hour$ - 0$ - 0
04024Option 41Hour$ - 0$ - 0
00025Base Period1Occurrence$ - 0$ - 0
01025Option 11Occurrence$ - 0$ - 0
02025Option 21Occurrence$ - 0$ - 0
03025Option 31Occurrence$ - 0$ - 0
04025Option 41Occurrence$ - 0$ - 0
00026Base Period1SF$ - 0$ - 0
01026Option 11SF$ - 0$ - 0
02026Option 21SF$ - 0$ - 0
03026Option 31SF$ - 0$ - 0
04026Option 41SF$ - 0$ - 0

&A Page &P of

Building 3

Location:
Item NumberDescriptionQuantityUnit of IssueUnit of PriceExtended AmountRecurring Standard Services TotalsNon-Recurring Standard Services Totals
Recurring Standard Services
00001Monthly Price for Facility Cleaning and Related Services: all costs associated with cleaning the structure and related services, including service request response, integrated pest management, annual window cleaning, ect. GSA: Assign costs to PGA11Base Period12Month$ - 0$ - 0Base Period$ - 0Base Period$ - 0
01001Option 112Month$ - 0$ - 0Option 1$ - 0Option 1$ - 0
02001Option 212Month$ - 0$ - 0Option 2$ - 0Option 2$ - 0
03001Option 312Month$ - 0$ - 0Option 3$ - 0Option 3$ - 0
04001Option 412Month$ - 0$ - 0Option 4$ - 0Option 4$ - 0
00002Monthly Price for Trash Separation and Removal including Recycling: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA13.Base Period12Month$ - 0$ - 0
01002Option 112Month$ - 0$ - 0
02002Option 212Month$ - 0$ - 0
03002Option 312Month$ - 0$ - 0
04002Option 412Month$ - 0$ - 0

00003 Monthly Price for Grounds Maintenance Services: all costs related to exterior grounds services including policing. GSA: Assign costs to PGA12.

Base Period12Month$ - 0$ - 0
01003Option 112Month$ - 0$ - 0
02003Option 212Month$ - 0$ - 0
03003Option 312Month$ - 0$ - 0
04003Option 412Month$ - 0$ - 0
00004Monthly Price for Frequently Touched Surface Cleaning ABOVE the 85% occupancy threshold: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA11.Base Period12Month$ - 0$ - 0
01004Option 112Month$ - 0$ - 0
02004Option 212Month$ - 0$ - 0
03004Option 312Month$ - 0$ - 0
04004Option 412Month$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Non-Recurring Standard Services
00005Price per Square Foot for Carpet Extraction GSA (See section C.15.1): Assign Costs to PGA 11.
Base Period1SF$ - 0$ - 0
01005Option 11SF$ - 0$ - 0
02005Option 21SF$ - 0$ - 0
03005Option 31SF$ - 0$ - 0
04005Option 41SF$ - 0$ - 0
00006Price per Occurrence for Interior Window Washing (See section C.15.2) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01006Option 11Occurrence$ - 0$ - 0
02006Option 21Occurrence$ - 0$ - 0
03006Option 31Occurrence$ - 0$ - 0
04006Option 41Occurrence$ - 0$ - 0
00007Price per Occurrence for Exterior Window Washing (See section C.15.3) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01007Option 11Occurrence$ - 0$ - 0
02007Option 21Occurrence$ - 0$ - 0
03007Option 31Occurrence$ - 0$ - 0
04007Option 41Occurrence$ - 0$ - 0

00008 Price per hour for Pressure Washing and Steam Cleaning (See section C.15.4) GSA: Assign costs to PGA12.

Base Period1Month$ - 0$ - 0
01008Option 11Month$ - 0$ - 0
02008Option 21Month$ - 0$ - 0
03008Option 31Month$ - 0$ - 0
04008Option 41Month$ - 0$ - 0

00009 Price Per hour for Tree Thinning Services (See section C.15.5)

Base Period1Hour$ - 0$ - 0
01009Option 11Hour$ - 0$ - 0
02009Option 21Hour$ - 0$ - 0
03009Option 31Hour$ - 0$ - 0
04009Option 41Hour$ - 0$ - 0

00010 Price per hour for planting government furnished trees and plants. (See section C.15.6)

Base Period1Hour$ - 0$ - 0
01010Option 11Hour$ - 0$ - 0
02010Option 21Hour$ - 0$ - 0
03010Option 31Hour$ - 0$ - 0
04010Option 41Hour$ - 0$ - 0

00011 Price per hour for Sub Contracted Graffiti removal (See section C.15.7) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01011Option 11Hour$ - 0$ - 0
02011Option 21Hour$ - 0$ - 0
03011Option 31Hour$ - 0$ - 0
04011Option 41Hour$ - 0$ - 0

00012 Price per hour for Above Standard High Cleaning (See section C.15.8) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01012Option 11Hour$ - 0$ - 0
02012Option 21Hour$ - 0$ - 0
03012Option 31Hour$ - 0$ - 0
04012Option 41Hour$ - 0$ - 0

00013 Price per hour for Machine Strip and Waxing of Resilient Flooring. (See section C.15.9) GSA: Assign Costs to PGA11 .

Base Period1Hour$ - 0$ - 0
01013Option 11Hour$ - 0$ - 0
02013Option 21Hour$ - 0$ - 0
03013Option 31Hour$ - 0$ - 0
04013Option 41Hour$ - 0$ - 0

00014 Price per hour for Cleaning and Disenfecting the Interior of Holding Cells. (See section C.15.10) GSA: Assign Costs to PGA11

Base Period1Hour$ - 0$ - 0
01014Option 11Hour$ - 0$ - 0
02014Option 21Hour$ - 0$ - 0
03014Option 31Hour$ - 0$ - 0
04014Option 41Hour$ - 0$ - 0

00015 Price per Occurrence of Cleaning/Polishing Exterior Brass Finishes. (See section C.15.11) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01015Option 11Occurrence$ - 0$ - 0
02015Option 21Occurrence$ - 0$ - 0
03015Option 31Occurrence$ - 0$ - 0
04015Option 41Occurrence$ - 0$ - 0

00016 Price per Occurrence for Postal Space Floor Sealing Service. (see section C.15.12) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01016Option 11Occurrence$ - 0$ - 0
02016Option 21Occurrence$ - 0$ - 0
03016Option 31Occurrence$ - 0$ - 0
04016Option 41Occurrence$ - 0$ - 0

00017 Price per Square foot of Additional Disinfecting of Frequently Touched Surfaces (see section C.15.13) GSA Assign Costs to PGA11

Base Period1SF$ - 0$ - 0
01017Option 11SF$ - 0$ - 0
02017Option 21SF$ - 0$ - 0
03017Option 31SF$ - 0$ - 0
04017Option 41SF$ - 0$ - 0
00018Price per Square Foot of Disinfecting In Response to a COVID-19 Event (See section C.15.14)Base Period1SF$ - 0$ - 0
01018Option 11SF$ - 0$ - 0
02018Option 21SF$ - 0$ - 0
03018Option 31SF$ - 0$ - 0
04018Option 41SF$ - 0$ - 0
00019Price per hour for Additional Labor Hours Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01019Option 11Hour$ - 0$ - 0
02019Option 21Hour$ - 0$ - 0
03019Option 31Hour$ - 0$ - 0
04019Option 41Hour$ - 0$ - 0
00020Price per hour for Additional Labor Hours Lead Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01020Option 11Hour$ - 0$ - 0
02020Option 21Hour$ - 0$ - 0
03020Option 31Hour$ - 0$ - 0
04020Option 41Hour$ - 0$ - 0
00021Price per hour for Additional Labor Hours Supervisor (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01021Option 11Hour$ - 0$ - 0
02021Option 21Hour$ - 0$ - 0
03021Option 31Hour$ - 0$ - 0
04021Option 41Hour$ - 0$ - 0
00022Price per hour for Additional Labor Hours Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01022Option 11Hour$ - 0$ - 0
02022Option 21Hour$ - 0$ - 0
03022Option 31Hour$ - 0$ - 0
04022Option 41Hour$ - 0$ - 0

00023 Price per hour for Additional Labor Hours Lead Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01023Option 11Hour$ - 0$ - 0
02023Option 21Hour$ - 0$ - 0
03023Option 31Hour$ - 0$ - 0
04023Option 41Hour$ - 0$ - 0

00024 Price per hour for Additional Labor Hours Supervisor-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01024Option 11Hour$ - 0$ - 0
02024Option 21Hour$ - 0$ - 0
03024Option 31Hour$ - 0$ - 0
04024Option 41Hour$ - 0$ - 0
00025Base Period1Occurrence$ - 0$ - 0
01025Option 11Occurrence$ - 0$ - 0
02025Option 21Occurrence$ - 0$ - 0
03025Option 31Occurrence$ - 0$ - 0
04025Option 41Occurrence$ - 0$ - 0
00026Base Period1SF$ - 0$ - 0
01026Option 11SF$ - 0$ - 0
02026Option 21SF$ - 0$ - 0
03026Option 31SF$ - 0$ - 0
04026Option 41SF$ - 0$ - 0

&A Page &P of

Building 4

Location:
Item NumberDescriptionQuantityUnit of IssueUnit of PriceExtended AmountRecurring Standard Services TotalsNon-Recurring Standard Services Totals
Recurring Standard Services
00001Monthly Price for Facility Cleaning and Related Services: all costs associated with cleaning the structure and related services, including service request response, integrated pest management, annual window cleaning, ect. GSA: Assign costs to PGA11Base Period12Month$ - 0$ - 0Base Period$ - 0Base Period$ - 0
01001Option 112Month$ - 0$ - 0Option 1$ - 0Option 1$ - 0
02001Option 212Month$ - 0$ - 0Option 2$ - 0Option 2$ - 0
03001Option 312Month$ - 0$ - 0Option 3$ - 0Option 3$ - 0
04001Option 412Month$ - 0$ - 0Option 4$ - 0Option 4$ - 0
00002Monthly Price for Trash Separation and Removal including Recycling: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA13.Base Period12Month$ - 0$ - 0
01002Option 112Month$ - 0$ - 0
02002Option 212Month$ - 0$ - 0
03002Option 312Month$ - 0$ - 0
04002Option 412Month$ - 0$ - 0

00003 Monthly Price for Grounds Maintenance Services: all costs related to exterior grounds services including policing. GSA: Assign costs to PGA12.

Base Period12Month$ - 0$ - 0
01003Option 112Month$ - 0$ - 0
02003Option 212Month$ - 0$ - 0
03003Option 312Month$ - 0$ - 0
04003Option 412Month$ - 0$ - 0
00004Monthly Price for Frequently Touched Surface Cleaning ABOVE the 85% occupancy threshold: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA11.Base Period12Month$ - 0$ - 0
01004Option 112Month$ - 0$ - 0
02004Option 212Month$ - 0$ - 0
03004Option 312Month$ - 0$ - 0
04004Option 412Month$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Non-Recurring Standard Services
00005Price per Square Foot for Carpet Extraction GSA (See section C.15.1): Assign Costs to PGA 11.
Base Period1SF$ - 0$ - 0
01005Option 11SF$ - 0$ - 0
02005Option 21SF$ - 0$ - 0
03005Option 31SF$ - 0$ - 0
04005Option 41SF$ - 0$ - 0
00006Price per Occurrence for Interior Window Washing (See section C.15.2) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01006Option 11Occurrence$ - 0$ - 0
02006Option 21Occurrence$ - 0$ - 0
03006Option 31Occurrence$ - 0$ - 0
04006Option 41Occurrence$ - 0$ - 0
00007Price per Occurrence for Exterior Window Washing (See section C.15.3) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01007Option 11Occurrence$ - 0$ - 0
02007Option 21Occurrence$ - 0$ - 0
03007Option 31Occurrence$ - 0$ - 0
04007Option 41Occurrence$ - 0$ - 0

00008 Price per hour for Pressure Washing and Steam Cleaning (See section C.15.4) GSA: Assign costs to PGA12.

Base Period1Month$ - 0$ - 0
01008Option 11Month$ - 0$ - 0
02008Option 21Month$ - 0$ - 0
03008Option 31Month$ - 0$ - 0
04008Option 41Month$ - 0$ - 0

00009 Price Per hour for Tree Thinning Services (See section C.15.5)

Base Period1Hour$ - 0$ - 0
01009Option 11Hour$ - 0$ - 0
02009Option 21Hour$ - 0$ - 0
03009Option 31Hour$ - 0$ - 0
04009Option 41Hour$ - 0$ - 0

00010 Price per hour for planting government furnished trees and plants. (See section C.15.6)

Base Period1Hour$ - 0$ - 0
01010Option 11Hour$ - 0$ - 0
02010Option 21Hour$ - 0$ - 0
03010Option 31Hour$ - 0$ - 0
04010Option 41Hour$ - 0$ - 0

00011 Price per hour for Sub Contracted Graffiti removal (See section C.15.7) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01011Option 11Hour$ - 0$ - 0
02011Option 21Hour$ - 0$ - 0
03011Option 31Hour$ - 0$ - 0
04011Option 41Hour$ - 0$ - 0

00012 Price per hour for Above Standard High Cleaning (See section C.15.8) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01012Option 11Hour$ - 0$ - 0
02012Option 21Hour$ - 0$ - 0
03012Option 31Hour$ - 0$ - 0
04012Option 41Hour$ - 0$ - 0

00013 Price per hour for Machine Strip and Waxing of Resilient Flooring. (See section C.15.9) GSA: Assign Costs to PGA11 .

Base Period1Hour$ - 0$ - 0
01013Option 11Hour$ - 0$ - 0
02013Option 21Hour$ - 0$ - 0
03013Option 31Hour$ - 0$ - 0
04013Option 41Hour$ - 0$ - 0

00014 Price per hour for Cleaning and Disenfecting the Interior of Holding Cells. (See section C.15.10) GSA: Assign Costs to PGA11

Base Period1Hour$ - 0$ - 0
01014Option 11Hour$ - 0$ - 0
02014Option 21Hour$ - 0$ - 0
03014Option 31Hour$ - 0$ - 0
04014Option 41Hour$ - 0$ - 0

00015 Price per Occurrence of Cleaning/Polishing Exterior Brass Finishes. (See section C.15.11) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01015Option 11Occurrence$ - 0$ - 0
02015Option 21Occurrence$ - 0$ - 0
03015Option 31Occurrence$ - 0$ - 0
04015Option 41Occurrence$ - 0$ - 0

00016 Price per Occurrence for Postal Space Floor Sealing Service. (see section C.15.12) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01016Option 11Occurrence$ - 0$ - 0
02016Option 21Occurrence$ - 0$ - 0
03016Option 31Occurrence$ - 0$ - 0
04016Option 41Occurrence$ - 0$ - 0

00017 Price per Square foot of Additional Disinfecting of Frequently Touched Surfaces (see section C.15.13) GSA Assign Costs to PGA11

Base Period1SF$ - 0$ - 0
01017Option 11SF$ - 0$ - 0
02017Option 21SF$ - 0$ - 0
03017Option 31SF$ - 0$ - 0
04017Option 41SF$ - 0$ - 0
00018Price per Square Foot of Disinfecting In Response to a COVID-19 Event (See section C.15.14)Base Period1SF$ - 0$ - 0
01018Option 11SF$ - 0$ - 0
02018Option 21SF$ - 0$ - 0
03018Option 31SF$ - 0$ - 0
04018Option 41SF$ - 0$ - 0
00019Price per hour for Additional Labor Hours Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01019Option 11Hour$ - 0$ - 0
02019Option 21Hour$ - 0$ - 0
03019Option 31Hour$ - 0$ - 0
04019Option 41Hour$ - 0$ - 0
00020Price per hour for Additional Labor Hours Lead Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01020Option 11Hour$ - 0$ - 0
02020Option 21Hour$ - 0$ - 0
03020Option 31Hour$ - 0$ - 0
04020Option 41Hour$ - 0$ - 0
00021Price per hour for Additional Labor Hours Supervisor (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01021Option 11Hour$ - 0$ - 0
02021Option 21Hour$ - 0$ - 0
03021Option 31Hour$ - 0$ - 0
04021Option 41Hour$ - 0$ - 0
00022Price per hour for Additional Labor Hours Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01022Option 11Hour$ - 0$ - 0
02022Option 21Hour$ - 0$ - 0
03022Option 31Hour$ - 0$ - 0
04022Option 41Hour$ - 0$ - 0

00023 Price per hour for Additional Labor Hours Lead Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01023Option 11Hour$ - 0$ - 0
02023Option 21Hour$ - 0$ - 0
03023Option 31Hour$ - 0$ - 0
04023Option 41Hour$ - 0$ - 0

00024 Price per hour for Additional Labor Hours Supervisor-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01024Option 11Hour$ - 0$ - 0
02024Option 21Hour$ - 0$ - 0
03024Option 31Hour$ - 0$ - 0
04024Option 41Hour$ - 0$ - 0
00025Base Period1Occurrence$ - 0$ - 0
01025Option 11Occurrence$ - 0$ - 0
02025Option 21Occurrence$ - 0$ - 0
03025Option 31Occurrence$ - 0$ - 0
04025Option 41Occurrence$ - 0$ - 0
00026Base Period1SF$ - 0$ - 0
01026Option 11SF$ - 0$ - 0
02026Option 21SF$ - 0$ - 0
03026Option 31SF$ - 0$ - 0
04026Option 41SF$ - 0$ - 0

&A Page &P of

Building 5

Location:
Item NumberDescriptionQuantityUnit of IssueUnit of PriceExtended AmountRecurring Standard Services TotalsNon-Recurring Standard Services Totals
Recurring Standard Services
00001Monthly Price for Facility Cleaning and Related Services: all costs associated with cleaning the structure and related services, including service request response, integrated pest management, annual window cleaning, ect. GSA: Assign costs to PGA11Base Period12Month$ - 0$ - 0Base Period$ - 0Base Period$ - 0
01001Option 112Month$ - 0$ - 0Option 1$ - 0Option 1$ - 0
02001Option 212Month$ - 0$ - 0Option 2$ - 0Option 2$ - 0
03001Option 312Month$ - 0$ - 0Option 3$ - 0Option 3$ - 0
04001Option 412Month$ - 0$ - 0Option 4$ - 0Option 4$ - 0
00002Monthly Price for Trash Separation and Removal including Recycling: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA13.Base Period12Month$ - 0$ - 0
01002Option 112Month$ - 0$ - 0
02002Option 212Month$ - 0$ - 0
03002Option 312Month$ - 0$ - 0
04002Option 412Month$ - 0$ - 0

00003 Monthly Price for Grounds Maintenance Services: all costs related to exterior grounds services including policing. GSA: Assign costs to PGA12.

Base Period12Month$ - 0$ - 0
01003Option 112Month$ - 0$ - 0
02003Option 212Month$ - 0$ - 0
03003Option 312Month$ - 0$ - 0
04003Option 412Month$ - 0$ - 0
00004Monthly Price for Frequently Touched Surface Cleaning ABOVE the 85% occupancy threshold: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA11.Base Period12Month$ - 0$ - 0
01004Option 112Month$ - 0$ - 0
02004Option 212Month$ - 0$ - 0
03004Option 312Month$ - 0$ - 0
04004Option 412Month$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Non-Recurring Standard Services
00005Price per Square Foot for Carpet Extraction GSA (See section C.15.1): Assign Costs to PGA 11.
Base Period1SF$ - 0$ - 0
01005Option 11SF$ - 0$ - 0
02005Option 21SF$ - 0$ - 0
03005Option 31SF$ - 0$ - 0
04005Option 41SF$ - 0$ - 0
00006Price per Occurrence for Interior Window Washing (See section C.15.2) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01006Option 11Occurrence$ - 0$ - 0
02006Option 21Occurrence$ - 0$ - 0
03006Option 31Occurrence$ - 0$ - 0
04006Option 41Occurrence$ - 0$ - 0
00007Price per Occurrence for Exterior Window Washing (See section C.15.3) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01007Option 11Occurrence$ - 0$ - 0
02007Option 21Occurrence$ - 0$ - 0
03007Option 31Occurrence$ - 0$ - 0
04007Option 41Occurrence$ - 0$ - 0

00008 Price per hour for Pressure Washing and Steam Cleaning (See section C.15.4) GSA: Assign costs to PGA12.

Base Period1Month$ - 0$ - 0
01008Option 11Month$ - 0$ - 0
02008Option 21Month$ - 0$ - 0
03008Option 31Month$ - 0$ - 0
04008Option 41Month$ - 0$ - 0

00009 Price Per hour for Tree Thinning Services (See section C.15.5)

Base Period1Hour$ - 0$ - 0
01009Option 11Hour$ - 0$ - 0
02009Option 21Hour$ - 0$ - 0
03009Option 31Hour$ - 0$ - 0
04009Option 41Hour$ - 0$ - 0

00010 Price per hour for planting government furnished trees and plants. (See section C.15.6)

Base Period1Hour$ - 0$ - 0
01010Option 11Hour$ - 0$ - 0
02010Option 21Hour$ - 0$ - 0
03010Option 31Hour$ - 0$ - 0
04010Option 41Hour$ - 0$ - 0

00011 Price per hour for Sub Contracted Graffiti removal (See section C.15.7) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01011Option 11Hour$ - 0$ - 0
02011Option 21Hour$ - 0$ - 0
03011Option 31Hour$ - 0$ - 0
04011Option 41Hour$ - 0$ - 0

00012 Price per hour for Above Standard High Cleaning (See section C.15.8) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01012Option 11Hour$ - 0$ - 0
02012Option 21Hour$ - 0$ - 0
03012Option 31Hour$ - 0$ - 0
04012Option 41Hour$ - 0$ - 0

00013 Price per hour for Machine Strip and Waxing of Resilient Flooring. (See section C.15.9) GSA: Assign Costs to PGA11 .

Base Period1Hour$ - 0$ - 0
01013Option 11Hour$ - 0$ - 0
02013Option 21Hour$ - 0$ - 0
03013Option 31Hour$ - 0$ - 0
04013Option 41Hour$ - 0$ - 0

00014 Price per hour for Cleaning and Disenfecting the Interior of Holding Cells. (See section C.15.10) GSA: Assign Costs to PGA11

Base Period1Hour$ - 0$ - 0
01014Option 11Hour$ - 0$ - 0
02014Option 21Hour$ - 0$ - 0
03014Option 31Hour$ - 0$ - 0
04014Option 41Hour$ - 0$ - 0

00015 Price per Occurrence of Cleaning/Polishing Exterior Brass Finishes. (See section C.15.11) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01015Option 11Occurrence$ - 0$ - 0
02015Option 21Occurrence$ - 0$ - 0
03015Option 31Occurrence$ - 0$ - 0
04015Option 41Occurrence$ - 0$ - 0

00016 Price per Occurrence for Postal Space Floor Sealing Service. (see section C.15.12) GSA: Assign Costs to PGA11

Base Period1Occurrence$ - 0$ - 0
01016Option 11Occurrence$ - 0$ - 0
02016Option 21Occurrence$ - 0$ - 0
03016Option 31Occurrence$ - 0$ - 0
04016Option 41Occurrence$ - 0$ - 0

00017 Price per Square foot of Additional Disinfecting of Frequently Touched Surfaces (see section C.15.13) GSA Assign Costs to PGA11

Base Period1SF$ - 0$ - 0
01017Option 11SF$ - 0$ - 0
02017Option 21SF$ - 0$ - 0
03017Option 31SF$ - 0$ - 0
04017Option 41SF$ - 0$ - 0
00018Price per Square Foot of Disinfecting In Response to a COVID-19 Event (See section C.15.14)Base Period1SF$ - 0$ - 0
01018Option 11SF$ - 0$ - 0
02018Option 21SF$ - 0$ - 0
03018Option 31SF$ - 0$ - 0
04018Option 41SF$ - 0$ - 0
00019Price per hour for Additional Labor Hours Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01019Option 11Hour$ - 0$ - 0
02019Option 21Hour$ - 0$ - 0
03019Option 31Hour$ - 0$ - 0
04019Option 41Hour$ - 0$ - 0
00020Price per hour for Additional Labor Hours Lead Custodian (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01020Option 11Hour$ - 0$ - 0
02020Option 21Hour$ - 0$ - 0
03020Option 31Hour$ - 0$ - 0
04020Option 41Hour$ - 0$ - 0
00021Price per hour for Additional Labor Hours Supervisor (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01021Option 11Hour$ - 0$ - 0
02021Option 21Hour$ - 0$ - 0
03021Option 31Hour$ - 0$ - 0
04021Option 41Hour$ - 0$ - 0
00022Price per hour for Additional Labor Hours Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.Base Period1Hour$ - 0$ - 0
01022Option 11Hour$ - 0$ - 0
02022Option 21Hour$ - 0$ - 0
03022Option 31Hour$ - 0$ - 0
04022Option 41Hour$ - 0$ - 0

00023 Price per hour for Additional Labor Hours Lead Custodian-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01023Option 11Hour$ - 0$ - 0
02023Option 21Hour$ - 0$ - 0
03023Option 31Hour$ - 0$ - 0
04023Option 41Hour$ - 0$ - 0

00024 Price per hour for Additional Labor Hours Supervisor-OVERTIME (See section C.15.15). GSA: Assign Costs to PGA11.

Base Period1Hour$ - 0$ - 0
01024Option 11Hour$ - 0$ - 0
02024Option 21Hour$ - 0$ - 0
03024Option 31Hour$ - 0$ - 0
04024Option 41Hour$ - 0$ - 0
00025Base Period1Occurrence$ - 0$ - 0
01025Option 11Occurrence$ - 0$ - 0
02025Option 21Occurrence$ - 0$ - 0
03025Option 31Occurrence$ - 0$ - 0
04025Option 41Occurrence$ - 0$ - 0
00026Base Period1SF$ - 0$ - 0
01026Option 11SF$ - 0$ - 0
02026Option 21SF$ - 0$ - 0
03026Option 31SF$ - 0$ - 0
04026Option 41SF$ - 0$ - 0

&A Page &P of

Building 6

Location:
Item NumberDescriptionQuantityUnit of IssueUnit of PriceExtended AmountRecurring Standard Services TotalsNon-Recurring Standard Services Totals
Recurring Standard Services
00001Monthly Price for Facility Cleaning and Related Services: all costs associated with cleaning the structure and related services, including service request response, integrated pest management, annual window cleaning, ect. GSA: Assign costs to PGA11Base Period12Month$ - 0$ - 0Base Period$ - 0Base Period$ - 0
01001Option 112Month$ - 0$ - 0Option 1$ - 0Option 1$ - 0
02001Option 212Month$ - 0$ - 0Option 2$ - 0Option 2$ - 0
03001Option 312Month$ - 0$ - 0Option 3$ - 0Option 3$ - 0
04001Option 412Month$ - 0$ - 0Option 4$ - 0Option 4$ - 0
00002Monthly Price for Trash Separation and Removal including Recycling: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA13.Base Period12Month$ - 0$ - 0
01002Option 112Month$ - 0$ - 0
02002Option 212Month$ - 0$ - 0
03002Option 312Month$ - 0$ - 0
04002Option 412Month$ - 0$ - 0

00003 Monthly Price for Grounds Maintenance Services: all costs related to exterior grounds services including policing. GSA: Assign costs to PGA12.

Base Period12Month$ - 0$ - 0
01003Option 112Month$ - 0$ - 0
02003Option 212Month$ - 0$ - 0
03003Option 312Month$ - 0$ - 0
04003Option 412Month$ - 0$ - 0
00004Monthly Price for Frequently Touched Surface Cleaning ABOVE the 85% occupancy threshold: Inclusive of labor, supplies, and any subcontracting costs. GSA: Assign costs to PGA11.Base Period12Month$ - 0$ - 0
01004Option 112Month$ - 0$ - 0
02004Option 212Month$ - 0$ - 0
03004Option 312Month$ - 0$ - 0
04004Option 412Month$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Base Period12Months$ - 0$ - 0
Option 112Months$ - 0$ - 0
Option 212Months$ - 0$ - 0
Option 312Months$ - 0$ - 0
Option 412Months$ - 0$ - 0
Non-Recurring Standard Services
00005Price per Square Foot for Carpet Extraction GSA (See section C.15.1): Assign Costs to PGA 11.
Base Period1SF$ - 0$ - 0
01005Option 11SF$ - 0$ - 0
02005Option 21SF$ - 0$ - 0
03005Option 31SF$ - 0$ - 0
04005Option 41SF$ - 0$ - 0
00006Price per Occurrence for Interior Window Washing (See section C.15.2) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01006Option 11Occurrence$ - 0$ - 0
02006Option 21Occurrence$ - 0$ - 0
03006Option 31Occurrence$ - 0$ - 0
04006Option 41Occurrence$ - 0$ - 0
00007Price per Occurrence for Exterior Window Washing (See section C.15.3) GSA: Assign Costs to PGA 11.Base Period1Occurrence$ - 0$ - 0
01007Option 11Occurrence$ - 0$ - 0
02007Option 21Occurrence$ - 0$ - 0
03007Option 31Occurrence$ - 0$ - 0
04007Option 41Occurrence$ - 0$ - 0

00008 Price per hour for Pressure Washing and Steam Cleaning (See section C.15.4) GSA: Assign costs to PGA12.

Base Period1Month$ - 0$ - 0
01008Option 11Month$ - 0$ - 0
02008Option 21Month$ - 0$ - 0
03008Option 31Month$ - 0$ - 0
04008Option 41Month$ - 0$ - 0

00009 Price Per hour for Tree Thinning Services (See section C.15.5)

Base Period1Hour$ - 0$ - 0
01009Option 11Hour$ - 0$ - 0
02009Option 21Hour$ - 0$ - 0
03009Option 31Hour$ - 0$ - 0
04009Option 41Hour$ - 0$ - 0

00010 Price per hour for planting government furnished trees and plants. (See section C.15.6)

Base Period1Hour$ - 0$ - 0
01010Option 11Hour$ - 0$ - 0
02010Option 21Hour$ - 0$ - 0
03010Option 31Hour$ - 0$ - 0
04010Option 41Hour$ - 0$ - 0

00011 Price per hour for Sub Contracted Graffiti removal (See section C.15.7) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01011Option 11Hour$ - 0$ - 0
02011Option 21Hour$ - 0$ - 0
03011Option 31Hour$ - 0$ - 0
04011Option 41Hour$ - 0$ - 0

00012 Price per hour for Above Standard High Cleaning (See section C.15.8) GSA: Assign Costs to PGA 11.

Base Period1Hour$ - 0$ - 0
01012Option 11Hour$ - 0$ - 0
02012Option 21Hour$ - 0$ - 0
03012Option 31Hour$ - 0$ - 0
04012Option 41Hour$ - 0$ - 0

00013 Price per hour for Machine Strip and Waxing of Resilient Flooring. (See section C.15.9) GSA: Assign Costs to PGA11 .

Base Period1Hour$ - 0$ - 0
01013Option 11Hour$ - 0$ - 0
02013Option 21Hour$ - 0$ - 0
03013Option 31Hour$ - 0$ - 0
04013Option 41Hour$ - 0$ - 0

00014 Price per hour for Cleaning and Disenfecting the Interior of Holding Cells. (See section C.15.10) GSA: Assign Costs to PGA11

Base Period1Hour$ - 0$ - 0
01014Option 11Hour$ - 0$ - 0
02014Option 21Hour$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .