12) Response to Questions 1 - RFP MG 09042024.pdf

PDF 225 KB Posted

Attached to
Slow Machine Protection System (MPS) Storage Ring (SR) Production
Solicitation number
MG-09042024
Issued by

About this file

This document is a response to questions regarding Request for Proposal (RFP) No. MG-09042024 for the Slow Machine Protection System (MPS) Storage Ring (SR) Production at the Lawrence Berkeley National Laboratory (LBNL). The key details are:

The RFP is seeking proposals for the production of the Slow Machine Protection System Storage Ring. The RFP and associated documents, including the Statement of Work, General Provisions, Price Proposal Schedule, and other required forms, were provided. The timeline of events includes the RFP release on 09/04/2024, supplier questions due by 09/19/2024, and proposal submissions due by 10/03/2024. The RFP response addresses questions related to hardware serial numbers, cable management, labeling requirements, use of Loctite, first article inspection, bill of materials, and part substitutions. The contracting agency is the Department of Energy, a civilian federal agency.

View the file

Other files

File Type Posted
AL-1593-3824B.pdf PDF
9) Price Proposal Schedule Attachment A - RFP MG-XXXX2024.xlsx XLSX spreadsheet
5) AL-1747-5356 Document List.pdf PDF
4) AL-1747-5362 - Supplied Components.pdf PDF
3) AL-1747-5370 - SOW.pdf PDF
2) Sample SubK - RFP MG-09042024.pdf PDF
6) GP-Commercial Supplies and Services.pdf PDF
1) RFP-MG-09042024 BVSS.pdf PDF
Documents.zip ZIP file
7) Rep Cert Form MG-09042024.docx DOCX document
8) AL-1208-0209C.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LBNL Response to Question 01 Re: LBNL RFP MG-09042024 – 09/20/2024

1. What serial numbers need to be recorded for each assembly? Are they the Allen Bradley parts only?

LBNL Response: No hardware serial number record is required. An ALS-U asset ID will be provided for each unit.

LBNL will use it as its serial number and will track them through LBNL’s Asset Management System. The following picture shows an example of a recent AR MPS D unit, which was handed off to the Injection and Extraction Group.

2. When there are unused pins in a cable, can we cut off the unused wires or do you want them to be buried for future use? i.e. molded DSUB cables with unused wires, 7C cables, etc.

LBNL Response: Cutoff unless specified.

3. Are shrink tube labels required or can we use Panduit wrap-around labels? Some of the photos show wrap-around labels being used.

LBNL Response: Per section 6.1.1 of SOW heat shrink must be used when possible. Section 5.5 chassis is a picture of a prototype with wrap-around labels but production units may have heat shrink. Certain deviations must be reviewed and approved.

4. Can we swap out hardware with Loctite already on it instead of using the liquid kind, when available? i.e. McMaster-Carr 91772A146 replaced with 96562A146.

LBNL Response: There are not many screws that require liquid Loctite and deviation must be reviewed and approved.

5. In the FAI Approval section Article II, note D, it states if the first article is disapproved then the Subcontractor must submit an additional first article for testing. How does that work if we are only assembling 1 unit?

Do we need to include in our quote material for 2 units? i.e. Model B and Model C chassis.

LBNL Response: Only one First Article unit per specified group and Section

3.1 of SOW states how these units are handled.

6. On assembly AL-1445-6303, the TC wire is missing from the bom.

LBNL Response: TC wire is listed as “Cable, TC” in AL-1445-6303-C D.4.

7. On assembly AL-1445-6303, do we need din rail mounts for the Winford added to the bom or does the part number come with mounts?

LBNL Response: Mounting nuts are listed as “PG80 thru 92 Nut” in AL-1445- 6303-C D.4.

8. Is there a substitute part list AL-1593-3824? I don't believe I received this document.

LBNL Response: There is no substitute. Document included with this response.