BID PROPOSAL FORM
MERRIFIELD PARK DRAINAGE IMPROVEMENTS
Proposal of _______________________________________________(hereinafter called “BIDDER”), organized and existing under laws of the State of South Carolina.
To: County of Greenville (hereinafter called “OWNER”). In compliance with your invitation for Bids, BIDDER hereby proposes to perform all WORK for the construction of Merrifield Park Drainage Improvements.
in strict accordance with the CONTRACT DOCUMENTS within the time set forth therein, and at the prices stated below.
By submission of the BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies as to his own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.
BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to substantially complete project within One Hundred Fifty (150) consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of One Hundred Fifty ($150.00) Dollars for each consecutive calendar day thereafter as provided in the General Conditions.
BIDDER acknowledges receipt of the following ADDENDUM:
BID SCHEDULE
MERRIFIELD PARK DRAINAGE IMPROVEMENTS
| Item # |
| Item |
| QTY |
| Unit |
| Unit Price |
| Total Price |
| 1 |
| Mobilization & De-Mobilization |
| 1 |
| LS |
| 2 |
| Clear/Grub, Remove Trees/Plants, Stump grinding |
| 1 |
| LS |
| 3 |
| Sawcut/Demo/Disposal of Asphalt Pavement |
| 750 |
| SY |
| 4 |
| Sawcut/Demo/Disposal of Concrete Drives/Slabs |
| 550 |
| SY |
| 5 |
| Sawcut/Demo/Disposal of Concrete Curbs |
| 600 |
| LF |
| 6 |
| Demo/Disposal of Pipes & Drainage Structures |
| 1 |
| LS |
| 7 |
| Demo/Disposal of Fences, Walls, Timbers, Edging, etc. |
| 1 |
| LS |
| 9 |
| *Unclassified Excavation (soil removed from site) |
| 500 |
| CY |
| 11 |
| Borrow Excavation (for trench backfill) |
| 500 |
| CY |
| 12 |
| Graded Aggregate Base Course, 6" Uniform |
| 750 |
| SY |
| 13 |
| Maintenance Stone/CR14 or Washed Stone |
| 250 |
| Ton |
| 14 |
| H.M. Asphalt Surface Course, Type C |
| 150 |
| Ton |
| 19 |
| 30" Alum. Arch (35"Wx24"H) |
| 40 |
| LF |
| 20 |
| 36" Alum Arch (42"Wx29"H) |
| 40 |
| LF |
| 21 |
| 4X4 Curb Inlet w/ Apron (*0>4 deep) |
| 6 |
| EA |
| 22 |
| 4X4 Yard Inlet (*0>4 deep) |
| 6 |
| EA |
| 23 |
| 4X4 Yard Inlet (*4>6 deep) |
| 1 |
| EA |
| 24 |
| 5X5 Curb Inlet w/ Apron (*0>4 deep) |
| 1 |
| EA |
| 25 |
| 5X5 Curb Inlet w/ Apron (*4>6 deep) |
| 5 |
| EA |
| 26 |
| 5X5 Yard Inlet (*0>4 deep) |
| 1 |
| EA |
| 27 |
| 5X5 Yard Inlet (*4>6 deep) |
| 2 |
| EA |
| 28 |
| 2x3 Drop Inlet (*0>4 deep) |
| 2 |
| EA |
| 29 |
| New 6"H Extruded Curb |
| 600 |
| LF |
| 30 |
| New Concrete Drive, 4" thk, 4000 PSI min. |
| 550 |
| SY |
| 31 |
| Install Flowable Fill in Exist. Pipe or Structure |
| 20 |
| CY |
| 32 |
| Replace Exist. 8" SS with DIP (10 LF) |
| 2 |
| EA |
| 33 |
| Remove/Reinstall 4"PVC Sewer Service incl. Cleanouts |
| 250 |
| LF |
| 34 |
| Riprap, Class C incl. Geotextile Fabric |
| 100 |
| Ton |
| 35 |
| Soil Prep, Seeding, Lime, Fertilizer, Mulch (per specs) |
| 7.5 |
| MSY |
| 36 |
| Select Top Soil (for yards) |
| 200 |
| CY |
| 38 |
| New 6'H PT Wood Privacy Fence |
| 250 |
| LF |
| 39 |
| New 5'H Galv. Chain Link Fence |
| 750 |
| LF |
| ---------------------------- Total Bid --------------------- |
| ----------- |
| ------ |
| ------------ |
| ----- |
* This line item only applies to excavated material removed from the site. Soil which is stockpiled and reused does not apply.
** For pricing, catch basin depth is measured from invert to throat and does not include the pedestals or top slab.
Note: Construction staking, lines and grades shall be provided by the County therefore a Staking Line Item is not shown.
All work performed as essential to the completion of the intent of the Contract Documents shall be paid for in accordance with the Bid Schedule. No direct payment shall be made for work performed which is not shown as a separate Bid Item. All costs shall be included in the various pay items in the Bid Schedule.
Project Total Bid to include all required work described in this document and/or on the project plans.
BIDDER ACKNOWLEDGES READING THE “INSTRUCTIONS TO BIDDERS”, “BID SCHEDULE”, AND “AGREEMENT”, AND IS IN AGREEMENT WITH THE CONDITIONS OF EACH.
Failure to complete, sign and return this page will cause the bid to be non‑responsive and ineligible for award consideration.
PROPOSAL SIGNATURE (All persons submitting proposals for this project shall sign below)
Legal Entity
Signature
Printed Name
SEAL - If Corporation
P.O. Box
Street Address
City, State, Zip Code
Telephone #
Fax #
S.C. Contractors License #
SCDOT Prequalified Bidder #
Federal ID#
S.C. Sales Tax #
FAILURE TO COMPLETE AND RETURN THIS PAGE WILL RESULT IN YOUR BID NOT BEING CONSIDERED FOR AWARD.
| Date: 6/18/2026 |
| Page 2 of 4 |
Merrifield Park Drainage Improvements
BID PROPOSAL FORM & SCHEDULE