Memorandum for Turnkey.pdf

PDF 185 KB Posted

Attached to
6525--January 2022 Consolidation Federal contract opportunity
Solicitation number
36A79722Q0010
Issued by
Department of Veterans Affairs National Acquisition Center

View the file

Other files for this federal contract opportunity

Other files attached to 6525--January 2022 Consolidation, newest first.
File Type Posted
36A79722Q0010 0001.docx DOCX document
Amendment 0001 - Continuation Page.pdf PDF
Jan 2022 Consolidation - Schedule of Line Items with QA - FINAL 4-3-22.xlsx XLSX spreadsheet
504B20001 - 539B20002 TS.zip ZIP file
541B20003 - 573B25015 TS.zip ZIP file
573B25017 - 635B20005 TS.zip ZIP file
640B24001 - 757B29001 TS.zip ZIP file
573B25008 - 573B25019 TS.zip ZIP file
436B20003 - 605B20004 BM.zip ZIP file
Jan 2022 Consolidation - Schedule of Line Items - Updated 3-2-2022.xlsx XLSX spreadsheet
Vendor Folders.zip ZIP file
605B20005 - 688B20003 BM.zip ZIP file
516B20004 - 541B20003 TS.zip ZIP file
Memorandum for Training.pdf PDF
642B20005 - 757B29001 TS.zip ZIP file
580B20019 - 640B24001 TS.zip ZIP file
541B20014 - 561B20005 TS.zip ZIP file
504B20001 - 516B20003 TS.zip ZIP file
36A79722Q0010_1.docx DOCX document
RFQ Instructions to Offerors - January 2022 Consolidation.pdf PDF
VA Directive 6550 - New Appendix A - published Jun. 2019.pdf PDF
Vendor Workup Spreadsheet - 36A79722Q0010.xlsx XLSX spreadsheet
January 2022 Consolidation Schedule.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Turnkey Specifications

In accordance with FAR 22.401, “Construction, alteration, or repair” means all types of work done by laborers and mechanics employed by the construction contractor or construction subcontractor on a particular building or work at the site thereof, including without limitations—

(1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated off-site;

(2) Painting and decorating;

(3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work;

(4) Transportation of materials and supplies between the site of the work within the meaning of paragraphs (1)(i) and (ii) of the “site of the work” definition of this section, and a facility which is dedicated to the construction of the building or work and is deemed part of the site of the work within the meaning of paragraph (2) of the “site of work” definition of this section; and

(5) Transportation of portions of the building or work between a secondary site where a significant portion of the building or work is constructed, which is part of the “site of the work” definition in paragraph (1)(ii) of this section, and the physical place or places where the building or work will remain (paragraph (1)(i) in the “site of the work” definition of this section).

FAR 22.4 implements statutes which prescribe labor standards for non-construction contracts involving some construction work, in excess of $2,000.00. HTME contracts are supply contracts for high-tech medical equipment, therefore they do not contain the FAR 22.4 statutes, terms and conditions. As a result, turnkey modifications that involve construction and are valued at over $2,000.00 fail to meet the mandated FAR requirements.

In accordance with FAR 22.402(b)(2), the requirements of FAR 22.4 do not apply if—

“(i) The construction work is incidental to the furnishing of supplies, equipment, or services (for example, the requirements do not apply to simple installation or alteration at a public building or public work that is incidental to furnishing supplies or equipment under a supply contract;

however, if a substantial and segregable amount of construction, alteration, or repair is required, such as for installation of heavy generators or large refrigerator systems or for plant modification or rearrangement, the requirements of this subpart apply); or

(ii) The construction work is so merged with non-construction work or so fragmented in terms of the locations or time spans in which it is to be performed, that it is not capable of being segregated as a separate contractual requirement.”

Effective immediately, to ensure compliance with mandatory FAR guidelines, all turnkey modification requests will be thoroughly reviewed to ensure added work is only that which is required for the proper installation and operation of the equipment. Requests will be limited to that work which is incidental to the furnishing of equipment and is not capable of being segregated as a separate contractual requirement. Any construction work required above and beyond this (e.g. HVAC, painting, building of restrooms and/or waiting rooms) must be completed as a separate requirement by a contracting office that has the proper authority to write construction contracts.

THE FOLLOWING APPLY TO ALL MODALITIES:

INSTALLATION - WITHIN 30 DAYS OF EQUIPMENT DELIVERY ADO

EXTENDED/TURNKEY INSTALLATION - WITHIN 30 DAYS OF EQUIPMENT DELIVERY ADO