Mechanical_Part_2of2 (2018).pdf

PDF 4 MB Posted

Attached to
391/16240. DCS - Caro Center - Emergency Repairs
Solicitation number
RFQ-171-180000000440-2
Issued by
Van Buren County, Capac Village, Michigan

About this file

This file contains mechanical engineering drawings and specifications for emergency repairs at the Caro Center in Michigan, produced by Peter Basso Associates Inc. The drawings detail steam trap basement mechanical plans, first floor mechanical plans, second floor mechanical plans, and various mechanical details and schedules. The plans show extensive steam system components including steam traps, convectors, and piping layouts across multiple floors of the facility.

The technical specifications include detailed schedules for split system air conditioning units, air handling unit fans, steam heating coils, air handling unit filters, and steam condensate pumps. The drawings also contain multiple piping diagrams showing steam drip configurations, sprinkler system details, and temperature control system architectures. The documentation includes comprehensive symbol lists and control diagrams for the building's mechanical systems, particularly focused on steam distribution and temperature control systems. The drawings are dated 2018 and include specific equipment details like AHU specifications, steam trap locations, and control valve arrangements.

View the file

Other files

File Type Posted
Civil_Part2of2 (2018).pdf PDF
Specifications (2018).pdf PDF
Architectural_Part_1of4 (2018).pdf PDF
Mechanical_Part_1of2 (2018).pdf PDF
Addendum 1 - Part 2 (2018).pdf PDF
Civil_Part1of2 (2018).pdf PDF
Architectural_Part_3of4 (2018).pdf PDF
Addendum 1 - Part 1 (2018).pdf PDF
Electrical (2018).pdf PDF
DTMB 415 (2018).pdf PDF
Architectural_Part_4of4 (2018).pdf PDF
Architectural_Part_2of4 (2018).pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M2.0 STEAM TRAP BASEMENT MECHANICAL PLAN

M2.1 STEAM TRAP FIRST FLOOR MECHANICAL PLAN
M2.2 STEAM TRAP SECOND FLOOR MECHANICAL PLAN
M6.1 MECHANICAL DETAILS AND SCHEDULES
M6.2 MECHANICAL DETAILS AND SCHEDULES
M8.1 TEMPERATURE CONTROLS
M8.2 TEMPERATURE CONTROLS