Mechanical_Part_1of2 (2018).pdf
PDF 5 MB Posted
- Attached to
- 391/16240. DCS - Caro Center - Emergency Repairs
- Solicitation number
- RFQ-171-180000000440-2
- Issued by
- Van Buren County, Capac Village, Michigan
About this file
This file contains mechanical drawings and specifications for emergency repairs at the Caro Center facility in Michigan. The document includes mechanical abbreviation lists, symbol lists, drawing indices, and detailed application schedules for plumbing pipe insulation, HVAC piping, and duct systems. The drawings show demolition plans and new work plans for Cottages 15 and 16, focusing on mechanical systems including domestic water heaters, air handling units, steam piping, and condensate return systems.
The technical drawings include specific requirements for sheet metal work, mechanical demolition procedures, and construction phasing guidelines. The plans detail the removal and replacement of existing mechanical equipment including steam mains, storage tanks, and air handling units. Comprehensive general notes cover plumbing, HVAC, and sheet metal specifications, with particular attention to demolition safety procedures and maintaining building operations during construction. The document includes installation schedules for pipe insulation, valves, and accessories, with specific material requirements and application methods outlined in the general notes sections.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M0.1 MECHANICAL STANDARDS AND DRAWING INDEX
| M0.2 MECHANICAL APPLICATION SCHEDULES AND GENERAL NOTES |
| M0.3 MECHANICAL APPLICATION SCHEDULES |
| MD1.0 COTTAGE 15 MECHANICAL DEMOLITION PLAN |
| MD1.1 COTTAGE 16 MECHANICAL DEMOLITION PLAN |
| M1.0 COTTAGE 15 MECHANICAL NEW WORK PLAN |
| M1.1 COTTAGE 16 MECHANICAL NEW WORK PLAN |
File details come from the government source that posted it. Updated .