McLean-Muhlenberg WLS.pdf

PDF 90 KB Posted

Attached to
RoW Mow Trim & Litter Removal McLean Muhlenberg Co D-2
Solicitation number
RFB 605 2300000450 2
Issued by
Madison County, Kentucky

About this file

This is a Work Location Sheet for road maintenance services in McLean and Muhlenberg Counties, Kentucky, specifying mowing and litter removal operations across multiple state and U.S. routes. The document details 19 distinct project segments covering approximately 231.32 total miles of roadway requiring routine maintenance. Services include Type 3 mowing operations across 1,149 acres with three annual cycles and litter removal across 10.7 miles, also with three annual cycles. Each mowing cycle must be completed within a maximum of 15 working days. The routes encompass U.S. 431, U.S. 62, and various Kentucky state routes including KY 81, KY 85, KY 56, KY 136, KY 140, KY 70, KY 171, KY 181, KY 189, KY 176, and KY 973, with segments identified by milepost locations and county boundaries.

The document indicates that Batwing Mowers may be utilized on specific routes marked with asterisks, while routes marked with pound symbols require dedicated litter removal operations. All work is organized under project numbers beginning with FE01 075 for McLean County segments and FE01 089 for Muhlenberg County segments. No information regarding pricing, contract term, award dates, incumbent contractors, or funding sources is provided in this work location sheet, as it serves primarily as a specification document defining the geographic scope and operational requirements for the maintenance contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Route Number System County Project Number From To

Project Length

Type 3 Mowing

Acres Number of Cycles

Litter Removal

Miles Number of Cycles

US 431 MP McLean FE01 075 0431 000-011

Muhlenberg Co Line (MP 0.00)

Daviess Co Line

(MP 11.573)

11.573 71 3

KY 81 MP McLean FE01 075 0081 000-018

Muhlenberg Co Line (MP 0.00)

Daviess Co Line

(MP 18.087)

18.087 122 3

KY 85 MP McLean FE01 075 0085 000-012

Hopkins Co Line

(MP 0.00)

Ohio Co Line

(MP 12.451)

12.451 58 3

KY 56 MP McLean FE01 075 0056 000-009

Webster Co Line

(MP 0.00)

Daviess Co Line

(MP 9.560)

9.56 56 3

KY 136 MP McLean FE01 075 0136 000-022

KY 56

(MP 0.00)

Ohio Co Line

(MP 22.618)

22.618 84 3

KY 140 RS McLean FE01 075 0140 000-013

KY 256

(MP 0.00)

Daviess Co Line

(MP 13.208)

13.208 54 3

KY 70 MP Muhlenberg FE01 089 0070 000-023

Hopkins Co Line

(MP 0.00)

Butler Co Line

(MP 23.060)

23.06 97 3

KY 171 RS Muhlenberg FE01 089 0171 000-012

Johnston Rd/Todd Co Line (MP 0.00)

US 62

(MP 12.572)

12.572 49 3

KY 181 MP/RS Muhlenberg FE01 089 0181 000-025

Todd Co Line

(MP 0.00)

KY 81

(MP 25.296)

25.296 116 3

US 431 MP Muhlenberg FE01 089 0431 000-028

Logan Co Line

(MP 0.000)

McLean Co Line

(MP 28.313)

28.313 134 3

US 431*# MP Muhlenberg FE01 089 0431 018-022

US 62

(MP 18.278)

KY 1031

(MP 22.034)

3.756 included above

3 3.7 3

US 62 MP Muhlenberg FE01 089 0062 000-008

Hopkins Co Line

(MP 0.000)

KY 189

(MP 8.780)

8.78 40 3

US 62*# MP Muhlenberg FE01 089 0062 014-016

KY 189

(MP 14.667)

US 431

(MP 16.471)

1.804 17 3 1.8 3

US 62 MP Muhlenberg FE01 089 0062 016-026

US431

(MP 16.471)

Ohio Co Line

(MP 26.005)

9.534 31 3

Work Location Sheet - McLean/Muhlenberg 2023

Route Number System County Project Number From To

Project Length

Type 3 Mowing

Acres Number of Cycles

Litter Removal

Miles Number of Cycles

KY 189 MP Muhlenberg FE01 089 0189 000-008

Christian Co Line

(MP 0.00)

US 62

(MP 8.75)

8.75 48 3

KY 189*# MP Muhlenberg FE01 089 0189 008-013

US 62

(MP 8.750)

US 62

(MP 13.962)

5.212 106 3 5.2 3

KY 176 MP Muhlenberg FE01 089 0176 000-007

US 62

(MP 0.00)

US 431

(MP 7.930)

7.93 29 3

KY 973 RS Muhlenberg FE01 089 0973 000-008

KY 181

(MP 0.00)

US 431

(MP 8.815)

8.815 37 3

Total 231.32 1149 10.7

* A Batwing Mower may be used on this route(s).

#Remove Litter on these routes Maximum days to complete a cycle: 15 working days.

McLean-Muhl

File details come from the government source that posted it. Updated .