MCIC RTU-ADDENDUM 01.pdf

PDF 132 KB Posted

Attached to
MCIC RTU Replacement Project
Solicitation number
RFP GIS 260000002382 2
Issued by
Genesee County, Michigan

About this file

This is Addendum No. One to the original plans and specifications for an RTU Replacement project at the Marion Crouse Instructional Center operated by the Genesee Intermediate School District in Warren, Michigan. The addendum, issued by Wakely Associates, Inc. Architects on July 30, 2026, modifies the contract documents for Proposal A-General Trades and includes a Pre-Bid Meeting Sign-In Sheet. The project work is restricted to the 2026 holiday break period, with contractors required to commence operations immediately upon contract award and perform all work exclusively between December 19, 2026, and January 1, 2027. Substantial completion of the project must be achieved no later than January 1, 2027. The building will be without staff during this time frame, allowing contractors to mobilize and work in all areas without interruption.

No drawings were issued with this addendum, and the document serves primarily as a clarification to the original specifications regarding project timing and work authorization. The compressed work schedule takes advantage of the facility's closure during the holiday break period to minimize disruption to normal school operations. Bidders who attended the pre-bid meeting are identified on the attached sign-in sheet, which was issued concurrently with the addendum.

View the file

Other files

File Type Posted
Bid Advertisement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WAKELY ASSOCIATES, INC. ADDENDUM NO. ONE

ARCHITECTS GENESEE INTERMEDIATE SCHOOL DISTRICT

30500 Van Dyke Ave. - Suite 209 MARION CROUSE INSTRUCTIONAL CENTER Warren, Michigan 48093 RTU REPLACEMENT

Page 1 of 1 (write up only)

July 30, 2026

ADDENDUM NO. ONE to the plans and specifications for the GENESEE

INTERMEDIATE SCHOOL DISTRICT, MARION CROUSE INSTRUCTIONAL CENTER,

RTU REPLACEMENT, Architect’s Project No. 262117, dated July 20, 2026.

The above plans and specifications are modified, supplemented, or augmented as follows, and this ADDENDUM NO. ONE is hereby made a part of the contract documents.

Pre-Bid Meeting Sign-In Sheet are being issued with this Addendum.

No Drawings are being issued with this Addendum.

ARCHITECTURAL SPECIFICATION ITEMS

ITEM NO. AS1: Refer to Pre-Bid Meeting Sign-In Sheet (Issued):

1. Refer to attached Pre-Bid Meeting Sign-In Sheet for the meeting attendance.

ITEM NO. AS2: Refer to Specification Section 01010-Summary of Work: Proposal

A-General Trades (Not Re-Issued):

For Clarification: All work is to be performed only during the 2026 holiday break, as follows:

TIME OF COMPLETION: PROPOSAL A – GENERAL TRADES

The undersigned agrees to commence work operations immediately upon award of contract and shall indicate below that he will be on-site to perform all work only between the days of December

19, 2026, thru January 1, 2027, with substantial completion of the project no later than January 1, 2027.

Note: The building will be without staff during this time frame and the contractor can mobilize and work in all areas during this time frame without interruption.

END OF ADDENDUM NO. 1

Cc: Jeff Jansen, GISD Addenda File