This Request for Proposal (RFP) is issued by McHenry County College (MCC) in Illinois for comprehensive utility locating, surveying, mapping, and Geographic Information System (GIS) services for the College's Main Campus, located at 8900 U.S. Highway 14, Crystal Lake, Illinois. The project encompasses approximately 4,838,357 square feet of property and seeks to develop a comprehensive record of existing underground and above-ground utility infrastructure. The contractor must locate and identify all utilities including electrical distribution, natural gas, domestic water, fire protection water, sanitary and storm sewers, irrigation, telecommunications, fiber optic, data/communications, and site lighting systems. Deliverables include complete field utility markings, final CAD utility drawings in DWG format, final PDF utility drawing sets, complete GIS-compatible utility data, an interactive web-based utility map, utility feature and attribute information, site photographs, and documentation of locating methods and limitations. Bidders must submit sealed bids by November 12, 2026, at 10:30 AM, with bid opening occurring at 10:35 AM the same day at Building A, Room 217. The College reserves the right to award all items to one vendor or multiple vendors at its discretion. MCC anticipates recommending an award to the Board of Trustees on November 19, 2026, with notification of award by November 30, 2026. The contract term is not explicitly specified, though work conditions indicate all labor shall be performed Monday through Friday, 6:00 AM to 6:00 PM on the Main Campus.

Pricing shall be submitted on the provided bid pricing sheet and must include all materials, labor, software licensing fees, miscellaneous costs, shipping, training, installation, setup, delivery, warranty, and repair service as applicable. The bid should remain in effect for 60 to 180 days. MCC is exempt from all federal excise, state, and local sales taxes, and the vendor shall absorb any applicable taxes. The project is designated as a prevailing wage project under the Davis-Bacon Act and Illinois Prevailing Wage Law, requiring all contractors and subcontractors to comply with prevailing wage rates and fringe benefits. This solicitation includes a Business Enterprise Program (BEP) participation aspirational goal of 30 percent of the total contract dollar amount for vendors certified as minority-owned (MBE), women-owned (WBE), or disability-owned (DBE) enterprises. Contractors must submit a completed BEP Utilization Plan demonstrating either achievement of the goal or good faith efforts to meet it; failure to do so renders the bid non-responsive and subject to rejection. The contractor must maintain comprehensive insurance coverage including workers' compensation ($1,000,000 per accident), commercial general liability ($1,000,000 each occurrence, $2,000,000 aggregate), commercial automobile liability ($1,000,000 combined single limit), umbrella liability ($5,000,000 each occurrence and aggregate), and professional liability ($1,000,000 per claim, $2,000,000 aggregate) with MCC named as an additional insured. For contracts exceeding $50,000, the contractor must provide a performance and payment bond for the full contract amount. Bidders must have a minimum of five years of previous experience and provide four client references with whom comparable services have been performed within the last three years.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8900 US Highway 14 Crystal Lake, IL 60012

(815) 455-3700 | www.mchenry.edu

MCHENRY COUNTY COLLEGE

REQUEST FOR PROPOSAL

Main Campus Utility Locating, Surveying, Mapping and GIS Services

You are invited to submit a bid to provide comprehensive MAIN CAMPUS UTILITY LOCATING, SURVEYING, MAPPING AND GIS SERVICES. Please include delivery charges in your price if applicable. The College is exempt from all sales tax. Bids are due by November 12, 2026, AT 10:30 AM.

McHenry County College reserves the right to award all items to one vendor or to multiple vendors depending on what is considered to be in the best interest of the College.

Bids must be in accordance with the instructions contained herein. All submittals are to contain a total of one (1) original, and one (1) copy in a sealed opaque envelope. EMAILS OR FAXES

ARE NOT ACCEPTABLE.

Vendors must submit their bid on the attached pricing sheet(s) by U.S. Mail or dropping off completed sealed bid in the Business Office, Room A246. After the College has advertised for bids, no pre-bid vendor shall contact any College officer(s) or employee(s) involved in the solicitation process, except for interpretation of bid specifications, clarification of bid submission requirements or any information pertaining to pre-bid conferences. Such bidder or sub-bidder making such request shall be made in writing at least seven (7) days prior to the date for receipt of bids. No vendor shall visit or contact any College officers or employees until after the bids are awarded, except in those instances when site inspection is a prerequisite for the submission of a bid. Any such visitation, solicitation, or sales call by any representative of a prospective vendor in violation of this provision may cause the disqualification of such bidder’s response. The sole point of contact is:

Sole Point of Contact: Sandy Schwendeman Assistant Vice President of Facilities Management sschwendeman@mchenry.edu

Mail Drop Off Bid to: Maricella Garza Coordinator of Purchasing mgarza@mchenry.edu McHenry County College Building A, Room 246 8900 US Highway 14 Crystal Lake, IL 60012-2738

Mark Outside of Envelope: MAIN CAMPUS UTILITY LOCATING, SURVEYING, MAPPING

AND GIS SERVICES RFP#11122026_GIS

REQUEST FOR PROPOSAL RFP#11122026_GIS

Page

INTRODUCTION

Introduction: McHenry County College (hereinafter “MCC”) is inviting responsible Vendors (hereinafter “Bidder” or “Contractor”) to submit bids for Evaporative Cooling and Ventilation System. A more complete description of the supplies and/or services sought is provided in the “Bid Specifications”. If you are interested and able to meet these requirements, we would appreciate and welcome a bid. This RFP will set forth any evaluation criteria to be used in determining product or service acceptability. It may require the submission of bid samples, descriptive literature, technical data, references, licenses, or other information or material.

Unsolicited bid samples or descriptive literature, however, are submitted at the vendor’s risk, may not be examined or tested, will not be deemed to vary any of the provisions of the RFP, and may not be utilized by the vendor to contest a decision or understanding with MCC.

The bid document and all attachments are available for download from the MCC website, www.mchenry.edu/bid. Contractors who download the bid document waive their right to have clarifications and/or addenda sent to them. Such Contractors are responsible for checking the website for clarifications and/or addenda. Failure to obtain clarifications and/or addenda from the website shall not relieve such Contractor from being bound by additional terms and conditions in the clarification and/or addenda, if any, or from considering additional information contained therein in preparing their bids. Note that there may be multiple clarifications and/or addenda. Any harm to a Contractor resulting from such failure shall not be valid grounds for protest against award(s) made under this bid. Bids will not be accepted in electronic form.

Background: McHenry County College (MCC) is a community college offering pre-baccalaureate programs for students planning to transfer to a four-year university, occupational education leading directly to employment, adult education and literacy programs, work force and workplace development services, and support services to help students succeed. McHenry County College serves one of the fastest growing counties in Illinois. MCC is located forty-five miles northwest of downtown Chicago, the college is committed to providing high quality, need-based educational and training opportunities to adult residents of Community College District

528. Nearly 250,000 residents live within the MCC district boundaries. The campus is located at 8900 U.S. Highway 14, Crystal Lake, IL 60012. Also, part of this college is the University Center, approximately nine miles northwest of MCC in the town of Woodstock, Illinois.

Contact Information: The contact, identified below, is the sole point of contact regarding the RFP from the date of issuance until selection of the successful vendor.

Sandy Schwendeman Assistant Vice President of Facilities Management 8900 US Highway 14 Crystal Lake, IL 60012 Email: sschwendeman@mchenry.edu

Contract Terms: The successful Contractor agrees to execute a formal written contract with McHenry County College subject to any modifications as may be required by MCC. Bids shall identify the individuals having authority to contractually bind the Contractor. It shall also name the person to be contacted both during the period of evaluation of bids and execution. This information is to include the name, title, address, telephone, fax number, and email address of this individual.

Bidder Qualifications: The following minimum qualifications must be met by each bidder:

The Bidder shall have had a minimum of five (5) years previous experience, possess manpower, equipment, financial resources, and an organization as herein specified to perform the type, magnitude, and quality of work specified.

Must provide all information required of the Minority Enterprise Program.

GENERAL INFORMATION

Key Event Dates: The following dates are set forth for informational and planning purposes;

however, MCC reserves the right to change the dates.

MCC Issues RFP listed at www.mchenry.edu/bid October 16, 2026 Last day for vendor questions via email sschwendeman@mchenry.edu October 26, 2026

Response to vendor questions will be listed by addendum at www.mchenry.edu/bid October 28, 2026

Bid End Date November 12, 2026, 10:30 AM CST Bid Opening Date November 12, 2026, 10:35 AM CST

Bid Opening Location

McHenry County College 8900 US Highway 14 Crystal Lake, IL 60012 Building A, Room 217

Reviewed by MCC Evaluation Team by November 12-18, 2026 Recommendation to Board of Trustees November 19, 2026 Notification of Award by November 30, 2026

BID SUBMISSION

Examination of Solicitation Documents and Explanation to Bidders: Bidders are responsible for examining the solicitation documents and any addenda issued to become informed as to all conditions that might in any way affect the cost or performance of any work.

Failure to do so will be at the sole risk of the bidder. Should the bidder find discrepancies in or omissions from the solicitation documents or should their intent or meaning appear unclear or ambiguous, or should any other question arise relative to the solicitation documents, the bidder shall promptly notify the Coordinator of Purchasing via email. The bidder making such request will be solely responsible for its timely receipt by the Coordinator of Purchasing. Replies to such notices may be made in the form of an addendum to the solicitation.

Submission: The submission of a response shall be prima facie evidence that the vendor has full knowledge of the scope and nature of the project requirements. Only electronic bids will be accepted.

Interpretation or Representations: MCC assumes no responsibility for any interpretation or representations made by any of its officers or agents unless interpretations or representations are incorporated into a formal written addendum to the solicitation.

RFP Questions and Clarifications: Questions and requests for clarification are only accepted via e-mail. Official answers to questions will be provided via addendum.

Addendum: The only method by which any requirement of this solicitation may be modified is by written addendum. MCC is not responsible if a vendor does not receive the bid revision in time to include the information with the bid submission. Any addendum will be posted to MCC’s website at www.mchenry.edu/bid. The addendum shall be acknowledged by signature and included in your bid submission.

Bid Preparation Costs: The costs for developing and delivering responses to this RFP are entirely the responsibility of the bidder. The College is not liable for any expense incurred by the bidder in the preparation and presentation of their bid or any other costs incurred by the bidder prior to execution of a Purchase Order or Contract.

Cancellation of RFP: If the Coordinator of Purchasing determines that it is in MCC’s best interest, he/she reserves the right to do any of the following

• Cancel this RFP

• Modify this RFP in writing as needed

• Reject any or all bids received in response to this RFP.

Accuracy/ Withdrawal of Bids Prior to Bid Opening: Bids may be withdrawn in writing any time prior to the opening hour. However, no bid may be withdrawn for a period of sixty (60) days subsequent to the opening of the Bid without the prior written approval of the Coordinator of Purchasing of McHenry County College.

Taxes: MCC is exempt from all federal excise, state and local taxes unless otherwise stated in this document. In the event taxes are imposed on the services purchased, MCC will not be responsible for payment of the taxes. The vendor shall absorb the taxes entirely. Upon request, MCC’s Tax Exemption Certificate will be furnished.

Evaluation: In evaluating the bids submitted, MCC will apply the “Best Value” standard in selecting the vendor to be awarded a contract for this project. Purchase price is not the only criteria that will be used in the evaluation process. Any award resulting from this bid will be made to that vendor whose offer conforms to the bid and it is determined to be the most advantageous, or “best value” to MCC, in the sole judgment of MCC. The selection process will include, but not be limited to, the following considerations:

• The quality and range of products and services the firm proposes to provide.

• The ability to provide products and services in an expedient and efficient manner.

• The firm’s overall experience, reputation, expertise, stability, and financial responsibility.

• The experience and qualifications of the staff that will be assigned to service MCC’s account.

• The provider’s ability to assist MCC in meeting the overall goals of bid.

• The bidder’s past relationship with MCC, if any.

• Any other relevant factor that a business entity would consider in selecting a vendor.

Award of Contract: MCC reserves the right to reject any or all prices or bids submitted, waive irregularities, and to accept that bid which is considered to be in the best interest of the College.

Any such decision shall be considered final and not subject to recourse. Unless we are advised to the contrary, it is understood that the bid has been submitted in strict accordance with specifications. Any exceptions and explanations regarding the items listed should be delivered with the bid. Submit complete specifications for any substitute offered.

The successful bidder will be notified within three business days by e-mail or telephone, of their award of contract following the Board of Trustees meeting. The vendor may not assign, sell, or otherwise transfer its interest in the contract award or any part thereof without written permission from MCC. This bid will be awarded in its entirety to one vendor. We reserve the right to make moderate quantity alterations to conform to budget limitations.

INSTRUCTION TO BIDDERS

Read the following instructions carefully before submitting any bid: Failure to follow these instructions and the rules may result in the rejection of your bid. MCC reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid.

Bid Format and Content: In order for MCC to evaluate bids fairly and completely, bidders must follow the format set forth herein and must provide all of the information requested. All items identified in the following list must be addressed as concisely as possible in order for a bid to be considered complete. Failure to conform to the stated requirements may necessitate rejection of the bid.

Cover Letter. The cover letter must confirm that the bidder understands all the terms and conditions contained in this RFP and will comply with all the provisions of this RFP. Further, should the contract be awarded to your company, you would be prepared to begin services upon contract approval from MCC. The cover letter must include the full contact information of the person(s) MCC shall contact regarding the bid. A bidder representative authorized to make contractual obligations must sign the cover letter. The letter must also state whether or not subcontractors will be used.

Pricing: The bidder shall submit pricing for all items listed on the Bid Pricing Sheet.

Packaging of Response: Vendors must submit their bid on the attached Bid Pricing sheet(s) and send by U.S. Mail or dropping off completed sealed bid in the Business Office, McHenry County College, Building A, Room 246; 8900 US Highway 14, Crystal Lake, IL 60012, on or before the due date of November 12, 2026, at 10:30 a.m. Please see the first page of this RFP for specific details. McHenry County College assumes no responsibility for lost mail.

Please allow ample time for mailing bids.

Late Bids: Regardless of cause, late bids will not be accepted and will automatically be disqualified from further consideration. It shall be the bidder’s sole risk to ensure delivery at the designated office by the designated time. Late bids will not be opened and may be returned to the bidder at the expense of the bidder or destroyed if requested.

Bidder’s Signature: The bid submission form must be signed in ink by an individual authorized to legally bind the business submitting the bid. The bidder’s signature on a bid in response to this RFP guarantees that the offer has been established without collusion and without effort to preclude MCC from obtaining the best possible supply or service.

Bid Opening: MCC will open all bids that are submitted in a proper and timely manner and will record the names and other information specified by law and rule. All bids become the property of MCC and will not be returned.

Responders’ Costs: The cost of developing a bid for this RFP belongs solely to the bidder and may not be charged to MCC.

GENERAL TERMS AND CONDITIONS

Applicability: These general terms and conditions will be observed in preparing for the bid to be submitted.

Purchase: Following the notice of award, the purchase will be implemented through purchase orders or appropriate contract documents executed by the Coordinator of Purchasing.

Right to Cancel: MCC may cancel contracts resulting from this RFP at any time for a breach of any contractual obligation by providing the contractor with thirty-calendar day's written notice of such cancellation. Should MCC exercise its right to cancel, such cancellation shall become effective on the date as specified in the notice to cancel.

Proprietary Information: Bidder should be aware that the contents of all submitted bids are subject to public review and will be subject to the Illinois Freedom of Information Act. All information submitted with your bid will be considered public information unless bidder identifies all proprietary information in the bid by clearly marking on the top of each page so considered, “Proprietary Information.” The Illinois Attorney General shall make a final determination of what constitutes proprietary information or trade secrets. While MCC will endeavor to maintain all submitted information deemed proprietary within MCC, MCC will not be liable for the release of such information.

Negotiation: MCC reserves the right to negotiate all elements, which comprise the bidder’s bid to ensure the best possible consideration, be afforded to all concerned. MCC further reserves the right to waive any and all minor irregularities in the bid, waive any defect, and/or reject any and all bids, and to seek new bids when such an action would be deemed in the best interest of MCC.

Retention of Documentation: All bid materials and supporting documentation that is submitted in response to this bid become the permanent property of MCC.

Insurance Requirements: If fabrication, construction, installation, service or other work is specified to be conducted on MCC’s premises, supplier shall maintain in force during the period of such work the following coverage’s: (a) worker’s compensation, as required by the laws of the State of Illinois; (b) commercial general liability for bodily injury and/or property damage in an amount of not less than $1,000,000 single limit, per occurrence; (c) automobile liability for bodily injury and/or property damage in an amount of not less than $1,000,000 single limit, per occurrence. The successful bidder shall provide a certificate of insurance, naming McHenry County College as additional insured.

Performance and Bond: For every project greater than Fifty Thousand Dollars ($50,000), Contractor shall procure a performance and bond for the full amount of the contract price. Prior to commencement of any work on the Project, the Contractor shall submit insurance and bonds.

Any provisions contained within the bonds creating a condition precedent for Owner, or abrogating Owner’s rights or remedies otherwise available in contract or law, are void.

Terms of Payment: MCC operates under Net 30 payment terms for work completed and products delivered, with payment due within 30 days of the invoice date. All invoices are subject to monthly approval prior to payment. MCC will not agree to assess or pay late fees unless payment remains outstanding for more than 60 days after the invoice date. This policy is based on applicable state statutes governing state-funded entities.

Smoke and Tobacco Free Campus: To promote a safe, clean and healthy learning environment, and in compliance with the Illinois Smoke-Free Campus Act (110 ILCS 64/1), McHenry County College prohibits the use of tobacco products inside College facilities, College vehicles and on all College property This includes the burning of any type of cigar, cigarette, pipe, electronic cigarette or any other smoking equipment The use of smokeless/chewing tobacco is also prohibited Refusal to comply with this policy will be met with increasingly severe penalties.

Indemnification: The Contractor shall protect, indemnify and hold MCC harmless against any liability claims and costs for injury to or death of any person or persons and for loss or damage to any property occurring in connection with or in any incident to or arising out of occupancy, use, service, operations or performance of work in connection with the contract, resulting in whole or in part from the negligent acts or omissions of the Contractor.

Substitutes to Specifications: Consideration will be given to alternatives if they are a standard manufactured item as evidenced by literature and specifications enclosed with this bid document. A demonstration may be requested. Submit complete specifications for any substitute offered.

Compliance with Law: Contractor will comply with all valid federal, state and local laws and all ordinances and regulations applicable to the manufacture, sale delivery and labeling of the goods ordered and in the performance of any work pursuant hereto. Contractor also certifies that the merchandise supplied meets both Illinois Life Safety Code and OSHA regulations.

Disclosure: Contractors shall note any and all relationships that might be a conflict of interest and include such information with the bid.

Performance Evaluation Disclaimer: This evaluation (if applicable) will assess the contractor's overall performance, quality of services, responsiveness, compliance with contract requirements, and ability to meet the needs of the organization. Satisfactory performance during this evaluation period is expected to support continuation of the contract; however, this evaluation does not alter the terms of the contract or create a guarantee of renewal beyond the initial contract period. Any renewal options will remain at the sole discretion of the organization and are subject to satisfactory performance, continued need, and available funding.

OSHA: The Occupational Safety & Health Administration (OSHA) Hazardous Communication Standard (29 CFR 1910.1200) states that contractors/suppliers must be informed of the hazardous chemicals their employees may be exposed to while performing their work and any appropriate protective measures. In order to comply with this requirement, McHenry County College has developed a list of all the hazardous chemicals known to be present in our facility.

A Material Safety Data Sheet (MSDS/SDS) is also on file for each of these chemicals and/or hazardous substances. This information is available to you and to your employees upon request. In order to protect the safety and health of our own employees as well as the employees of contractors/suppliers, contractor/suppliers must maintain and provide, upon request, an MSDS/SDS on any hazardous chemical(s) or material(s) which they bring to the facility. Failure to maintain an MSDS/SDS and provide this information in a timely manner will result in the removal of the contractor/supplier from the premises. Each employer is also responsible for notifying any subcontractor they employ regarding the requirements of OSHA’s Hazard Communication Standard and other provisions described in this letter.

Business Enterprise for Minorities, Females and Persons with Disabilities Act: The College recognizes the importance of increasing the participation of businesses owned by minorities, females, veterans and persons with disabilities in public contracts. It is the policy of the College to promote the economic development of disadvantaged business enterprises by setting aspirational goals to award contracts to businesses owned by minorities, females, veterans and persons with disabilities for certain services, to the extent provided by the Business Enterprise for Minorities, Females and Persons with Disabilities Act (“Act”), 30 ILCS 575/0.01 et seq. and the Business Enterprise Council for Minorities, Females, and Persons with Disabilities (“Council”) which serves to implement, monitor and enforce the goals of the Act.

BID SPECIFICATIONS

MAIN CAMPUS

McHenry County College is inviting responsible Contractors to submit bids to provide comprehensive MAIN CAMPUS UTILITY LOCATING, SURVEYING, MAPPING AND GIS SERVICES. Each product must come with the necessary accessories to begin operation in an educational setting. The successful bidder will supply all materials and perform all labor necessary to complete the project based on the specifications listed below. All pricing shall be listed and submitted on the form(s) below. If using other or additional forms other than the one listed below, please itemize and price all items. The College is exempt from all sales tax.

Also include pricing for any training, installation, setup, delivery, shipping and handling, warranty, repair service, etc. The bid should be in effect for 60-180 days. Pricing should reflect the purchase for each item or unit and include a total price. Please include any discount for volume purchasing.

MAIN CAMPUS

Project Description McHenry County College (MCC) is seeking qualified contractors to provide comprehensive utility locating, identification, marking, surveying, and mapping services for the College's Main Campus property, located at 8900 U.S. Highway 14, Crystal Lake, Illinois.

The Main Campus encompasses approximately 4,838,357 square feet of property. The purpose of this project is to develop a comprehensive and accurate record of existing underground and above-ground utility infrastructure throughout the campus.

The selected contractor shall locate and identify utilities, mark utility routes in the field, document the findings, and provide MCC with accurate digital and hard-copy utility maps that can be used for future construction, maintenance, renovation, emergency response, and campus planning.

The contractor shall coordinate with MCC Facilities personnel throughout the project and shall verify field conditions to the greatest extent reasonably possible. Existing drawings, utility records, site plans, and other information provided by MCC may be used as reference information; however, the contractor shall be responsible for field verification of utility locations.

Project Details

The purpose of this project is to establish a comprehensive record of existing campus utility infrastructure that can be used by MCC Facilities for future construction, renovation, maintenance, emergency response, utility coordination, and campus planning.

All services and deliverables identified in this Scope of Work shall be included in the contractor's base bid unless specifically identified as an optional service.

Pre-Project Coordination Prior to beginning field work, the contractor shall meet with MCC Facilities representatives to review the project area, scope of work, available utility information, access requirements, and anticipated schedule.

The contractor shall:

• Review the project limits and campus map

• Review available existing utility drawings, as-built drawings, site plans, utility maps, and other records provided by MCC

• Identify any additional information or documentation needed from MCC

• Identify areas requiring access to mechanical rooms, utility rooms, manholes, vaults, handholes, meter rooms, telecommunications rooms, fenced areas, or other restricted locations

• Coordinate access requirements with MCC Facilities

• Provide MCC with a proposed fieldwork schedule

• Identify any anticipated limitations or areas where additional investigation may be necessary

MCC will make reasonable efforts to provide available utility records and facilitate access to campus areas necessary to complete the work.

Utility Locating The contractor shall locate and identify existing utilities throughout the entire designated project area.

The contractor shall use appropriate industry-standard locating equipment and techniques, which may include:

• Electromagnetic (EM) locating equipment

• Ground-penetrating radar (GPR)

• Inductive locating

• Direct connection locating

• Passive locating

• Tracing equipment

• Other appropriate non-destructive locating methods

The contractor shall make reasonable efforts to locate detectable utilities, including but not limited to:

• Electrical distribution

• Natural gas

• Domestic water

• Fire protection water

• Sanitary sewer

• Storm sewer

• Irrigation

• Telecommunications

• Fiber optic

• Telephone

• Data/communications

• Site lighting

• Other underground utilities identified within the project area

The contractor shall trace utilities between accessible points wherever reasonably possible and shall identify the approximate alignment of each utility.

MAIN CAMPUS

Utility Structures and Above Ground Features The contractor shall identify and map above ground and accessible utility structures associated with the utility systems.

These features may include:

• Manholes

• Catch basins

• Storm structures

• Sanitary structures

• Cleanouts

• Outfalls

• Valves

• Valve boxes

• Fire hydrants

• Water meters

• Gas meters

• Utility vaults

• Electrical pull boxes

• Junction boxes

• Handholes

• Transformers

• Utility poles

• Conduits

• Utility markers

• Tracer wires

• Building utility connections

• Well casings

• Pavement cuts

• Other utility-related structures and features

Each feature shall be mapped and identified according to information reasonably obtainable in the field.

Utility Depth and Elevation Information Where reasonably obtainable, the contractor shall collect depth and/or elevation information for underground utilities.

Depth information should be collected at significant locations, including:

• Utility crossings

• Building entrances

• Utility structures

• Changes in direction

• Utility connections

• Areas containing multiple utilities

• Other locations determined to be significant

The contractor shall identify whether depth information is:

• Field measured

• Calculated

• Estimated

• Obtained from existing records

The contractor shall not be required to certify the depth or exact location of an underground utility unless the location can be physically verified.

GPS/GIS Data Collection The contractor shall collect geospatial data for all utilities and utility-related features identified during the project.

The contractor shall utilize survey-grade or equivalent GPS/GNSS equipment and Network RTK corrections, where site conditions permit, to obtain accurate positional data.

GPS/GIS data shall be collected for:

• Utility alignments

• Utility structures

• Utility access points

• Utility connections

• Above-ground utility features

• Other significant utility-related features

The contractor shall document areas where GPS/GNSS accuracy may be reduced due to:

• Buildings

• Tree cover

• Structures

• Obstructions

• Urban or congested conditions

• Other site-specific factors

The contractor shall make reasonable efforts to obtain the highest practical level of positional accuracy using the equipment and methods proposed.

CAD Mapping The contractor shall develop comprehensive CAD drawings based on field investigation and GPS/GIS data collection.

CAD files shall be provided in Autodesk Civil 3D DWG format, or another format approved in writing by MCC.

The CAD drawings shall:

• Show the entire project area

• Show above ground and underground utilities

• Identify utility types

• Show utility alignments

• Identify utility structures and features

• Include applicable utility attributes

• Include a utility legend

• Include symbols and abbreviations

• Identify information obtained from existing records

• Identify areas where utility locations are approximate or uncertain

• Utilize available digital aerial/orthographic imagery as a base map where appropriate

The final CAD files shall be provided to MCC.

PDF Utility Drawing Set The contractor shall provide a complete and final PDF drawing set of the utility mapping.

The PDF drawing set shall include:

• Overall campus utility map

• Utility-specific drawings where appropriate

• Detailed drawings for areas with significant utility congestion

• Utility legend

• Symbols and abbreviations

• North arrow

• Drawing scale

• Project limits

• Applicable notes

• Utility identification and labeling

• Areas of uncertainty or limited locating

Drawings shall be suitable for both electronic use and printing.

Where practical, drawing sheets shall be provided on 24-inch by 36-inch sheets with appropriate margins and a consistent drawing format.

GIS Data Deliverables The contractor shall provide MCC with the complete collected utility information in a GIS-compatible digital format.

The GIS deliverables shall include where applicable:

• Utility line features

• Utility point features

• Utility structures

• Utility connections

• Above-ground utility features

• Utility type

• Utility size

• Utility material

• Depth/elevation information

• Utility status

• Identification numbers

• Other relevant attribute information collected during the project

GIS data shall be provided in one or more commonly used formats, including but not limited to:

• SHP

• GeoJSON

• KMZ/KML

• Other mutually approved GIS-compatible formats

The GIS data shall be organized so MCC can import and utilize the information in its GIS environment.

Interactive Web Map The contractor shall provide MCC with a fully functional interactive web-based utility map as part of the base project.

The interactive map shall allow authorized MCC users to:

• Pan throughout the campus

• Zoom in and out

• View the entire project area

• View individual utility systems

• Turn utility layers on and off

• Identify individual utility features

• View available utility information

• Navigate to specific campus buildings and areas

• View utility alignments and structures

The contractor shall provide MCC with the web address and all necessary access information.

The contractor shall clearly identify any limitations associated with the web map, including whether the map can be exported, downloaded, edited, or maintained by MCC.

If the web map requires an ongoing hosting, subscription, or licensing fee, the contractor shall identify those costs separately in the bid.

The interactive web map shall be included in the base bid and shall not be considered an optional deliverable.

MAIN CAMPUS

Site Photographs

The contractor shall provide electronic photographs documenting field conditions and significant utility locating activities where site conditions permit.

Photographs should include, where appropriate:

• Utility structures

• Utility markings

• Significant utility crossings

• Utility access points

• Areas with difficult locating conditions

• Other conditions that may assist MCC in interpreting the final utility mapping

Utility Locating Limitations The contractor shall document any utilities or areas that could not be positively located.

Final documentation shall identify, where applicable:

• Utilities successfully located

• Utilities partially located

• Utilities identified from records but not field verified

• Utilities that could not be detected

• Areas where access was unavailable

• Areas where site conditions prevented locating

• Utilities composed of materials that are difficult or impossible to detect using standard locating methods

• Areas where additional investigation is recommended

The contractor shall not identify a utility as nonexistent solely because it could not be detected.

The final mapping shall distinguish, to the extent practical, between field-verified information and information obtained from existing records.

MAIN CAMPUS

Final Deliverables At the completion of the project, the contractor shall provide MCC with all of the following as part of the base contract price:

1. Complete field utility markings

2. Final CAD utility drawings in DWG format

3. Final PDF utility drawing set

4. Complete GIS-compatible utility data

5. Interactive web-based utility map

6. Utility feature and attribute information

7. Site photographs, where available

8. Documentation of locating methods used

9. Identification of limitations and areas of uncertainty

10. Final project documentation

11. Any supporting digital files necessary for MCC to utilize the completed utility information

All electronic files shall be organized in a logical folder structure with clearly labeled file names.

The final information shall be provided in a format that allows MCC Facilities to use the data for future construction, renovation, maintenance, emergency response, utility coordination, and campus planning.

811/Public Utility Locates The contractor's scope is intended to identify and map private/on-campus utility infrastructure within the project area.

The contractor shall make reasonable efforts to identify public utility infrastructure when encountered or when information is provided by the utility owner; however, the contractor's work shall not replace the statutory requirements associated with utility locating prior to excavation.

MCC and/or its contractors shall continue to utilize the Illinois 811 system prior to any excavation or ground-disturbing activity as required by applicable law.

Information contained within the contractor's utility mapping shall not be considered a substitute for an active 811 utility locate prior to excavation.

The contractor shall clearly distinguish, where reasonably possible, between utilities located as part of this project and public utility information obtained from existing records or other sources.

Access Requirements The contractor shall have full and unobstructed access to areas necessary to perform the work, subject to coordination with MCC Facilities.

Access may be required to:

• Mechanical rooms

• Electrical rooms

• Telecommunications rooms

• Utility rooms

• Manholes

• Handholes

• Vaults

• Meter rooms

• Fenced compounds

• Utility structures

• Building utility connections

• Other restricted areas

The contractor shall notify MCC in advance of any required access.

MCC shall make reasonable efforts to provide access and coordinate the movement of vehicles, equipment, or other obstructions when necessary.

Any conditions that prevent the contractor from completing the required scope shall be documented and reported to MCC.

Ownership of Deliverables All CAD drawings, PDF drawings, GIS data, utility mapping data, photographs, documentation, and other project-specific information created and paid for as part of this project shall be provided to and become the property of McHenry County College upon completion and payment of the contract, subject to any standard third-party software or platform licensing restrictions.

The contractor shall provide MCC with editable/native files whenever applicable and shall not restrict MCC from using the completed utility information for future campus planning, maintenance, construction, renovation, or emergency response.

The contractor shall identify any third-party software, licensing, hosting, or access restrictions that may affect MCC's ability to use or maintain the deliverables after completion of the project.

Conditions

• All work, unless otherwise specified, shall be performed Monday-Friday 6am-6pm

• All work, unless otherwise specified will be performed on the main campus address of

8900 U.S. Highway 14, Crystal Lake, IL 60012.

• All local utility incentives will be explored and applied for

• This project is a prevailing wage project as defined by the Davis-Bacon Act and Illinois

Prevailing Wage Law. Prevailing wage rates and fringe benefits are required for all labor performed on the project

• Any necessary unforeseen additions to the project will be submitted as a change order

• All OSHA safety regulations will be followed

• All MCC rules will be followed while on property

BID PRICING SHEET

SCOPE OF WORK – GRAND TOTAL PRICING

The contractor shall provide Grant Total pricing for the project. Also include pricing for any training, installation, setup, delivery, shipping and handling, warranty, repair service, etc. The proposal should be in effect for 60-180 days. Pricing should reflect the purchase for each item or unit and include a total price. Please include any discount for volume purchasing. Please use an additional sheet(s) as needed.

BASE BID PRICING:

MATERIALS

LABOR

SOFTWARE

LICENSING FEES

MISCELLANEOUS

OTHER

SHIPPING

GRAND TOTAL

BID SUBMISSION FORM

Bid Submitted By and Authorized Signature: The individual's signature below constitutes that the person is an officer of the company who is authorized to contractually obligate the company listed below. They further constitute that they have read and agree to all instructions and specifications listed in this bid document unless otherwise marked and listed in the "exception to bid" section.

Bid Submitted by: __________________________________________________________

Signature: ____________________________________________________________

Title: ____________________________________________________________

� The Owner/ � Member of the � Officer of the � Member of the Sole Proprietor Partnership Corporation Joint Venture

Company: ____________________________________________________________

Address: ____________________________________________________________

Email Address: ____________________________________________________________

Telephone: ____________________________________________________________

Date: ____________________________________________________________

Contact Person : __________________________________________________________

Contact Email : ____________________________________________________________

REFERRAL/REFERENCE LIST

List at least four clients with whom your company has worked or is currently working with in procuring comparable services within the last three years.

Company 1 Name Address Phone Email

Company 2

Address

Company 3

Address

Company 4

Address

Company 5

Address

MINIMUM INSURANCE REQUIREMENTS

The undersigned Contractor/Vendor or User of College Campus Facilities shall purchase and maintain the following insurance coverages with carriers with a Bests Financial Rating not less than A, XII to which McHenry County College has no reasonable objection.

A Contractor/Vendor or User shall furnish a certificate of insurance and the specified endorsement to McHenry County College prior to the commencement of any work covered by this, or any resulting contract or purchase order, as evidence that all requirements of this addendum have been complied with. The certificate and endorsement shall also contain a provision that the coverage afforded under the policies required shall not be cancelled or allowed to expire unless 60 days prior written notice has been given to McHenry County College. Failure on the part of the Contractor/Vendor or User to maintain coverage as required shall constitute a default and entitle McHenry County College, at its sole option, to either terminate the contract or procure replacement coverage and offset the cost against any money due the Contractor/Vendor or User.

Coverages, whether written on occurrence or claims made, shall be maintained without interruption from the date of commencement of work/event until the date of final payment and termination of any coverage to be maintained after final payment. The vendor shall furnish McHenry County College a certificate of insurance and policy endorsement as evidence of coverage, in addition to those coverages as required in paragraphs, 1, 2, and 3.

1. WORKERS COMPENSATION/EMPLOYERS LIABILITY:

• $1,000,000 per accident

• $1,000,000 disease, policy limit

• $1,000,000 disease, each

• The policy will be endorsed showing a waiver of right of recovery form #WC000313 or equivalent in favor of McHenry County College.

2. COMMERCIAL GENERAL LIABILITY:

Coverage shall include premises operations, independent contractors, contractual liability, products and completed operations including broad form property damage, covering bodily injury and property damage or limits as shown below. Products and completed operations liability shall be maintained for two years after completion of the work performed under this Contract or Purchase Order.

• $1,000,000 each occurrence

• $2,000,000 general aggregate

• Policy shall be properly endorsed to show McHenry County

College as an Additional Insured on a primary and noncontributory basis.

• The policy will be endorsed showing a waiver of right of recovery in favor of McHenry

County College.

• The policy shall also contain form #GL2503 showing the aggregate limits apply per pro ject or #GL2504 showing that the aggregate limit applies per location.

3. COMMERCIAL AUTOMOBILE LIABILITY:

Coverage shall be written to include all owned, non‐owned, and hired automobiles covering bodily injury and property damage, including uninsured and underinsured motorist’s coverage for limits as shown below.

• $1,000,000 combined single limit each occurrence

• The policy will be endorsed showing a waiver of right of recovery in favor of McHenry

County College.

• Policy shall be properly endorsed to show McHenry County College as an Additional

Insured on a primary and noncontributory basis.

4. UMBRELLA LIABILITY:

The policy shall cover excess of Employers Liability, General Liability, and Automobile Liability with underlying limits as shown in items 1, 2, and 3 and shall also name McHenry County College as an ADDITIONAL INSURED on a primary noncontributory basis with the following limits.

• $5,000,000 each occurrence

• $5,000,000 general aggregate

5. PROFESSIONAL LIABILITY:

Should this contract provide for Professional services, such as, but not limited to, Athletic Trainers, Sports Medicine, Counseling, Dental, Medical, Psychological, and Contractors, the vendor shall purchase and maintain Professional Liability coverage for the services to be rendered for limits not less than:

• $1,000,000 per claim or occurrence, $2,000,000 aggregate

Should any of the above policies be written on a claims-made basis, the policy date or retroactive date shall predate the contract. The Additional Insured provisions as contained in these paragraphs shall be maintained for a period of not less than five years after the expiration and or nonrenewal of this Contract. The termination date of the policy or applicable extended reporting period shall be no earlier than the termination date of coverages required to be maintained as shown above.

CONTRACTOR CERTIFICATION

Illinois Revised Stature 1987 Chapter 38, Sections 33E-3 and 33E-4

The undersigned hereby certifies that it is not barred from bidding on this contract as a result of violation of either Section 33E-3 (bid rigging) or 33E-4 (bid rotating) of the Illinois Revised Statutes 1987, Chapter 38.

Under penalty of perjury, the undersigned Contractor certifies that this bid has not been arrived at collusively or otherwise in violation of Federal or Illinois antitrust laws.

Company

By *

Address

City / State / Zip

∗ Must be actual signature in ink of a representative of Contractor authorized to legally commit the Contractor.

Section 33E-5(b) pertains to disclosure of information related to the terms of a bid and any bidder's responsiveness to a request for bids. Specifically, district officials or employees must not knowingly open a sealed bid at a time or place other than as specified by the district. Also, any official who knowingly discloses any information related to the terms of a sealed bid or any bidder's responsiveness to the request for bids commits a class 3 felony. This section does allow, however, that no violation occurs if any disclosure made to an interested person also is made generally available to the public. CONSEQUENTLY, COLLEGES SHOULD BE

CAUTIOUS NOT TO DISCLOSE ANY INFORMATION THAT IS NOT RELEASED TO THE

PUBLIC.

Section 33E-6 contains several provisions potentially impacting College purchasing procedures. SPECIFICALLY, A PERSON COMMITS A CLASS 4 FELONY WHEN

INFORMATION CONCERNING THE SPECIFICATIONS OF A CONTRACT IS KNOWINGLY

CONVEYED TO A BIDDER OR PROSPECTIVE BIDDER OTHER THAN THROUGH THE

BID INVITATION, PRE-BID CONFERENCE, OR CONTRACT SOLICITATION PROCEDURE.

Thus, once a RFP for a particular contract is released, MCC cannot respond to individual inquiries from bidders. Likewise, no information may be volunteered concerning potential Subcontractors if the contract involves subcontracting work.

W9 FORM

SECTION 00 43 39 – MCC BUSINESS ENTERPRISE PROGRAM -

MINORITIES, FEMALES, AND PERSONS WITH DISABILITY PARTICIPATION

AND UTILIZATION PLAN

The Business Enterprise Program for Minorities, Females, and Persons with Disabilities Act (BEP) establishes certain goals for community colleges contracting with businesses that are owned and controlled by persons who are minorities (MBE), women (WBE), or persons with disabilities (DBE) (collectively, BEP certified vendor(s)).

Contract Goal to be Achieved by Vendor: This solicitation includes a specific BEP participation aspirational goal of 30% of the total dollar amount of the contract.

The BEP participation goal is applicable to all bids or offers. McHenry County College (College) will award this contract to a Vendor that meets the goal or makes good faith efforts to meet the goal. This goal is also applicable to change orders and allowances within the scope of work provided by the BEP certified vendor. If Vendor is a BEP certified vendor, the entire goal is met and no subcontracting with a BEP certified vendor is required; however, Vendor must submit a Utilization Plan indicating that the goal will be met by self-performance. Failure to complete a Utilization Plan or provide good faith effort documentation shall render the bid or offer non-responsive or not responsible and subject to rejection and/or disqualification in the College’s sole discretion.

The following are guidelines for Vendor’s completion of the Utilization Plan. Please read the guidelines carefully. A format for the Utilization Plan is included in this section. Vendor should include any additional information that will add clarity to Vendor’s proposed utilization of certified BEP vendors to meet the targeted goal. The Utilization Plan must demonstrate that Vendor has either: (1) met the entire contract goal or (2) made good faith efforts towards meeting the goal. Any submission of good faith efforts by Vendor shall be considered as a request for a full or partial waiver.

To meet the College’s BEP participation goals, Vendor, or Vendor’s proposed Subcontractor(s), must be certified with the Business Enterprise Council as a BEP certified vendor. If Vendor or Vendor’s proposed Subcontractor(s) are not BEP certified vendors but do meet the definition of MBE, WBE, or DBE companies as set forth in 30 ILCS 575/2, Vendor shall have the burden of submitting sufficient evidence of the company’s ownership. The College shall have the sole discretion of whether to accept non-BEP certified vendors and applying said contracts towards its BEP participation goals.

1. If applicable where there is more than one prime vendor, the Utilization Plan should include an executed Joint Venture Agreement specifying the terms and conditions of the relationship between the parties and their relationship and responsibilities to the contract.

The Joint Venture Agreement must clearly evidence that the BEP certified vendor will be responsible for a clearly defined portion of the work and that its responsibilities, risks, profits and contributions of capital, and…