The document is a Critical Path Method (CPM) Schedule for the Stanton Ave/McCandless Ave Stairs project by the City of Pittsburgh's Department of Mobility and Infrastructure (DOMI). The comprehensive project schedule spans from August 1, 2022, to August 25, 2023, and details a multi-phase construction process involving pre-construction activities, site preparation, structural work, and project closeout. Key phases include concrete quality control planning, environmental and safety controls, caisson drilling, soldier pile installation, precast panel placement, foundation and landing construction, railing installation, and final site restoration.
The schedule indicates a structured workflow with multiple concurrent and sequential activities, including shop drawing submissions, reviews, fabrication, and construction stages. Critical milestones include anticipated Notice to Proceed on August 1, 2022, with specific deadlines for various technical reviews, material preparations, and construction elements. The project encompasses activities such as removing existing guiderails, clearing and grubbing, demolishing existing stairs, implementing traffic control, drilling caissons, pouring concrete, setting precast components, and completing seeding and erosion control measures. The final project deadline is set for August 25, 2023, with a comprehensive closeout process including final inspection, punch list item resolution, and complete site restoration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Line Activity ID Activity Desc. Start Finish Duration Total float Calendar Constraint Predecessors Successors
2022 2023
2 3 4 1 2
11 12 13 14 15 16 17 18 19 20 21 22 23 24
010.10
010.20
010.40
030.05
030.10
030.20
030.30
030.40
040.05
040.10
040.40
040.50
040.60
040.70
060.05
060.10
060.15
060.20
060.25
070.01
070.10
070.15
070.20
070.25
Administrative Tasks
Anticipated Notice to Proceed (8/1/2022)
Mobilization
Project Completion
PRE-CONSTRUCTION ACTIVITIES
Concrete QC Plans and Mix Designs
Develop/Submit QC Plans and Mix Designs
DOMI Review
Revise and Resubmit QC Plans and Mix Designs
DOMI Review and Approval
Pre-Concrete Meeting
Advanced Notice/RNAs
Notify County Conservation District
Notice to Municipalities and Emergency Services
Erect Advanced Warning Signs
Initial Press Release Notification
PA One Call
On-Site Pre Construction Meeting
CPM Schedule
Develop CPM Schedule
DOMI Review
Revise/Resubmit CPM Schedule
DOMI Review and Acceptance
Monitor and Progress Schedule
Precast Components
Prepare and submit precast component shop drawings
DOMI review of precast component shop drawings
Revise and resubmit precast component shop drawings
DOMI Review and Acceptance of precast component shop drawings
Fabricate precast components
01 Aug 22
01 Aug 22 *
15 Aug 22
01 Aug 22
01 Aug 22
01 Aug 22
01 Aug 22
06 Aug 22
22 Aug 22
27 Aug 22
06 Sep 22
01 Aug 22
01 Aug 22
01 Aug 22
01 Aug 22
01 Aug 22
01 Aug 22
01 Aug 22
01 Aug 22
01 Aug 22
13 Aug 22
29 Aug 22
03 Sep 22
11 Sep 22
01 Aug 22
01 Aug 22
31 Aug 22
15 Sep 22
22 Sep 22
29 Sep 22
15 Aug 22
01 Aug 22
15 Aug 22
01 Aug 22
16 Apr 23
06 Sep 22
05 Aug 22
19 Aug 22
26 Aug 22
02 Sep 22
06 Sep 22
14 Aug 22
14 Aug 22
14 Aug 22
10 Aug 22
10 Aug 22
03 Aug 22
01 Aug 22
15 Sep 22
12 Aug 22
26 Aug 22
02 Sep 22
10 Sep 22
15 Sep 22
01 Dec 22
30 Aug 22
14 Sep 22
21 Sep 22
28 Sep 22
01 Dec 22
11.0d
1.0d
1.0d
250.0d
36.0d
5.0d
14.0d
5.0d
7.0d
1.0d
14.0d
14.0d
14.0d
10.0d
10.0d
3.0d
1.0d
33.0d
10.0d
14.0d
5.0d
7.0d
5.0d
84.0d
30.0d
14.0d
5.0d
7.0d
60.0d
258.0d
0.0d
159.0d
268.0d
113.0d
205.0d
145.0d
207.0d
145.0d
207.0d
145.0d
225.0d
234.0d
234.0d
238.0d
238.0d
245.0d
165.0d
133.0d
131.0d
189.0d
131.0d
189.0d
197.0d
127.0d
181.0d
181.0d
127.0d
181.0d
181.0d
5-DAY
5-DAY
5-DAY
5-DAY
7-DAY
7-DAY
5-DAY
7-DAY
5-DAY
7-DAY
5-DAY
7-DAY
Calendar Day
Calendar Day
Calendar Day
Calendar Day
Calendar Day
5-DAY
5-DAY
5-DAY
7-DAY
5-DAY
7-DAY
Calendar Day
5-DAY
7-DAY
7-DAY
5-DAY
7-DAY
7-DAY
None
Start on
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
Anticipated Notice to Proceed (8/1/2022), PA One Call, Notify County Conservation District, Notice to Municipalities and Emergency Services, Erect Advanced Warning
Signs, Initial Press Release Notification
Anticipated Notice to Proceed (8/1/2022)
Anticipated Notice to Proceed (8/1/2022)
Develop/Submit QC Plans and Mix Designs
DOMI Review
Revise and Resubmit QC Plans and Mix Designs
DOMI Review and Approval
Anticipated Notice to Proceed (8/1/2022)
Anticipated Notice to Proceed (8/1/2022)
Anticipated Notice to Proceed (8/1/2022)
Anticipated Notice to Proceed (8/1/2022)
Anticipated Notice to Proceed (8/1/2022)
Anticipated Notice to Proceed (8/1/2022)
Anticipated Notice to Proceed (8/1/2022)
Develop CPM Schedule
DOMI Review
Revise/Resubmit CPM Schedule
DOMI Review and Acceptance
Anticipated Notice to Proceed (8/1/2022)
Prepare and submit precast component shop drawings
DOMI review of precast component shop drawings
Revise and resubmit precast component shop drawings
DOMI Review and Acceptance of precast component shop drawings
Mobilization , PA One Call, Develop/Submit QC Plans and Mix Designs, Notify County Conservation District, Notice to Municipalities and Emergency Services, Erect Advanced Warning Signs, Initial Press Release Notification, Develop CPM Schedule, Prepare and submit railing shop drawings, Project Completion, On-Site Pre Construction Meeting, Prepare and submit precast component shop drawings, Prepare Precast Panel Shop Drawings, Structural Steel - Soldier Piles
Implement Traffic Control
Project Complete
DOMI Review
Revise and Resubmit QC Plans and Mix Designs
DOMI Review and Approval
Pre-Concrete Meeting
Drill caissons - set soldier piles for retaining wall - pour caisson concrete, Install precast panels, Drill caissons for landings 4, 3, 2, 1 and 0, set cages, and pour, Form, tie, and pour columns at landings 4, 3, 2, and 1, Excavate, form, tie, and pour pad at landing 0, Form, tie, and pour walls at landing 0, Excavate, form, tie, and pour foundation at landing 5
Mobilization
Mobilization
Mobilization , Implement Traffic Control
Mobilization
Mobilization
Implement Traffic Control, Install E&S Controls
DOMI Review
Revise/Resubmit CPM Schedule
DOMI Review and Acceptance
Monitor and Progress Schedule
Project Complete, Install E&S Controls
DOMI review of precast component shop drawings
Revise and resubmit precast component shop drawings
DOMI Review and Acceptance of precast component shop drawings
Fabricate precast components
Set precast components
Line Activity ID Activity Desc. Start Finish Duration Total float Calendar Constraint Predecessors Successors
2 3 4 1 2
11 12 13 14 15 16 17 18 19 20 21 22 23 24
080.05
080.15
080.20
080.25
080.30
100.05
100.10
100.15
100.20
100.21
100.25
200.020
200.030
200.040
200.041
200.045
200.050
200.060
200.070
200.071
200.080
200.100
200.110
200.130
200.140
200.150
200.160
200.165
200.170
200.180
200.185
200.190
Railing
Prepare and submit railing shop drawings
DOMI review of railing shop drawings
Revise and resubmit railing shop drawings
DOMI review and acceptance railing shop drawings
Fabricate railings
Retaining Wall - Precast Lagging and Soldier Piles
Prepare Precast Panel Shop Drawings
DOMI Review of Precast Panel Shop Drawings
Revise and Resubmit Precast Panel Shop Drawings
DOMI Review and Acceptance of Precast Panel Shop Drawings
Fabricate precast lagging
Structural Steel - Soldier Piles
Construction Work
Install E&S Controls
Remove Existing Guiderail along McCandless Avenue
Clearing and Grubbing
Demolish Existing Stairs
Implement Traffic Control
Drill caissons - set soldier piles for retaining wall - pour caisson concrete
Cure caisson concrete
Install precast panels
Form, tie, and pour closure pours
Cure closure pours
Backfill soldier pile wall
Drill caissons for landings 4, 3, 2, 1 and 0, set cages, and pour
Cure caisson concrete
Form, tie, and pour columns at landings 4, 3, 2, and 1
Cure column concrete at landings 4, 3, 2, and 1
Form, tie, pour caps at landings 4, 3, 2, and 1
Cure caps at landings 4, 3, 2, and 1
Excavate, form, tie, and pour foundation at landing 5
Cure foundation at landing 5
Backfill foundation at landing 5
Set precast components
01 Aug 22
01 Aug 22
13 Sep 22
27 Sep 22
04 Oct 22
12 Oct 22
01 Aug 22
01 Aug 22
13 Aug 22
29 Aug 22
03 Sep 22
11 Sep 22
01 Aug 22
16 Sep 22
16 Sep 22
17 Sep 22
19 Sep 22
20 Sep 22
31 Oct 22
01 Nov 22
04 Nov 22
12 Nov 22
14 Nov 22
16 Nov 22
23 Nov 22
23 Nov 22
29 Nov 22
06 Dec 22
08 Dec 22
15 Dec 22
21 Dec 22
21 Dec 22
24 Dec 22
31 Dec 22
03 Jan 23
16 Apr 23
12 Sep 22
26 Sep 22
03 Oct 22
11 Oct 22
16 Apr 23
10 Nov 22
12 Aug 22
26 Aug 22
02 Sep 22
10 Sep 22
10 Nov 22
31 Oct 22
19 Apr 23
16 Sep 22
17 Sep 22
19 Sep 22
21 Sep 22
31 Oct 22
03 Nov 22
10 Nov 22
12 Nov 22
15 Nov 22
22 Nov 22
23 Nov 22
28 Nov 22
05 Dec 22
07 Dec 22
14 Dec 22
20 Dec 22
27 Dec 22
23 Dec 22
30 Dec 22
31 Dec 22
04 Jan 23
176.0d
30.0d
14.0d
5.0d
7.0d
180.0d
72.0d
10.0d
14.0d
5.0d
7.0d
60.0d
90.0d
177.0d
1.0d
1.0d
1.0d
2.0d
1.0d
3.0d
7.0d
1.0d
2.0d
7.0d
1.0d
3.0d
7.0d
2.0d
7.0d
5.0d
7.0d
3.0d
7.0d
1.0d
2.0d
81.0d
79.0d
113.0d
79.0d
113.0d
113.0d
106.0d
106.0d
152.0d
106.0d
152.0d
152.0d
151.0d
97.0d
161.0d
161.0d
161.0d
161.0d
129.0d
129.0d
159.0d
129.0d
129.0d
157.0d
159.0d
129.0d
155.0d
129.0d
155.0d
129.0d
160.0d
129.0d
156.0d
129.0d
129.0d
5-DAY
5-DAY
7-DAY
5-DAY
7-DAY
7-DAY
5-DAY
5-DAY
7-DAY
5-DAY
7-DAY
7-DAY
7-DAY
6-DAY
6-DAY
6-DAY
6-DAY
6-DAY
6-DAY
6-DAY
CURE
6-DAY
6-DAY
CURE
6-DAY
6-DAY
CURE
6-DAY
CURE
6-DAY
CURE
6-DAY
CURE
6-DAY
6-DAY
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
Anticipated Notice to Proceed (8/1/2022)
Prepare and submit railing shop drawings
DOMI review of railing shop drawings
Revise and resubmit railing shop drawings
DOMI review and acceptance railing shop drawings
Anticipated Notice to Proceed (8/1/2022)
Prepare Precast Panel Shop Drawings
DOMI Review of Precast Panel Shop Drawings
Revise and Resubmit Precast Panel Shop Drawings
DOMI Review and Acceptance of Precast Panel Shop Drawings
Anticipated Notice to Proceed (8/1/2022)
Monitor and Progress Schedule, On-Site Pre Construction Meeting
Install E&S Controls
Remove Existing Guiderail along McCandless Avenue
Clearing and Grubbing
On-Site Pre Construction Meeting, Erect Advanced Warning Signs, Mobilization , Demolish Existing Stairs
Clearing and Grubbing, Pre-Concrete Meeting, Structural Steel - Soldier Piles, Implement Traffic Control
Drill caissons - set soldier piles for retaining wall - pour caisson concrete
Cure caisson concrete, Pre-Concrete Meeting, Fabricate precast lagging
Install precast panels
Form, tie, and pour closure pours
Cure closure pours
Pre-Concrete Meeting, Cure closure pours
Drill caissons for landings 4, 3, 2, 1 and 0, set cages, and pour
Cure caisson concrete, Pre-Concrete Meeting
Form, tie, and pour columns at landings 4, 3, 2, and 1
Cure column concrete at landings 4, 3, 2, and 1
Form, tie, pour caps at landings 4, 3, 2, and 1
Pre-Concrete Meeting, Form, tie, pour caps at landings 4, 3, 2, and 1
Excavate, form, tie, and pour foundation at landing 5
Cure foundation at landing 5
Backfill foundation at landing 5, Cure caps at landings 4, 3, 2, and 1, Fabricate precast components, Backfill soldier pile wall
DOMI review of railing shop drawings
Revise and resubmit railing shop drawings
DOMI review and acceptance railing shop drawings
Fabricate railings
Install railing
DOMI Review of Precast Panel Shop Drawings
Revise and Resubmit Precast Panel Shop Drawings
DOMI Review and Acceptance of Precast Panel Shop Drawings
Fabricate precast lagging
Install precast panels
Drill caissons - set soldier piles for retaining wall - pour caisson concrete
Remove Existing Guiderail along McCandless Avenue
Clearing and Grubbing
Drill caissons - set soldier piles for retaining wall - pour caisson concrete, Demolish Existing Stairs
Implement Traffic Control
Drill caissons - set soldier piles for retaining wall - pour caisson concrete
Cure caisson concrete
Install precast panels
Form, tie, and pour closure pours
Cure closure pours
Backfill soldier pile wall, Drill caissons for landings 4, 3, 2, 1 and 0, set cages, and pour
Set precast components
Cure caisson concrete
Form, tie, and pour columns at landings 4, 3, 2, and 1
Cure column concrete at landings 4, 3, 2, and 1
Form, tie, pour caps at landings 4, 3, 2, and 1
Cure caps at landings 4, 3, 2, and 1, Excavate, form, tie, and pour foundation at landing 5
Set precast components
Cure foundation at landing 5
Backfill foundation at landing 5
Set precast components
Excavate, form, tie, and pour pad at landing 0
Line Activity ID Activity Desc. Start Finish Duration Total float Calendar Constraint Predecessors Successors
2 3 4 1 2
11 12 13 14 15 16 17 18 19 20 21 22 23 24
200.200
200.201
200.202
200.210
200.220
200.230
200.240
200.245
200.250
300.010
300.020
800.010
800.020
800.030
800.40
Excavate, form, tie, and pour pad at landing 0
Cure pad at landing 0
Form, tie, and pour walls at landing 0
Cure walls at landing 0
Backfill walls at landing 0
Install railing
Restore pavement along Stanton and McCandless Aves
Reinstall guideraill along McCandless Ave
Remove Traffic Control
Seeding / E&S Controls
Complete Seeding / Germination (March 15th to June 1st, and August 1st to October 15th)
Remove E&S controls
Project Closeout
Final Inspection
Project Punchlist Items
Project Complete
Project Deadline (Finish on or before August 25th)
05 Jan 23
08 Jan 23
11 Jan 23
13 Jan 23
20 Jan 23
17 Apr 23
21 Jan 23
24 Jan 23
19 Apr 23
15 Mar 23
15 Mar 23 *
26 Apr 23
27 Apr 23
27 Apr 23
28 Apr 23
11 May 23
25 Aug 23
07 Jan 23
10 Jan 23
12 Jan 23
19 Jan 23
20 Jan 23
18 Apr 23
23 Jan 23
24 Jan 23
19 Apr 23
26 Apr 23
25 Apr 23
26 Apr 23
25 Aug 23
27 Apr 23
11 May 23
11 May 23
25 Aug 23 *
3.0d
3.0d
2.0d
7.0d
1.0d
2.0d
2.0d
1.0d
1.0d
43.0d
42.0d
1.0d
85.0d
1.0d
10.0d
129.0d
155.0d
130.0d
155.0d
131.0d
97.0d
131.0d
168.0d
97.0d
104.0d
104.0d
89.0d
0.0d
74.0d
74.0d
74.0d
0.0d
6-DAY
CURE
6-DAY
CURE
6-DAY
6-DAY
6-DAY
6-DAY
6-DAY
7-DAY
7-DAY
6-DAY
5-DAY
5-DAY
5-DAY
5-DAY
5-DAY
None
None
None
None
None
None
None
None
None
None
Start on or after
None
None
None
None
None
Finish on
Set precast components, Pre-Concrete Meeting
Excavate, form, tie, and pour pad at landing 0
Cure pad at landing 0, Pre-Concrete Meeting
Form, tie, and pour walls at landing 0
Cure walls at landing 0
Backfill walls at landing 0, Fabricate railings
Backfill walls at landing 0
Restore pavement along Stanton and McCandless Aves
Restore pavement along Stanton and McCandless Aves, Install railing, Reinstall guideraill along McCandless Ave
Restore pavement along Stanton and McCandless Aves
Complete Seeding / Germination (March 15th to June 1st, and August 1st to October 15th)
Remove E&S controls
Final Inspection, Remove E&S controls, Remove Traffic Control
Monitor and Progress Schedule, Project Punchlist Items, Project Completion
Project Complete
Cure pad at landing 0
Form, tie, and pour walls at landing 0
Cure walls at landing 0
Backfill walls at landing 0
Install railing, Restore pavement along Stanton and McCandless Aves
Remove Traffic Control
Remove Traffic Control, Complete Seeding / Germination (March 15th to June 1st, and August 1st to October 15th), Reinstall guideraill along McCandless Ave
Remove Traffic Control
Project Punchlist Items
Remove E&S controls
Project Punchlist Items, Final Inspection
Project Punchlist Items
Project Complete
Project Deadline (Finish on or before August 25th)
Milestone Appearances
Diamond
File details come from the government source that posted it. Updated .