About this file

The document is a Critical Path Method (CPM) Schedule for the Stanton Ave/McCandless Ave Stairs project by the City of Pittsburgh's Department of Mobility and Infrastructure (DOMI). The comprehensive project schedule spans from August 1, 2022, to August 25, 2023, and details a multi-phase construction process involving pre-construction activities, site preparation, structural work, and project closeout. Key phases include concrete quality control planning, environmental and safety controls, caisson drilling, soldier pile installation, precast panel placement, foundation and landing construction, railing installation, and final site restoration.

The schedule indicates a structured workflow with multiple concurrent and sequential activities, including shop drawing submissions, reviews, fabrication, and construction stages. Critical milestones include anticipated Notice to Proceed on August 1, 2022, with specific deadlines for various technical reviews, material preparations, and construction elements. The project encompasses activities such as removing existing guiderails, clearing and grubbing, demolishing existing stairs, implementing traffic control, drilling caissons, pouring concrete, setting precast components, and completing seeding and erosion control measures. The final project deadline is set for August 25, 2023, with a comprehensive closeout process including final inspection, punch list item resolution, and complete site restoration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line Activity ID Activity Desc. Start Finish Duration Total float Calendar Constraint Predecessors Successors

2022 2023

2 3 4 1 2

11 12 13 14 15 16 17 18 19 20 21 22 23 24

010.10

010.20

010.40

030.05

030.10

030.20

030.30

030.40

040.05

040.10

040.40

040.50

040.60

040.70

060.05

060.10

060.15

060.20

060.25

070.01

070.10

070.15

070.20

070.25

Administrative Tasks

Anticipated Notice to Proceed (8/1/2022)

Mobilization

Project Completion

PRE-CONSTRUCTION ACTIVITIES

Concrete QC Plans and Mix Designs

Develop/Submit QC Plans and Mix Designs

DOMI Review

Revise and Resubmit QC Plans and Mix Designs

DOMI Review and Approval

Pre-Concrete Meeting

Advanced Notice/RNAs

Notify County Conservation District

Notice to Municipalities and Emergency Services

Erect Advanced Warning Signs

Initial Press Release Notification

PA One Call

On-Site Pre Construction Meeting

CPM Schedule

Develop CPM Schedule

DOMI Review

Revise/Resubmit CPM Schedule

DOMI Review and Acceptance

Monitor and Progress Schedule

Precast Components

Prepare and submit precast component shop drawings

DOMI review of precast component shop drawings

Revise and resubmit precast component shop drawings

DOMI Review and Acceptance of precast component shop drawings

Fabricate precast components

01 Aug 22

01 Aug 22 *

15 Aug 22

01 Aug 22

01 Aug 22

01 Aug 22

01 Aug 22

06 Aug 22

22 Aug 22

27 Aug 22

06 Sep 22

01 Aug 22

01 Aug 22

01 Aug 22

01 Aug 22

01 Aug 22

01 Aug 22

01 Aug 22

01 Aug 22

01 Aug 22

13 Aug 22

29 Aug 22

03 Sep 22

11 Sep 22

01 Aug 22

01 Aug 22

31 Aug 22

15 Sep 22

22 Sep 22

29 Sep 22

15 Aug 22

01 Aug 22

15 Aug 22

01 Aug 22

16 Apr 23

06 Sep 22

05 Aug 22

19 Aug 22

26 Aug 22

02 Sep 22

06 Sep 22

14 Aug 22

14 Aug 22

14 Aug 22

10 Aug 22

10 Aug 22

03 Aug 22

01 Aug 22

15 Sep 22

12 Aug 22

26 Aug 22

02 Sep 22

10 Sep 22

15 Sep 22

01 Dec 22

30 Aug 22

14 Sep 22

21 Sep 22

28 Sep 22

01 Dec 22

11.0d

1.0d

1.0d

250.0d

36.0d

5.0d

14.0d

5.0d

7.0d

1.0d

14.0d

14.0d

14.0d

10.0d

10.0d

3.0d

1.0d

33.0d

10.0d

14.0d

5.0d

7.0d

5.0d

84.0d

30.0d

14.0d

5.0d

7.0d

60.0d

258.0d

0.0d

159.0d

268.0d

113.0d

205.0d

145.0d

207.0d

145.0d

207.0d

145.0d

225.0d

234.0d

234.0d

238.0d

238.0d

245.0d

165.0d

133.0d

131.0d

189.0d

131.0d

189.0d

197.0d

127.0d

181.0d

181.0d

127.0d

181.0d

181.0d

5-DAY

5-DAY

5-DAY

5-DAY

7-DAY

7-DAY

5-DAY

7-DAY

5-DAY

7-DAY

5-DAY

7-DAY

Calendar Day

Calendar Day

Calendar Day

Calendar Day

Calendar Day

5-DAY

5-DAY

5-DAY

7-DAY

5-DAY

7-DAY

Calendar Day

5-DAY

7-DAY

7-DAY

5-DAY

7-DAY

7-DAY

None

Start on

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

Anticipated Notice to Proceed (8/1/2022), PA One Call, Notify County Conservation District, Notice to Municipalities and Emergency Services, Erect Advanced Warning

Signs, Initial Press Release Notification

Anticipated Notice to Proceed (8/1/2022)

Anticipated Notice to Proceed (8/1/2022)

Develop/Submit QC Plans and Mix Designs

DOMI Review

Revise and Resubmit QC Plans and Mix Designs

DOMI Review and Approval

Anticipated Notice to Proceed (8/1/2022)

Anticipated Notice to Proceed (8/1/2022)

Anticipated Notice to Proceed (8/1/2022)

Anticipated Notice to Proceed (8/1/2022)

Anticipated Notice to Proceed (8/1/2022)

Anticipated Notice to Proceed (8/1/2022)

Anticipated Notice to Proceed (8/1/2022)

Develop CPM Schedule

DOMI Review

Revise/Resubmit CPM Schedule

DOMI Review and Acceptance

Anticipated Notice to Proceed (8/1/2022)

Prepare and submit precast component shop drawings

DOMI review of precast component shop drawings

Revise and resubmit precast component shop drawings

DOMI Review and Acceptance of precast component shop drawings

Mobilization , PA One Call, Develop/Submit QC Plans and Mix Designs, Notify County Conservation District, Notice to Municipalities and Emergency Services, Erect Advanced Warning Signs, Initial Press Release Notification, Develop CPM Schedule, Prepare and submit railing shop drawings, Project Completion, On-Site Pre Construction Meeting, Prepare and submit precast component shop drawings, Prepare Precast Panel Shop Drawings, Structural Steel - Soldier Piles

Implement Traffic Control

Project Complete

DOMI Review

Revise and Resubmit QC Plans and Mix Designs

DOMI Review and Approval

Pre-Concrete Meeting

Drill caissons - set soldier piles for retaining wall - pour caisson concrete, Install precast panels, Drill caissons for landings 4, 3, 2, 1 and 0, set cages, and pour, Form, tie, and pour columns at landings 4, 3, 2, and 1, Excavate, form, tie, and pour pad at landing 0, Form, tie, and pour walls at landing 0, Excavate, form, tie, and pour foundation at landing 5

Mobilization

Mobilization

Mobilization , Implement Traffic Control

Mobilization

Mobilization

Implement Traffic Control, Install E&S Controls

DOMI Review

Revise/Resubmit CPM Schedule

DOMI Review and Acceptance

Monitor and Progress Schedule

Project Complete, Install E&S Controls

DOMI review of precast component shop drawings

Revise and resubmit precast component shop drawings

DOMI Review and Acceptance of precast component shop drawings

Fabricate precast components

Set precast components

Line Activity ID Activity Desc. Start Finish Duration Total float Calendar Constraint Predecessors Successors

2 3 4 1 2

11 12 13 14 15 16 17 18 19 20 21 22 23 24

080.05

080.15

080.20

080.25

080.30

100.05

100.10

100.15

100.20

100.21

100.25

200.020

200.030

200.040

200.041

200.045

200.050

200.060

200.070

200.071

200.080

200.100

200.110

200.130

200.140

200.150

200.160

200.165

200.170

200.180

200.185

200.190

Railing

Prepare and submit railing shop drawings

DOMI review of railing shop drawings

Revise and resubmit railing shop drawings

DOMI review and acceptance railing shop drawings

Fabricate railings

Retaining Wall - Precast Lagging and Soldier Piles

Prepare Precast Panel Shop Drawings

DOMI Review of Precast Panel Shop Drawings

Revise and Resubmit Precast Panel Shop Drawings

DOMI Review and Acceptance of Precast Panel Shop Drawings

Fabricate precast lagging

Structural Steel - Soldier Piles

Construction Work

Install E&S Controls

Remove Existing Guiderail along McCandless Avenue

Clearing and Grubbing

Demolish Existing Stairs

Implement Traffic Control

Drill caissons - set soldier piles for retaining wall - pour caisson concrete

Cure caisson concrete

Install precast panels

Form, tie, and pour closure pours

Cure closure pours

Backfill soldier pile wall

Drill caissons for landings 4, 3, 2, 1 and 0, set cages, and pour

Cure caisson concrete

Form, tie, and pour columns at landings 4, 3, 2, and 1

Cure column concrete at landings 4, 3, 2, and 1

Form, tie, pour caps at landings 4, 3, 2, and 1

Cure caps at landings 4, 3, 2, and 1

Excavate, form, tie, and pour foundation at landing 5

Cure foundation at landing 5

Backfill foundation at landing 5

Set precast components

01 Aug 22

01 Aug 22

13 Sep 22

27 Sep 22

04 Oct 22

12 Oct 22

01 Aug 22

01 Aug 22

13 Aug 22

29 Aug 22

03 Sep 22

11 Sep 22

01 Aug 22

16 Sep 22

16 Sep 22

17 Sep 22

19 Sep 22

20 Sep 22

31 Oct 22

01 Nov 22

04 Nov 22

12 Nov 22

14 Nov 22

16 Nov 22

23 Nov 22

23 Nov 22

29 Nov 22

06 Dec 22

08 Dec 22

15 Dec 22

21 Dec 22

21 Dec 22

24 Dec 22

31 Dec 22

03 Jan 23

16 Apr 23

12 Sep 22

26 Sep 22

03 Oct 22

11 Oct 22

16 Apr 23

10 Nov 22

12 Aug 22

26 Aug 22

02 Sep 22

10 Sep 22

10 Nov 22

31 Oct 22

19 Apr 23

16 Sep 22

17 Sep 22

19 Sep 22

21 Sep 22

31 Oct 22

03 Nov 22

10 Nov 22

12 Nov 22

15 Nov 22

22 Nov 22

23 Nov 22

28 Nov 22

05 Dec 22

07 Dec 22

14 Dec 22

20 Dec 22

27 Dec 22

23 Dec 22

30 Dec 22

31 Dec 22

04 Jan 23

176.0d

30.0d

14.0d

5.0d

7.0d

180.0d

72.0d

10.0d

14.0d

5.0d

7.0d

60.0d

90.0d

177.0d

1.0d

1.0d

1.0d

2.0d

1.0d

3.0d

7.0d

1.0d

2.0d

7.0d

1.0d

3.0d

7.0d

2.0d

7.0d

5.0d

7.0d

3.0d

7.0d

1.0d

2.0d

81.0d

79.0d

113.0d

79.0d

113.0d

113.0d

106.0d

106.0d

152.0d

106.0d

152.0d

152.0d

151.0d

97.0d

161.0d

161.0d

161.0d

161.0d

129.0d

129.0d

159.0d

129.0d

129.0d

157.0d

159.0d

129.0d

155.0d

129.0d

155.0d

129.0d

160.0d

129.0d

156.0d

129.0d

129.0d

5-DAY

5-DAY

7-DAY

5-DAY

7-DAY

7-DAY

5-DAY

5-DAY

7-DAY

5-DAY

7-DAY

7-DAY

7-DAY

6-DAY

6-DAY

6-DAY

6-DAY

6-DAY

6-DAY

6-DAY

CURE

6-DAY

6-DAY

CURE

6-DAY

6-DAY

CURE

6-DAY

CURE

6-DAY

CURE

6-DAY

CURE

6-DAY

6-DAY

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

Anticipated Notice to Proceed (8/1/2022)

Prepare and submit railing shop drawings

DOMI review of railing shop drawings

Revise and resubmit railing shop drawings

DOMI review and acceptance railing shop drawings

Anticipated Notice to Proceed (8/1/2022)

Prepare Precast Panel Shop Drawings

DOMI Review of Precast Panel Shop Drawings

Revise and Resubmit Precast Panel Shop Drawings

DOMI Review and Acceptance of Precast Panel Shop Drawings

Anticipated Notice to Proceed (8/1/2022)

Monitor and Progress Schedule, On-Site Pre Construction Meeting

Install E&S Controls

Remove Existing Guiderail along McCandless Avenue

Clearing and Grubbing

On-Site Pre Construction Meeting, Erect Advanced Warning Signs, Mobilization , Demolish Existing Stairs

Clearing and Grubbing, Pre-Concrete Meeting, Structural Steel - Soldier Piles, Implement Traffic Control

Drill caissons - set soldier piles for retaining wall - pour caisson concrete

Cure caisson concrete, Pre-Concrete Meeting, Fabricate precast lagging

Install precast panels

Form, tie, and pour closure pours

Cure closure pours

Pre-Concrete Meeting, Cure closure pours

Drill caissons for landings 4, 3, 2, 1 and 0, set cages, and pour

Cure caisson concrete, Pre-Concrete Meeting

Form, tie, and pour columns at landings 4, 3, 2, and 1

Cure column concrete at landings 4, 3, 2, and 1

Form, tie, pour caps at landings 4, 3, 2, and 1

Pre-Concrete Meeting, Form, tie, pour caps at landings 4, 3, 2, and 1

Excavate, form, tie, and pour foundation at landing 5

Cure foundation at landing 5

Backfill foundation at landing 5, Cure caps at landings 4, 3, 2, and 1, Fabricate precast components, Backfill soldier pile wall

DOMI review of railing shop drawings

Revise and resubmit railing shop drawings

DOMI review and acceptance railing shop drawings

Fabricate railings

Install railing

DOMI Review of Precast Panel Shop Drawings

Revise and Resubmit Precast Panel Shop Drawings

DOMI Review and Acceptance of Precast Panel Shop Drawings

Fabricate precast lagging

Install precast panels

Drill caissons - set soldier piles for retaining wall - pour caisson concrete

Remove Existing Guiderail along McCandless Avenue

Clearing and Grubbing

Drill caissons - set soldier piles for retaining wall - pour caisson concrete, Demolish Existing Stairs

Implement Traffic Control

Drill caissons - set soldier piles for retaining wall - pour caisson concrete

Cure caisson concrete

Install precast panels

Form, tie, and pour closure pours

Cure closure pours

Backfill soldier pile wall, Drill caissons for landings 4, 3, 2, 1 and 0, set cages, and pour

Set precast components

Cure caisson concrete

Form, tie, and pour columns at landings 4, 3, 2, and 1

Cure column concrete at landings 4, 3, 2, and 1

Form, tie, pour caps at landings 4, 3, 2, and 1

Cure caps at landings 4, 3, 2, and 1, Excavate, form, tie, and pour foundation at landing 5

Set precast components

Cure foundation at landing 5

Backfill foundation at landing 5

Set precast components

Excavate, form, tie, and pour pad at landing 0

Line Activity ID Activity Desc. Start Finish Duration Total float Calendar Constraint Predecessors Successors

2 3 4 1 2

11 12 13 14 15 16 17 18 19 20 21 22 23 24

200.200

200.201

200.202

200.210

200.220

200.230

200.240

200.245

200.250

300.010

300.020

800.010

800.020

800.030

800.40

Excavate, form, tie, and pour pad at landing 0

Cure pad at landing 0

Form, tie, and pour walls at landing 0

Cure walls at landing 0

Backfill walls at landing 0

Install railing

Restore pavement along Stanton and McCandless Aves

Reinstall guideraill along McCandless Ave

Remove Traffic Control

Seeding / E&S Controls

Complete Seeding / Germination (March 15th to June 1st, and August 1st to October 15th)

Remove E&S controls

Project Closeout

Final Inspection

Project Punchlist Items

Project Complete

Project Deadline (Finish on or before August 25th)

05 Jan 23

08 Jan 23

11 Jan 23

13 Jan 23

20 Jan 23

17 Apr 23

21 Jan 23

24 Jan 23

19 Apr 23

15 Mar 23

15 Mar 23 *

26 Apr 23

27 Apr 23

27 Apr 23

28 Apr 23

11 May 23

25 Aug 23

07 Jan 23

10 Jan 23

12 Jan 23

19 Jan 23

20 Jan 23

18 Apr 23

23 Jan 23

24 Jan 23

19 Apr 23

26 Apr 23

25 Apr 23

26 Apr 23

25 Aug 23

27 Apr 23

11 May 23

11 May 23

25 Aug 23 *

3.0d

3.0d

2.0d

7.0d

1.0d

2.0d

2.0d

1.0d

1.0d

43.0d

42.0d

1.0d

85.0d

1.0d

10.0d

129.0d

155.0d

130.0d

155.0d

131.0d

97.0d

131.0d

168.0d

97.0d

104.0d

104.0d

89.0d

0.0d

74.0d

74.0d

74.0d

0.0d

6-DAY

CURE

6-DAY

CURE

6-DAY

6-DAY

6-DAY

6-DAY

6-DAY

7-DAY

7-DAY

6-DAY

5-DAY

5-DAY

5-DAY

5-DAY

5-DAY

None

None

None

None

None

None

None

None

None

None

Start on or after

None

None

None

None

None

Finish on

Set precast components, Pre-Concrete Meeting

Excavate, form, tie, and pour pad at landing 0

Cure pad at landing 0, Pre-Concrete Meeting

Form, tie, and pour walls at landing 0

Cure walls at landing 0

Backfill walls at landing 0, Fabricate railings

Backfill walls at landing 0

Restore pavement along Stanton and McCandless Aves

Restore pavement along Stanton and McCandless Aves, Install railing, Reinstall guideraill along McCandless Ave

Restore pavement along Stanton and McCandless Aves

Complete Seeding / Germination (March 15th to June 1st, and August 1st to October 15th)

Remove E&S controls

Final Inspection, Remove E&S controls, Remove Traffic Control

Monitor and Progress Schedule, Project Punchlist Items, Project Completion

Project Complete

Cure pad at landing 0

Form, tie, and pour walls at landing 0

Cure walls at landing 0

Backfill walls at landing 0

Install railing, Restore pavement along Stanton and McCandless Aves

Remove Traffic Control

Remove Traffic Control, Complete Seeding / Germination (March 15th to June 1st, and August 1st to October 15th), Reinstall guideraill along McCandless Ave

Remove Traffic Control

Project Punchlist Items

Remove E&S controls

Project Punchlist Items, Final Inspection

Project Punchlist Items

Project Complete

Project Deadline (Finish on or before August 25th)

Milestone Appearances