Questions received with answers provided by MCC.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MCC-16-RFQ-0011_0003_-_Q_and_A_and_Extension.pdf | ||
| MCC-16-RFQ-0011_0002.pdf | ||
| MCC-16-RFQ-0011_FY16-_10_MAR_2016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
03/23/2016
N/A
Millennium Challenge Corporation Contracts and Grants Management Division 1099 Fourteenth Street NW Suite 700 Washington, DC 20005-3553
Millennium Challenge Corporation Contracts and Grants Management Division 1099 Fourteenth Street NW, Suite 700 Washington, DC 20005-3553 Ray Staniewski, Sr. Contract Specialist (KTR)(202)521-3656
To all Offerors/Bidders
MCC-16-RFQ-0011
03/11/2016
X
X X
X
See CONTINUATION Page
The purpose of Amendment 0001 to this solicitation is to:
a) Post the questions received from potential offerors with the answers provided by MCC.
b) This Amendment makes no other changes.
c) See questions and answers beginning at top of page two of this Amendment.
MCC-16-RFQ-0011 0001 Page 2 of 3
CONTINUATION PAGE
Economic Analysis and Evaluation Services Burkina Faso Q & A
Solicitation Number: MCC-16-RFQ-0011
1. Recently MCC commented that all offerors for the Ghana and Tanzania roads assessment RFQ missed or did not explicitly address a key scope item. Given that the scope for the Burkina Faso RFP is so similar, would MCC highlight this key scope item so that the offerors do not miss its inclusion, and can properly address it in the approach and methodology sections as well as in the budget?
MCC RESPONSE: Every solicitation is an independent procurement. MCC has successfully awarded previous roads evaluation contracts similar in scope to the current solicitation in Burkina Faso. Thus, this solicitation should be considered by its own merits, and is not related or dependent upon any prior solicitations issued by MCC. This solicitation includes multiple components (the five key research areas) that are intended to provide a nuanced and in-depth perspective on the effects of MCC investments. The five research areas are intended to be complementary, contributing to a cohesive final analysis. However, assessing these five areas well requires a diverse set of analyses and a diverse skill set. Thus, we strongly recommend all offerors to assess the strength of their proposal for each and every one of the research areas and for each and every staffing requirement. MCC recognizes that the necessary skills sets may not exist within a single organization. Thus, as stated in section H.16, “If deemed necessary by the offeror to meet these requirements, firms are encouraged to seek collaborations with individuals and/or firms that have complementary skill sets.”
2. MCC has encouraged the use of automated traffic counting mechanisms on page 11 of the RFQ, item C.3.3.5, research area 5, to support the twice yearly review of traffic growth.
Would MCC elaborate on the benefits and rational for ordering automated methods over traditional ground counts method with human surveyors? Particularly given the complications with automated equipment such as lasers, pressure counters (strings), and video poles. These technologies are frequently unavailable in countries of Sub-Saharan Africa, may be costly to import, and do not adequately capture NMT traffic. They additionally may be stolen or damaged by local residents if left without onsite human monitoring.
MCC RESPONSE: Research Area 5 of this solicitation requires the contractor to assess the change in traffic patterns over time. Given the potential role that automatic traffic counting measures COULD play in the assessment of traffic patterns over time, “MCC encourages offerors to consider automated traffic counting mechanisms in meeting this requirement and addressing Research Area 5” (emphasis added for clarity). Thus, the use of automated methods is not required. There are benefits and drawbacks to all potential data collection methods, and offerors should weigh these benefits and drawbacks when creating their proposal and selecting their recommended methods. MCC expects all offerors to propose the methods the offeror considers best for meeting MCC’s requirement in assessing the change in traffic patterns over time, as described under Research Area 5.
3. MCC has requested the collection of post-construction aerial photography of 5cm resolution. Typically this type of imagery is gathered using low-flying single-engine aircraft or potentially drones. The latter option is not FAA-approved in the United States.
Would MCC elaborate on the benefit and rationale for preferring 5 cm aerial photography to verify traffic volumes over traditional ground counting method using automated or human surveyors? These latter methods can provide the same level of detail and accuracy on 2- and 4-lane roads for a significantly lower cost.
MCC RESPONSE: The Contractor is expected to collect aerial photography in Burkina Faso, where the use of 5cm technologies is an acceptable practice. However, potential offerors should understand that the
MCC-16-RFQ-0011 0001 Page 3 of 3 objective of the 5cm aerial photography is less for the verification of traffic volumes and more for the verification and documentation of road condition and data collected. Specifically, section C.5.5.16 indicates that, “The Contractor shall collect satellite imagery at a resolution of at least 50cm of each road (pre-construction project) and aerial photos (orthophotos) at a resolution of 5cm or greater (post construction project) and overlay the collected data including collection points and counting stations. The purpose is to convey in a high level format the essential elements driving the ERR, both positively and negatively, including the documentation of what work was done.” The objective of collecting the satellite imagery and photography is to have documentation not just of road location and status, but also to combine that information with traffic count data (whether collected manually or otherwise) as well as other data points collected during the evaluation. Thus, the objective is to display and document the data, not necessarily to verify it.
(End of Q&A)