MC-5223-DWG-GoldenAveDrawings-Revised Final RV Signed.pdf

PDF 7 MB Posted

Attached to
Golden Avenue Water Main Replacement Project (WD-54-22)
Solicitation number
WD-23-049
Issued by
Los Angeles County, California

About this file

This document is a set of construction plans for the Golden Avenue Water Main Replacement Project (WD-54-22), submitted by GHD and approved by the Long Beach Water Department in Long Beach, California. The project involves the replacement of water main infrastructure along Golden Avenue between Spring Street and 32nd Street. The plans include detailed design specifications, construction notes, utility coordination details, traffic control measures, and service connection diagrams. The project is identified as Contract Number MC-5223 and was prepared in November 2022, with approval dated December 12, 2022. The plans encompass approximately 2,291.25 linear feet of water main replacement, including the installation of new valves at stations 10+30.00 and 22+91.25, air relief and vacuum valves, blow-off assemblies, fire hydrants, water meters, and service lateral connections. The document specifies construction requirements for 8-inch diameter polyvinyl chloride (PVC) pipe with concrete encasement in designated areas, proper depth installation, trench restoration standards, and coordination with existing utilities including gas, electric, sewer, and telecommunications lines.

The project manager and engineer responsible for the work is Pedro Alvarez (R.C.E. 85667, expiration date September 30, 2024), and the General Manager is Christopher J. Garner. The Director of Engineering/Chief Engineer for the Long Beach Water Department approved the plans. The specifications require contractors to maintain dust control, provide public safety and traffic management during construction, remove and dispose of existing water infrastructure, coordinate with all relevant public agencies and utility providers, and complete work in accordance with applicable American Water Works Association (AWWA) standards and City of Long Beach specifications. Temporary traffic control measures are detailed for the Spring Street and Golden Avenue intersection, with work restricted to normal hours between 6 a.m. and 5 p.m. No information regarding contract pricing, bidding procedures, award dates, or funding sources is included in these design plans.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL MANAGER

CHRISTOPHER J. GARNER

R.C.E. 85667

PROJECT MANAGER/ENGINEER:

PEDRO ALVAREZ

(EXPIRES SEPTEMBER 30, 2024)

GHD

SUBMITTED BY:

ROBERT J. VERCELES DATE

LONG BEACH WATER DEPARTMENT

LONG BEACH, CALIFORNIA

GOLDEN AVENUE WATER MAIN REPLACEMENT PROJECT

WD-54-22

NOVEMBER 2022

GOLDEN AVENUE BETWEEN SPRING STREET AND 32ND STREET

DIRECTOR OF ENGINEERING/CHIEF ENGINEER

LONG BEACH WATER DEPARTMENT

APPROVED BY:

MC-5223

LONG BEACH

WATER DEPARTMENT

LONG BEACH WATER DEPARTMENT

GOLDEN AVENUE WATER MAIN

REPLACEMENT PROJECT

T F E W

TITLE SHEET

12/12/2022

12/12/22

LEGEND

VICINITY MAP

F22 F21

F22 F21

F21 F20

F21 F20

CITY MAP

GENERAL NOTES, VICINITY AND SHEET INDEX MAP, PUBLIC

AGENCIES AND UTILITIES, UNDERGROUND UTILITY LEGEND,

NOTES TO CONTRACTOR, AND ABBREVIATIONS

LIST OF DRAWINGS

PUBLIC AGENCIES & UTILITIES

SYMBOLS AND ABBREVIATIONS

GENERAL NOTES GENERAL NOTES (CONT.)

MC-5223

LONG BEACH

WATER DEPARTMENT

LONG BEACH WATER DEPARTMENT

GOLDEN AVENUE WATER MAIN

REPLACEMENT PROJECT

T F E W

BASIS OF BEARINGS

BENCHMARK

L14L13

S

S S

S

S S

S

SD

SD

SD

SD

SD

.97

MC-5223

LONG BEACH

WATER DEPARTMENT

LONG BEACH WATER DEPARTMENT

GOLDEN AVENUE WATER MAIN

REPLACEMENT PROJECT

T F E W

PLAN & PROFILE: STA. 10+00 TO 18+00

F21F20

F21F20

SERVICE CONNECTION NOTES

GOLDEN AVENUE

CONSTRUCTION NOTES

S

SD

SD

SD

SD

SD

MC-5223

LONG BEACH

WATER DEPARTMENT

LONG BEACH WATER DEPARTMENT

GOLDEN AVENUE WATER MAIN

REPLACEMENT PROJECT

T F E W

PLAN & PROFILE: STA. 18+00 TO 22+91.25

F22F21

F22F21GOLDEN AVENUE

CONSTRUCTION NOTES

SERVICE CONNECTION NOTES

S

MC-5223

LONG BEACH

WATER DEPARTMENT

LONG BEACH WATER DEPARTMENT

GOLDEN AVENUE WATER MAIN

REPLACEMENT PROJECT

T F E W

DETAILS

CONNECTION TO EXISTING VALVE

SCALE = NOT TO SCALE

PIPE CONCRETE ENCASEMENT

SCALE = NOT TO SCALE

CONNECTION DETAIL: GOLDEN AVE & 31ST ST

SCALE = 1" = 10'

VALVE AT STA 10+30.00 VALVE AT STA 22+91.25

TYPICAL SECTION ENCASEMENT AT MANHOLE -

SECTION VIEW

SECTION A-A

SCALE: 1" = 4'

CONSTRUCTION NOTES

A

TYPICAL CROSS SECTION - STA 10+55.82 N TO 16+15.00 N

SCALE = NOT TO SCALE

ELEVATION

SECTION A-A PLAN VIEW

TRACER WIRE ACCESS

PORT (CP BOX) DETAIL

SECTION B-B: WATER LATERAL

MC-5223

LONG BEACH

WATER DEPARTMENT

LONG BEACH WATER DEPARTMENT

GOLDEN AVENUE WATER MAIN

REPLACEMENT PROJECT

T F E W

NON-METALLIC PIPE DETAILS

INSTALLATION OF WATER METER, METER BOX AND

NON-METALLIC WATER SERVICE LATERAL

SCALE = NOT TO SCALE

2" AIR RELIEF AND VACUUM VALVE WITH NON-METALLIC PIPING

SCALE = NOT TO SCALE

A

FIRE HYDRANT ASSEMBLY WITH NON-METALLIC PIPING

SCALE = NOT TO SCALE

WARNING TAPE, IDENTIFICATION TAPE, AND TRACER WIRE INSTALLATIONS

SCALE = NOT TO SCALE

B

2" BLOWOFF ASSEMBLY WITH NON-METALLIC PIPING

SCALE = NOT TO SCALE

S S

S S

S

SS

S

S

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

S

S

S

S

S

SD

SD

SD

SD

SD

MC-5223

LONG BEACH

WATER DEPARTMENT

LONG BEACH WATER DEPARTMENT

GOLDEN AVENUE WATER MAIN

REPLACEMENT PROJECT

T F E W

TRAFFIC CONTROL TITLE SHEET & TRAFFIC CONTROL

PLAN FOR SPRING/GOLDEN INTERSECTION

TEMPORARY TRAFFIC CONTROL PLAN GENERAL NOTES LEGEND

SCALE: NTS

SIGN LEGEND

TEMPORARY TRAFFIC CONTROL KEY MAP

PHASE 1: TEMPORARY TRAFFIC CONTROL AT SPRING ST & GOLDEN AVE

SCALE: 1"=40'

Sheets and Views
1 G-001
2 G-002
3 C-001
4 C-002
5 C-003
6 C-004
7 T-001

File details come from the government source that posted it. Updated .