This document is a set of construction plans for the Golden Avenue Water Main Replacement Project (WD-54-22), submitted by GHD and approved by the Long Beach Water Department in Long Beach, California. The project involves the replacement of water main infrastructure along Golden Avenue between Spring Street and 32nd Street. The plans include detailed design specifications, construction notes, utility coordination details, traffic control measures, and service connection diagrams. The project is identified as Contract Number MC-5223 and was prepared in November 2022, with approval dated December 12, 2022. The plans encompass approximately 2,291.25 linear feet of water main replacement, including the installation of new valves at stations 10+30.00 and 22+91.25, air relief and vacuum valves, blow-off assemblies, fire hydrants, water meters, and service lateral connections. The document specifies construction requirements for 8-inch diameter polyvinyl chloride (PVC) pipe with concrete encasement in designated areas, proper depth installation, trench restoration standards, and coordination with existing utilities including gas, electric, sewer, and telecommunications lines.
The project manager and engineer responsible for the work is Pedro Alvarez (R.C.E. 85667, expiration date September 30, 2024), and the General Manager is Christopher J. Garner. The Director of Engineering/Chief Engineer for the Long Beach Water Department approved the plans. The specifications require contractors to maintain dust control, provide public safety and traffic management during construction, remove and dispose of existing water infrastructure, coordinate with all relevant public agencies and utility providers, and complete work in accordance with applicable American Water Works Association (AWWA) standards and City of Long Beach specifications. Temporary traffic control measures are detailed for the Spring Street and Golden Avenue intersection, with work restricted to normal hours between 6 a.m. and 5 p.m. No information regarding contract pricing, bidding procedures, award dates, or funding sources is included in these design plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL MANAGER
CHRISTOPHER J. GARNER
R.C.E. 85667
PROJECT MANAGER/ENGINEER:
PEDRO ALVAREZ
(EXPIRES SEPTEMBER 30, 2024)
GHD
SUBMITTED BY:
ROBERT J. VERCELES DATE
LONG BEACH WATER DEPARTMENT
LONG BEACH, CALIFORNIA
GOLDEN AVENUE WATER MAIN REPLACEMENT PROJECT
WD-54-22
NOVEMBER 2022
GOLDEN AVENUE BETWEEN SPRING STREET AND 32ND STREET
DIRECTOR OF ENGINEERING/CHIEF ENGINEER
LONG BEACH WATER DEPARTMENT
APPROVED BY:
MC-5223
LONG BEACH
WATER DEPARTMENT
LONG BEACH WATER DEPARTMENT
GOLDEN AVENUE WATER MAIN
REPLACEMENT PROJECT
T F E W
TITLE SHEET
12/12/2022
12/12/22
LEGEND
VICINITY MAP
F22 F21
F22 F21
F21 F20
F21 F20
CITY MAP
GENERAL NOTES, VICINITY AND SHEET INDEX MAP, PUBLIC
AGENCIES AND UTILITIES, UNDERGROUND UTILITY LEGEND,
NOTES TO CONTRACTOR, AND ABBREVIATIONS
LIST OF DRAWINGS
PUBLIC AGENCIES & UTILITIES
SYMBOLS AND ABBREVIATIONS
GENERAL NOTES GENERAL NOTES (CONT.)
MC-5223
LONG BEACH
WATER DEPARTMENT
LONG BEACH WATER DEPARTMENT
GOLDEN AVENUE WATER MAIN
REPLACEMENT PROJECT
T F E W
BASIS OF BEARINGS
BENCHMARK
L14L13
S
S S
S
S S
S
SD
SD
SD
SD
SD
.97
MC-5223
LONG BEACH
WATER DEPARTMENT
LONG BEACH WATER DEPARTMENT
GOLDEN AVENUE WATER MAIN
REPLACEMENT PROJECT
T F E W
PLAN & PROFILE: STA. 10+00 TO 18+00
F21F20
F21F20
SERVICE CONNECTION NOTES
GOLDEN AVENUE
CONSTRUCTION NOTES
S
SD
SD
SD
SD
SD
MC-5223
LONG BEACH
WATER DEPARTMENT
LONG BEACH WATER DEPARTMENT
GOLDEN AVENUE WATER MAIN
REPLACEMENT PROJECT
T F E W
PLAN & PROFILE: STA. 18+00 TO 22+91.25
F22F21
F22F21GOLDEN AVENUE
CONSTRUCTION NOTES
SERVICE CONNECTION NOTES
S
MC-5223
LONG BEACH
WATER DEPARTMENT
LONG BEACH WATER DEPARTMENT
GOLDEN AVENUE WATER MAIN
REPLACEMENT PROJECT
T F E W
DETAILS
CONNECTION TO EXISTING VALVE
SCALE = NOT TO SCALE
PIPE CONCRETE ENCASEMENT
SCALE = NOT TO SCALE
CONNECTION DETAIL: GOLDEN AVE & 31ST ST
SCALE = 1" = 10'
VALVE AT STA 10+30.00 VALVE AT STA 22+91.25
TYPICAL SECTION ENCASEMENT AT MANHOLE -
SECTION VIEW
SECTION A-A
SCALE: 1" = 4'
CONSTRUCTION NOTES
A
TYPICAL CROSS SECTION - STA 10+55.82 N TO 16+15.00 N
SCALE = NOT TO SCALE
ELEVATION
SECTION A-A PLAN VIEW
TRACER WIRE ACCESS
PORT (CP BOX) DETAIL
SECTION B-B: WATER LATERAL
MC-5223
LONG BEACH
WATER DEPARTMENT
LONG BEACH WATER DEPARTMENT
GOLDEN AVENUE WATER MAIN
REPLACEMENT PROJECT
T F E W
NON-METALLIC PIPE DETAILS
INSTALLATION OF WATER METER, METER BOX AND
NON-METALLIC WATER SERVICE LATERAL
SCALE = NOT TO SCALE
2" AIR RELIEF AND VACUUM VALVE WITH NON-METALLIC PIPING
SCALE = NOT TO SCALE
A
FIRE HYDRANT ASSEMBLY WITH NON-METALLIC PIPING
SCALE = NOT TO SCALE
WARNING TAPE, IDENTIFICATION TAPE, AND TRACER WIRE INSTALLATIONS
SCALE = NOT TO SCALE
B
2" BLOWOFF ASSEMBLY WITH NON-METALLIC PIPING
SCALE = NOT TO SCALE
S S
S S
S
SS
S
S
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
S
S
S
S
SD
SD
SD
SD
SD
MC-5223
LONG BEACH
WATER DEPARTMENT
LONG BEACH WATER DEPARTMENT
GOLDEN AVENUE WATER MAIN
REPLACEMENT PROJECT
T F E W
TRAFFIC CONTROL TITLE SHEET & TRAFFIC CONTROL
PLAN FOR SPRING/GOLDEN INTERSECTION
TEMPORARY TRAFFIC CONTROL PLAN GENERAL NOTES LEGEND
SCALE: NTS
SIGN LEGEND
TEMPORARY TRAFFIC CONTROL KEY MAP
PHASE 1: TEMPORARY TRAFFIC CONTROL AT SPRING ST & GOLDEN AVE
SCALE: 1"=40'
| Sheets and Views |
| 1 G-001 |
| 2 G-002 |
| 3 C-001 |
| 4 C-002 |
| 5 C-003 |
| 6 C-004 |
| 7 T-001 |
File details come from the government source that posted it. Updated .