MATOC Draft ATTACHMENT 5 - AF3052.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
GENERAL CONSTRUCTION - MULTIPLE AWARD TASK ORDER CONTRACT DRAFT SOLICITATION Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a draft solicitation for a General Construction - Multiple Award Task Order Contract (MATOC), which is an indefinite delivery indefinite quantity (IDIQ) contract. The MATOC will be used for a broad range of design and construction projects at Maxwell Air Force Base/Gunter Annex, Lake Martin Recreation Area, or Vigilant Warrior training site. Work may include construction, repair, alteration, and demolition of facilities, roads, and infrastructure. The magnitude of construction is over $10 million.

The solicitation will be issued as a 100% Small Business Set-Aside, with a North American Industry Classification System (NAICS) code of 236220 - Commercial and Institutional Building Construction. Interested offerors must be registered in the System for Award Management (SAM) and have a minimum aggregate bonding capacity of $19,999,031.25. The solicitation includes attachments such as a Statement of Work, specifications, drawings, and required forms. The Government is not requesting quotes or proposals at this time, but is providing draft documents for informational purposes.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total CONSTRUCTION COST ESTIMATE BREAKDOWN - DRAFT ATTACHMENT 5 OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
DATEMaxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPLACE CHILLER B1095$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 23-4685BLDG 1095 MAXWELL AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYdManhoursAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Mechancial Contractor as Prime$0.00$0.00$0.00
1.0Project ManagerMH$0.00$0.00$0.00
2.0SuperintendentMH$0.00$0.00$0.00
3.0pickupEA$0.00$0.00$0.00
4.0CraneWK$0.00$0.00$0.00
5.0Toolswk$0.00$0.00$0.00
6.0Daily cleanupMH$0.00$0.00
7.0Truck, 3TWK$0.00$0.00$0.00
8.0$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
9.0DIVISION 3 CONCRETE
10.0DONE BY PRIME CONTRACTOR LABOR
11.0Forms to extend the chiller padLot1$0.00$0.00$0.00
12.0concreteCY$0.00$0.00$0.00
13.0
14.0DIVISION 15 (MECHANICAL)
15.0
16.0Remove pipe supports to use againLot1$0.00$0.00
16.0Remove thermometers and gagesEA$0.00$0.00$0.00
17.0Remove piping, pumps, and accessoriesLot$0.00$0.00
18.0Remove old chillerEA$0.00$0.00
19.040T air-cooled chillerEA$0.00$0.00$0.00
20.0Heat traceLot$0.00$0.00$0.00
21.0Re-install pipe supportslot$0.00$0.00$0.00
22.02" steel pipe, material onlyLF$0.00$0.00$0.00
23.02 x 3 steel weld reducersEA$0.00$0.00$0.00
24.02.5 x 3 reducersEA$0.00$0.00$0.00
25.02" steel flanges WNEA$0.00$0.00$0.00
26.02" gaskets and bolt kitsEA$0.00$0.00$0.00
27.02.5" Pipe, material onlyLF$0.00$0.00$0.00
28.02.5" elbowsEA$0.00$0.00$0.00
29.02.5" flanges WNEA$0.00$0.00$0.00
30.02.5" bolt and gaskets kitEA$0.00$0.00$0.00
31.03" Steel pipe, welded, material onlyLF$0.00$0.00$0.00
32.03" Steel 90-degree elbow, weldedEA$0.00$0.00$0.00
33.03" steel Tee, weldedEA$0.00$0.00$0.00
34.03" x 12" flexible SS hoseEA$0.00$0.00$0.00
35.03" WN flangesEA$0.00$0.00$0.00
36.03" Blind flange, material onlyEA$0.00$0.00
37.03" gaskets and boltsEA$0.00$0.00$0.00
38.03" mech jointEA$0.00$0.00$0.00
39.03" air/dirt separatorEA$0.00$0.00$0.00
40.08-gal expansion tankEA$0.00$0.00$0.00
41.01 hp primary pumpEA$0.00$0.00$0.00
42.03 hp secondary pumpEA$0.00$0.00$0.00
43.00.75"water pressure reducing valveEA$0.00$0.00$0.00
44.00.75 relief valveEA$0.00$0.00$0.00
45.00.75 backflow preventor with shut-off valvesEA$0.00$0.00$0.00
46.00.75 ball valvesEA$0.00$0.00$0.00
47.00.75" pipe, material onlyLF$0.00$0.00$0.00
48.03" butterfly valveEA$0.00$0.00$0.00
49.02.5" Butterfly valveEA$0.00$0.00
50.03" multi-purpose valveEA$0.00$0.00$0.00
51.03" wye strainerEA$0.00$0.00$0.00
52.0variable speed drive, 3 hp, material onlyEA$0.00$0.00$0.00
53.03 hp combination starter, NEMA 3R, material onlyEA$0.00$0.00$0.00
54.0ThermometerEA$0.00$0.00$0.00
55.0Pressure gaugeEA$0.00$0.00$0.00
56.0$0.00$0.00$0.00
57.0INSULATION CONTRACTOR$0.00$0.00$0.00
58.0$0.00$0.00$0.00
59.0insulate 0.75" piping and accessoriesLOT1$0.00$0.00$0.00
60.0insulate expansion tankEA$0.00$0.00$0.00
61.0insulate air/dirt separatorEA$0.00$0.00$0.00
62.0insulate pumpEA$0.00$0.00$0.00
63.02.5" pipe insulation, foamglass with coveringLF$0.00$0.00$0.00
64.02.5" Pipe fitting insulation with coveringEA$0.00$0.00$0.00
65.03" pipe insulation, foamglass with coveringLF$0.00$0.00$0.00
66.03" Pipe fitting insulation with coveringEA$0.00$0.00$0.00
67.0Insulation subcontractor OH&PLot$0.00$0.00$0.00
68.0$0.00$0.00$0.00
69.0TAB CONTRACTOR$0.00$0.00$0.00
70.0water balance pumpEA$0.00$0.00$0.00
71.0water balance AHU, chilled waterEA$0.00$0.00$0.00
72.0TAB contractor travel time from B'hmMH$0.00$0.00$0.00
73.0TAB contractor travel expensemiles$0.00$0.00
74.0$0.00$0.00$0.00
75.0CONTROLS CONTRACTOR$0.00$0.00$0.00
76.0$0.00$0.00$0.00
77.0control connectionsLOT1$0.00$0.00$0.00
78.0$0.00$0.00$0.00
79.0DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)$0.00$0.00$0.00
80.0$0.00$0.00$0.00
81.0Remove existing conduit and wiringLOT1$0.00$0.00$0.00
82.0Remove disconnectsEA$0.00$0.00$0.00
83.0Remove StarterEA$0.00$0.00$0.00
84.0Remove VRDEA$0.00$0.00$0.00
85.0Remove 100A breakerEA$0.00$0.00$0.00
86.0TrenchingLF$0.00$0.00$0.00
87.0125A breakerEA$0.00$0.00$0.00
88.0heavy duty 30A disconnect, NEMA 3REA$0.00$0.00$0.00
89.0Heavy duty 100A disconnect, NEMA 3REA$0.00$0.00$0.00
90.0Connect VFDEA$0.00$0.00$0.00
91.0Connect 3 hp combination starterEA$0.00$0.00$0.00
92.00.75" conduit, rigidLF$0.00$0.00$0.00
93.01.5" conduit, rigidLF$0.00$0.00$0.00
94.01.5" conduit, PVC, undergoundLF$0.00$0.00
95.0#12 WireLF$0.00$0.00$0.00
96.0#1 wireLF$0.00$0.00$0.000.0
97.0#8 wireLF$0.00$0.00$0.00
98.0.075" flex conduitEA$0.00$0.00$0.00
99.01.5" flex conduitEA$0.00$0.00$0.00
100.01.5" fittings at 20% of conduitLOT1$0.00$0.00$0.00
101.0Electrical sub OH&PLot1$0.00$0.00$0.00
102.0$0.00$0.00$0.00
103.0TOTAL$0.00$0.00$0.00$0.00
104.0$0.00$0.00$0.00
105.0Material Costs$0.00$0.00
106.0Tax on Materials10%$0.00$0.00
107.0TOTAL MATERIAL COST$0.00$0.00
108.0$0.00$0.00$0.00
109.0Labor Cost$0.00$0.00
110.0Insurance & Tax on Labor$0.00$0.00
111.0TOTAL LABOR COST$0.00$0.00
112.0$0.00$0.00$0.00
113.0Total Other Direct Costs$0.00$0.00$0.00
114.0Total Material, Labor, Tax & Insurance$0.00$0.00
115.0
116.0TOTAL DIRECT COSTS$0.00$0.00$0.00
117.0$0.00$0.00$0.00
118.0Overhead$0.00$0.00$0.00
119.0Subtotal$0.00$0.00$0.00$0.00
120.0Profit$0.00$0.00$0.00
121.0Sub Total$0.00$0.00
122.0$0.00$0.00
123.0
124.0Bonds$0.00$0.00
125.0TOTAL$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00

I acknowledge the above cost estimate has been estimated to the best of my ability and means.

File details come from the government source that posted it. Updated .