MATOC Draft ATTACHMENT 5 - AF3052.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- GENERAL CONSTRUCTION - MULTIPLE AWARD TASK ORDER CONTRACT DRAFT SOLICITATION Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document is a draft solicitation for a General Construction - Multiple Award Task Order Contract (MATOC), which is an indefinite delivery indefinite quantity (IDIQ) contract. The MATOC will be used for a broad range of design and construction projects at Maxwell Air Force Base/Gunter Annex, Lake Martin Recreation Area, or Vigilant Warrior training site. Work may include construction, repair, alteration, and demolition of facilities, roads, and infrastructure. The magnitude of construction is over $10 million.
The solicitation will be issued as a 100% Small Business Set-Aside, with a North American Industry Classification System (NAICS) code of 236220 - Commercial and Institutional Building Construction. Interested offerors must be registered in the System for Award Management (SAM) and have a minimum aggregate bonding capacity of $19,999,031.25. The solicitation includes attachments such as a Statement of Work, specifications, drawings, and required forms. The Government is not requesting quotes or proposals at this time, but is providing draft documents for informational purposes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MATOC Draft ATTACHMENT 6-Past Performance Questionnaire.pdf | ||
| MATOC Draft ATTACHMENT 2 - Specifications.pdf | ||
| MATOC Draft ATTACHMENT 8 - Subcontractor Consent Letter.pdf | ||
| MATOC Draft ATTACHMENT 7 -Past Performance Information.pdf | ||
| MATOC Draft ATTACHMENT 1 - SOW.pdf | ||
| MATOC Draft ATTACHMENT 9 - Section L-Instructions Conditions and Notice to Bidders v3.docx | DOCX document | |
| MATOC Draft ATTACHMENT 4 - B1095 - DRAWINGS.pdf | ||
| MATOC Draft ATTACHMENT 10 - Section M-Evaluation Factors.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total CONSTRUCTION COST ESTIMATE BREAKDOWN - DRAFT ATTACHMENT 5 OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | ||||||||
| DATE | Maxwell Air Force Base Alabama | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPLACE CHILLER B1095 | $0.00 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | |||||||||
| PNQS 23-4685 | BLDG 1095 MAXWELL AFB | ||||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | ||||||||
| LINE | ITEM | OF | QUANTITY | d | Manhours | AVERAGE | DIRECT | LINE | |||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | |||||||||||
| Mechancial Contractor as Prime | $0.00 | $0.00 | $0.00 | ||||||||
| 1.0 | Project Manager | MH | $0.00 | $0.00 | $0.00 | ||||||
| 2.0 | Superintendent | MH | $0.00 | $0.00 | $0.00 | ||||||
| 3.0 | pickup | EA | $0.00 | $0.00 | $0.00 | ||||||
| 4.0 | Crane | WK | $0.00 | $0.00 | $0.00 | ||||||
| 5.0 | Tools | wk | $0.00 | $0.00 | $0.00 | ||||||
| 6.0 | Daily cleanup | MH | $0.00 | $0.00 | |||||||
| 7.0 | Truck, 3T | WK | $0.00 | $0.00 | $0.00 | ||||||
| 8.0 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| 9.0 | DIVISION 3 CONCRETE | ||||||||||
| 10.0 | DONE BY PRIME CONTRACTOR LABOR | ||||||||||
| 11.0 | Forms to extend the chiller pad | Lot | 1 | $0.00 | $0.00 | $0.00 | |||||
| 12.0 | concrete | CY | $0.00 | $0.00 | $0.00 | ||||||
| 13.0 | |||||||||||
| 14.0 | DIVISION 15 (MECHANICAL) | ||||||||||
| 15.0 | |||||||||||
| 16.0 | Remove pipe supports to use again | Lot | 1 | $0.00 | $0.00 | ||||||
| 16.0 | Remove thermometers and gages | EA | $0.00 | $0.00 | $0.00 | ||||||
| 17.0 | Remove piping, pumps, and accessories | Lot | $0.00 | $0.00 | |||||||
| 18.0 | Remove old chiller | EA | $0.00 | $0.00 | |||||||
| 19.0 | 40T air-cooled chiller | EA | $0.00 | $0.00 | $0.00 | ||||||
| 20.0 | Heat trace | Lot | $0.00 | $0.00 | $0.00 | ||||||
| 21.0 | Re-install pipe supports | lot | $0.00 | $0.00 | $0.00 | ||||||
| 22.0 | 2" steel pipe, material only | LF | $0.00 | $0.00 | $0.00 | ||||||
| 23.0 | 2 x 3 steel weld reducers | EA | $0.00 | $0.00 | $0.00 | ||||||
| 24.0 | 2.5 x 3 reducers | EA | $0.00 | $0.00 | $0.00 | ||||||
| 25.0 | 2" steel flanges WN | EA | $0.00 | $0.00 | $0.00 | ||||||
| 26.0 | 2" gaskets and bolt kits | EA | $0.00 | $0.00 | $0.00 | ||||||
| 27.0 | 2.5" Pipe, material only | LF | $0.00 | $0.00 | $0.00 | ||||||
| 28.0 | 2.5" elbows | EA | $0.00 | $0.00 | $0.00 | ||||||
| 29.0 | 2.5" flanges WN | EA | $0.00 | $0.00 | $0.00 | ||||||
| 30.0 | 2.5" bolt and gaskets kit | EA | $0.00 | $0.00 | $0.00 | ||||||
| 31.0 | 3" Steel pipe, welded, material only | LF | $0.00 | $0.00 | $0.00 | ||||||
| 32.0 | 3" Steel 90-degree elbow, welded | EA | $0.00 | $0.00 | $0.00 | ||||||
| 33.0 | 3" steel Tee, welded | EA | $0.00 | $0.00 | $0.00 | ||||||
| 34.0 | 3" x 12" flexible SS hose | EA | $0.00 | $0.00 | $0.00 | ||||||
| 35.0 | 3" WN flanges | EA | $0.00 | $0.00 | $0.00 | ||||||
| 36.0 | 3" Blind flange, material only | EA | $0.00 | $0.00 | |||||||
| 37.0 | 3" gaskets and bolts | EA | $0.00 | $0.00 | $0.00 | ||||||
| 38.0 | 3" mech joint | EA | $0.00 | $0.00 | $0.00 | ||||||
| 39.0 | 3" air/dirt separator | EA | $0.00 | $0.00 | $0.00 | ||||||
| 40.0 | 8-gal expansion tank | EA | $0.00 | $0.00 | $0.00 | ||||||
| 41.0 | 1 hp primary pump | EA | $0.00 | $0.00 | $0.00 | ||||||
| 42.0 | 3 hp secondary pump | EA | $0.00 | $0.00 | $0.00 | ||||||
| 43.0 | 0.75"water pressure reducing valve | EA | $0.00 | $0.00 | $0.00 | ||||||
| 44.0 | 0.75 relief valve | EA | $0.00 | $0.00 | $0.00 | ||||||
| 45.0 | 0.75 backflow preventor with shut-off valves | EA | $0.00 | $0.00 | $0.00 | ||||||
| 46.0 | 0.75 ball valves | EA | $0.00 | $0.00 | $0.00 | ||||||
| 47.0 | 0.75" pipe, material only | LF | $0.00 | $0.00 | $0.00 | ||||||
| 48.0 | 3" butterfly valve | EA | $0.00 | $0.00 | $0.00 | ||||||
| 49.0 | 2.5" Butterfly valve | EA | $0.00 | $0.00 | |||||||
| 50.0 | 3" multi-purpose valve | EA | $0.00 | $0.00 | $0.00 | ||||||
| 51.0 | 3" wye strainer | EA | $0.00 | $0.00 | $0.00 | ||||||
| 52.0 | variable speed drive, 3 hp, material only | EA | $0.00 | $0.00 | $0.00 | ||||||
| 53.0 | 3 hp combination starter, NEMA 3R, material only | EA | $0.00 | $0.00 | $0.00 | ||||||
| 54.0 | Thermometer | EA | $0.00 | $0.00 | $0.00 | ||||||
| 55.0 | Pressure gauge | EA | $0.00 | $0.00 | $0.00 | ||||||
| 56.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 57.0 | INSULATION CONTRACTOR | $0.00 | $0.00 | $0.00 | |||||||
| 58.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 59.0 | insulate 0.75" piping and accessories | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||
| 60.0 | insulate expansion tank | EA | $0.00 | $0.00 | $0.00 | ||||||
| 61.0 | insulate air/dirt separator | EA | $0.00 | $0.00 | $0.00 | ||||||
| 62.0 | insulate pump | EA | $0.00 | $0.00 | $0.00 | ||||||
| 63.0 | 2.5" pipe insulation, foamglass with covering | LF | $0.00 | $0.00 | $0.00 | ||||||
| 64.0 | 2.5" Pipe fitting insulation with covering | EA | $0.00 | $0.00 | $0.00 | ||||||
| 65.0 | 3" pipe insulation, foamglass with covering | LF | $0.00 | $0.00 | $0.00 | ||||||
| 66.0 | 3" Pipe fitting insulation with covering | EA | $0.00 | $0.00 | $0.00 | ||||||
| 67.0 | Insulation subcontractor OH&P | Lot | $0.00 | $0.00 | $0.00 | ||||||
| 68.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 69.0 | TAB CONTRACTOR | $0.00 | $0.00 | $0.00 | |||||||
| 70.0 | water balance pump | EA | $0.00 | $0.00 | $0.00 | ||||||
| 71.0 | water balance AHU, chilled water | EA | $0.00 | $0.00 | $0.00 | ||||||
| 72.0 | TAB contractor travel time from B'hm | MH | $0.00 | $0.00 | $0.00 | ||||||
| 73.0 | TAB contractor travel expense | miles | $0.00 | $0.00 | |||||||
| 74.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 75.0 | CONTROLS CONTRACTOR | $0.00 | $0.00 | $0.00 | |||||||
| 76.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 77.0 | control connections | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||
| 78.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 79.0 | DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | $0.00 | |||||||
| 80.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 81.0 | Remove existing conduit and wiring | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||
| 82.0 | Remove disconnects | EA | $0.00 | $0.00 | $0.00 | ||||||
| 83.0 | Remove Starter | EA | $0.00 | $0.00 | $0.00 | ||||||
| 84.0 | Remove VRD | EA | $0.00 | $0.00 | $0.00 | ||||||
| 85.0 | Remove 100A breaker | EA | $0.00 | $0.00 | $0.00 | ||||||
| 86.0 | Trenching | LF | $0.00 | $0.00 | $0.00 | ||||||
| 87.0 | 125A breaker | EA | $0.00 | $0.00 | $0.00 | ||||||
| 88.0 | heavy duty 30A disconnect, NEMA 3R | EA | $0.00 | $0.00 | $0.00 | ||||||
| 89.0 | Heavy duty 100A disconnect, NEMA 3R | EA | $0.00 | $0.00 | $0.00 | ||||||
| 90.0 | Connect VFD | EA | $0.00 | $0.00 | $0.00 | ||||||
| 91.0 | Connect 3 hp combination starter | EA | $0.00 | $0.00 | $0.00 | ||||||
| 92.0 | 0.75" conduit, rigid | LF | $0.00 | $0.00 | $0.00 | ||||||
| 93.0 | 1.5" conduit, rigid | LF | $0.00 | $0.00 | $0.00 | ||||||
| 94.0 | 1.5" conduit, PVC, undergound | LF | $0.00 | $0.00 | |||||||
| 95.0 | #12 Wire | LF | $0.00 | $0.00 | $0.00 | ||||||
| 96.0 | #1 wire | LF | $0.00 | $0.00 | $0.00 | 0.0 | |||||
| 97.0 | #8 wire | LF | $0.00 | $0.00 | $0.00 | ||||||
| 98.0 | .075" flex conduit | EA | $0.00 | $0.00 | $0.00 | ||||||
| 99.0 | 1.5" flex conduit | EA | $0.00 | $0.00 | $0.00 | ||||||
| 100.0 | 1.5" fittings at 20% of conduit | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||
| 101.0 | Electrical sub OH&P | Lot | 1 | $0.00 | $0.00 | $0.00 | |||||
| 102.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 103.0 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 104.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 105.0 | Material Costs | $0.00 | $0.00 | ||||||||
| 106.0 | Tax on Materials | 10% | $0.00 | $0.00 | |||||||
| 107.0 | TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||||
| 108.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 109.0 | Labor Cost | $0.00 | $0.00 | ||||||||
| 110.0 | Insurance & Tax on Labor | $0.00 | $0.00 | ||||||||
| 111.0 | TOTAL LABOR COST | $0.00 | $0.00 | ||||||||
| 112.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 113.0 | Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||||
| 114.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0.00 | ||||||||
| 115.0 | |||||||||||
| 116.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | |||||||
| 117.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 118.0 | Overhead | $0.00 | $0.00 | $0.00 | |||||||
| 119.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 120.0 | Profit | $0.00 | $0.00 | $0.00 | |||||||
| 121.0 | Sub Total | $0.00 | $0.00 | ||||||||
| 122.0 | $0.00 | $0.00 | |||||||||
| 123.0 | |||||||||||
| 124.0 | Bonds | $0.00 | $0.00 | ||||||||
| 125.0 | TOTAL | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
File details come from the government source that posted it. Updated .