MATOC ATTACHMENT 5 - AF3052.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- GENERAL CONSTRUCTION - MULTIPLE AWARD TASK ORDER CONTRACT Federal contract opportunity
- Solicitation number
- FA330024R0027
About this file
This document is a Construction Cost Estimate Breakdown form associated with a federal contract opportunity for a Multiple Award Task Order Contract (MATOC) to perform a broad range of construction projects at Maxwell Air Force Base/Gunter Annex, Lake Martin Recreation Area, and Vigilant Warrior training site.
The MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract with a magnitude of construction over $10 million. Work may involve design, construction, modifications, and renovations across all divisions of the Master Format. The solicitation will be a 100% Small Business Set-Aside with a 250-mile radius limitation. Offerors must have a minimum aggregate bonding capacity of $19,999,031.25. The North American Industry Classification System (NAICS) code is 236220 - Commercial and Institutional Building Construction. The Solicitation Number is FA330024R0027 and the deadline for proposals will be listed in the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MATOC ATTACHMENT 6-Past Performance Questionnaire.pdf | ||
| MATOC ATTACHMENT 3 - B1095 - SPECIFICATIONS.pdf | ||
| MATOC ATTACHMENT 11 - WD AL20240093.pdf | ||
| MATOC ATTACHMENT 1 - SOW.pdf | ||
| MATOC ATTACHMENT 2 - Specifications.pdf | ||
| MATOC ATTACHMENT 7 -Past Performance Information.pdf | ||
| Solicitation - FA330024R0027 20Aug24.pdf | ||
| MATOC ATTACHMENT 10 - Section M-Evaluation Factors.docx | DOCX document | |
| MATOC ATTACHMENT 9 - Section L-Instructions Conditions and Notice to Bidders v3.docx | DOCX document | |
| MATOC ATTACHMENT 8 - Subcontractor Consent Letter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total CONSTRUCTION COST ESTIMATE BREAKDOWN - ATTACHMENT 5 OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | ||||||||
| DATE | Maxwell Air Force Base Alabama | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPLACE CHILLER B1095 | $0.00 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | |||||||||
| PNQS 23-4685 | BLDG 1095 MAXWELL AFB | ||||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | ||||||||
| LINE | ITEM | OF | QUANTITY | d | Manhours | AVERAGE | DIRECT | LINE | |||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | |||||||||||
| Mechancial Contractor as Prime | $0.00 | $0.00 | $0.00 | ||||||||
| 1.0 | Project Manager | MH | $0.00 | $0.00 | $0.00 | ||||||
| 2.0 | Superintendent | MH | $0.00 | $0.00 | $0.00 | ||||||
| 3.0 | pickup | EA | $0.00 | $0.00 | $0.00 | ||||||
| 4.0 | Crane | WK | $0.00 | $0.00 | $0.00 | ||||||
| 5.0 | Tools | wk | $0.00 | $0.00 | $0.00 | ||||||
| 6.0 | Daily cleanup | MH | $0.00 | $0.00 | |||||||
| 7.0 | Truck, 3T | WK | $0.00 | $0.00 | $0.00 | ||||||
| 8.0 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | |||||||||
| 9.0 | DIVISION 3 CONCRETE | ||||||||||
| 10.0 | DONE BY PRIME CONTRACTOR LABOR | ||||||||||
| 11.0 | Forms to extend the chiller pad | Lot | 1 | $0.00 | $0.00 | $0.00 | |||||
| 12.0 | concrete | CY | $0.00 | $0.00 | $0.00 | ||||||
| 13.0 | |||||||||||
| 14.0 | DIVISION 15 (MECHANICAL) | ||||||||||
| 15.0 | |||||||||||
| 16.0 | Remove pipe supports to use again | Lot | 1 | $0.00 | $0.00 | ||||||
| 16.0 | Remove thermometers and gages | EA | $0.00 | $0.00 | $0.00 | ||||||
| 17.0 | Remove piping, pumps, and accessories | Lot | $0.00 | $0.00 | |||||||
| 18.0 | Remove old chiller | EA | $0.00 | $0.00 | |||||||
| 19.0 | 40T air-cooled chiller | EA | $0.00 | $0.00 | $0.00 | ||||||
| 20.0 | Heat trace | Lot | $0.00 | $0.00 | $0.00 | ||||||
| 21.0 | Re-install pipe supports | lot | $0.00 | $0.00 | $0.00 | ||||||
| 22.0 | 2" steel pipe, material only | LF | $0.00 | $0.00 | $0.00 | ||||||
| 23.0 | 2 x 3 steel weld reducers | EA | $0.00 | $0.00 | $0.00 | ||||||
| 24.0 | 2.5 x 3 reducers | EA | $0.00 | $0.00 | $0.00 | ||||||
| 25.0 | 2" steel flanges WN | EA | $0.00 | $0.00 | $0.00 | ||||||
| 26.0 | 2" gaskets and bolt kits | EA | $0.00 | $0.00 | $0.00 | ||||||
| 27.0 | 2.5" Pipe, material only | LF | $0.00 | $0.00 | $0.00 | ||||||
| 28.0 | 2.5" elbows | EA | $0.00 | $0.00 | $0.00 | ||||||
| 29.0 | 2.5" flanges WN | EA | $0.00 | $0.00 | $0.00 | ||||||
| 30.0 | 2.5" bolt and gaskets kit | EA | $0.00 | $0.00 | $0.00 | ||||||
| 31.0 | 3" Steel pipe, welded, material only | LF | $0.00 | $0.00 | $0.00 | ||||||
| 32.0 | 3" Steel 90-degree elbow, welded | EA | $0.00 | $0.00 | $0.00 | ||||||
| 33.0 | 3" steel Tee, welded | EA | $0.00 | $0.00 | $0.00 | ||||||
| 34.0 | 3" x 12" flexible SS hose | EA | $0.00 | $0.00 | $0.00 | ||||||
| 35.0 | 3" WN flanges | EA | $0.00 | $0.00 | $0.00 | ||||||
| 36.0 | 3" Blind flange, material only | EA | $0.00 | $0.00 | |||||||
| 37.0 | 3" gaskets and bolts | EA | $0.00 | $0.00 | $0.00 | ||||||
| 38.0 | 3" mech joint | EA | $0.00 | $0.00 | $0.00 | ||||||
| 39.0 | 3" air/dirt separator | EA | $0.00 | $0.00 | $0.00 | ||||||
| 40.0 | 8-gal expansion tank | EA | $0.00 | $0.00 | $0.00 | ||||||
| 41.0 | 1 hp primary pump | EA | $0.00 | $0.00 | $0.00 | ||||||
| 42.0 | 3 hp secondary pump | EA | $0.00 | $0.00 | $0.00 | ||||||
| 43.0 | 0.75"water pressure reducing valve | EA | $0.00 | $0.00 | $0.00 | ||||||
| 44.0 | 0.75 relief valve | EA | $0.00 | $0.00 | $0.00 | ||||||
| 45.0 | 0.75 backflow preventor with shut-off valves | EA | $0.00 | $0.00 | $0.00 | ||||||
| 46.0 | 0.75 ball valves | EA | $0.00 | $0.00 | $0.00 | ||||||
| 47.0 | 0.75" pipe, material only | LF | $0.00 | $0.00 | $0.00 | ||||||
| 48.0 | 3" butterfly valve | EA | $0.00 | $0.00 | $0.00 | ||||||
| 49.0 | 2.5" Butterfly valve | EA | $0.00 | $0.00 | |||||||
| 50.0 | 3" multi-purpose valve | EA | $0.00 | $0.00 | $0.00 | ||||||
| 51.0 | 3" wye strainer | EA | $0.00 | $0.00 | $0.00 | ||||||
| 52.0 | variable speed drive, 3 hp, material only | EA | $0.00 | $0.00 | $0.00 | ||||||
| 53.0 | 3 hp combination starter, NEMA 3R, material only | EA | $0.00 | $0.00 | $0.00 | ||||||
| 54.0 | Thermometer | EA | $0.00 | $0.00 | $0.00 | ||||||
| 55.0 | Pressure gauge | EA | $0.00 | $0.00 | $0.00 | ||||||
| 56.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 57.0 | INSULATION CONTRACTOR | $0.00 | $0.00 | $0.00 | |||||||
| 58.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 59.0 | insulate 0.75" piping and accessories | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||
| 60.0 | insulate expansion tank | EA | $0.00 | $0.00 | $0.00 | ||||||
| 61.0 | insulate air/dirt separator | EA | $0.00 | $0.00 | $0.00 | ||||||
| 62.0 | insulate pump | EA | $0.00 | $0.00 | $0.00 | ||||||
| 63.0 | 2.5" pipe insulation, foamglass with covering | LF | $0.00 | $0.00 | $0.00 | ||||||
| 64.0 | 2.5" Pipe fitting insulation with covering | EA | $0.00 | $0.00 | $0.00 | ||||||
| 65.0 | 3" pipe insulation, foamglass with covering | LF | $0.00 | $0.00 | $0.00 | ||||||
| 66.0 | 3" Pipe fitting insulation with covering | EA | $0.00 | $0.00 | $0.00 | ||||||
| 67.0 | Insulation subcontractor OH&P | Lot | $0.00 | $0.00 | $0.00 | ||||||
| 68.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 69.0 | TAB CONTRACTOR | $0.00 | $0.00 | $0.00 | |||||||
| 70.0 | water balance pump | EA | $0.00 | $0.00 | $0.00 | ||||||
| 71.0 | water balance AHU, chilled water | EA | $0.00 | $0.00 | $0.00 | ||||||
| 72.0 | TAB contractor travel time from B'hm | MH | $0.00 | $0.00 | $0.00 | ||||||
| 73.0 | TAB contractor travel expense | miles | $0.00 | $0.00 | |||||||
| 74.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 75.0 | CONTROLS CONTRACTOR | $0.00 | $0.00 | $0.00 | |||||||
| 76.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 77.0 | control connections | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||
| 78.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 79.0 | DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | $0.00 | |||||||
| 80.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 81.0 | Remove existing conduit and wiring | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||
| 82.0 | Remove disconnects | EA | $0.00 | $0.00 | $0.00 | ||||||
| 83.0 | Remove Starter | EA | $0.00 | $0.00 | $0.00 | ||||||
| 84.0 | Remove VRD | EA | $0.00 | $0.00 | $0.00 | ||||||
| 85.0 | Remove 100A breaker | EA | $0.00 | $0.00 | $0.00 | ||||||
| 86.0 | Trenching | LF | $0.00 | $0.00 | $0.00 | ||||||
| 87.0 | 125A breaker | EA | $0.00 | $0.00 | $0.00 | ||||||
| 88.0 | heavy duty 30A disconnect, NEMA 3R | EA | $0.00 | $0.00 | $0.00 | ||||||
| 89.0 | Heavy duty 100A disconnect, NEMA 3R | EA | $0.00 | $0.00 | $0.00 | ||||||
| 90.0 | Connect VFD | EA | $0.00 | $0.00 | $0.00 | ||||||
| 91.0 | Connect 3 hp combination starter | EA | $0.00 | $0.00 | $0.00 | ||||||
| 92.0 | 0.75" conduit, rigid | LF | $0.00 | $0.00 | $0.00 | ||||||
| 93.0 | 1.5" conduit, rigid | LF | $0.00 | $0.00 | $0.00 | ||||||
| 94.0 | 1.5" conduit, PVC, undergound | LF | $0.00 | $0.00 | |||||||
| 95.0 | #12 Wire | LF | $0.00 | $0.00 | $0.00 | ||||||
| 96.0 | #1 wire | LF | $0.00 | $0.00 | $0.00 | 0.0 | |||||
| 97.0 | #8 wire | LF | $0.00 | $0.00 | $0.00 | ||||||
| 98.0 | .075" flex conduit | EA | $0.00 | $0.00 | $0.00 | ||||||
| 99.0 | 1.5" flex conduit | EA | $0.00 | $0.00 | $0.00 | ||||||
| 100.0 | 1.5" fittings at 20% of conduit | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||
| 101.0 | Electrical sub OH&P | Lot | 1 | $0.00 | $0.00 | $0.00 | |||||
| 102.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 103.0 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 104.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 105.0 | Material Costs | $0.00 | $0.00 | ||||||||
| 106.0 | Tax on Materials | 10% | $0.00 | $0.00 | |||||||
| 107.0 | TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||||
| 108.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 109.0 | Labor Cost | $0.00 | $0.00 | ||||||||
| 110.0 | Insurance & Tax on Labor | $0.00 | $0.00 | ||||||||
| 111.0 | TOTAL LABOR COST | $0.00 | $0.00 | ||||||||
| 112.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 113.0 | Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||||
| 114.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0.00 | ||||||||
| 115.0 | |||||||||||
| 116.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | |||||||
| 117.0 | $0.00 | $0.00 | $0.00 | ||||||||
| 118.0 | Overhead | $0.00 | $0.00 | $0.00 | |||||||
| 119.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 120.0 | Profit | $0.00 | $0.00 | $0.00 | |||||||
| 121.0 | Sub Total | $0.00 | $0.00 | ||||||||
| 122.0 | $0.00 | $0.00 | |||||||||
| 123.0 | |||||||||||
| 124.0 | Bonds | $0.00 | $0.00 | ||||||||
| 125.0 | TOTAL | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
File details come from the government source that posted it. Updated .