The provided document is an installed equipment list related to a federal contract opportunity. It contains detailed information about equipment and materials that were replaced as part of a construction project to replace a coiling roll-up door and security grille in Building 15. The list includes the asset number, description, building and room number, quantity, unit of measure, replacement cost, supplier/vendor information, manufacturer details, warranty information, and installation date for each item.
The related federal contract opportunity is for the installation of a ladder safety system in Building 1006, Room 104. The solicitation number is N0025324Q0020, and it will be a single firm-fixed price service contract set aside for small businesses. The ladder is approximately 24 feet tall and requires a ladder climbing device to be installed per the manufacturer's instructions. The Government anticipates issuing the solicitation on or about March 20, 2024 with a 30-day response time, and targeting an award on April 19, 2024. The NAICS code is 236220 with a $45 Million small business size standard, and the Product Service Code is Z2GZ.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0025324Q0020U0001.pdf | ||
| N0025324Q0020U0002.pdf | ||
| bid form.docx | DOCX document | |
| N0025324Q0020.pdf | ||
| OSHA-Calculating Injury and Illness Incident Rate.pdf | ||
| NAVSEA Guide to Environmental Compliance Requirements.pdf | ||
| OPSEC Guide for Defense Contractors_2016.pdf | ||
| Safety Requirements for Contractors and Subcontractors (30 AUG 2021).pdf | ||
| Past Performance References.docx | DOCX document | |
| Joint Venture Proposed Distribution of Work Form.docx | DOCX document | |
| OSHA-RK-Forms-Package.pdf | ||
| Safety_Data_Sheet.docx | DOCX document | |
| Contractors Guide to Env Compliance 2019 Rev1.docx | DOCX document | |
| PPI_Form.docx | DOCX document | |
| Wage Determination - Building Kitsap.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | |||||||||||||||
| Project Title: | Bldg. 15 Replace Coiling Rollup door and Security grille | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |