Joint Venture Proposed Distribution of Work Form.docx
DOCX document 24 KB Posted
- Attached to
- Bldg 1006 Ladder Safety System
- Solicitation number
- N0025324Q0020
About this file
This document is the Joint Venture Proposed Distribution of Work Form. It requires offerors to provide the percentage of work expected to be performed by each member of a joint venture and any proposed key subcontractors, if applicable. The total distribution of work must equal 100%.
The related federal contract opportunity is for the installation of a ladder safety system in Building 1006, Room 104 at the Naval Undersea Warfare Center Division Keyport. The project requires the contractor to provide and install a ladder climbing device per the manufacturer's instructions and provide engineering design. The government intends to award a single firm fixed-price service contract. The solicitation will be 100% set aside for small businesses and use a Low Price Technically Acceptable evaluation approach. The target award date is Tuesday, April 19, 2024, and the solicitation will be issued on or about Monday, March 20, 2024 with a 30-day response time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0025324Q0020U0001.pdf | ||
| N0025324Q0020U0002.pdf | ||
| Past Performance References.docx | DOCX document | |
| Safety Requirements for Contractors and Subcontractors (30 AUG 2021).pdf | ||
| OPSEC Guide for Defense Contractors_2016.pdf | ||
| Contractors Guide to Env Compliance 2019 Rev1.docx | DOCX document | |
| NAVSEA Guide to Environmental Compliance Requirements.pdf | ||
| OSHA-Calculating Injury and Illness Incident Rate.pdf | ||
| Wage Determination - Building Kitsap.pdf | ||
| bid form.docx | DOCX document | |
| N0025324Q0020.pdf | ||
| Materials Equipment In-Place List Rev. 1.xlsx | XLSX spreadsheet | |
| Safety_Data_Sheet.docx | DOCX document | |
| PPI_Form.docx | DOCX document | |
| OSHA-RK-Forms-Package.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT JL.2
Proposed Distribution of Work
Offerors shall include the percentage of work expected to be performed by each member of a Joint Venture and each proposed key subcontractor, as applicable.
Prime _______%
Joint Venture
| Company A | _______% (if applicable) |
| Company B | _______% (if applicable) |
Key Subcontractor (provide firm’s name) ` _______% (if applicable) Key Subcontractor
| (provide Firm’s name) | _______% (if applicable) | |
| Total | 100 % |
NOTE: DISTRIBUTION OF WORK SHALL EQUAL 100%
EXAMPLE: For JV Prime
Prime _______%
Joint Venture
| Company A-Firm ABC | 70 % (if applicable) |
| Company B- Firm Z | 30 % (if applicable) |
Total 100 %